ESBD_441739_1753987918804_02. Specification TO-4048.pdf

PDF 265 KB Posted

Attached to
Pole Mount Cabinets State and local contract opportunity
Solicitation number
601310000096800
Issued by
Texas

About this file

This document is a detailed Texas Department of Transportation (TxDOT) Departmental Specification (TO-4048) for a Full-Actuated Solid State Controller Unit (TS-2) with Diamond, Time-Based Coordination (TBC), Preempt, and Closed Loop Operation, along with a Base-Mounted TS-2 Cabinet Assembly. The specification outlines comprehensive technical requirements for a traffic signal controller and cabinet system, including detailed specifications for controller functionality, diamond intersection operations, preemption capabilities, closed loop system integration, and communication protocols. The document provides extensive technical details covering hardware design, timing requirements, coordination control, NTCIP compliance, detector operations, power supply specifications, and testing/acceptance criteria.

The specification requires a highly sophisticated traffic signal control system with specific technical capabilities, including 16-phase full-actuated solid-state controllers, internal time-based coordination, railroad/emergency vehicle preemption, and compatibility with NEMA TS-2 standards. The system must support multiple operational modes including 3-phase and 4-phase diamond intersections, closed loop operations, and advanced communication protocols. Warranty coverage is set at a minimum of 5 years for the entire cabinet assembly, including all contents, with software/firmware updates included. The document includes rigorous testing requirements, with TxDOT conducting burn-in tests, potential 120-hour shop environment testing, and possible additional NEMA standard testing. Vendors must provide comprehensive documentation, including schematics, parts lists, and service manuals, and must be prepared for potential retesting costs estimated at $1,500 per test.

View the file

Other files for this state and local contract opportunity

Other files attached to Pole Mount Cabinets, newest first.
File Type Posted
ESBD_441739_1753988004624_BidTable 601310000096800.xlsx XLSX spreadsheet
ESBD_441739_1753987983565_06. Exceptions Schedule.xlsx XLSX spreadsheet
ESBD_441739_1753987899070_01. RFO 601310000096800.pdf PDF
Bid_notify_601310000096800.txt TXT text file
ESBD_441739_1753987934398_03. Execution of Offer.pdf PDF
ESBD_441739_1753987950848_04. Texas Family Code.pdf PDF
ESBD_441739_1753987968139_05. Assumptions Schedule.xlsx XLSX spreadsheet
Bid_notify_601310000096800.txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIGNAL OPERATIONS TO-4048, REV. 07/12

1 - 52

Traffic Operations Traffic Engineering Division Section

TEXAS DEPARTMENT OF TRANSPORTATION

DEPARTMENTAL SPECIFICATION

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS-2)

WITH DIAMOND, TBC, PREEMPT, AND CLOSED LOOP OPERATION; AND

BASE-MOUNTED TS-2 CABINET ASSEMBLY

1.0 SCOPE

1.1 This specification sets forth the minimum requirements for a shelf-mounted 16 phase full-actuated solid state controller unit with internal Time-Based Coordination (TBC), railroad/fire (emergency vehicle) preemption, diamond intersection operation, and closed loop secondary operation in a traffic signal controller assembly and cabinet assembly.

1.2 Appendix A identifies the equipment type and options available in this specification.

Equipment supplied shall be according to the selections made in Appendix A.

2.0 CONTROLLER UNIT

2.1 The controller unit shall meet the requirements of NEMA Standards Publication TS-2 2003

V2.06 or latest revision. The controller/cabinet unit shall meet all current AASHTO and ANSI standards applicable to the industry. The controller/cabinet unit shall comply with all current and applicable National Transportation Communications for ITS Protocol (NTCIP) standards.

The controller/cabinet unit shall comply with all the criteria of this specification. Where a difference occurs between this specification (TO-4048) and another specification or standard the requirements of this specification (TO-4048) shall govern. The purchase document shall identify either a TS-2 Type 1 interface or TS-2 Type 2 interface. The cabinets for TS-2 Type 1 controllers are specified in this document. TS-2 Type 2 controller cabinets shall use a cabinet specification identified in the solicitation document.

2.2 Each controller unit shall have a unique serial number that is permanently and neatly displayed on the face of the unit. If this serial number is not on the face of the unit, then an additional temporary label that is neatly printed or typed shall be affixed to the controller unit face.

2.3 Hardware Design Requirements - NEMA Controller

2.3.1 The controller unit shall be completely solid state and digitally timed. All timing shall be referenced to the 60 Hz power line.

2.3.2 The dimensions of the controller unit shall not exceed 305 mm high, 440 mm wide, and

305 mm deep.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

BASE-MOUNTED TS 2 CABINET ASSEMBLY

2 - 52

2.3.3 Both TS-2 Type 1 and TS-2 Type 2 controllers shall be supplied with Port 1 SDLC and Port 2 RS 232 connectors as defined by the TS-2 specification. Port 3 shall be capable of FSK communications with a 9 pin FSK and 25 pin RS 232 connector provided on the front face of the unit. The controller shall have an Ethernet port on the front face of the unit

2.3.4 The controller unit shall be built using one or more circuit boards. All printed circuit boards shall be designed to plug into or out of a mother board or harness within the unit. Power supply, transformers, capacitors, and heat dissipating components are exempted from the above requirements.

2.3.5 The design shall allow for removal or replacement of a circuit board without unplugging or removing other circuit boards.

2.3.6 The unit shall be designed so that one side of each board can be completely accessible for troubleshooting and testing the unit while it is still operating. This may be accomplished with extender boards or cables. This need apply to only one circuit board at a time.

2.3.7 No more than two circuit boards shall be attached to each other to constitute a circuit sub-assembly. Attaching hardware shall use captive nuts or other acceptable method to secure the boards together. The boards shall be designed so TxDOT can test and operate the controller unit with the boards separated.

