This is a solicitation for an indefinite-delivery, indefinite-quantity contract to procure up to 750 each 3kW Tactical Quiet Generators and up to 1,000 Power Distribution Units. The U.S. Army's Program Manager Expeditionary Energy & Sustainability Systems requires the generators and units to provide stand-alone power sources or power other Department of Defense systems. The generators must conform to the established statement of work, purchase description, and technical data package. The Power Distribution Units are ancillary items that satisfy the requirements in the purchase description attachment. The contract also provides for potential future design changes and retrofit kits to the generators to improve reliability, avoid obsolescence, and incorporate items like improved inverters and cables. The Army Materiel Command Army Contracting Command is the contracting agency. Pricing will be firm fixed price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 0007 3kW (98-831) TDP updated as of 20210621.pdf | ||
| Attachment 0007 3kW (98-831) TDP updated as of 20210621.pdf | ||
| W909MY21R0010-0002.pdf | ||
| Attachment 0007 3kW (98-831) TDP6222021.pdf | ||
| Attachment 0004 Price Model_updated as of 20210617 (002).xlsx | XLSX spreadsheet | |
| W909MY21R0010-0001.pdf | ||
| Attachment 0002 3 kW PURCH_DESCRIPTION - PD 6115-0076D updated as of 20210617.pdf | ||
| Attachment 0006 GFP LIST.xlsx | XLSX spreadsheet | |
| Attachment 0001-SOW 5-27-2021.pdf | ||
| Attachment 0007 3kW (98-831) TDP.pdf | ||
| Attachment 0006 GFP LIST.pdf | ||
| Attachment 0005 Appendix D Past Performance Questionnaire.pdf | ||
| Attachment 0003_PDU Description.pdf | ||
| W909MY21R0010.pdf | ||
| Attachment 0002 3 kW PURCH_DESCRIPTION - PD 6115-0076D.pdf | ||
| Attachment 0004 Price Model.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W909MY21R0010- 3kw Tactical Quiet Generator Sets Production and System Support Contract
Appendix A
Deliverables
A-1.0 Data Deliverables
The Government shall develop Contract Data Requirements List (CDRLs) (DD Form 1423) requirements for base contract and each individual Task Order/Delivery Order (TO/DO) as required. The Contractor shall then deliver CDRLs per DD Form 1423 and Data Item
Deliverable (DID) requirements, as specified in their corresponding TOs/DOs. The CDRLs associated with this effort are listed in Table B-1 and included in Section J of the contract. This list does not preclude the Government from adding CDRLs to subsequent TOs/DOs based upon specific TO/DO requirements; any additional CDRLs shall be included and addressed through
TO/DO negotiations.
Table B-1 – Contract Data Requirements List (CDRL)
Sequence No. Date Item Title DID# PWS Reference
Paragraph
A001 Contractor Configuration Management Plan
DI-CMAN-
80858A
3.5.3
A002 Configuration Control Document
DI-MISC-
80711A
3.5.5, 3.5.5.3 & 3.5.5.5
A003 Production Qualification Test Plan
DI-NDTI-80566 3.6.2
A004 Production Qualification Test Reports
DI-NDTI-
80809B
3.6.4
A005 Test Incident Report
DI-MISC-
80711A
3.6.5
A006 Failed Item Analysis Report
DI-MISC-
80711A
3.6.6 & 3.8.2.2
A007 Physical Configuration Audit (PCA) Report
DI-CMAN-
81022
3.6.7
A008 Quality Assurance Plan
DI-MISC-
80711A
3.8.1
A009 Production Forecast
DI-MGMT-
80034 3.13.8.3
A010 Component Warranty List – 60 Hz
DI-MISC-
80711A
3.11
A011 Design Change Notice DI-ALSS-81529 3.13.1, 3.13.1.1 &
3.13.1.7
A012
TM 9-6115-639-13&P
Changes to Repair Parts and
Special Tools List Changes
(RPSTL)
DI-MISC-
80711A
3.13.3.1.1 &
3.13.3.1.2
A013
TM 9-6115-639-13&P
Changes to Electronic TM
DI-MISC-
80711A
3.13.5.1.2 rosetta.wisdomrussel Typewritten Text
EXHIBIT A
Sequence No. Date Item Title DID# PWS Reference Paragraph
A014
TM 9-6115-639-13&P
Changes to Maintenance Allocation Chart (MAC)
DI-MISC80711A 3.13.8.7
A015 3kW Family Tree – 60 Hz DI-MISC80508B 3.13.9
A016 Conference Minutes DI-
ADMN81250B
3.3.1.3
A017 Post Award Orientation Meeting
DI-
ADMN81250B
3.3.1.1
A018 Status Reports DI-
MGMT80368A
3.3
A019 Briefings DI-
MGMT80368A
3.3, 3.3.1 & 3.3.1.2
A020 Engineering Change Proposal
(ECP)
DI-SESS-
80639E
3.5.5.1
A021 Coordination with Arsenals DI-MISC_0711A
3.15
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-
4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT A C. CATEGORY:
0011 TDP TM X OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
3 kW TQG
1. DATA ITEM 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Configuration Management Plan
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-CMAN-80858A SOW Para 3.5.3 SFAE-CSS-E2-S INSERT
7. DD 250
REQ
9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
LT 1 Time SEE ITEM 16
a. ADDRESSEE
b. COPIES SECT. B
8. APP CODE E 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
A SEE ITEM 16 SEE ITEM 16
Reg Repro
16. REMARKS:
Block 12: Submit draft 140 days after contract award. The government requires 30 days for review/comment.
