Exhibit A - Technical Requirements Document.pdf

PDF 361 KB Posted

Attached to
White Phosphorous Image Intensifier for AN/AVS-6 ANVIS Federal contract opportunity
Solicitation number
SPRBL1-23-R-0016
Issued by
Defense Logistics Agency

View the file

Other files for this federal contract opportunity

Other files attached to White Phosphorous Image Intensifier for AN/AVS-6 ANVIS, newest first.
File Type Posted
SPRBL123R0016 Amendment 0002.pdf PDF
SPRBL123R0016 Amendment 0001.pdf PDF
Attachment 0001 - DD 254.pdf PDF
SPRBL1-23-R-0016.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A SPRBL1-23-R-0016 Page 1 of 30 Issue: 21 Apr 2023

Version: 23 Jun 2017

TECHNICAL REQUIREMENTS DOCUMENT

For Solicitation SPRBL1-23-R-0016

NSN 5855-01-692-7710

Part Number A3314408-6 / MX-12607

White Phosphor Image Intensifier Tube in Support of

Aviator’s Night Vision Imaging System (ANVIS)

Exhibit A SPRBL1-23-R-0016 Page 2 of 30

TABLE OF CONTENTS

APPLICABLE DOCUMENTS

CONFIGURATION BASELINE

Obsolescence Management Requirements / Obsolete Components and Materials

Definitions

DMSMS Management Program

Design Changes

Subcontractor Manangement

DMSMS Costs

PACKAGING

Wood Packing Material

Marking

Military Packaging

SPECIALIZED TESTING

CONTRACT SECURITY REQUIREMENTS

Program Management requirements

CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1

CDRL List

Individual CDRLs

Exhibit A SPRBL1-23-R-0016 Page 3 of 30

APPLICABLE DOCUMENTS

Military and Federal Standards MIL-STD-129R Military Marking for Shipment and Storage MIL-STD-2073-1E w/Chg 1 Standard Practice for Military Packaging Military and Federal Specifications

MIL-PRF-A3314408

Performance Specification, 18 MM Image Intensifier (I2) Tubes, Aviation: MX-12606 Green Phosphor (GP) and MX-12607 White Phosphor (WP), Ground: MX-12608 (GP) and MX-12609 (WP)

Other Documents

Commercial Documents ISPM Number 15 Regulation of Wood Packaging in International Trade ANSI/ISO/ASQ(E) Q9001-2015 American National Standard, Quality Management Systems

Requirements EIA-649-1 Configuration Management Requirements For Defense Contracts ANSI/NCSL Z540.3-2006 Requirements for the Calibration of Measuring and Test Equipment ANSI/ASQ Q10012-2003 Measurement Management Systems – Requirements for

Measurement Processes and Measuring Equipment ANSI/ASQ Z1.4-2003 (R2013) Sampling Procedures and Tables For Inspection By Atrributes

Security Documents SCG Security Classification Guide for Image Intensifier Devices (31

October 2013)

CONFIGURATION BASELINE

The applicable Configuration Baselines (CB), for the listed Configuration Item (CI) and/or Computer Software Configuration Item (CSCI), are as listed in the table below.

NSN Nomenclature Part Numbers/Drawings 5855-01-692-7710 Image Intensifier A3314408-6

Each CI/CSCI, as developed/built and delivered, shall conform to the cited CB and (if applicable) all subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO). The Contractor shall establish a Configuration Management Program in accordance with EIA-649-1.

No changes or departures from the CB are acceptable except for changes or departures which are submitted in accordance with EIA-649-1, CDRL A001, CDRL B001, and CDRL C001, and are approved by the Government

Exhibit A SPRBL1-23-R-0016 Page 4 of 30

Configuration Manager (C Mgr.) or Configuration Management Officer (CMO) and which are made applicable to the contract by the PCO.

An Engineering Change Proposal (ECP) describes the changes to be made to the CI/CSCI and all associated Government documents and data that are affected by the proposed engineering change. ECP should be prepared in accordance with EIA-649-1, CDRL A001, and DI-SESS-80639.

A Request For Variance (RFV) is a specific written authorization to depart from a particular requirement(s) of an item’s approved configuration documentation for a specific number of units or a specified period of time, either as an advance request or after the fact. The contractor shall identify the impact of the RFV on performance, operational readiness and logistics support of the affected CIs. The Government may require consideration for any RFV. RFV should be prepared in accordance with EIA-649-1, CDRL B001, and DI-

SESS-80640.

A Notice of Revision (NOR) shows the detailed changes that must be made to technical documentation, except specifications, following approval of an ECP. A NOR shall be submitted for each document affected by an ECP. NOR should be prepared in accordance with EIA-649-1, CDRL C001, and DI-SESS-80642

Obsolescence Management Requirements / Obsolete Components and Materials

Definitions.