2.3.8 No circuit cuts shall be allowed on circuit boards in any of the equipment supplied. Any wire jumpers included on circuit boards shall be placed in plated through holes specifically designed to contain them. Jumpers that are tack soldered to circuit traces or are added to correct board layout errors are not acceptable.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

3 - 52

2.3.9 Each of the following shall be simultaneously displayed during standard NEMA dual ring operation on the face of the unit:

1. Phase(s) in service (one per ring)

2. Phase(s) next to be serviced (one per ring)

3. Presence of vehicle call (one per phase)

4. Presence of pedestrian call (one per phase)

5. Reason for green termination (one per ring)

(1) Gap-out

(2) Maximum time-out

(3) Force-off

6. Pedestrian service (one per ring)

7. Max II in effect (one per ring)

2.3.10 User programmed entries shall be stored and maintained in non-volatile memory. Battery power will not be allowed for this application.

2.3.11 Controller unit shall be designed to operate properly with the logic ground isolated from the

AC neutral (common).

2.3.12 High quality keyboard with a rated lifetime of 1 X 106 operations/key shall be provided on the front panel of the controller unit. The keyboard shall be used for programming all user-entered timings and settings. An operator entry shall be provided that will enable/disable the audible sound output (default shall be enabled).

2.3.13 Direct-reading alphanumeric liquid crystal display (LCD) with back lighting shall be provided on the front panel of the controller unit. The display shall be clearly readable in ambient light including the cabinet light, in full sunlight, or in the absence of light from a distance of 1.0 meters at a 45 degree angle. The display shall have an automatic time-out feature unless the display has an expected continuous life of 10 years or more, and shall have an operating temperature range of -34°C to +74°C. The display shall blank out approximately 10 minutes after the last keystroke is made.

2.3.14 Display shall be a minimum 40 characters X 4 line display. The respondent may be required to supply literature which demonstrates all display requirements of this specification are met prior to the awarding of the purchase order. If a LCD contrast adjustment is required for visibility at temperature extremes, then the control shall be on the face of the controller unit, adjustable without the use of tools.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

4 - 52

2.4 Time Clock

2.4.1 The clock shall use the 60 Hz power line frequency as time base when power is present. The clock operating voltage range shall be 89 to 135V AC over the temperature range of -34°C to +74°C. A 10 year lithium battery shall maintain the time-of-day clock and digital data during a power outage lasting up to 30 days. Lead-acid, nickel-cadmium, or alkaline batteries are not acceptable.

2.4.2 The time base clock shall be maintained to within ± 0.005% at 20°C and to within a ± 0.02% over the specified operating temperature range as compared to coordinated universal time (WWV) standard for a period of 30 days during periods when AC power is not applied.

2.5 Clock/Calendar Programming Requirements

2.5.1 The clock shall be easily set to the year, month, day of month, day of week, hour, minute, and second.

2.5.2 Automatic daylight savings time shall be available by keyboard entry.

2.5.3 The dates for fixed and floating holidays and special events shall be keyboard programmable by the user.

2.5.4 Calendar adjustments for leap years shall be automatic.

2.5.5 The clock shall store sequences of operations in the form of 255 entries and 15 day plans.

Global Time Base Schedule Actuated Traffic Signal Schedule

Entry Months Dates of Month

Days of Week

Day Plan Time Base Actions

1 1-12 1-31 1-7 1-15 entry 1 actions

255 " " " " entry 255 actions

2.5.6 The structure and interrelationships of each type of program shall be in accordance with the following paragraphs:

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

5 - 52

2.5.6.1 A day plan shall consist of the following:

Hour : Minute Action 1 (time to implement: action to implement)

Hour : Minute Action 10 (time to implement: action to implement)

Where each action is unique, there shall be a minimum of ten actions per day plan.

There shall be a minimum of 15 day plans.

2.5.6.2 Each action in a day plan shall consist of a group of the following objects:

• pattern (consisting of):

cycle length offset split MUTCD flash (on/off) free operation

• sequence

• special functions 1-8 (on/off)

• auxiliary functions 1-3 (on/off)

• mode of operation (a means of changing operating modes by T.O.D.)

• max II

• gap/ext II

• phase omits

Any or all of these may be selected within a single action.

Transfer into and out of flash shall be in accordance with the Texas MUTCD. It shall be possible to program each phase and overlap to flash either yellow or red via the front panel of the controller unit. This shall be accomplished by flashing the load switch driver outputs simultaneously.

2.5.6.3 An entry shall consist of time period implemented: day plan, month(s), date(s) of month, and day(s) of week.

2.5.6.4 A minimum of 255 entries shall be programmable.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

6 - 52

2.5.6.5 There shall be a copy feature that allows the transfer of entries between day plans.

2.5.6.6 Other programming schemes meeting the functional intent are acceptable but require approval in writing by the Traffic Operations Division Signal Operations Engineer.

2.6 Program Requirements

2.6.1 Programming

2.6.1.1 Programming of the controller unit shall be by the use of a keyboard and display on the front of the controller unit. Programming shall require only simple keystrokes aided by full menu displays. It shall be possible for the controller to interface with a laptop and using compatible software, upload, download, and save data to a database

2.6.1.2 Ease of programming through a well-organized menu structure and ease in interpreting the display shall be required for acceptance. The menu structure shall contain a main menu that contains options for all sections of the controller on one screen. Each option shall be selectable by a numeric entry. Each subsequent menu shall be a detailed breakdown of one of the previous menu options. Each menu option shall be a descriptive name to prompt the user to the desired section for programming.

All entries shall be displayed and entered in plain English. Toggle type entries shall be set by entering YES/NO or ON/OFF responses. Non-alphanumeric symbols and abbreviations used to display information shall be clear and unambiguous in their meaning. Numeric entries shall be in the base 10 (decimal) number system. Entries in other number bases, such as hexadecimal or binary, are not acceptable.

2.6.1.3 A user selectable 4 digit (minimum) code shall be available to secure access to timing and configuration of the unit. Display features shall be available without the need to access the unit. The controller units shall be supplied with the code preset to be all zeros (0000). Internal DIP switches may be used to establish codes.