Block 13: Submit final 30 days after government approval.
SFAE-CSS-E2-S
AMSEL-LCP-S
15. TOTAL 3 5 0
G. PREPARED BY
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOSE.D.1 Digitally signed by
SANTOS.JOSE.D.1239719550
239719550 Date: 2021.05.18 16:40:20 -04'00'
H. DATE
18 May 2021
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by DONG-
OMALLEY.CHENXI.126756 OMALLEY.CHENXI.1267565992
5992 Date: 2021.05.19 10:07:09 -04'00'
J. DATE
18 May 2021
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of
Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT
RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM
NO. 0011
B. EXHIBIT C. CATEGORY:
TDP TM X OTHER
D. SYSTEM/ITEM F. CONTRACTOR
3kW TQG Sets
E. CONTRACT/PR NO.
TBD
1. DATA ITEM 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Configuration Control Document
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED T
DI-MISC-80711A SOW Para 3.5.5, 3.5.5.3 & 3.5.5.5 SFAE-CSS-E2-S INSERT
7. DD 250
REQ
9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION IN
LT ASREQ SEE ITEM 16
a. ADDRESSEE
b. COPIES SECT. B
8. APP CODE E 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
A SEE ITEM 16 SEE ITEM 16
Reg Repro
16. REMARKS:
Data Item Description DI-MISC-80711A: Delete block 10 instructions entirely and follow the instructions found in the SOW paragraph shown in block 5 above.
The contractor shall prepare and submit Configuration Control
Documents in accordance with the SOW section for Configuration
Control (Para 3.5) when a change to or a departure from a contractual baseline document is deemed necessary. Submit reproductions to SFAE-CSS-E2-S. Electronic CCD.
Distribution Statement E: Distribution authorized to DOD components only; Documents may contain proprietary or procurement sensitive information. Other requests for this information shall be referred to SFAE-CSS-E2-S.
SFAE-CSS-E2-S
PCO
ACO
QAR
AMSEL-LCP-S
*VECP only
*1
15. TOTAL 4 5 0
G. PREPARED BY
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOSE. Digitally signed by
SANTOS.JOSE.D.1239719550
D.1239719550 Date: 2021.05.18 16:41:00 -04'00'
H. DATE
18 May 2021
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by DONG-
OMALLEY.CHENXI.
OMALLEY.CHENXI.1267565992
Date: 2021.05.19 10:13:01
1267565992 -04'00'
(1 Data Item)
Original Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information
Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0011 TDP TM OTHER X NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
3kW TQG Sets TBD
1. DATA ITEM
A003
2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
Production Qualification Test (PQT) Plan
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL
PRICE
DI-NDTI-80566 SOW Para 3.6.2 SFAE-CSS-E2-S INSERT
7. DD 250
REQ
9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION IN
LT One/P SEE ITEM 16 b. COPIES SECT. B
8. APP CODE E 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
Draft
A SEE ITEM 16 SEE ITEM 16
Reg Repro
16. REMARKS:
An electronic copy of the Plan to be submitted 120 DAC.
The Test Plan shall address the Production Qualification testing to be conducted in accordance with the 3 kW TQG Set PD 6115-0076D. The Test
Plan shall also list scheduled maintenance actions to be performed during the reliability test.
Government will review and provide comments within 15 days. Final submittal due 15 days after receipt of Government comments.
Distribution Statement E: Distribution authorized to DOD components only;
Documents may contain proprietary or procurement sensitive information.
Other requests for this information shall be referred to SFAE-CSS-E2-S.
Submit DD-250 with final plans.