For the purpose of this part –

An “Approved Item” is the resolution of an obsolescence issue by the use of items already approved for use on the drawing (e.g., an approved alternate part already on a specification control drawing). The use of an approved item does not require configuration management approval or the establishment of a DMSMS Management Case.

“Backorder Avoidance” is an estimate of the number of supply system backorders for the next higher higher assembly (NHA) which would be avoided by resolving the case proactively. Backorder Avoidance is defined as the user demand for the NHA that would not have been filled as a result of the time spent resolving the issue had the issue been discovered reactively (i.e., the commencement of a contractual procurement or repair action).

A “Bill of Materials (BOM)” is a list of the items, including but not limited to: raw materials, sub-assemblies, intermediate assemblies, sub-components, parts, chemicals, software (SW), and the quantities of each needed to produce an end product. The BOM may include additional information that allows the user to determine the precise location of an item within an end product. A DMSMS BOM is limited to just those items selected for comprehensive monitoring by the DMSMS program.

“Commercial item” and “commercially available off-the-shelf (COTS) item” are items that meet their respective definitions in FAR Part 2.101 – Definitions.

A “Complex Substitute” is the resolution of an Obsolescence Issue by the use of a replacement item that has different specifications which need to be researched and validated, but requires no modification of the Next Higher Assembly (NHA). The use of a complex substitute requires configuration management approval and the establishment of a DMSMS Management Case.

Exhibit A SPRBL1-23-R-0016 Page 5 of 30

“Cost Avoidance” is the difference between the cost of the government approved proactive DMSMS Case resolution and the estimated cost of case resolution should the DMSMS issue have been discovered reactively (i.e., the commencement of a contractual procurement or repair action). Note that this definition shall be used in lieu of the definitions in SD-22.

“Diminishing Manufacturing Sources and Material Shortages (DMSMS)” is the loss, or impending loss, of qualified source(s), manufacturers, or suppliers that may impact the production or sustainment of an item or system.

“DMSMS Issues” are problems related to shortages or projected shortages of items caused by obsolescence or the loss of qualified manufacturers or suppliers of items. DMSSMS issues are further classified as:

“Documented DMSMS Issues” are DMSMS Issues for which there is documentation advising that an item is unavailable or will be unavailable at a specific date in the future. Documented DMSMS Issues tend to identify issues for which the Years to End of Life (YTEOL) is typically one year or less and rarely in excess of two years.

“Predicted DMSMS Issues” are DMSMS Issues predicted to occur that have been identified by analysis of the item, its technology and market forces affecting the future availability of this item. A number of service providers exist in the private sector with tools capable of predicting DMSMS issues beyond 2 years to as much as 10 years.

A “Reactive DMSMS Issue” is a DMSMS Issue which was not identified until the commencement of a current procurement or production action for the item or a higher assembly for which the item is a component.

A “DMSMS Management Case” is a project established to analyze and resolve DMSMS Issues.

“DMSMS Impact” is the negative effect of a DMSMS Issue on the ability to produce and/or support an item and/or its higher assemblies during its planned service life.

A “DMSMS Roadmap” is a data visualization tool, depicting the health of the product's as-sustained configuration that will be used to identify, manage and plan for the resolution of DMSMS Issues at the sub-system or assembly level to include software.

“End of Life” is the last date for which the item can be purchased. In the case of software, it represents the last day a software license is available for purchase.

“End of Support” is the last date for which software support is provided by the software licensor and occurs when either software updates or technical support ends.

“Firmware” is software contained on Non-Volatile Memory (NMV) for which updates occur via either the replacement of the NVM component or by replacement of an assembly containing the NVM component. Software on NVM components which is updated by any other means shall not be considered Firmware.

“Item” means any part, assembly, software, material, chemical, etc., used in the manufacture, assembly, or operation of deliverables of this contract.

Exhibit A SPRBL1-23-R-0016 Page 6 of 30

“Non-Development Items (NDI)” shall be as defined in the FAR Part 2.101 – Definitions. Privately developed NDI which do meet the FAR definition of a commercial item are considered commercial items.

“Obsolescence” is the condition when a needed item is out of production.

The “Original Component Manufacturer (OCM)” is the organization responsible for the component design, specification and its production.

The “Original Equipment Manufacturer (OEM)” is the organization responsible for the equipment design, specification and its production.

A “Simple Substitute” is the resolution we issue by its replacement with an existing item that meets all requirements and does not require modification to either the item or its NHA, but has not yet been approved by the design approving authority. Simple substitutes typically require only minimal qualification. The use of a simple substitute requires configuration management approval and the establishment of a DMSMS Management Case.