2.6.1.4 Instructions for use of the access code shall not be provided on the face of the unit.

2.6.1.5 A keyboard entered coded command (a series of commands or entries, not a single entry) shall be provided which will set all controller and TBC timings and entries to a default or inactive value. This coded command shall allow new values to be entered without first deleting prior entries.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

7 - 52

2.6.1.6 With the intersection display active, a keyboard command shall enable the keyboard for the user to place a call to each phase individually.

2.6.2 Phase Operation

2.6.2.1 In NEMA operating mode, the controller unit shall provide as a minimum, 16 possible phases and 8 possible overlaps. All overlaps shall be programmable through the keyboard and shall function as specified by TS-2.

2.6.2.2 Each of the NEMA timing intervals shall be programmable for a minimum of 8 phases at a time from the same display screen in a spreadsheet format. The display may be rolled or paged down to display additional intervals or information.

2.6.2.3 The controller unit shall have a copying mode whereby the user, after having programmed all intervals of one phase may copy this information into all or selected remaining phases. Other versions of the copying process that meet the functional intent are acceptable.

2.6.2.4 In addition to the modes defined by TS-2, the following modes shall be available on a per phase basis:

1. Soft recall

2. Phase omit

2.6.2.5 The following configurations, as a minimum, shall be programmed within the controller unit and be user selectable:

1. 8 phase NEMA

2. 8 phase sequential

3. NEMA phasing to the left of the barrier, sequential phasing to the right of the barrier

(quad sequential).

4. 4 phase diamond

5. 3 phase diamond

6. Separate intersection (see Paragraph 2.8.1.3)

2.6.2.6 The controller shall have a configuration which allows user programmable rings (compatibility lines, reference points to assure there shall be no concurrent selection and timing of conflicting phases). A minimum of 4 rings will be available in this configuration.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

8 - 52

2.6.2.7 The controller shall have programmable conflicting phase settings where simultaneous operation of compatible phases is not allowed.

2.6.2.8 A dynamic maximum operation which increments the current maximum in programmable steps

(dynamic max step) in seconds to a maximum limit (dynamic max limit) in seconds shall be provided. The operation shall function as defined by NEMA Standard Publication NTCIP 1202:1996 (TS 3.5) Object Definitions for Actuated Traffic Signal Controller Units, or latest revision.

2.6.2.9 The TBC shall select and coordinate reversible left turn sequence operations (dual leading, leading and lagging, or lagging and leading left turns). It shall be possible to transfer operation from one sequence to another at a preprogrammed time. Transfer shall take place at T0 during coordination (see Paragraph 2.6.4.2).

2.6.3 Pedestrian Timing

2.6.3.1 Actuated pedestrian movements shall operate as follows:

1. When NO pedestrian calls are present, the normal phase timings shall be effective for service of the intersection.

2. When a pedestrian call is present, the call will be serviced by extended phase timings that account for pedestrian crossing times and override the normal phase timings. If the intersection is coordinated, it may drop out of coordination when servicing the pedestrian call if the pedestrian times exceed the vehicle splits. The controller shall return to coordination in the manner described in this specification after the call is serviced.

2.6.3.2 The controller shall rest in main-street green and Don't Walk when no actuated pedestrian calls are present.

2.6.4 Coordination

2.6.4.1 A minimum of 16 timing plans, each with a unique cycle length and split combination, shall be required as per TS-2. Each of the 16 timing plans shall have 3 unique offsets available. Cycle length selections are to be each changeable from 30 to 255 seconds in one second increments.

Split and offset selections adjustable from 0 to 254 in 1 second increments.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

9 - 52

2.6.4.2 The coordinator shall reference a system-wide reference cycle timer (system cycle timer). The term T0 shall refer to the point in the local cycle timer when the first coordinated phase (or leading coordinated phase if a pair of coordinated phases was selected by the user) is scheduled on for the first time. NOTE: This may not be the beginning of green in the case of early return. The offset shall be the amount the local cycle timer is behind the system cycle timer.

Example: If the offset is +10 seconds, T0 (the point at which the local cycle timer is at 0) will occur when the system cycle timer is at 10 seconds.

2.6.4.3 There shall be two modes of automatic coordination programming, fixed and floating force off modes. The following information shall be all that is required from the user to establish a pattern.

1. Basic NEMA controller timing.

2. Cycle length in seconds.

3. Phase sequence desired for the particular pattern.

4. Total seconds of the cycle that a phase is to be active including green, amber, and red clearance times when there is constant demand on all input detectors.

5. The coordinated phase or phases (from Paragraph 2.6.4.9).

6. The offset of the first coordinated phase serviced in the sequence from the reference clock's T0 in seconds.

2.6.4.4 Using the above information in fixed force-off mode, the coordinator must perform the following functions for each pattern.

1. Guarantee the coordinated phase(s) programmed time will be serviced in its entirety to achieve coordination between intersections (when not correcting). The programmed time of the first coordinated phase in the phase sequence shall start at T0.

2. Calculate each phase's force off point (the point at which a phase's Green must terminate in order to not violate the following phases' programmed times).

3. Calculate the beginning of each phase's permissive window (the point in the cycle when the coordinated phase is allowed to yield to each corresponding phase).

4. Calculate the end of each phase's vehicle permissive window (the point preceding a phase's force off point by its minimum time and the prior phase's clearance time). Any phase receiving a vehicle call before the end of vehicle permissive window will be serviced during the current cycle.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

10 - 52

5. Calculate the end of each phase's pedestrian permissive window (the point preceding a phase's force off point by pedestrian Walk and pedestrian clearance times and the prior phase's clearance time). Any pedestrian call received by a phase before the end of pedestrian permissive window will be serviced during the current cycle up to the beginning of the phase vehicle green.

6. Guarantee that each phase's programmed time be serviced in full if a call was received before the beginning of permissive window and the phase does not terminate due to Gap out.