SFAE-CSS-E2-S
AMSEL-LCP-S
15. TOTAL 2 2 0
G. PREPARED BY
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOSE. Digitally signed by
SANTOS.JOSE.D.1239719550
D.1239719550 Date: 2021.05.18 16:41:20 -04'00'
H. DATE
18 May 2021
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by DONG-
OMALLEY.CHENXI.12 OMALLEY.CHENXI.1267565992
Date: 2021.05.19 10:14:25
67565992 -04'00'
(1 Data Item)
Original Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0011 TDP TM OTHER X NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
3kW TQG Sets TBD
1. DATA ITEM
A004
2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
Production Qualification Test (PQT) Report
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL
PRICE
DI-NDTI-80809B SOW Para 3.6.4 SFAE-CSS-E2-S INSERT
7. DD 250
REQ
9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
DD One/P SEE ITEM 16 b. COPIES SECT. B
8. APP CODE E 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
Draft
A SEE ITEM 16 SEE ITEM 16
Reg Repro
16. REMARKS:
Test Report shall be provided 390 DAC in accordance with paragraph 4.5
“Production Qualification Inspection” of the 3 kW TQG Set PD 6115-0076D.
Government requires 30 days for review/comment. Contractor shall have 15 days to incorporate Government comments.
Distribution Statement E: Distribution authorized to DOD components only;
Documents may contain proprietary or procurement sensitive information.
Other requests for this information shall be referred to SFAE-CSS-E2-S.
Submit DD-250 with final reports.
SFAE-CSS-E2-S
AMSEL-LCP-S
15. TOTAL 2 2 0
G. PREPARED BY
Jose Santos
Ld Engineer, 3kW TQG Tm, PD SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
H. DATE
18 May 2021
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
J. DATE
18 May 2021
DONG- Digitally signed by DONG-
SANTOS.JOSE. Digitally signed by
SANTOS.JOSE.D.1239719550
OMALLEY.CHENXI. OMALLEY.CHENXI.1267565992
D.1239719550 Date: 2021.05.18 16:41:37 -04'00'
1267565992 Date: 2021.05.19 10:15:44 -04'00'
(1 Data Item)
Original Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in
Block E.
A. CONTRACT LINE
ITEM NO.
B. EXHIBIT C. CATEGORY:
TDP TM OTHER X NDTI
D. SYSTEM/ITEM F. CONTRACTOR
3kW TQG Sets
E. CONTRACT/PR NO.
TBD
1. DATA ITEM
A005
2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
Test Incident Reports (TIR)
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL
PRICE
DI-MISC-80711A SOW Para 3.6.5 SFAE-CSS-E2-S INSERT
7. DD 250
REQ
9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
LT One/P SEE ITEM 16
a. ADDRESSEE
b. COPIES SECT. B
8. APP CODE E 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
N/A SEE ITEM 16 SEE ITEM 16
Rag Repro
16. REMARKS:
Delete block 10 of DI-MISC-80711A.
Test Incident Report (TIR) due within 5 working days after the occurrence of an incident.
Revisions to any TIR are required whenever any new information and /or corrected information have been added. Revised TIRs due within 5 working days after addition of information.
Distribution Statement E: Distribution authorized to DOD components only;
Documents may contain proprietary or procurement sensitive information. Other requests for this information shall be referred to SFAE-CSS-E2-S.
SFAE-CSS-E2-S 0 1 0
15. TOTAL 0 1 0
G. PREPARED BY
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOSE.D Digitally signed by
SANTOS.JOSE.D.1239719550
.1239719550 Date: 2021.05.18 16:44:04 -04'00'
H. DATE
18 May 2021
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by DONG-
OMALLEY.CHENXI.1267565 OMALLEY.CHENXI.1267565992
992 Date: 2021.05.19 10:17:12 -04'00'
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Original Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in
Block E.
A. CONTRACT LINE ITEM
NO. 0011
B. EXHIBIT C. CATEGORY:
TDP TM X OTHER MISC
D. SYSTEM/ITEM F. CONTRACTOR
3 kW TQG Sets
E. CONTRACT/PR NO.
TBD
1. DATA ITEM NO 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A006 Failed Item Analysis Reports (FIAR)
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATE
D TOTAL
PRICE
DI-MISC-80711A SOW Para 3.6.6 & 3.8.2.1 SFAE-CSS-E2-S INSERT
7. DD 250 REQ 9
S
.DIST
TATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
LT ASREQ SEE ITEM 16 b. COPIES SECT. B
8. APP CODE E 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
Draft
N/A SEE ITEM 16 SEE ITEM 16
Rag Repro
16. REMARKS:
Delete block 10 of DI-MISC-80711A.
Failed Item Analysis Reports due within 15 working days after a failure occurrence.
Allow 30 days for Government review. Final report shall be updated and resubmitted 15 days after receipt of Government comments. Final report due no later than 60 days after failure occurrence.