“Standard Parts” or “Commonly Used Parts” are those parts identified in the contractor’s Parts Management or Parts Selection processes as preferred for use by their design engineers. These parts are typically documented on Preferred Parts List (PPL) or equal.

“Subcontractor” is a person or entity to which the prime Contractor has delegated part or all of its obligations. Note that by this definition, most suppliers will not be considered “Subcontractors”, and as such, would not be automatically subject to the flow down of DMSMS program requirements.

“Technology Insertion” is a defined programmatic system management strategy to redesign an LRU or subsystem to provide new capability or improved performance to the weapon system.

“Technology Refreshment” is a defined programmatic system management strategy to replace the electronics (including software/firmware) in a system over a specific period of time, usually with the goal of resolving multiple DMSMS issues or to prevent the occurrence of DMSMS Issues preemptively by upgrading the technology of the design. From a DMSMS perspective, Technology Refreshment events should be planned to coincide with Technology Insertion events whenever possible.

DMSMS Management Program

For the weapon system or items on contract, the Contractor shall establish and execute a proactive DMSMS management program in accordance with (IAW) this TRD for the period of performance of this contract. The government’s objective in this program is to efficiently and effectively identify, report, and resolve DMSMS issues, eliminate unplanned redesigns and maintain alignment to the objective of a minimum five-year interval before any DMSMS issue is forecast to occur within the system.

The program shall include processes or procedures to identify or predict DMSMS Issues over a minimum 5-years planning horizon, assess risk and develop obsolescence mitigation strategies to determine the most cost effective solution to DMSMS Issues. The program shall also include processes and procedures for selecting standard or commonly available parts and parts with more than one source of supply and with at least five (5) years to the end of life (YTEOL).

Exhibit A SPRBL1-23-R-0016 Page 7 of 30

Design Changes Design changes shall be made in accordance with the Configuration Management requirements of this contract.

Subcontractor Manangement.

The Contractor shall ensure that its Subcontractors (see Subcontractor definition) adhere to the DMSMS/Obsolescence requirements of this TRD.

DMSMS Costs

The Contractor shall be responsible for all costs associated with mitigating DMSMS Issues, including:

- Monitoring parts, material and software availability;

- Locating alternate/substitute parts and/or material and software;

- Vendor interface and communication;

- Implementing the selected solutions, including redesign;

- System compatibility assurance;

- Interface with the Army Network; and

- Non-government qualification testing.

PACKAGING

Preservation, packing and marking for shipment shall be in accordance with Section "D" of the contract.

Packaging/packing shall be in accordance with MIL-STD-2073-1E w/Chg 1, Level of Protection (LOP):

Military, Level of Pack, (LPK): Quantity Unit Pack (QUP): 001. Marking shall be accordance with MIL-STD- 129R.

Wood Packing Material Wood packing material includes pallets. See DLAD T/Q Requirement RP001 DLA Packaging Requirements for Procurement, which includes requirements for treatment of wood packaging material.

Marking

All unit packs, intermediate packs, and exterior shipping containers shall be legibly and durably marked in accordance with MIL-STD-129R.

Wood Packing Material Wood Packaging Materials (WPM) shall meet the following requirements:

Wood packaging material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames and cleats. This requirement excludes materials that have under

Exhibit A SPRBL1-23-R-0016 Page 8 of 30 gone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSB).

All WPM shall meet the requirements of the International Standards for Phytosanitary Measures (ISPM) Number 15, “Regulation of Wood Packaging Material in International Trade”. DoD shipments inside and outside of the United States shall meet the requirements of ISPM 15 whenever WPM is used to ship DoD cargo.

All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KDHT) in accordance with American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).

All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the contractor any remediation costs incurred by the Government.

Exhibit A SPRBL1-23-R-0016 Page 9 of 30

Military Packaging DS7029 and/or DS7033 Preservation, Packing and Marking Instructions

DS7029 - DS7033 LEGEND

Qty Quantity Prot Req Protection Required PGE-REF Packaging Reference (Military Standard) LPK Level of Packing QUP Quantity per Unit Pack ICQ Intermediate Container Quantity Pkg Reqmt Codes Packaging Requirement Codes when PKG-REF cites MIL-STD-2073 The below codes are for special markings:

PC Project Code WG Warranty/Guarantee SL Shelf Life BC Bar Code FMS Foreign Military Sales

DS7029 - DS7033

NSN Prot Req PKG-REF or SPI LPK QUP ICQ Special Markings

Pkg J. J J J J J J J J J Reqmt I. II. III. IV. V. VI. VII. VII.a IX X Codes (MP) (CD) (PM) (WM) (CD) (CT) (UC) (IC) (PK) (SM) 5855-01-692-7710