2.6.4.5 Using the same information in floating force-off mode, the coordinator must operate in the same manner as fixed force-off mode except that if a non-coordinated phase is entered early, it will remain active only for the time programmed in the split time. Automatically setting the max timer in each split to accomplish this function is acceptable.

2.6.4.6 No percentage inputs are allowed. Once the information for phase service is entered via the keyboard, the controller unit shall test the plan to insure that the plan does not violate any minimum times based on the specified numbers and cycle length. If a faulty plan is detected, the controller unit shall show an error code indicating the problem. If the error is not corrected, the controller unit shall run in free operation mode whenever the erroneous plan is selected. If actuated pedestrian movements are programmed, the coordinator shall ignore errors detected due to the pedestrian Walk and clearance times violating the phase split time for any actuated pedestrian.

2.6.4.7 The coordinator shall be programmable to seek offsets by short-way (lengthening or shortening the cycle length up to 20%) and by dwell in the coordination phase awaiting the proper offset.

The user shall determine which method and may program the longest permissible dwell times.

2.6.4.8 The controller unit coordination program shall be designed to be programmed from the front panel to emulate the operation of a pre-timed controller by recall for applications where no vehicle detection is provided.

2.6.4.9 For each configuration a coordinated phase must be selected from Ring 1. A coordinated phase must also be selected from other rings if a compatible phase with the Ring 1 coordinated phase exists. The coordinated phase or phase pair shall be selectable from one of the individual phases or phase pairs shown in the following table:

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

11 - 52

CONFIGURATION

Coordinated Phase(s)

8 Phase NEMA dual ring and 3φ Diamond

Quad Sequential

8 Phase Sequential

4φ Diamond

Individual -- 4 or 8 2, 4, 6, or 8 Pairs 2 & 6 or

4 & 8 2 & 6 -- 2 & 5, 4 & 5, 1 & 6, or 1 & 8

Compatible phase pairs shall not be forced to begin simultaneously.

2.6.4.10 When establishing its offset from the reference point the coordinator shall reference only the leading edge of the sync pulse, regardless of its width.

2.6.4.11 The internal coordination and upload/download programs shall not interfere with normal intersection operation except when changing ring structure in the controller or active phases.

These operations (changing ring structure and active phases) shall require a confirmation and put the controller in a flash condition and a restart sequence. The implementation of revised timing parameters loaded into the timer shall be programmed to occur only at points in the controller coordination cycles which do not alter the controller phase sequence. The controller unit may temporarily drop out of synchronization during the upload/download, but must continue to operate.

2.7 Time-Based Coordinator (TBC)

2.7.1 The internal reference sync pulse, from which the local offset is calculated, shall re-sync at midnight, or the re-sync shall be user programmable with a default to midnight. A pulse shall be generated whenever the time-of-day clock shows a time that is an exact multiple of the current cycle length after this resynchronization. In case of a power failure, re-sync shall be calculated from the programmed re-sync time. The power failure recovery routine shall accommodate the case of a power failure at midnight.

2.8 Diamond Operation

2.8.1 Program Requirements for Diamond Operation

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

12 - 52

2.8.1.1 Phase numbers shall be assigned to traffic movements as shown on the diamond intersection layout of Figure 1. Overlap A (OL A) is defined as phases 1+2. Overlap B (OL B) is defined as phases 5+6.

φ 4φ 3 φ 6OL A φ 1 φ 5φ 2 OL B φ 7 φ 8

Figure 1

2.8.1.2 There shall be 6 additional user programmable overlaps. All additional overlaps shall be programmable through the keyboard and shall function as specified by TS-2.

2.8.1.3 The controller unit shall be programmable for 4 phase and 3 phase diamond operation as well as 2 independent 4 phase rings (separate intersection operation) as defined in Figure 2.

Ring 1

Ring 2

Figure 2

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

13 - 52

2.8.1.4 The following modes shall be available for each phase and for the intervals identified as special intervals in 3 phase and 4 phase operation:

1. Maximum recall

2. Minimum recall

3. Pedestrian recall

4. Detector locking and non-locking memory

5. Phase omit

2.8.1.5 The controller unit shall be designed to provide pedestrian phasing with phases 2, 4, 6, and 8.

2.8.1.6 All timing entries and displays shall be available for phases 3 and 7.

2.8.1.7 The operation of the controller unit as a 4 phase, 3 phase, or separate intersection operation diamond shall be keyboard selectable. This shall be overridden while under closed loop system control or by TBC control.

2.8.2 Four Phase Operation

2.8.2.1 The controller unit shall perform the sequences for 4 phase and/or 6 phase diamond operation defined in Figures 3a to 3f.

2.8.2.2 The normal 4 phase operation sequence shall be 25 → 45 → 16 → 18. The 6 phase operation sequence shall be 25 → 35 → 45 → 16 → 17 → 18.

2.8.2.3 The point at which operation may be switched from 4 phase to 3 phase operation shall be at the clearance interval 2516B or 2518B to the 3 phase clearance interval 2648.

2.8.3 Concurrent Timing Requirements

Refer to Figures 3a - 3f for the following descriptions:

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

14 - 52

A. Intervals 4516B and 4516C shall time concurrently with interval 16, however interval 16 may not terminate green until interval 4516C has timed out.

B. Intervals 3516B and 3516C shall time concurrently with interval 16, however interval 16 may not terminate green until interval 3516C has timed out.

C. Intervals 1825B and 1825C shall time concurrently with interval 25, however interval 25 may not terminate green until interval 1825C has timed out.

D. Intervals 1725B and 1725C shall time concurrently with interval 25, however interval 25 may not terminate green until interval 1725C has timed out.

E. All left to right internal clearance times (intervals 4518B, 4517B, 3518B, 3517B, 2518B, 2517B, 2516B) shall use the same timing settings for minimum green, extension, maximum green, yellow clearance, and red clearance.

F. All right to left internal clearance times (intervals 1845B, 1835B, 1745B, 1735B, 1645B, 1635B, 1625B) shall use the same timing settings for minimum green, extension, maximum green, yellow clearance, and red clearance.

G. Separate timing settings for minimum green, extension, maximum green, yellow clearance, and red clearance shall be provided for each of the 4 external clearance intervals (1825B, 1725B, 4516B, 3516B).

Clearance Interval to 16

2516A

2516C 2517C or 2518C

From 25 Clearance Interval to 35 or 45

2535A or 2545A

Clearance Interval to 17 or 18

2517A or 2518A

2516B* 2517B* or 2518B*

* Special Interval

Figure 3a

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

15 - 52

From 16 Clearance Interval to 17 or 18

1617A or 1618A

Clearance Interval to 25

1625A

Clearance Interval to 35 or 45

1635A or 1645A

1625B* 1635B* or 1645B*

1625C 1635C or 1645C

Figure 3c

4517C or 4518C 4516C

4517B* or 4518B*

From 45 Clearance Interval to 25 or 35

4525A or 4535A

Clearance Interval to 17 or 18

4517A or 4518A 4516A

Clearance Interval to 16

4516B*

Figure 3b

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

16 - 52

1835B* or 1845B*

1835C or 1845C

From 18 Clearance Interval to 16 or 17

1816A or1817A

Clearance Interval to 35 or 45

1835A or 1845A1825A

Clearance Interval to 25

1825B*

1825C

Figure 3d

3517B* or 3518B*

3517C or 3518C

From 35 Clearance Interval to 25 or 45

3525A or 3545A

Clearance Interval to 17 or 18

3517A or 3518A3516A

Clearance Interval to 16

3516B*

3516C

Figure 3e

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

17 - 52

1735B* or 1745B*

1735C or 1745C

From 17 Clearance Interval to 16 or 18

1716A or 1718A

Clearance Interval to 35 or 45

1735A or 1745A1725A

Clearance Interval to 25

1725B*

1725C

* Special Interval

Figure 3f

2.8.4 Diamond Detector Operation

2.8.4.1 The loop detector layout for 3 phase, 4 phase, 6 phase, or separate intersection diamond operation shall be as defined in Figure 4. The detector operation defined shall be automatically loaded when any diamond sequences are selected.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

18 - 52

2.8.4.2 The controller unit software shall provide the logic for detector operation described below:

Detector 1 In 4 phase operation:

1. Shall call phase 6 if overlap A is not green and phase 7 is not called.

2. Shall call phase 6 if overlap A is not green and phase 8 is not called.

3. Extend intervals 2516B, 2517B, 2518B, 4517B, 4518B, 3517B, and 3518B.

In 3 phase operation: call and extend phase 1 (left turn)

Detector 5 In 4 phase operation:

1. Shall call phase 2 if overlap B is not green and phase 3 is not called.

2. Shall call phase 2 if overlap B is not green and phase 4 is not called.

3. Extend intervals 1625B, 1635B, 1645B, 1735B, 1745B, 1835B, and 1845B.

In 3 phase operation: call and extend phase 5 (left turn) φ 8 φ 6 φ 5

1 φ 1 φ 7 φ 3 φ 4

11φ 2

8 7

Figure 4

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

19 - 52

Detectors 2, 3, 4, 6, 7, and 8 These setback detectors (or detector sets) belong to the parent phases with the same number (e.g. detector 2 belongs to phase 2) as shown in Figure 4. These detectors shall have a 2 second delay set during red conditions of their parent phase. The detector(s) are used to extend during green.

Detectors 11, 12, 15, 16, 17, and 18 These detectors are stop bar detectors and are used to call the associated parent phases shown in Figure 4. The parent phase green plus a call for that phase plus a 0.2 second gap on the detector shall disable the detector until the end of green.

Detectors 9 and 10 In 4 phase operation:

1. Shall extend phase 2 if phase 3 is called.

2. Shall extend phase 2 if phase 4 is called.

3. Shall call phase 6 if overlap A is not green and phase 7 is not called.

4. Shall call phase 6 if overlap A is not green and phase 8 is not called.

5. Extend intervals 2516B, 2517B, 2518B, 4517B, 4518B, 3517B, and 3518B.

In 3 phase operation: shall function as a phase 1 calling detector during phase 3 or 4 and as a phase 1 extending detector when a phase 3 or 4 call exists.

Detectors 13 and 14 In 4 phase operation:

1. Shall extend phase 6 if phase 7 is called.

2. Shall extend phase 6 if phase 8 is called.

3. Shall call phase 2 if overlap B is not green and phase 3 is not called.

4. Shall call phase 2 if overlap B is not green and phase 4 is not called.

5. Extend intervals 1625B, 1635B, 1645B, 1735B, 1745B, 1835B, and 1845B.

In 3 phase operation: shall function as a phase 5 calling detector during phase 7 or 8 and as a phase 5 extending detector when a phase 7 or 8 call exists.

2.8.5 Three Phase Operation

2.8.5.1 The controller unit shall be keyboard selectable for 3 phase diamond operation.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

20 - 52

2.8.5.2 The controller unit shall perform the sequences for 3 phase diamond operation defined in Figures 5a to 5b.

2.8.5.3 The normal sequence of operation shall be 4+8 → 2+6 → 1+5.

2.8.5.4 The point at which operation may be switched from 3 phase to 4 phase operation shall be through the transition phase sequence to 4 phase interval 2516 as indicated in Figure 5a.

2.8.5.5 The controller shall be programmable for simultaneous gap operation for phases 4 and 8 in

3 phase operation to allow a phase to extend out of a green rest state. When the phase(s) to be serviced next conflicts with both phases being serviced, both concurrent phases must reach a green rest state together before they terminate. Termination of the max timer or application of a force off shall override this feature. The phases shall not be allowed to advance to a green interval beyond the rest state which might override defeat the simultaneous gap operation.

Transition Phase to 4 Phase Operation

Figure 5a

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

21 - 52

3 Phase Diamond Sequence Figure 5b

From IF AND GO TO Interval Call On No Call On Interval 48 2 and 6 ---- 2+6 2 or 6 1 or 5 2+6 1 and 6 2 1+6 2 and 5 6 2+5 5 1 or 2 or 6 4+5 4 and 5 8 4+5 if min. time of 5 can be serviced before max. time of 4 1 2 or 5 or 6 1+8 1 and 8 4 1+8 if min. time of 1 can be serviced before max. time of 8 1 and 5 2 or 6 1+5

45 8 ---- 4+8 if 4+8 was not serviced immediately prior to 4+5 8 1 or 2 or 6 4+8 2 and 6 8 2+6 6 8 or 1 2+6 2 8 or 6 2+5 1 and 6 8 or 2 1+6 1 8 or 2 or 6 1+5

18 4 ---- 4+8 if 4+8 was not serviced immediately prior to 1+8 4 5 or 2 or 6 4+8 2 and 6 4 2+6 2 4 or 5 2+6 6 4 or 2 1+6 2 and 5 4 or 6 2+5 5 4 or 2 or 6 1+5

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

22 - 52

From IF AND GO TO Interval Call On No Call On Interval 26 (1 and 5) or 4 or 8 2 or 6 1+5 5 6 or 4 or 8 2+5 2 and 5 6 2+5 1 2 or 4 or 8 1+6 1 and 6 2 1+6

25 1 or 8 ---- 1+5 4 1 or 8 4+5 6 1 or 4 or 8 2+6

16 4 or 5 ---- 1+5 8 4 or 5 1+8 2 4 or 5 or 8 2+6

15 4 and 8 ---- 4+8 4 8 4+5 8 4 1+8 2 and 6 4 or 8 2+6 2 4 or 6 or 8 2+5 6 2 or 4 or 8 1+6

2.9 Coordination Control Hierarchy

2.9.1 When the system switch is in the system position, the controller unit shall be under the control of the master controller or TBC.

2.9.2 In the absence of any on-line closed loop system control by a master controller, the internal

TBC shall control the coordinated, free, and flash operation of the intersection when the system switch is in the system position.

2.9.3 When a master controller brings the intersection on-line, its control shall supersede that of the internal time base coordination.

2.9.4 When the system switch is in the free position, the controller unit shall operate in a non-coordinated (free) mode.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

23 - 52

2.10 Preemption (PE)

2.10.1 The internal preemptor supplied shall be easily programmable from the front panel for either railroad or emergency vehicle preemption sequences.

2.10.2 Phases shall be selectable such that a limited signal sequence may be operational during preempt (PE). It shall be possible to add phases to this special limited sequence, which is not in the intersection sequence. This shall be accomplished without adding external logic.

2.10.3 The following intervals shall be provided as a minimum. Terminology may vary but the meaning must be clear. Additional unspecified intervals that may lead to confusion shall be programmable to zero. If abbreviations are used on the display, they shall be defined on the front panel. While in preemption, the display will clearly identify the intervals being timed as preempt intervals. Yellow and red clearances from the phase timings may be utilized in place of the clearance intervals shown.

2.10.3.1 Preemption Timing Interval Definition

All intervals are sequential.

0. PE Delay - This time shall start immediately when the preempt command is received. It shall not affect the normal operation of the controller unit until the delay time out occurs.

This interval may be used for emergency vehicle (fire lane) preemption delay. If 0 time is set, the interval shall be omitted.

1. PE Minimum Duration - The preempt sequence shall not terminate until the preempt input signal is removed and the minimum duration time has expired.

2. PE Minimum Green - Any vehicle signal that is green at the time this interval becomes active shall not terminate unless it has been displayed for at least the time programmed in this interval. If 0 time is set the interval shall be omitted.

3. PE Minimum Walk - Preempt minimum walk time in seconds. A preempt initiated transition shall not cause the termination of a Walk prior to its display for this period.

4. PE Pedestrian Clearance - At the time of preempt call, Walk indications shall immediately change to pedestrian clearance interval. The pedestrian clearance interval shall not terminate unless it has been displayed for at least the time programmed in this interval. If 0 time is set, the interval shall be omitted.

5. PE Track Green - Signals programmed as track (or fire lane) signals shall remain green or be changed to green. All other signals shall be red. This interval shall be optionally programmable to zero during emergency vehicle PE.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

24 - 52

6. PE Dwell Green - Minimum dwell time in seconds. This parameter controls the minimum timing for the dwell movement. The phase(s) allowed during the dwell interval shall be selectable to include all phases that do not cross the track. The dwell interval shall not terminate prior to the completion of preempt duration time, preempt dwell time, and the call is no longer present. Each signal shall be keyboard programmable for red, red flash, yellow flash or green. As an alternative, a limited cycle shall be programmable for use with railroad preempts.

7. PE Exit Pedestrian Clear - Preemption exit pedestrian clear time in seconds. This parameter controls the pedestrian clear timing for a Walk signal transition to the exit phase(s).

8. PE Exit Yellow - This interval shall provide a solid yellow clearance for indications that were green or flashing yellow. Red and flashing red displays shall display solid red.

9. PE Exit Red Clearance - This interval shall be an all red clearance in preparation for return to the normal cycle. Return phases shall be programmable from the keyboard.

10. PE Max Call - This interval is the amount of time that a preempt call may remain active and be considered valid. When the preempt call has been active for this amount of time, the controller shall return to normal operation. The preempt call shall be considered invalid until the call is no longer active.

2.10.3.2 Preempt Timing Interval Ranges

TIMING INTERVAL TIME

(Seconds)

INCREMENTS

(Seconds)

0. PE Delay (emergency vehicle preempt)

1. PE Minimum Duration

2. PE Minimum Green

3. PE Minimum Walk

4. PE Pedestrian Clearance

5. PE Track Green

6. PE Dwell Green

7. PE Exit Pedestrian Clear

8. PE Exit Yellow

9. PE Exit Red Clearance

10. PE Max Call

0-999 0-999 0-255 0-255 0-255 0-255 1-255 0-255

3.0-25.5 0-25.5 0-999

0.1 0.1

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

25 - 52

2.10.4 The phases to be serviced following the preempt sequence shall be front panel keyboard programmable.

2.10.5 Preempt sequences shall be selectable using external inputs. Preempt priority shall be assigned with number 1 being the highest. If a higher priority preempt input is received during a preempt sequence, the controller unit shall immediately transition to the new sequence subject to the constraints of PE minimum green and PE minimum walk. The transition shall take place in a safe manner from any point in the sequence meeting all Texas MUTCD requirements.

Provisions shall be made to clear two conflicting track phases from a single preempt input.

This may be provided by two track clearance phases for a single preempt or by combining two preempts.

2.10.6 Preempt 1 shall be reserved for a priority railroad preempt. If more than two preempts are provided it shall be possible to delete the priority override for all but the railroad preempt. If a non-priority preempt is activated during another preempt cycle, the one in progress shall continue through its entire cycle. If the second preempt input is still active when the first one is completed, the controller unit shall immediately go to all red flash or initiate the non-priority preempt. When all preempt inputs are removed, the controller unit shall proceed through the normal sequence to return red clearance (interval 9).

2.10.7 Once the controller unit has entered the first timed interval following preempt delay

(interval 1), the sequence shall continue to the end even if the preempt call is dropped. If the call returns, the minimum preempt duration (interval 1) the controller unit should reinitiate track green and complete the preempt sequence.

2.10.8 The controller unit shall be programmable to be in flash or in limited sequence during interval 6. If flash is specified, the phases shall flash yellow or red as programmed from the front panel. Flash shall be implemented by simultaneously flashing the appropriate load switch driver outputs. If limited sequence is selected, all phases shall be programmable even if not normally used in the intersection sequence.

2.10.9 In the event of a power interrupt as defined by TS-2, if the preempt command is present when power is restored, the controller unit shall power up in cabinet flash operation and remain there until the PE command is removed.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

26 - 52

2.10.10 Overlap phases shall begin and terminate with the parent phases as described in TS-2. If the PE call occurs during yellow or red displays between parent phases, the overlap phase shall display a minimum of 3 seconds of yellow and a minimum of 1 second of red clearance.

2.10.11 Don't Walk shall be displayed throughout the preempt sequence unless a limited cycle is run.

During a limited cycle (interval 6) the pedestrian heads may be programmed to be dark.

2.10.12 Preempt routines shall have priority over all controller functions.

2.10.13 The controller shall be programmable to allow multiple track clearance phases either within a single preemption sequence or by mapping multiple preempts together in all modes of operation including 3 phase and 4 phase diamond modes.

2.11 Closed Loop Operation and Monitoring Software (CLS)

2.11.1 The controller software shall either be capable of implementing NTCIP or be downward compatible with CLS masters supplied by the same manufacturer since January 1992 and provide all necessary components to upgrade to NTCIP, as specified by the plans. Short haul FSK modems, necessary to operate the controller as a closed loop system secondary, shall be provided internal to the timer. All necessary cables and communication ports needed for operation in a closed loop system cabinet shall be provided. The modems shall meet TS-2 environmental requirements for traffic signal equipment.

2.11.2 Window-based CLS software shall be provided (with a minimum of 5 licensed users per copy) according to the solicitation, that will allow the monitoring, setup, and programming of all controller unit timing entries, functions, and features. These functions and features shall include but not be limited to the following:

1. Monitoring signal indications, detectors, alarms, and time base functions.

2. Controller database error checking.

3. Coordination parameters.

4. Remote resetting of coordination errors.

5. Toggle special function outputs from the controller.

6. Receive reports and alarms generated from the controller.

7. Setting up the dial-up modem for the traffic signal controller needed to accomplish the remote operation through the controller or the PC software. The setup strings for Hayes compatible modems (including Hayes, US Robotics, and Computer Peripherals modems as a minimum) shall be provided.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

27 - 52

All capabilities from the controller keyboard shall be capable remotely through the computer interface through a telephone modem connection. The software shall not require that the controller unit be connected while making entries until the actual download/upload process.

2.11.3 A cable shall be supplied to direct connect the controller to a PC in order to upload and download data as well as monitor the controller operation.

2.11.4 The controller shall have a minimum of 8 detector inputs per intersection for use with closed loop system operation. The system shall report volume and occupancy counts based on a user-selectable time period for each detector. Storage of this data may take place at either the local controller or on-street master. Allowances in the software shall be made for a minimum of 8 system detectors at any local controller, in addition to any local detectors.

2.12 NTCIP Compliance

2.12.1 The controller software shall comply with the referenced NTCIP standards when installed. The software shall comply with the versions of the relevant NTCIP standards that are current at the date of this document, or latest revision.

2.12.2 The software shall comply with NEMA Standard Publication TS-3.2 2003 (TS-3.2), or latest revision, the Simple Transportation Management Framework, and shall meet the requirements for Conformance Level 2. The software shall comply with NEMA Standard Publication TS-3.3 2003 (TS 3.3), or latest revision, the Class B Profile, and shall include both an EIA/TIA 232-E and an FSK modem interface for NTCIP based communications.

2.12.3 The software shall implement all mandatory objects of all mandatory conformance groups as defined in Global Object Definitions, NEMA Standard Publication NTCIP 1201:1996 (TS 3.4), or latest revision:

• Configuration Conformance Group and Actuated Signal Controller Object Definitions, NEMA Standard Publication NTCIP 1202:1996 (TS 3.5), or latest revision.

• Phase Conformance Group

• Detector Conformance Group

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

28 - 52

2.12.4 The software shall implement all mandatory objects of all optional conformance groups as defined in Global Object Definitions, NTCIP 1201:1996, or latest revision:

• Database Management Conference Group

• Time Management Conformance Group

• Time Base Event Schedule Conformance Group

• Report Conformance Group

• STMF Conformance Group

• PMPP Conformance Group and Actuated Signal Controller Object Definitions, NTCIP

1202: 1996, or latest revision.

• Volume Occupancy Report Conformance Group

• Unit Conformance Group

• Special Function Conformance Group

• Coordination Conformance Group

• Time Base Conformance Group

• Preempt Conformance Group

• Ring Conformance Group

• Channel Conformance Group

• Overlap Conformance Group

• TS-2 Port 1 Conformance Group

2.12.5 The software shall also implement the following optional objects as defined in the Global Object Definitions, NTCIP 1201:1996, or latest revision:

• globalSetIDParameter

• dbMakeID

• eventLogOID

• eventConfigAction

• eventClassDescription

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

29 - 52

2.12.6 The software shall also implement the following optional objects as defined in the Actuated Signal Controller Object Definitions, NTCIP 1202:1996, or latest revision:

• unitRedRevert

• phaseDynamicMaxLimit

• phaseDynamicMaxStep

• phaseControlGroupTable

• ringControlGroupForceOff

• vehicleDetectorQueueLimit

• vehicleDetectorFailTime

• vehicleDetectorReportedAlarms

• alarmGroupTable

• specialFunctionOutputTable

• preemptMinimumGreen

• preemptMinimumWalk

• preemptEnterPedClear

• preemptState

• preemptControlTable

• ringControlGroupMax2

• ringControlGroupMaxInhibit

2.12.7 All objects required by these procurement specifications shall support all values within its standardized range, unless otherwise approved by the Project Engineer. The standardized range is defined by a size, range, or enumerated listing indicated in the object’s syntax field and/or through descriptive text in the object’s description field of the relevant standard. The following provides the current listing of known variances for this project:

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

30 - 52

TABLE 2.1 OBJECT RANGE VALUES FOR ACTUATED SIGNAL CONTROLLERS

OBJECT MINIMUM PROJECT

REQUIREMENTS

NTCIP 1201:1996

moduleType Value 3 dbCreateTransaction All Values dbErrorType All Values globalDaylightSaving Values 2 & 3 maxTimeBaseScheduleEntries 255 maxDayPlans 15 maxDayPlanEvents 10 maxEventLogConfigs 255 eventConfigMode Values 2 thru 5 eventConfigAction Values 2 & 3 maxEventLogSize 255 maxEventClasses 7 maxGroupAddress 2

NTCIP 1202:1996

maxPhases 16 phaseStartup Values 2 thru 6 phaseOptions All Values maxPhaseGroups 2 maxVehicleDetectors 32 vehicleDetectorOptions All Values maxPedestrianDetectors 8 unitAutoPedestrianClear All Values unitControlStatus All Values unitFlashStatus All Values unitControl All Values maxAlarmGroups 1 maxSpecialFunctionOutputs 8 coordCorrectionMode Values 2 thru 4 coordMaximumMode Values 2 thru 4 coordForceMode Values 2 & 3 maxPatterns 48 patternTableType Either 2 or 3

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

31 - 52

OBJECT MINIMUM PROJECT

REQUIREMENTS

maxSplits 16 splitMode Values 2 thru 7 localFreeStatus Values 2 thru 11 maxTimebaseASCActions 255 maxPreempts 6 preemptControl All Values preemptState Values 2 thru 9 maxRings 4 maxSequences 16 maxChannels 16 channelControlType Values 2 thru 4 channelFlash All Values channelDim All Values maxChannelStatusGroups 16 maxOverlaps 8 overlapType Values 2 & 3 maxOverlapStatusGroups 8 maxPort1Addresses 255 port1Status Values 2 & 3

2.12.8 The controller shall be able to implement all NTCIP messages called for in the specification without any additional vendor specific/proprietary statements.

2.12.9 The software shall be supplied with full documentation, including a CD-ROM disk and/or other approved storage media containing ASCII versions of the following MIB files in ASN.1 format:

• the relevant version of each official NEMA standard MIB module referenced by the device functionality; and

• if the device does not support the full range of any given object within a NEMA standard MIB module, a manufacturer specific version of the official NEMA standard MIB module with the supported range indicated in ASN.1 format in the Syntax field of the Object-Type macro. The filename of this file shall be the same as the standard MIB filename with the extension “.man”.

TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

32 - 52

2.12.10 The software shall be supplied with full documentation, including a CD-ROM disk or other approved storage media containing ASCII versions of any and all manufacturer-specific objects supported by the device in ASN.1 format in a manufacturer-specific MIB with accurate and meaningful description fields and supported ranges indicated in the syntax field of the object-type macros.

2.12.11 The manufacturer shall not place any restrictions as to the passage of any and all of this documentation to any portion of TxDOT.

2.12.12 The manufacturer shall provide a copy of the following table that has been completed to describe the operation of their controller including which objects are used and the procedures that are done with these objects to implement the functions listed using NTCIP.

Table 2.2

Function Objects Procedures to Implementation Example: Function X Object T

Object Y Object Z

Get object T then send objects Y and Z if T>0.

Change split time in an active coordination plan

Change ring structure

Change minimum Green in an active coordination plan

Change alternate sequence in an active coordination plan

2.13 Flashing Yellow Arrow Operation. Provide a Flashing Yellow Arrow (FYA) routine that:

• is programmable in the controller unit,

• provides as a minimum for operation of up to 4 FYA left turn signal displays per the

MUTCD,

• uses data entries in the controller unit to define when the signal face displays the protected (green arrow) and the permissive (flashing yellow arrow), TO-4048

FULL-ACTUATED SOLID STATE CONTROLLER UNIT (TS 2)

33 - 52

• can be programmed for permissive only, permissive-protected, or protected only operation by time of day, transition from FYA permissive-protected operation to protected only operation must be accomplished after concurrent termination of both the FYA and the associated opposing through movement..

3.0 MALFUNCTION MANAGEMENT UNIT (MMU)

3.1 This specification sets forth the minimum requirements for a shelf-mountable, 16 channel, solid-state MMU. The MMU shall meet as a minimum, Section 4 of the NEMA Standards Publication TS-2 2003, or latest revision. Where differences occur, this specification shall govern.

3.2 No circuit cuts shall be allowed on circuit boards in any of the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .