Electrical Power Plan.pdf
PDF 334 KB Posted
- Attached to
- Y1DA--632-21-122 – Electrical Power Upgrade Federal contract opportunity
- Solicitation number
- 36C24222B0033
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Sign-in Sheet - Electrical Power Upgrade.pdf | ||
| 36C24222B0033 0001.docx | DOCX document | |
| Electrical One Line Diagram and Panel Schedule 03_EP-102-EP-102.pdf | ||
| 36C24222B0033_1.docx | DOCX document | |
| Electrical General Notes and Symbols 01_EG-001-EG-001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BREAK ROOM
C1-76K
OFFICE
C1-76L
CORE
LABORATORY
SUPERVISOR
C1-76M
FLOW CYTOM
C1-76N
PATHOLOGY
SECRETARY
OFFICE
C1-76O
CHIEF
PATHOLOGY
LAB MEDICAL
SERVICE
C1-760
OFFICE
C1-76C
BLOOD
BANK
C1-76A
FE
BLOOD
BANK &
REFRIGERATOR
C1-76B
PATHOLOGIST/
ASST. CHIEF
C1-76J
SUPERV. MED.
TECH. / BLOOD
BANK
C1-76H
LEAD TECH. OFF.
C1-76G
LAB. ADMIN.
C1-76F
LAB.
MGR.
C1-76E
CORR.
C1-C10
LABORATORY
C1-76
(E) (E)67 69
LOCKER
ROOM
C1-76D
LAB
STORAGE
C1-78
BLOOD
DRAWING
ROOM
C1-77
LAB
STORAGE
C1-79A
LAB
STORAGE
C1-79
TOILET
C1-80
LABORATORY
C1-82
A
B C
D
EF
(E) 65
(E) 50,52 (E) 50,52 (E) 56,58 (E) 44,46 (E) 44,46 (E) 44,46
(E)
(E)
48(E)
48(E)
(E)
(E)
(E)
(E)
(E)
50(E)
(E)
(E)
(E)
(E)
56,58
(E) 76
(E)
(E) 62(E) 64 (E) 78
(E) 60
(E) 74
(E) 74(E) 66
(E) 68(E) 66
(E)
(E)
(E)
(E)
1,3
NEW AIR
COMPRESSOR
CL1-D4 #37,39,41
3#8+#8G-3/4"C
DISCONNECT SWITCH
240V/3P/60A
13,15 17,19
21,23 25,27
5,7
10,12 45
2,4 6,8 49 51 53 55
14,16 9,11 18,20
SEE NOTE I
SEE NOTE M
22,2461
SEE NOTE E
SEE NOTE F
SEE NOTE G
SEE NOTE H
SEE NOTE J
SEE NOTE K
SEE NOTE L
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
NORTHPORT VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
79 MIDDLEVILLE RD, NORTHPORT, NY 11768
DWG.
ELECTRICAL
POWER PLAN
ELECTRICAL POWER
UPGREADE FOR NEW
LABORATORY EQUIPMENT
01-07-22 KC KC
632-21-122
EP-101
ELECTRICAL POWER PLAN
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A. ALL THE WORK TO BE PERFORMED ON AND OFF-HOURS WITHOUT DISTURBING ALL THE WORK TO BE PERFORMED ON AND OFF-HOURS WITHOUT DISTURBING EXISTING EQUIPMENT IN ACTIVE 24/7 OPERATION OF THE LABORATORY. LAB OPERATION SHALL NOT BE INTERRUPTED DURING FIELD WORK. CONTRACTOR SHALL CAREFULLY COORDINATE WITH LABORATORY MANAGER ANY SCHEDULED/APPROVED CIRCUIT OUTAGES IN ADVANCE OF ANY WORK THAT WOULD AFFECT LAB OPERATION. B. PROVIDE ALL CUTTING, PATCHING AND FIRE-STOPPING AS REQUIRED TO COMPLETE PROVIDE ALL CUTTING, PATCHING AND FIRE-STOPPING AS REQUIRED TO COMPLETE PROJECT AS SHOWN. CONCEAL ALL WIRING AND CIRCUITRY IN FINISHED AREA AND SPACES. C. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT GROUNDING CONDUCTOR. D. ALL EQUIPMENT, RECEPTACLES AND DATA OUTLETS SHOWN ARE IN A GENERAL ALL EQUIPMENT, RECEPTACLES AND DATA OUTLETS SHOWN ARE IN A GENERAL LOCATION AND EXACT LOCATION SHALL BE VERIFIED AND COORDINATED IN FIELD WITH LABORATORY STAFF AND EQUIPMENT SUPPLIER PRIOR TO INSTALLATION. E. EXISTING PANELBOARD 'CL1-D3' TO BE REMOVED INCLUDING ALL BRANCH CIRCUIT EXISTING PANELBOARD 'CL1-D3' TO BE REMOVED INCLUDING ALL BRANCH CIRCUIT WIRING TO EXISTING EQUIPMENT/OUTLETS. DISCONNECT AND REMOVE EXISTING FEEDER FROM PANELBOARD 'CLB-DD' IN BASEMENT. F. EXISTING PANELBOARD 'CH1-DA' TO REMAIN. EXISTING PANELBOARD 'CH1-DA' TO REMAIN. G. EXISTING PANELBOARD 'CL1-D3A' TO REMAIN INCLUDING ALL BRANCH CIRCUIT EXISTING PANELBOARD 'CL1-D3A' TO REMAIN INCLUDING ALL BRANCH CIRCUIT WIRING TO EXISTING EQUIPMENT/OUTLETS IN LABORATORY. PROVIDE NEW FEEDER FROM NEW PANELBOARD 'CL1-D4'. H. EXISTING PANELBOARD 'NL1-D5' TO REMAIN INCLUDING ALL BRANCH CIRCUIT EXISTING PANELBOARD 'NL1-D5' TO REMAIN INCLUDING ALL BRANCH CIRCUIT WIRING TO EXISTING EQUIPMENT/OUTLETS IN LABORATORY. I. DISCONNECT AND REMOVE EXISTING PANELBOARD 'CL1D3B' IN THE COLUMN 'D' DISCONNECT AND REMOVE EXISTING PANELBOARD 'CL1D3B' IN THE COLUMN 'D' INCLUDING ALL BRANCH CIRCUIT WIRING TO RECEPTACLES IN COLUMNS A,B,C AND D. J. DISCONNECT AND REMOVE ALL EXISTING RECEPTACLES IN COLUMN A,B,C AND D. DISCONNECT AND REMOVE ALL EXISTING RECEPTACLES IN COLUMN A,B,C AND D. PROVIDE NEW RECEPTACLES AND DATA OUTLETS AS SHOWN. NUMBERS NEXT TO RECEPTACLES INDICATE BRANCH CIRCUITS IN NEW PANELBOARD 'CL1-D4'. K. EXISTING WIREMOLD/RECEPTACLES TO REMAIN. PROVIDE NEW BRANCH CIRCUIT EXISTING WIREMOLD/RECEPTACLES TO REMAIN. PROVIDE NEW BRANCH CIRCUIT WIRING TO NEW PANELBOARD 'CL1-D4' AS SHOWN ON PANELBOARD SCHEDULE. NUMBERS NEXT TO RECEPTACLE INDICATES BRANCH CIRCUIT IN NEW PANELBOARD 'CL1-D4'. L. NEW PANELBOARD 'CL1-D4'. SEE SCHEDULE ON DRAWING EP-102. NEW PANELBOARD 'CL1-D4'. SEE SCHEDULE ON DRAWING EP-102. M. PROVIDE NEW AIR SUPPLY PIPING AS REQUIRED BY EQUIPMENT SUPPLIER. THIS PROVIDE NEW AIR SUPPLY PIPING AS REQUIRED BY EQUIPMENT SUPPLIER. THIS WORK TO BE PROVIDED BY OTHERS.
AutoCAD SHX Text %%uGENERAL NOTES:
AutoCAD SHX Text
1 REVISED PER FIRE SAFETY ENGINEER 1-14-21
| Sheets and Views |
| EP-101 |
File details come from the government source that posted it. Updated .