Military

MIL-STD-2073-1E

w/Chg 1 B 001 10 1 00 00 GA D ED Military

Exhibit A SPRBL1-23-R-0016 Page 10 of 30

SPECIALIZED TESTING

The contractor shall perform Initial Production Testing (IPT) or a Qualification Test (also referred to as First Article Testing) and Conformance Inspection (CI) IAW MIL-PRF-A3314408 and this document. Products delivered on this contract shall be qualified by Product Manager Soldiers Manuever Sensors, CECOM Integrated Logistics Support Center (ILSC), or DEVCOM Command, Control, Communications, Comoputer, Cyber, Intelligence Surveillance and Reconnaissance (C5ISR)Center via performance of an IPT. Test methods for the IPT and CI shall be in accordance with (IAW) the Government approved Test Procedures.

The Government may require that IPT be repeated over the life of this contract to requalify the product; should the contractor fail to deliver any of these items for a period of one year, make changes to products and/or processes, change a supplier of a component, or move the production line.

The Government reserves the right to waive IPT for contractors that have previously qualified by Product Manager Soldier Manuever Sensors or CECOM Integrated Logistics Support Center (ILSC) and have completed Initial Production Testing. The contractor shall be required to provide evidence that their product has been previously qualified by Product Manager Soldier Manuever Sensors,CECOM ILSC, or DEVCOM C5ISR Center and have maintained production, with deliveries to the Government within a period of one year, prior to the Governemnt approving a waiver. The Government also reserves the right to require an IPT if the contractor fails to deliver for a year or there are design changes which require requalification.

The Government reserves the right to conduct an operational test (OT), to include compatibility testing, to ensure the system is operationally effective and suitable, and interoperable with other Army equipment. If an OT is required, IPT approval is contingent on a successful OT.

As part of IPT, the contractor shall:

a) Develop the Qualification Test Plan (QTP) and test procedures necessary to demonstrate that these units conform to the requirements established by the applicable specification(s) and other technical data provided in this contract.

b) Notify the Government and test the IPT units.

c) Provide a Qualification Test Report to the Government which documents the IPT results.

d) Insure all equipment used to take performance readings for acceptance tests are kept within the performance parameters delineated by the manufacturer of that equipment and capable of satisfying the performance parameters of this contract. All equipment manufactured by the contractor shall be listed and the parameters established and maintained for this equipment also.

The sample size shall be 20 units. All IPT samples shall be assembled at the same location at which production units will be assembled, using the same parts, materials, and manufacturing processes to be employed for subsequent production.

Prior to any IPT or Qualification, the contractor shall submit a Qualification Test Plan (QTP) in accordance with CDRL D001 and this document. IPT shall be performed in accordance with the MIL-PRF-A3314408, the

Exhibit A SPRBL1-23-R-0016 Page 11 of 30

Government approved QTP, Government approved test procedures, and this document. In addition to the information required by DI-NDTI-81307A, this submission shall contain:

a. The delineation and allocation of tests to be performed on each of the IPT units and the order of such tests.

b. Test milestones schedules and the contractor's test readiness posture.

c. A table which cross references the paragraph number of the specification requirement (including a brief description of the requirement) and the associated test procedure number.

Prior to IPT and Conformance Inspection, the contractor shall submit all Test Procedures to be used in accordance with CDRL E001 and this document. Test Procedures shall contain:

a. Step-by-step test procedures for each test.

b. Data sheets to be employed to document the results of testing.

c. Identification of required test facilities, equipment and personnel.

The contractor shall submit a Qualification Test Report (QTR) in accordance with CDRL F001 and this document. Initial Production Testing or Qualification approval shall be contingent upon the submission of a complete and acceptable QTR to include verification of corrective action for reported IPT Failures to include adequacy of identified changes to the design/manufacturing process. IPT samples shall meet all contractual requirements or all variances shall be documented by Government approved waivers.

The QTR shall be complete, accurate, and readable and shall provide sufficient data to determine that the hardware item meets all the requirements delineated in the contract. The report will include the following:

a. Contractor's name and address.

b. Contract number.

c. Nomenclature, type number and (if assigned) stock number of item represented by the IPT.

d. Name and address of plant where IPT units were fabricated and assembled.

e. Place and date of performance of tests.

f. Identification of applicable test and inspection equipment used in performance of Initial Production Testing.

g. Sample size or quantity submitted for test or inspection.

Exhibit A SPRBL1-23-R-0016 Page 12 of 30

h. A table which cross-references the paragraph numbers of the specification, the test procedures, and data sheet entry.

i. Complete test results showing actual or quantitative observations and all required calculations, allowable tolerances for each parameter, date the test was performed, the name and signature of tester, name and signature of the Government verifier/witness, and serial number of the equipment.

j. The final revision of the Government approved FIAR for each failure that occurred and corresponding approval letter.

