Exhibit_1_detailed_Unit_chrt.pdf

PDF 173 KB Posted

Attached to
Johnson Mesa Reforestation Federal contract opportunity
Solicitation number
127EAV24R0004
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

This document appears to be the Detailed Information Chart (Exhibit 1) associated with the Johnson Mesa Reforestation solicitation. It provides detailed specifications for 12 separate planting units across the Johnson Mesa area, including acreage, location, site preparation, species to be planted, quantity estimates, access, and site preparation and planting requirements.

The key details include the requirement to plant Douglas Fir, Ponderosa Pine, and Western Pine trees in container-grown, 1-year old stock across approximately 1,680 acres. The planting is to be completed following a 2022 wildfire, with specific requirements for tree planting hole size, scalping, and shade/protection placement. Quantity estimates range from 14,300 to 61,300 trees per unit, with a total estimated quantity of 212,000 trees. All units require access roads but no walk-in access. The solicitation is being issued by the USDA Forest Service Region 3 - Southwestern Region.

View the file

Other files for this federal contract opportunity

Other files attached to Johnson Mesa Reforestation, newest first.
File Type Posted
QUESTIONS AND ANSWERS.docx DOCX document
Exhibit_3_ispct_sheet.pdf PDF
John_Mesa_2024_units_map.pdf PDF
Exhibit 2 Project Maps Johnson Mesa Reforestation.pdf PDF
127EAV24R0004.pdf PDF
WD 1969-0115 Rev. 80.pdf PDF
John_Mesa_2024_vinicity_map.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J – Exhibit 1

DETAILED INFORMATION CHART

Item 1.1 1.1 1.1 1.1 Unit Name Johnson Mesa A Johnson Mesa B Johnson Mesa C Johnson Mesa D

Acres* 166 167 168 87

Location-Legal Description T17N R14E Sec. 15 T17N R14E Sec. 14,15,22,23 T17N R14E Sec. 23 T17N R14E

Sec.22,23,26,27

Stand Description

Boundary Marking pink flagging/ electronic pink flagging/ electronic pink flagging/ electronic pink flagging/ electronic

Method, Year of Site Prep. wildfire 2022 wildfire 2022 wildfire 2022 wildfire 2022 Elevation (average) 8400 8400 8100 8200

Aspect (average) N to Se E to SW E to W SW Slope (average) 45 40 40 35

Trees – Planting Stock Species to plant DF, PP, WP PP, DF PP PP

Species mix requirements** 50/30/20 60/40 n/a n/a

Stock Type container-grown container-grown container-grown container-grown Age 1 1 1 1

Estimated Quantity (1000s) +/-20% 22.6 27.2 19.9 14.3

Access Roads yes yes yes yes

Walk-in no no no no Tree Preparation Method n/a

Tree Planting Clearing yes yes yes yes

Minimum diameter (inches) 6 6 6 6 Maximum depth (inches) 4 4 4 4

Scalping yes yes yes yes Minimum diameter (inches) 18 18 18 18

Maximum depth (inches) 1 ½ 1 ½ 1 ½ 1 ½ Shade Requirement

Aspects NW to SE clockwise #4 #4 #4 #4 Aspects SE to NW clockwise

& level (<5%) #4 #4 #4 #4

Avg. Spacing (feet)*** 15 14 14 14 ProtectionTubes /

Shelters yes yes yes yes Acceptable Est. Trees

Species Residual tree C.4.3.7 and aspen

Residual tree C.4.3.7 and aspen

Residual tree C.4.3.7 and aspen

Residual tree C.4.3.7 and aspen

Size (inches) > 6” tall > 6” tall > 6” tall > 6” tall Distance (if not stated in

C.4.3.6).

50% of ave.

spacing 50% of ave.

spacing 50% of ave.

spacing 50% of ave.

spacing

Item 1.1 1.1 1.1 1.1 Unit Name Johnson Mesa E Johnson Mesa F Johnson Mesa H Johnson Mesa J

Acres* 122 131 335 153

Location-Legal Description T17N R14E Sec.

23,26

T17N R14E Sec.

22,27

T17N R14E Sec.

22,23

T17N R14E Sec.