If a particular failure analysis cannot be completed within the time frame specified, a preliminary report shall be issued within fifteen working (15) days, and a final report shall be submitted no later than sixty (60) days after a failure occurrence.
Distribution Statement E: Distribution authorized to DOD components only;
Documents may contain proprietary or procurement sensitive information. Other requests for this information shall be referred to SFAE-CSS-E2-S.
SFAE-CSS-E2-S 0 1 0
15. TOTAL 0 1 0
G. PREPARED BY
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOSE. Digitally signed by
SANTOS.JOSE.D.1239719550
D.1239719550 Date: 2021.05.18 16:44:23 -04'00'
H. DATE
18 May 2021
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by DONG-
OMALLEY.CHENXI.126
OMALLEY.CHENXI.1267565992
Date: 2021.05.19 10:21:25
7565992 -04'00'
(1 Data Item)
Original Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in
Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0011 TDP TM X OTHER MISC
D. SYSTEM/ITEM F. CONTRACTOR
3kW TQG Sets
E. CONTRACT/PR NO.
TBD
1. DATA ITEM
NO.
2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A007 Physical Configuration Audit (PCA) Report
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMAT
ED TOTAL
PRICE
DI-CMAN-81022 SOW Para 3.6.7 SFAE-CSS-E2-S INSERT
7. DD 250
REQ
9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
DD SEE ITEM 16 SEE ITEM 16
a. ADDRESSEE
b. COPIES SECT. B
8. APP CODE E 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
A SEE ITEM 16 SEE ITEM 16
Rag Repro
16. REMARKS:
Blocks 12 and 13: The Contractor shall submit Draft Physical
Configuration Audit (PCA) Report no later than 30 days after the completion of the PCA. Government will review and provide comments within 30 days after receiving the Draft. The Contractor shall incorporate comments and submit the Final PCA Report no later than 30 days after receiving the comments.
Contractor shall submit the Final with DD 250.
SFAE-CSS-E2-S 0 1 0
15. TOTAL 0 1 0
G. PREPARED BY
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOSE. Digitally signed by
SANTOS.JOSE.D.1239719550
D.1239719550 Date: 2021.05.18 16:44:46 -04'00'
H. DATE
18 May 2021
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by DONG-
OMALLEY.CHENXI.12
OMALLEY.CHENXI.1267565992
Date: 2021.05.19 10:23:18
67565992 -04'00'
(1 Data Item)
Original Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC
20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0011 TDP TM X OTHER MISC
D. SYSTEM/ITEM F. CONTRACTOR
3 kW TQG Sets
E. CONTRACT/PR
NO. TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A008 Quality Assurance Plan
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATE
D TOTAL
PRICE
DI-MISC-80711A SOW Para 3.8.1 SFAE-CSS-E2-S INSERT
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
NA ASREQ See item 16
a. ADDRESSEE
b. COPIES SECT. B
8. APP CODE E 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
N/A 1st Use See item 16 Rag Repro
16. REMARKS:
Delete block 10 of DI-MISC-80711A. Use contractor format. Days required are in working days
Block 12: Submit draft 140 days after contract award. The government requires 30 days for review/comment.
Block 13: Submit final 30 days after government approval.
DISTRIBUTION STATEMENT E: Distribution authorized to DoD components only. Documents may contain proprietary or procurement sensitive information. Other requests for this information shall be referred to
SFAE-CSS-E2-S.
SFAE-CSS-E2-S
AMSEL-LCP-S
ACO
PCO
15. TOTAL 0 1 0
G. PREPARED BY
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOSE. Digitally signed by
SANTOS.JOSE.D.1239719550
D.1239719550 Date: 2021.05.18 16:45:09 -04'00'
H. DATE
18 May 2021
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by DONG-
OMALLEY.CHENXI.1
OMALLEY.CHENXI.1267565992
Date: 2021.05.19 10:25:31
267565992 -04'00'
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURNS your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
3 kW TQG Sets
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A009 Production Forecast
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL
PRICE
DI-MGMT-80034 SOW Para 3.13.8.3 AMSEL-LCP-S Insert
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
DD ASREQ SEE ITEM 16
a. ADDRESSEE
b. COPIES SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
A ASREQ
Reg Repro
16. REMARKS:
Item 4: Delete Block 10 of Data Item Description and prepare IAW this CDRL and
Statement of Work, para 3.13.8.3. Contractor shall provide a schedule as the first deliverable for each delivery order under this contract in contractor format.
Quantities ordered shall match current contract and any Modification production schedules so that the delivery of the TM from the government will not delay the delivery of the Gensets from the Contractor to the final Government destination.
Item 7: Submit final DD250 at conclusion of contract.