The contractor shall report all IPT Failures and submit a Failed Item Analysis Report (FIAR) IAW CDRL G001 and this document. For any failure that occurs in a Government conducted Operational Test (OT), the contractor shall submit a FIAR and incorporate corrective actions.

The IPT samples shall NOT serve as a manufacturing standard. Upon successful completion of IPT, Items which are refurbishable and made fully compliant with contractual requirements shall be delivered as production items. The Government shall determine the acceptability of all IPT samples. Those items which are not refurbishable shall not be delivered as production items.

The contractor shall conduct Conformance Inspections for all product delivered in accordance with MIL-PRF- A3314408, the Government approved test procedures, and the requirements of this document. Conformance Inspection procedures used to test production units shall be identical to those used to test First Article samples.

After IPT is approved, any proposed changes to the test procedures will be submitted per CDRL E001 for evaluation. Such submissions will provide complete justification for the change. Changes to the approved test procedures shall not be implemented without written Government approval.

Delivery of subsequent lots shall not be made prior to successful completion of Conformance Inspection.

The contractor shall notify the cognizant Government Quality Assurance Representative (QAR) in writing at least 2 days in advance, of the time and place for each Conformance Inspection. The contractor shall notify the QAR in writing within 2 working days of completion of Conformance Inspection for a specific production lot.

The contractor shall notify the PCO and Technical Activity in writing upon completion of Conformance Inspection. This notification will be submitted by email not later than 10 days after the test is completed, and will include:

- Contract Number.

- Item Identification (Nomenclature and/or Part Number)

- Date of Testing

- Lot Size, Number, and time frame represented

- Sample Size

- List of any associated failures

Exhibit A SPRBL1-23-R-0016 Page 13 of 30

The contractor shall report each IPT Failure and each Conformance Inspection failure occurring in Test Groups B, C, and D, to the Government Quality Assurance Representative (QAR) and the Technical Activity within 48 hours of failure occurrence as required by CDRL H001. Within 10 working days of failure occurrence, the contractor shall submit a Failed Item Analysis Report (FIAR) through the cognizant QAR to the Technical Activity as required by CDRL G001. In addition to the information required by DI-SESS-81315B, the report shall include:

a. Contractor's name, address and applicable contract number

b. Identification of failed item

c. Number of units in lot and sample size

d. Date and time of failure occurrence

e. Failure Mode

f. Summary of failure analysis

g. Root cause of failure

h. History of the failure

i. Proposed Corrective Action to eliminate root cause, contain the failure, and prevent reoccurrence

j. Re-inspection plan to validate the corrective action

k. Proposed disposition of failed item and lot

l. Verification that Corrective Action was effective.

The contractor shall implement the proposed corrective action on all units in the lot, select new samples and conduct re-inspection and other required re-testing in accordance with the re-inspection plan in the FIAR.

Results of the re-inspection and validation of the corrective action shall be included in the FIAR.

Final acceptance and shipment approval will be withheld until results of the re-inspection substantiate that the corrective action was effective and the FIAR was accepted, as authorized by the PCO.

The contractor shall prepare and submit a Production Reliability Acceptance Test (PRAT) Report for each production lot subjected to Reliability Testing. The PRAT shall be prepared in accordance with CDRL J001 and this document. The PRAT shall include but not be limited to a test summary, test description, identification of item(s) under test, lot from which the test sample was taken, lots represented by the sample, test group number, performance requirements, measured values taken during the test, conclusions, and any applicable failed item analysis reports (FIARs) and their approval letters.

In the event of an Image Intensifier Reliability lot failure, the Government may, with Contractor concurrence, agree to accept consideration in lieu of correcting units that have already been delivered to the Government.

The following calculation shall be used to determine the amount of consideration.

Damages = [ ( MTTFREQ – MTTFDEM ) / ( MTTFREQ ) ] * # of units * cost per unit

MTTFREQ = Mean Time To Failure Required MTTFDEM = Mean Time To Failure Demonstrated

The number of units in the above calculation shall be all units delivered since the last production lot to successful complete Reliability test, or any other number of units as agreed to by the Government. The MTTF

Exhibit A SPRBL1-23-R-0016 Page 14 of 30 used in the equation is a cumulative total of all samples subjected to Reliability Testing in that particular lot.

When calculating the MTTFDEM for the lot, the MTTF demonstrated for an individual unit shall not exceed the required MTTF for that unit.

The contractor shall prepare and submit an Electromagnetic Interference (EMI) test report documenting the results of all required EMI Testing. The EMI Test Report shall be prepared in accordance with CDRL K001 and this document.

