Submittals_15-006.pdf

PDF 16 KB Posted

Attached to
DRILL 10 STOCK WELLS Federal contract opportunity
Solicitation number
F15PS00974
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

Submittals List (Post Award Submittals List For Reference Only)

View the file

Other files for this federal contract opportunity

Other files attached to DRILL 10 STOCK WELLS, newest first.
File Type Posted
Sol_F15PS00974.pdf PDF
Descriptions-Specifications.pdf PDF
Kirwin_Well_Project_Maps_with_GPS_Coordinates.zip ZIP file
Past_Performance_Questionnaire.doc DOC document
Notice_to_Offerors.docx DOCX document
Wage_Rates_-_KS150008_-_Building.docx DOCX document
Bid_Bond_-_SF24.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NAME: NEW STOCK/DOMESTIC WATER WELLS ENGR. PROJECT NO.: 15-006

LOCATION: Kirwin NWR CONTRACT NO.:

CONTRACTOR: SHEET NO.: 1 OF: 1

Spec.

Section Number

Spec.

Paragraph No.

Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)

Contractor's Submittal Number

Date Submitted

Action Taken

Date Resubmitted

Action Taken Comments

01 33 00 1.02 Construction Progress Schedule 03 41 00 1.03.B. Shop Drawings, Fabrications Details 22 11 23 1.02.B. Pump Specifications, Valve Data, Drop Pipe Data, Certified Pump Curves, Installation and Maintenance Manuals, Product data for Solar Panels, Motor, Controller, Control Box and Related Electrical Components.

33 21 00 1.03.B. Method of Drilling, Well Logs, Proposed Method of Drilling, Perforated casing Size and Location, Gravel Pack Size and Location, Pumping Capacity of Well, Drawdown versus Discharge Testing Results, and Product Data for Well Casing and Perforated Casing.

33 21 00 1.03.C. Water Well Decommissioning Details

Submittal Codes: A - Approved B - Approved, except as noted. Resubmittal not required C - Approved, except as noted. Resubmission Required. D - No Action taken. See comments. Resubmission required.

E - Disapproved. See comments. Resubmission Required.

PROJECT SUBMITTAL LIST

Sheet1