Item 12: Delivery shall be within 5 days after contractor and Government approve of a delivery order.
Government requires 15 days for review and comment. Contractor to submit final
DCN within 5 days of receipt of Government comments.
AMSEL-LCP-S
SFAE-CSS-E2-S
15. TOTAL 2 2 0
G. PREPARED BY H. DATE
18 May 2021
I. APPROVED BY J. DATE
18 May 2021
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOS Digitally signed by
SANTOS.JOSE.D.1239
E.D.1239719 719550
Date: 2021.05.18
16:45:28 -04'00'
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by
OMALLEY.CHENXI.1
OMALLEY.CHENX 92
I.1267565992 Date: 2021.05.19
-04'00'
DONG-
2675659
10:30:53
DD Form 1423-1, 1 Jun 90
Original Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in
Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM X OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
3 kW TQG Sets
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A010 Component Warranty List (60 Hz)
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMAT
ED TOTAL
PRICE
DI-MISC-80711A SOW Para 3.11 SFAE-CSS-E2-S INSERT
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
DD ASREQ SEE ITEM 16
a. ADDRESSEE
b. COPIES SECT. B
8. APP CODE E 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
A SEE ITEM 16 SEE ITEM 16
Reg Repro
16. REMARKS:
Delete block 10 from DI-MISC-80711A.
Listing shall be submitted prior to First End Item Delivery.
Supplements to the list will be submitted as any changes occur to the initial submission.
Submit DD-250 with final report.
SFAE-CSS-E2-S 0 1 0
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOSE. Digitally signed by
SANTOS.JOSE.D.1239719550
D.1239719550 Date: 2021.05.18 16:45:49 -04'00'
18 May 2021 Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703)664-5338
DONG- Digitally signed by
OMALLEY.CHENXI.
OMALLEY.CHENXI.12
Date: 2021.05.19 10:3
1267565992 -04'00'
DONG-
67565992
3:17
Based upon DD Form 1423-1, 1 Jun 90
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURNS your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0011 TDP TM OTHER X ALSS
D. SYSTEM/ITEM F. CONTRACTOR
3 kW TQG Sets
E. CONTRACT/PR NO.
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A011 Design Change Notice
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL
PRICE
DI-ALSS-81529 SOW Para 3.13.1, 3.13.1.1 &
3.13.1.7
AMSEL-LCP-S Insert
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
DD ASREQ SEE ITEM 16
a. ADDRESSEE
b. COPIES SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
A ASREQ
Reg Repro
16. REMARKS:
Item 7: Submit final DD250 at conclusion of contract.
Item 12: Delivery shall be within 10 days after contractor is notified of
Government approval of changes to design or vendor’s part number.
Government requires 15 days for review and comment. Contractor to submit final DCN within 15 days of receipt of Government comments.
See Appendix C to SOW entitled "Provisioning Data Element
Definitions" for preparation of Provisioning Technical
Documentation.
AMSEL-LCP-S
SFAE-CSS-E2-S
15. TOTAL 2 2 0
G. PREPARED BY H. DATE
18 May 2021
I. APPROVED BY J. DATE
18 May 2021
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
Digitally signed by
SANTOS.JOSE. SANTOS.JOSE.D.1239719
D.1239719550 Date: 2021.05.18 16:46:11 -04'00'
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by
OMALLEY.CHENXI.12
OMALLEY.CHENXI 2
.1267565992 Date: 2021.05.19 10:
-04'00'
DONG-
6756599
36:28 ct
17. PRICE
GROUP
18.
ESTIMATED
TOTAL
PRICE
Insert
IN
SECT. B
CONTRACT DATA REQUIREMENTS LIST
W(19D0a9taMIteYm)21R0010- 3kw Tactical Quiet Generator Sets Production and Form Approved
OSMyBsNteom. 07S04u-0p1p88ort Contra Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO
TBD
F. CONTRACTOR
3kW TQG Sets
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A012 TM 9-6115-639-13&P Changes to Repair Parts and Special Tools List Changes (RPSTL)
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80711A SOW Para 3.13.3.1.1 &
3.13.3.1.2
AMSEL-LCP-S
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
DD ASREQ SEE ITEM 16
a. ADDRESSEE
b. COPIES
8. APP CODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft
Final
A ASREQ SEE ITEM 16
Reg Repro
16. REMARKS:
Item 4:
Delete Block 10 of Data Item Description and prepare in accordance with this CDRL and the State
Work paragraphs referenced in block 5 above.
Item 12:
Acceptance determination 30 days after receipt.
Item 12 & Item 13:
Government requires 30 days to provide to contractor review comments
(for all reviews). Contractor shall have 15 days to incorporate all comments resulting from all Government reviews.