A Government-approved calibration system with respect to radiation sources, photometric equipment, color temperature, and ancillary equipment shall be maintained to support this program. Test requirements matrices shall be found in the pertinent MIL-PRF. Test environments shall be maintained that provide the ability to produce the environmental conditions required to verify performance of delivered product in accordance with system/component performance specifications and the approved test procedure. The US Government’s Command, Control, Communications, Computers, Combat Systems, Intelligence, Surveillance, and Reconnaissance (C5ISR) Center defines all of test conditions, technical interpretations, and test methods for the Image Intensifier Tube. The contractor shall have an equal or superior approach to that defined in the associated MIL-PRF documents. If the contractor approach is different than as defined in the associated MIL-PRF documents, Government approval is required for its use. Government-approved production test and acceptance equipment performance will also be monitored through Round Robin correlation tests between the contractors and C5ISR. The contractor shall maintain not fewer than three (3) each contractor-owned image tube standards of each tube assembly and module type. For these image tube standards, the contractor shall maintain measurement records for critical performance parameters including Signal-to-Noise (SNR), Center Resolution, Luminance Gain, Saturation, Equivalent Background Input (EBI), Halo, Modulation Transfer Function (MTF), and Photocathode Sensitivity. These measurements shall be made and documented on at least a quarterly basis (i.e., no longer than every 90 days) and all such data shall be made available to the Government upon request for the life of the contract. All such measurements shall be performed on actual production test and acceptance equipment. The contractor shall allow the Government to visit the contractor’s production test/evaluation facilities on up to a quarterly basis, in order to ensure conformance with the above requirements. As part of this process, the contractor shall also measure during this visit, up to fifteen (15) Government-owned tube assemblies and modules of each tube type. These measurements will be used for correlation assessments against measurements made at the C5ISR Center, as well as other manufacturing facilities and DoD organizations. In the case of discrepancies between measurements made at the C5ISR Center and the contractor’s facility, the C5ISR Center’s measurements shall take precedence; the contractor shall correct their measurement system or methodology to bring their measurements into correlation with those of the C5ISR Center; and the Government shall stop product acceptance until such time that the contractor measurement system is brought into correlation with that of the C5ISR Center.

CONTRACT SECURITY REQUIREMENTS

The contractor shall adhere to the requirements of the signed DD-254 Contract Security Classification Specification and "Security Classification Guide (SCG) for Image Intensifier Devices". In the event of a discrepancy between the signed DD 254, included as an attachment to the solicitaition/contract, and the language in this section, the signed DD 254 information shall take precedence.

Exhibit A SPRBL1-23-R-0016 Page 15 of 30

Access to Controlled Unclassified Information (CUI) is required in the performance of this contract.

Information designated as CUI, e.g., For Official Use Only (FOUO), generated or provided under this contract shall be controlled, handled, stored, marked, safeguarded, transmitted, and destroyed IAW DoDM 5200.01 Vol 4, DoDM 5400.0, AR 380-5, AR 25-55, AR 25-2, and the following guidance:

Electronically transmitted CUI shall be sent via:

1) Encrypted email

2) Password protected/encrypted document

3) DoD Safe Access File Exchange at https://safe.apps.mil

4) An accredited information system with proper security controls.

The contractor may disseminate FOUO information to their employees and subcontractors that have a need-to-know.

The contractor shall report the unauthorized disclosure of CUI to the COR.

Contractor is authorized to receive, store, and generate classified material at the contractor’s facility. Contractor will reference the appropriate security classification guidance when generating or deriving classified material or hardware, reference item 10k. All classified information received or generated will be properly stored and handled according to the markings on the material. All classified information received or generated is the property of the U.S. Government. At the termination or expiration of this contract, the U.S. Government will be contacted for proper disposition instructions.

If performing on contractor site, the contractor shall develop an OPSEC Plan IAW AR 530-1 as listed in the TRD CDRL number L001. Requiring Activity (RA) is responsible for providing to the contractor a current and valid program/command OPSEC Plan. The contractor will use the program/command OPSEC Plan to ensure the contractor developed OPSEC Plan includes the same Critical Information List (CIL) and OPSEC measures.

Contractor is authorized to receive, store, or generate CUI in the performance of this contract. Information designated as CUI, e.g., FOUO generated under this contract shall be controlled, handled, stored, marked, safeguarded, transmitted and destroyed IAW DoDM 5200.01, DoDM 5400.07, AR 380-5, AR 25-2, AR 25-55, and the following guidance:

Electronically transmitted CUI shall be sent via:

1) Encrypted email

2) Password protected/encrypted document

3) DoD Safe Access File Exchange at https://safe.apps.mil

4) An accredited information system with proper security controls.