26,27

Stand Description

Boundary Marking pink flagging/ electronic pink flagging/ electronic pink flagging/ electronic pink flagging/ electronic

Method, Year of Site Prep. wildfire 2022 wildfire 2022 wildfire 2022 wildfire 2022 Elevation (average) 8100 c 8300 8000

Aspect (average) W and N to SE NE to E NE to SW N to SE Slope (average) 30 35 35 40

Trees – Planting Stock Species to plant PP DF, PP DF, PP PP

Species mix requirements** n/a 50/50 15/85 n/a

Stock Type container-grown container-grown container-grown container-grown Age 1 1 1 1

Estimated Quantity (1000s) +/-20% 19.5 17.5 61.3 25.0

Access Roads yes yes yes yes

Walk-in no no no no Tree Preparation Method n/a no no no

Tree Planting Clearing yes yes yes yes

Minimum diameter (inches) 6 6 6 6 Maximum depth (inches) 4 4 4 4

Scalping yes yes yes yes Minimum diameter (inches) 18 18 18 18

Maximum depth (inches) 1 ½ 1 ½ 1 ½ 1 ½ Shade Requirement

Aspects NW to SE clockwise #4 #4 #4 #4 Aspects SE to NW clockwise

& level (<5%) #4 #4 #4 #4

Avg. Spacing (feet)*** 14 15 14 14 ProtectionTubes /

Shelters yes yes yes yes Acceptable Est. Trees

Species Residual tree C.4.3.7 and aspen

Residual tree C.4.3.7 and aspen

Residual tree C.4.3.7 and aspen

Residual tree C.4.3.7 and aspen

Size (inches) > 6” tall > 6” tall > 6” tall > 6” tall Distance (if not stated in

C.4.3.6).

50% of ave.

spacing 50% of ave.

spacing 50% of ave.

spacing

* Acres are estimates. The actual area may vary by +/- 15% depending on site conditions and available planting stock.

** The Government reserves the right to alter species mix *** Average spacing may be adjusted slightly due to site conditions or available stock

Item 1.1 1.1 Unit Name Johnson Mesa K Johnson Mesa L

Acres* 146 103

Location-Legal Description T17N R14E Sec.27,34

T17N R14E Sec.26,27,34,35

Stand Description

Boundary Marking pink flagging/ electronic pink flagging/ electronic

Method, Year of Site Prep. wildfire 2022 wildfire 2022 Elevation (average) 8100 7900

Aspect (average) N to SE N to SE Slope (average) 45 35

Trees – Planting Stock Species to plant PP PP

Species mix requirements** n/a n/a

Stock Type container-grown container-grown Age 1 1

Estimated Quantity (1000s) +/-20% 23.6 16.2

Access Roads yes yes

Walk-in no no Tree Preparation Method n/a n/a

Tree Planting Clearing yes yes

Minimum diameter (inches) 6 6 Maximum depth (inches) 4 4

Scalping yes yes Minimum diameter (inches) 18 18

Maximum depth (inches) 1 ½ 1 ½ Shade Requirement

Aspects NW to SE clockwise #4 #4 Aspects SE to NW clockwise

& level (<5%) #4 #4

Avg. Spacing (feet)*** 15 14 ProtectionTubes /

Shelters yes yes Acceptable Est. Trees

Species Residual tree C.4.3.7 and aspen

Residual tree C.4.3.7 and aspen

Size (inches) > 6” tall > 6” tall Distance (if not stated in

C.4.3.6).

50% of ave.

spacing

Shade Requirements (C.4.3.3.)

1. Stationary material only. Tree shall be planted next to stationary material when it is available. When stationary material is not available, no tree shall be planted.

2. Stationary material first, then plant in open. A tree shall be planted next to stationary material when it is available. When stationary material is not available, tree may be planted in the open.

3. Stationary material first, then transportable shade. A tree shall be planted next to stationary material when it is available. When stationary material does not exist in the spacing allowance, shade shall be transported to the seedlings. When neither stationary nor transportable material exists, no tree shall be planted.

4. Stationary material first, transportable shade second, plant in open last. A tree shall be planted next to stationary material when it is available. If stationary material does not exist in the spacing allowance, shade shall be transported to the tree. When neither stationary nor transportable material exists, the tree may be planted in the open.

5. Stationary material or transportable shade (planter discretion). A tree may be planted next to either stationary material or transportable shade at the planter’s discretion. When neither stationary nor transportable material is available, no tree is planted.

6. Stationary material or transportable shade (planter discretion), then plant in the open. A tree may be planted next to either stationary material or transportable shade at the planter’s discretion. When neither stationary nor transportable material is available, the tree may be planted in the open.

7. No shade. A tree may be planted based on spacing and there is no requirement to select the planting spot based on shade or protection.

File details come from the government source that posted it. Updated .