Item 13:
Final digital files shall be submitted via DD Form 250
15 days after receipt of Government comments.
The contractor shall deliver digital files for all RPSTL changes developed under this contract.
For the final ETM, the Contractor shall provide a complete set of all related files associated with the XML (this includes, but not limited to, the .gent, .xml, .png files and all original illustrations) for the manuals in a native format that is compatible with the latest version of CECOM Web Compose Tool, unless otherwise discussed with and approved by the Government acceptance activity. The integrated copy must appear on screen and print exactly as printed final.
The final delivery shall also include a complete RPSTL in Adobe Acrobat searchable Portable
Format (PDF) acceptable by LOGSA.
All digital files will be provided both by direct submission, as arranged with the requiring office (preference: electronic mail), and also
CD, readable by computers running the most currently utilized Microsoft Operating System. Illustrations in PDF format for windows.
AMSEL-LCP-S
DIGITAL DRAFT
DIGITAL FINAL
PAPER PROOF
15. TOTAL 1 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jose Santos 18 May 2021 Chenxi Dong-O’Malley 18 May 2021
Lead Engineer, 3kW TQG Tm, PD Product Director, SEPS
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SFAE-CSS-E2-S
COMM: (703) 664-5338
Digitally signed by
SANTOS.JOSE. SANTOS.JOSE.D.123971
D.1239719550 Date: 2021.05.18
16:48:15 -04'00'
9550 DONG- Digitally signed by DONG-
OMALLEY.CHENXI.126
OMALLEY.CHENXI.1267565992
7565992 Date: 2021.05.19 10:41:27
-04'00'
SECT. B
18.
ESTIMATED
TOTAL PRICE
INSERT
IN
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT A C. CATEGORY:
TDP TM X OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
3kW TQG
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM 3. SUBTITLE
Changes for TM 9-6115-639-13&P
(Electronic TM)
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80711A SOW Para 3.13.5.1.2 AMSEL-LCP-S
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
DD ONE/R AS REQD b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
A AS REQD SEE ITEM 16
Reg Repro
REMARKS: Block 3: Changes to Operator and Field Maintenance AMSEL-LCP-S 1 1
Manual and Repair Parts and Special Tools List.
Item 4: Delete Block 10 of Data Item Description and prepare IAW this CDRL and Statement of Work, para 3.13.5.1.2 and attachments.
The Government requires 30 days for review of all changes.
For each publication change, the contractor shall deliver digital files for the ETM revision and/or change package developed under this contract. The contractor shall provide a complete set of all integrated text and graphics files (with graphics embedded) CECOM WEB
COMPOSE TOOL GENERATED PDF. unless otherwise approved by the Government Acceptance Office. The integrated copy must appear on screen and print exactly as printed final. Final delivery is also required as non-integrated native files containing editable text and resizable graphics. All digital files shall be provided both by electronic submission, e.g., e-mail, FTP, etc., as approved by the requiring office, and by CD, readable by computers running the most currently Government utilized Microsoft Operating System.
Contractor shall be required to deliver digital file and three paper copies to the Government Acceptance Office.
VALIDATEDDIGFILE
SFAE-CSS-E2-S
OTHERSTOBE
PROVIDEDBYGOVERNMENT.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to the
Department of Defense and U.S. DOD contractors only, for official use or for administrative or operational purposes. Other requests for this document must be referred to Commander, U.S. Army CECOM PED/PLM, Generators Branch
Aberdeen Proving Ground, MD. 21005
ATTN: AMSEL-LCP-S
DESTRUCTION NOTICE -- Destroy by any method that will prevent disclosure contents or reconstruction of the document.
TBD
15. TOTAL 0
G. PREPARED BY
Jose Santos
Lead Engineer, 3kW TQG Tm, PD SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
Digitally signed by
SANTOS.JOSE. SANTOS.JOSE.D.12397195
D.1239719550 Date: 2021.05.18 16:48:41
-04'00'
H. DATE
18 May 2021
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by DONG-
OMALLEY.CHENXI.126
OMALLEY.CHENXI.1267565992
Date: 2021.05.19 10:44:25
7565992 -04'00'