The contractor may disseminate CUI to their employees and subcontractors that have a need-toknow.

Disposal/destruction shall be by means of shredding when no longer needed. If shredding capabilities are unavailable on contractor site – contractor may coordinate with government representative for shredding services.

The contractor shall report the unauthorized disclosure of CUI to the KO/COR, CM, or ISS.

Exhibit A SPRBL1-23-R-0016 Page 16 of 30

PROGRAM MANAGEMENT REQUIREMENTS

The Government and contractor shall incorporate an Integrated Product and Process Team (IPPT) discipline into the ANVIS program. The objective of the IPPT is to implement an open shared data/information environment with results oriented objectives of on schedule delivery of specification compliant units, continuously improving the various Government/contractor processes, and reducing the system life cycle cost.

The IPPT shall also complete the following additional actions throughout the life of the contract:

a) Hold IPPT reviews.

b) Use risk management techniques to document, track, and manage program areas of risk.

c) Review/concur in program documentation.

d) Review follow-on Initial Production Tests (IPTs) with the goal of reducing repetitive testing.

e) Review/concur on all Failed Item Analysis Reports (FIARs), ECPs, Request for Variances, and Trade studies.

The IPPT process as described in paragaraph(s) is solely to facilitate communications between the Government and contractor during contract administration. Responsibility for dealing with issues raised and for meeting all contract requirements remains with the contractor. No communication made during the IPPT process may be construed as a change unless specifically designated by the contracting officer.

The IPPT membership shall consist of Government and contractor personnel associated with the ANVIS program and related efforts. CECOM, Logistics Readiness Center (LRC), Enterprise Soldier Aviation (ESA) Directorate shall co-chair the IPPT with the associated contractor counterpart. The IPPT chairpersons shall concur on all items requiring IPPT concurrence. The co-chairs shall define IPPT membership and issue escalation procedures at the post award conference. For each meeting, the contractor shall prepare and submit an agenda and briefing charts to the Government in accordance with CDRL M001. The contractor and Government at the end of each review/meeting shall jointly prepare action items and review/meeting minutes.

The contractor shall submit the meeting minutes and action item list to the Government in accordance with CDRL N001. The contractor shall schedule, prepare for, and conduct the following reviews/meetings with Government concurrence:

The contractor shall participate in and support IPPT reviews at approximately 90-day intervals. IPPT reviews may be conducted as teleconferences or video-teleconferences (VTCs) if mutually agreed upon by the IPPT chairpersons. IPPT reviews shall provide a working level forum to identify, discuss, and resolve issues that are, or could, affect the systems performance, design, production, testing, logistics support, system deliveries, life cycle cost, and program schedule. Risk mitigation documentation shall also be reviewed.

Reports, Reviews, Meetings. Reports, reviews and meetings shall be required on a bi-weekly basis for this contract. The contractor shall be available for informal reviews and Government visits in addition to the IPPT reviews. The contractor shall participate in an informal bi-weekly meeting, to identify, discuss, and resolve issues.

The contractor shall submit, as a minimum, written program correspondence or documentation via electronic submittal. The preferred method of file submission is via e-mail. Deviations from this requirement are allowed

Exhibit A SPRBL1-23-R-0016 Page 17 of 30 on a case by case basis, with Government verbal concurrence (either Government IPPT chairpersons or Government contracting officer).

Transmission of Classified Material shall be in accordance with DoD 5220.22-M.

Data items shall be submitted, to the Government via electronic media. The electronic format shall be compliant with Microsoft Office for text documents, spreadsheets, graphics presentations, and program schedules.

It is the Government’s intent to use Contractor Integrated Technical Information Service (CITIS) to gain on-line access to contractor maintained data, configuration files, and information supporting this contract. The type of information to be placed on CITIS shall be concurred to by the IPPT prior to its implementation. The most recent version of all data shall be made available within five working days of being updated. The CITIS shall allow the Government the capability of retrieving all current and last modified versions of documentation. If the contractor determines this to be a restrictive cost driver, they can propose any alternative data submittal process (i.e. electronic data submittals, e-mail, etc.). Classified data shall be provided on magnetic or optical media.

Classified data shall be handled in accordance with DoD 5220.22-M and DD Form 254 attached to the contract.

Any restrictions on the use of the electronic data shall be as prescribed in the Data Rights Clause.

CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1

CDRL List

CDRL

Data Line No. DID Identification Title

A001 DI-SESS- 80639 Engineering Change Proposal B001 DI-SESS- 80640 Request for Variance C001 DI-SESS- 80642 Notice of Revision D001 DI-NDTI- 81307A Test Plan – Qualification Test Plan E001 DI-NDTI- 80603 Test Procedures F001 DI-NDTI- 80603 Test/Inspection Report – Qualification Test Report G001 DI-NDTI- 80809B Failure Analysis and Corrective Action Report – Failed Item

Analysis Report (FIAR) H001 Failure Notification J001 DI-TMSS- 81586A Reliability Test Reports – Production Reliability Acceptance

Test (PRAT) Report K001 DI-EMCS- 80200C Electromagnetic Interference Test Report L001 DI-MGMT- 80934C OPSEC Plan

M001 DI-ADMN- 81373 Presentation Material - Briefing Charts N001 DI-ADMN- 81505 Report, Record of Meeting/Minutes - Meeting Minutes

Exhibit A SPRBL1-23-R-0016 Page 18 of 30

Individual CDRLs

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Original Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202‐4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704‐0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

9000 A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-12607 Image Intensifier TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A001 Engineering Change Proposal

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-80639 AMSEL-LCE-INV

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

IN

LT

ASREQ SEE ITEM 16

b. COPIES

SECT. B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

Reg Repro

16. REMARKS:

The contractor shall prepare and submit Engineering Change Proposal in accordance with EIA-649-1 and this DID when a change to a contractual baseline document is deemed necessary.

The Government will have 30 days to review, accept, and/or comment on the draft submission. The contractor shall incorporate changes into the electronic deliverable within 30 days after receIPT of Government comments. The Government will have 30 days to review, accept, and/or comment on the final submission.

Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

E-mail notification is required with any electronic submission.

AMSEL-LCE-INV

RDER-PRA-CA

QAR

PCO

ACO

15. TOTAL 0 5 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Tim Langan

RDER-PRA-CA

Engineer

Dan Webster

RDER-PRA-CA

Branch Chief

Exhibit A SPRBL1-23-R-0016 Page 19 of 30

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202‐4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704‐0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

9000 A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-12607 Image Intensifier TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

B001 Request For Variance

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80640 AMSEL-LCE-INV

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

SUBMISSION

a. ADDRESSEE

16. REMARKS: The contractor shall prepare and submit Request For Variance in accordance with EIA-649-1 and this DID when a departure from a contractual baseline document is deemed necessary.

The Government will have 30 days to review, accept, and/or comment on the draft submission. The contractor shall incorporate changes into the electronic deliverable within 30 days after receipt of Government comments. The Government will have 30 days to review, accept, and/or comment on the final submission.

Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

E-mail notification is required with any electronic submission.

AMSEL-LCE-INV

RDER-PRA-CA

QAR

Tim Langan

RDER-PRA-CA

Engineer

Dan Webster

Exhibit A SPRBL1-23-R-0016 Page 20 of 30

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202‐4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704‐0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

9000 A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-12607 Image Intensifier TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

C001 Notice of Revision

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80642 AMSEL-LCE-INV

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

SUBMISSION

a. ADDRESSEE

16. REMARKS: The contractor shall prepare and submit Notice of Revision in accordance with EIA-649-1 and this DID when a change to a contractual baseline document is deemed necessary.

The Government will have 30 days to review, accept, and/or comment on the draft submission. The contractor shall incorporate changes into the electronic deliverable within 30 days after receipt of Government comments. The Government will have 30 days to review, accept, and/or comment on the final submission.

Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

E-mail notification is required with any electronic submission.

AMSEL-LCE-INV

RDER-PRA-CA

QAR

Tim Langan

RDER-PRA-CA

Engineer

Dan Webster

Exhibit A SPRBL1-23-R-0016 Page 21 of 30

ONTRACT DATA REQUIREMENTS LIST

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202‐4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704‐0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

9000 A TDP TM OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-12607 Image Intensifier TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

D001 Test Plan Qualification Test Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-81307A AMSEL-LCE-INV

INSER

T

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

DD

SECT.

B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

A

16. REMARKS: The contractor shall prepare and submit a Qualification Test Plan (QTP) prior to any qualification test.

Government requires 30 days for review/comments. Submit final within 30 days of receipt of Government comments, via DD 250.

Each draft and the final submissions shall be delivered in a format, compatible with Microsoft Office software delivered by e-mail.

Alternative delivery media may be discussed with the Contracting Officer prior to delivery. E-mail notification is required with any electronic submission.

AMSEL-LCE-INV

15. TOTAL 4 4 0

Tim Langan

RDER-PRA-CA

Engineer

Dan Webster

Exhibit A SPRBL1-23-R-0016 Page 22 of 30

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202‐4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704‐0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

9000 A TDP TM OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MX-12607 Image Intensifier TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

E001 Test Procedures

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80603

INSER

T

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

ASREQ 30 DAC

SECT.

B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

16. REMARKS: The contractor shall prepare and submit Test Procedures that will be used in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .