Atch_4_Bozeman_FTC_Submittals.pdf

PDF 14 KB Posted

Attached to
BOZEMAN WATER CLARIFIER Federal contract opportunity
Solicitation number
F17PS00722
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

Submittals Bozeman FTC Water Clarifier

View the file

Other files for this federal contract opportunity

Other files attached to BOZEMAN WATER CLARIFIER, newest first.
File Type Posted
Sol_F17PS00722_Amd_0002.pdf PDF
F17PS00722-001.pdf PDF
Atch_6_Bozeman_FTC_Past_Perf_Quest.doc DOC document
Atch_1_Bozeman_FTC_Clarifier_Spec.pdf PDF
Atch_7_F17PS00722_1-4.pdf PDF
Atch_5_Bozeman_FTC_Wage_Det_MT34.pdf PDF
Sol_F17PS00722.pdf PDF
Atch_3_Bozeman_FTC_Drawing_Coversheet.pdf PDF
Atch_2_Bozeman_FTC_Clarifier_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET 1 OF 1

A - Approved as Submitted.

B - Approved, Except as Noted. No Resubmission Required.

C - Approved, Except as Noted. Resubmission Required.

D - No Action Taken. See Comments. Resubmission Required.

E - disapproved. See Comments. Resubmission Required.

PROJECT NAME: Wastewater Effluent Clarifier Rehabilitation ENGR. PROJECT NO.: 16-013C LOCATION: Bozeman Fish Technology Center CONTRACT NO.: WO#: F2014246938

CONTRACTOR:

Spec.

Section Number

Spec.

Paragraph No.

Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals etc )

Contractor's Submittal Number

Date Submitted

Action Taken

Date Resubmitted

Action Taken Comments

01 33 00 1.1B1 Preliminary Schedule of Shop Drawings, Samples, & Proposed substitutes 1 Due 7 days after NTP

01 33 00 1.1B2 List of Permits and Licenses to be obtained by contractor 1 Due 7 days after NTP

01 33 00 1.2A Revised Schedule of Shop Drawings, Samples, & proposed substitutes 1

At the Preconstruction Conference

01 33 00 1.2A Revised list of Permits and Licenses to be obtained by contractor 2

At the Preconstruction Conference

01 33 00 1.2A Preliminary Sschedule of values per 01 29 73 2 At the Preconstruction Conference

01 33 00 1.2A 60-day plan of operation per 01 32 16 2 At the Preconstruction Conference

01 33 00 1.2A Detailed layout of field office per 01 52 00 2 At the Preconstruction Conference

01 33 00 1.3 Shop Drawings 3

PROJECT SUBMITTAL LIST