J. DATE
DD Form 1423-1, 1 June 90
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0011 TDP TM X OTHER
D. SYSTEM/ITEM F. CONTRACTOR
3kW TQG
E. CONTRACT/PR NO.
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
Changes for
17. PRICE
GROUP
A014 TM 9-6115-639-13&P Changes to
Maintenance Allocation Chart (MAC)
TM 9-6115-639-13&P (MAC)
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATE
D TOTAL
PRICE
DI-MISC-80711A SOW Para 3.13.8.7 AMSEL-LCP-S INSERT
7. DD 250
REQ
9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
DD ASREQ SEE ITEM 16
a. ADDRESSEE
b. COPIES SECT. B
8. APP CODE A 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
A ASREQ SEE ITEM 16
Reg Repro
Item 4: Delete Block 10 of Data Item Description and prepare AMSEL-LCP-S
MAC DIGITALFILE
100%IPRDIGFILE
PAPERDRAFT
100%IPRDIGFILE
PAPERDRAFT
100%IIPRDIGFILE
PAPERDRAFT
VALIDATEDDIGFILE
VALIDATEDPAPER
PRO0F
FINAL DIGFILE
FINALPAPER
FINAL DIGITALFILE
INPDFFORMAT
SFAE-CSS-E2-S
FINAL DIGITALFILE
PAPERFINAL
ADDRESSESSESFOR
DELIVERIESOF ALL
DRAFTSWILL BE
PROVIDEDBY
GOVERNMENT.
6*
IAW this CDRL and Statement of Work, para 3.13.8.7, and attachments.
Item 12: Draft Maintenance Allocation Chart (MAC) Digital
File shall be submitted electronically and via Letter of Transmittal
(LT) 30 days after draft change to TM based on ECP has been submitted.
Item 13: Subsequent MAC updates and Final MAC to be submitted with TM deliverables. The Government requires 30 days for review of all deliverables.
- Final digital files due 30 days after verification.
Government will have 30 days for review/comments/approval.
All final review/comments shall be incorporated into the final digital files by contractor within 20 days of receipt. The contractor shall deliver digital files for the ETM revision and/or change package developed under this contract. For final ETM, the contractor shall provide a complete set of all integrated text and graphics files (with graphics embedded) in CECOM WEB
COMPOSE TOOL GENERATED editable format that is compatible with the latest version of Microsoft Word for
Windows, unless otherwise approved by the Government
Acceptance Office. Final delivery shall include a complete
CECOM WEB COMPOSE TOOL GENERATED ETM with all changes inserted in Adobe Acrobat searchable Portable
Document Format (PDF) acceptable by LOGSA. All digital files shall be provided both by electronic submission, e.g., e-mail, FTP, etc., as approved by the requiring office, and by CD, readable by computers running the most currently Government utilized Microsoft Operating System.
15. TOTAL 22 7 0
G. PREPARED BY H. DATE I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by DONG-
OMALLEY.CHENXI.126756599
OMALLEY.CHENXI. 2
1267565992 Date: 2021.05.19 10:47:49
-04'00'
J. DATE
Jose Santos
Lead Engineer, 3kW TQG Tm, PD 18 May 2021 18 May 2021
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOSE. SANTOS.JOSE.D.12397195
D.1239719550 Date: 2021.05.18 16:49:13 ct
DD Form 1423-1, 1 Jun 90
17. PRICE
GROUP
18.
ESTIMATED
TOTAL
PRICE
Insert
IN
SECT. B
CONTRACT DATA REQUIREMENTS LIST
W(19D0a9taMIteYm)21R0010- 3kw Tactical Quiet Generator Sets Production and Form Approved
OSMyBsNteom. 07S04u-0p1p88ort Contra
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER X MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
3kW TQG Sets
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A015 3kW Family Tree (60 Hz)
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para 3.13.9 AMSEL-LCP-S
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
DD SEE ITEM 16 SEE ITEM 16
a. ADDRESSEE
b. COPIES
8. APP CODE N/A 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
A SEE ITEM 16
Reg Repro
16. REMARKS:
Item 10: One/P.
Item 12: Draft Family Tree shall be digitally submitted concurrently with all TM submissions. Government requires 30 days for review and comment.
Item 13: Final Family Tree shall be submitted concurrent with final TM submission.
DD250 shall be submitted with final Family Tree.
All digital files will be provided both by direct submission as arranged with the requiring office (preference: FTP, electronic mail, etc.) and also on CD, readable by computers running the most currently utilized Microsoft
Operating System.
AMSEL-LCP-S
SFAE-CSS-E2-S
15. TOTAL 2 2 0
G. PREPARED BY
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOSE. Digitally signed by
SANTOS.JOSE.D.1239719550
D.1239719550 Date: 2021.05.18 16:50:43 -04'00'
H. DATE
18 May 2021
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by DONG-
OMALLEY.CHENXI.
OMALLEY.CHENXI.1267565992
Date: 2021.05.19 10:52:31
1267565992 -04'00'
J. DATE
TBD
(1 Data Item)
Original Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0011 TDP TM OTHER X NDTI
D. SYSTEM/ITEM F. CONTRACTOR
3kW TQG Sets
E. CONTRACT/PR NO.
TBD
1. DATA ITEM
A016
2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
Conference Minutes
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL
PRICE
DI-ADMN-81250B SOW Para 3.3.1.3 SFAE-CSS-E2-S INSERT
7. DD 250
REQ
9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION IN
LT One/P SEE ITEM 16
a. ADDRESSEE
b. COPIES SECT. B
8. APP CODE E 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
A SEE ITEM 16 SEE ITEM 16
Reg Repro
16. REMARKS:
Meeting Minutes due within 5 working days after the occurrence of a meeting.
Government will review and provide comments within 15 days. Final submittal due 15 days after receipt of Government comments, if not
Government approved.
Distribution Statement E: Distribution authorized to DOD components only;
Documents may contain proprietary or procurement sensitive information.
Other requests for this information shall be referred to SFAE-CSS-E2-S.
Submit DD-250 with final plans.
SFAE-CSS-E2-S 0 1 0
15. TOTAL 0 1 0
G. PREPARED BY
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOSE. Digitally signed by
SANTOS.JOSE.D.1239719550
D.1239719550 Date: 2021.05.18 16:51:08 -04'00'
H. DATE
18 May 2021
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703) 664-5338
DONG- Digitally signed by DONG-
OMALLEY.CHENXI.1267
OMALLEY.CHENXI.1267565992
Date: 2021.05.19 10:57:01 565992 -04'00'
(1 Data Item)
Original Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE
ITEM NO.
B. EXHIBIT C. CATEGORY:
TDP TM OTHER X NDTI
D. SYSTEM/ITEM F. CONTRACTOR
3kW TQG Sets
E. CONTRACT/PR NO.
TBD
1. DATA ITEM
A017
2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
Post Award Orientation Meeting Agenda
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL
PRICE
DI-ADMN-81250B SOW Para 3.3.1.1 SFAE-CSS-E2-S INSERT
7. DD 250
REQ
9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION IN
LT One/P SEE ITEM 16
a. ADDRESSEE
b. COPIES SECT. B
8. APP CODE E 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
A SEE ITEM 16 SEE ITEM 16
Reg Repro
16. REMARKS:
The contractor shall convene a Post Award Orientation Conference at the contractor’s facility no later than 30 days after contract award
No more than 15 Government personnel will attend. The conference shall be no more than two days in duration. An exact date shall be coordinated with the
Contracting Officer’s Representative (COR) after contract award.
Distribution Statement E: Distribution authorized to DOD components only;
Documents may contain proprietary or procurement sensitive information.
Other requests for this information shall be referred to SFAE-CSS-E2-S.
Submit DD-250 with final plans.
SFAE-CSS-E2-S 0 1 0
15. TOTAL 0 1 0
G. PREPARED BY
Jose Santos
Lead Engineer, 3kW TQG Tm, PD
SEPS
SFAE-CSS-E2-S
COMM: (703) 655-3581
SANTOS.JOSE. Digitally signed by
SANTOS.JOSE.D.1239719550
D.1239719550 Date: 2021.05.18 16:51:35 -04'00'
H. DATE
18 May 2021
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director, SEPS
SFAE-CSS-E2-S
COMM: (703 )664-5338
DONG- Digitally signed by DONG-
OMALLEY.CHENXI.126
OMALLEY.CHENXI.1267565992
Date: 2021.05.19 11:01:06
7565992 -04'00'
(1 Data Item)
Original Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in
Block E.
A. CONTRACT LINE
ITEM NO.
B. EXHIBIT C. CATEGORY:
TDP TM OTHER X NDTI
D. SYSTEM/ITEM F. CONTRACTOR
3kW TQG Sets
E. CONTRACT/PR NO.
TBD
1. DATA ITEM
A018
2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
Status Report
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL
PRICE
DI-MGMT-80368A SOW Para 3.3 SFAE-CSS-E2-S INSERT
7. DD 250
REQ
9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION IN
LT Monthly 45-Days ACA
a. ADDRESSEE
b. COPIES SECT. B
8. APP
CXODE
E 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
Draft
Final
A SEE ITEM 16 SEE ITEM 16
Reg Repro
16. REMARKS:
a. The contractor shall provide the status reports each month, statrting 45-days after contract award with following reportd due by the 12th day of the month following the end of month covered by the report.
b. Contractor format is acceptable with the report addressing the elements described in the DID.
Distribution Statement E: Distribution authorized to DOD components only;
Documents may contain proprietary or procurement sensitive information.
Other requests for this information shall be referred to SFAE-CSS-E2-S.
Submit DD-250 with final plans.
SFAE-CSS-E2-S
AMSEL-LCP-S
ACO
PCO
15. TOTAL 0 1 0