EDL.pdf
PDF 55 KB Posted
- Attached to
- F-16 Cable and Conduit Assembly Federal contract opportunity
- Solicitation number
- SPRHA423R0130
- Issued by
- Defense Logistics Agency Aviation
About this file
This document contains an Engineering Data List (EDL) and details of a related federal contract opportunity for cable and conduit assemblies for F-16 aircraft. The EDL specifies engineering drawings, documents, and data required to manufacture the cable and conduit assembly, including distribution codes and furnishing methods for each item. The related federal contract opportunity is solicitation number SPRHA423R0130 for F-16 cable and conduit assemblies issued by the Defense Logistics Agency Aviation. The opportunity is set aside for approved source BAE Systems with CAGE code 12436. The solicitation seeks the cable and conduit assembly in support of F-16 aircraft.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRHA423R0130_______0001.pdf | ||
| Pkg_SOW.pdf | ||
| EDR.pdf | ||
| SPI.pdf | ||
| SPRHA423R0130.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERING DATA LIST
DATE:
12 APR 2021
REVISION: 1 *HISTORY*
CAGE:
12436
PAGE:
NSN:
6150013713937WF
DATA TECH:
Pusey, Brian D
END ITEM:
F-16
ORGANIZATION/OFFICE SYMBOL:
429 SCMS GUMACA/
MANUFACTURER NAME:
BAE SYSTEMS INFORMATION AND
REFERENCE NUMBER:
2215386-006
NOUN:
CABLE AND CONDUIT A
LINE/
SUB CAGE
ENG DRAWING NUM/ ACCOMP
DOC NUM REV
NR
SHEETS
FURN
CODE
DIST
CODE NOUN REMARKS
L 98747 HILL AFB FORM 462 X ENGINEERING DATA
REQUIREMENTS-
ATTACHMENT "A"
STANDARD ENGINEERING TEXT
Pusey, Brian D 12 APR 2021
RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.
NAME: DATE:
C - CLASSIFIED DOCUMENT.
S - FURNISHED WITH SOLICITATION.
M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH
CONTRACT AWARD.
X - DATA SUPPLIED (NOT IN JEDMICS).
R - FURNISHED BY PCO UPON REQUEST.
P - PARTIAL DOCUMENT FURNISHED.
V - VENDOR DRAWING; (NOT PROVIDED).
G - GOV'T DOCUMENT.
O - OTHERS, CONTRACTOR MUST ACQUIRE.
A- DATA NOT AVAILABLE.
FURNISHED METHOD CODE LEGEND:
Page 1 of 1EDL Version 1Generated by PRPS using Jasper Reports on 17 Nov 2022
File details come from the government source that posted it. Updated .