Exhibit C - Pricing Schedule.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Milham Well #4 Project State and local contract opportunity
- Solicitation number
- RFB-2025-0000000104
- Issued by
- Kalamazoo County, Michigan
About this file
The document is Exhibit C - Pricing Schedule for the Milham Well #4 Project issued by the City of Portage, Michigan. The project involves comprehensive well construction services including drilling a pilot borehole, collecting soil samples, constructing a 16-inch diameter production well and a 5-inch diameter observation well, and performing various technical assessments such as performance testing, digital video recording, and plumbness and alignment testing. The pricing schedule outlines 11 line items covering the full scope of work, with specific quantities for each service: 180 feet of sample collection boring, 180 feet of observation well construction, 180 feet of production well bore hole, 150 feet of production well casing and grouting, 30 feet of production well screen and gravel pack, 30 hours of well development, and 76 hours of test pump operation.
The pricing schedule currently shows $0.00 for all unit prices and line totals, suggesting this is a template or preliminary document awaiting final pricing from the selected contractor. The comprehensive nature of the pricing schedule indicates a detailed, structured approach to well construction with clear delineation of each project phase and associated tasks. While specific funding sources are not detailed in this document, the project appears to be a municipal infrastructure improvement initiative for water resource development in Portage, Michigan.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 2025 RFB Milham Well #4.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
EXHIBIT C - PRICING SCHEDULE
Contractor:
| Base Bid Items | |||||
| Item | Description | Units | Quantity | Unit Price | Line Total |
| 1 | Mobilization and Demobilization, Max 10% | LSUM | 1 | $0.00 | |
| 2 | Sample Collection Boring and Sieve Analyses | Ft | 180 | $0.00 | |
| 3 | 5-inch PVC Observation Well - Complete | Ft | 180 | $0.00 | |
| 4 | Production Well Bore Hole | Ft | 180 | $0.00 | |
| 5 | Production Well Casing and Grouting | Ft | 150 | $0.00 | |
| 6 | Production Well Screen and Gravel Pack | Ft | 30 | $0.00 | |
| 7 | Well Development | Hr | 30 | $0.00 | |
| 8 | Furnish, Install and Remove Test Pumping Equipment | LSUM | 1 | $0.00 | |
| 9 | Test Pump Operation | Hr | 76 | $0.00 | |
| 10 | Plumbness and Alignment Survey | LSUM | 1 | $0.00 | |
| 11 | Digital Video Survey | LSUM | 1 | $0.00 | |
| Total Base Bid | $0.00 |
File details come from the government source that posted it. Updated .