Amendment 0003 Final.pdf
PDF 319 KB Posted
- Attached to
- Federal Student Aid Data Mart Federal contract opportunity
- Solicitation number
- ED-FSA-11-R-0023
About this file
Expanded Section B Pricing Tables revised Section L instructions added SOO data feed details and modify instructions for the submission of Past Performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0004.pdf | ||
| Amendment 0002 Q and A s.pdf | ||
| Final ADM Questions and Responses 30 sep 11.pdf | ||
| ADM RFP Amendment 0001.pdf | ||
| ADM Full RFP 15 Sep 11 v3.pdf | ||
| ADM Full RFP 14 Sep 11 v2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
of
SECTIO
B.1 GEN
The contr be perform
B.1.1 BA
maintenan
Extern
Recor
Mont
Maint
Mont
Maint
Mont
Mont
Mont respo
Mont respo
B.1.2 VA
Baselines
B.1.2.1 M
Simple In
<B*+10%
ON B: SUPPL
ERAL DESC
ractor shall pe med in accord
SELINE: Th nce support ac nal Users rds Stored hly Complex tenance Requ hly Simple tenance Requ hly Simple Ca hly Complex hly Simple M onses hly Complex onses
RIABLE PR
shown at B.1
Monthly Activi quires C
LIES OR SE
CRIPTION
erform the eff dance with all he following t ctivities inclu uests (CRs) uests (CRs) alls
Calls ail box
Mail box
RICING: The
1.1 for each v ity Level for
Complex Inqu
<B*+10%
REPLA
RVICES & P
fort required u l sections of t able reflects t uded within th
Base 400‐500 w
Varies >
<5 D c r r
<10 D t
<10 D h
<5 D t
<25 D h
<5 D t e below tables variable task.
“Inquiries” uiries Base
ACE IN TOT
PRICES OR
under this con this Contract.
the baseline le he scope to X eline Quant with anticipat
>10 million <
Definition of C coordinated t requires coor requires more
Definition of S than 2 weeks
Definition of S hours.
Definition of C than 48 hours
Definition of S hours
Definition of C than 48 hours s reflect the v
OY1
TAL
R COSTS
ntract on a Fix evel of variab X01-X04 Clins tities ted annual 5
60 Million
Complex: A c through Ente rdination with e than 2 wee
Simple: A ch s to resolve
Simple: A ca
Complex: A c s
Simple: An e
Complex: An s.
variable pricin
OY2
xed Price bas ble operationa s for each per
% growth change reque rprise Change h other vendo ks to resolve.
ange request ll that is reso call that is res e‐mail that is r e‐mail that is ng for activitie
2 OY3
sis. The work al and rformance yea est that is e Manageme ors, and/or t that takes le lved within 4 olved in more resolved with s resolved in es above the
OY4
shall ar.
nt, ess e hin 48 more
>B+10%<
>B+25%<
>B+40%<
>B+60%<
Note 3 Sim
*FY12
** No
B.1.2.2 M
Simple
Maintena
Requests
<B*+10%
>B+10%<
>B+25%<
>B+40%<
>B+60%<
Note 3 Sim
B.1.2.3 M
Simple Ca
Response
<B*+10%
>B+10%<
>B+25%<
>B+40%<
>B+60%<
Note 3 Sim
B+25% >
B+40% >
B+60% >
B+75%** > mple = 1 Com
2 expected Ba ot to Exceed
Monthly Activi ance
C
M
R
B+25% >
B+40% >
B+60% >
B+75%** > mple = 1 Com
2 expected Ba ot to Exceed
Monthly ”Call all s
C
R
B+25% >
B+40% >
B+60% >
B+75%** > mple = 1 Com
>B+10%<B+2
>B+25%<B+4
>B+40%<B+6
>B+60%<B+7 mplex aseline Month ity Level for “
Complex
Maintenance
Requests
<B*+10%
>B+10%<B+2
>B+25%<B+4
>B+40%<B+6
>B+60%<B+7 mplex aseline Month
Center Calls”
Complex Call
Responses
<B*+10%
>B+10%<B+2
>B+25%<B+4
>B+40%<B+6
>B+60%<B+7 mplex
5% $
0 $
0% $
5%** $ hly Volume
“Maintenanc e
Base
5% $
0 $
0% $
5%** $ hly Volume
Base
5% $
0 $
0% $
5%** $ e Requests/C e OY1 e OY1
Change Requ
OY2
OY2
uests”
2 OY3
2 OY3
OY4
OY4
B.1.2.4 M
Simple Em
Response
<B*+10%
>B+10%<
>B+25%<
>B+40%<
>B+60%<
Note 3 Sim
B.2 SERV
The follow
CLIN ‐ C
NTE ‐ No FFP –Firm
B.2.1 BA
B.2.2 OP
2 expected Ba ot to Exceed
Monthly “Ema mail Inbox s
C
I
B+25% >
B+40% >
B+60% >
B+75%** > mple = 1 Com
2 expected Ba ot to Exceed
VICES AND
wing abbrevia ontract Line I ot To Exceed m Fixed Price
SE PERIOD
CLIN
Tota
Total N Total Esti
TION PERIO
CLIN
aseline Month il Inbox Resp
Complex Ema
Inbox Respon
<B*+10%
>B+10%<B+2
>B+25%<B+4
>B+40%<B+6
>B+60%<B+7 mplex aseline Month
PRICES/CO
ations are use Item Number e
D Ba
N# 1 Busi 2 Oper 3 Cust 4 Proje
Qual al Ope ----- Not
5 Syst 6 Trav
NTE ------
imated
OD ONE
Opti
N# 1 Busin 2 Oper hly Volume ponses” ail nses
Base
5% $
0 $
0% $
5%** $ hly Volume
OSTS
ed in this price r ase Year: Date Descripti iness Service O rations & Main tomer Service ect Managemen lity Control Pro erations and M to Exceed as R em Enhanceme vel ionYear-1: Da Descripti ness Service Op rations & Maint e OY1 e schedule:
e of Award – on perations ntenance nt and ogram
Maintenance Required ents ate of Award on perations tenance
OY2
– 12 Months Monthly Price
– 24 Months Monthly Pric
2 OY3
e Annual P
$750,000 $15,000 $765,0 s ce Annual P
OY4
Price
0.00 0.00
Price
B.2.3 OP
B.2.4 OP
B.2.5 OP
Tota
Total N Total Estima
TION PERIO
CLIN
Tota
Total N Total Estim
TION PERIO
CLIN
Tota
Total N Total Estim
TION PERIO
CLIN
3 Custo 4 Proje
Cont al Oper ----- Not t
5 Syste 6 Trav
NTE ------
ated
OD TWO
Opti
N# 1 Busin 2 Opera 3 Custo 4 Projec
Contro al Opera ----- Not to
5 System 6 Trave
NTE -------
mated
OD THREE
Opti
N# 1 Busin 2 Opera 3 Custo 4 Projec
Contro al Opera ----- Not to
5 System 6 Trave
NTE -------
mated
OD FOUR
Opti
N# 1 Busin 2 Opera 3 Custo 4 Projec omer Service ect Managemen trol Program rations and Ma to Exceed as R em Enhancemen el ionYear-2: Da Descriptio ess Service Ope ations & Mainte mer Service ct Management ol Program ations and Mai o Exceed as Re m Enhancemen l ionYear-3: Da Descriptio ess Service Ope ations & Mainte mer Service ct Management ol Program ations and Mai o Exceed as Re m Enhancemen l ionYear-4: Da Descriptio ess Service Ope ations & Mainte mer Service ct Management nt and Quality aintenance Required nts ate of Award on erations enance and Quality intenance equired ts ate of Award on erations enance and Quality intenance equired ts ate of Award on erations enance and Quality
– 36 Months Monthly Price
– 48 Months
– 60 Months
$780,00 $15,000 $795,0 s e Annual P
$810,000 $15,000 $825,0 s Annual Pr
$845,000 $16,000.
$861,00 s Annual Pr
0.00 0.00
Price
0.00 0.00 rice
.00 rice
N
B.2.6 TO
B.3 CON
The follow with the E
Title/ Category
Tota
Total N Total Estim
TAL OF AL
NTRACTOR
wing Labor R Enhancements
D
Contro al Opera ----- Not to
5 System 6 Trave
NTE -------
mated
LL YEARS
Bas Opt Opt Opt Opt Tot
LABOR RA
Rates are prop s Task Order
Description ol Program ations and Mai o Exceed as Re m Enhancemen l
All Es Year se tion Year 1 tion Year 2 tion Year 3 tion Year 4 tal
ATEs posed in suppo
Issuance Pro
Qualif
END O
intenance equired ts stimated Price Pr ort of CLINs cess as descri fications
OF SECTION B
es rice
105, 205, 305 ibed at Sectio
Base Year
Op
B
$880,00 $16,000 $896,00
5, 405, and 50 on H.8.
ption 1 Opti
05 in accorda ion 2 Option ance n 3 Option
SECTION
L.2.2 Vo Factor 4: P
L.2.2.1 P Each Off at the con order wit example, Failure to may resu following
a. P at ac O X
b. P N m i ii iii iv v vi
L.2.3 Co complete
N L – Instru olume II – Pr Price Propos
Price Criteria feror shall co ntractors’ fac thin each CL , CLIN 1 is t o follow this ult in the reje g sections:
roposed vari t Section B.1 ctivities abo
ONLY, IF NO
XX01 – XX0
roposed bas Numbers X01 minimum:
. Complet
. A Breakd include p 305, 405
. A Breakd the hours proposed
. The Offe
. A breakd proposed are appli
. An expla mpete, sign ed.
Ins ctions to Off rice Proposal sal Realism Reasonablen a (Factor 4) omplete Sect cility. The G
LIN. NOTE
the first year s format or to ection of Off iable pricing
1.2 pricing ta ve the “Base
OT ALREAD
04 AS PART
eline (in acc 1 – X04 for e tion of the B down of the projected lab 5, and 505 ta down of the s by month.
d labor categ eror shall ide down of pric d prices and ied.
anation of ho and date the sert the fo ferors……… l ness tion B of the Government : The CLIN r of performa o provide co feror's propo g for those ac ables. Plug i eline” levels
DY INCLUD
T OF THE M
cordance wit each perform ase and Opti projected la bor categorie sks, yet defi projected di The Offeror gories and al entify all dire ce including clearly delin ow all of the e form 1449
END O
ollowing ch …….…….Pag e solicitation t has provide
NS are equiva ance. Local omplete Price osal. The Pric ctivities refle in the added s shown at B
DED WITH
MONTHLY B
th Section B mance year, ion Period P abor hours by es that may b ned.
irect labor do r shall includ l projected r ect labor esc projected fix neate the cos se price/cost and insure th
OF SECTION
hange to:
ge 60 n, pricing tab ed the anticip alent to year l travel costs e informatio ce/Cost Volu ected at B.1 price for the
B.1.1. THE A
HIN THE FL
BASELINED
.1.1) price/c as listed in S
Pricing Table y labor categ be used in pe ollars associ de the base la rates for all o calation facto xed price. Th st/price basis t estimates w hat all Sectio
N L ble, which sh pated quanti rs of perform s are not reim on for all lab ume shall co
.1 at the scal e correspond
ADDITIONA
LAT PRICES
D SUPPORT
costs by Cont Section B.2 t es gory making erforming C iated with th abor rate (bu option years ors.
he Offeror s s in which th were derived ons B and I hall be perfo ties it expec mance. For mbursable.
or categorie onsist of the led levels sh ding level of
AL COST
S AT CLINS
T ACTIVIT
tract Line Ite to include at g up the price LINs 105, 2 he projection urdened) for hall break ou he percentag d is required.
fill-ins are ormed ts to s hown f
S
TIES.
em t a es, to 205, n of r all ut all ges
Insert t
….(PEPS
mart invo
• Fe
Int
1 Loan Fees
2 Bene
3 Spec Allo
4 LaR
5 LaR
6 Lend
7 Lend Asso
8 Fee
9 Serv Rela
10 Pare
11 GA
the followi
S) and the N olves the fol eeds (or push terface Name Description n Origination s efits cial owances
Rs Part IV Dat
Rs Part V Data der Fee der ociation
Tracking vicer Lender ationship ent Lenders
Invoices ing change
National Stud lowing:
hes) to ADM e Source System n FMS- LaRs
FMS-
LaRs
FMS-
LaRs ta FMS- LaRs a FMS- LaRs
FMS-
LaRs
FMS-
LaRs
FMS-
LaRs
FMS-
LaRs
FPDM
Operati ons
FMS-
GAFR
e to the SO dent Loan Da
M of organiz Target Syste m
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
m
FPDM B
a t
OO beginn ata System (N ational data, Frequenc
/Timing Constrain
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Beginning of month.
Bi-Weekly, 1 and the last d the month.
ing on pag
NSLDS). Th
, aggregated cy g nts
C
5th day of
170,0 appro /data recei week
5th day of
5th day of
5th day of
5th day of
5th day of
5th day of
5th day of
5th day of f the 350 r appro ata su recei mont
5th day of
11,60 appro as of load ge 67 of 91 he maintenan d loan data
Capacity
000 records oximately a submittal ived bi-kly.
records oximately/d ubmittal ived thly
00 records oximately f the latest received nce of the da
Co origfee.txt benefits.txt spallow.txt callrpt1.txt callrpt2.txt lndrfee.txt allids.txt feetrak.txt allsrvcr.txt
Parents5.xl
SR_F_GA_
table ata mments s
_INVOICES
Int
12 FFE
State Acco Repo
13 FFE
Repo
14 FFE
Repo
15 FFE
Quar
16 LEA
Perf
17 LEA
18 FFE
Wee
19 FFE
Repo
20 LEA
App
21 Lend Infor
22 Lend Deta terface Name
ELGA
ement Of ounts (SOA) orts
ELGA Annual orts
ELGA Monthl orts
ELGA
rterly Reports
APP
formance
AP Allotment
ELVFA
ekly Reports
ELVFA Fee orts
AP
ropriation der Payment rmation der Payment ail e Source System
FMS-
GAFR
l FMS-
GAFR
ly FMS-
GAFR
s
FMS-
GAFR
FMS-
GAFR
FMS-
GAFR
FMS-
GAFR
FMS-
GAFR
FMS-
GAFR
FMS-
GAFR
FMS-
GAFR
Target Syste m
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
FPDM B
a t
Frequenc /Timing
Constrain
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
Bi-Weekly, 1 and the last d the month.
cy g nts
C
5th day of
30,00 appro /data recei week
5th day of
5th day of
5th day of
5th day of
5th day of
5th day of
5th day of
5th day of
5th day of
5th day of
Capacity
00 records oximately a submittal ived bi-kly.
Co
SR_FFELG
RTS table
REPORTS
_REPORTS
T_REPORT
SR_LEAPP
PERFORM
T table.
SR_LEAP_
table
SR_FFELV
_REPORTS
SR_FFELV
ORTS table
SR_LEAP_
ON table
FMS_LND
INFO_DAT
FMS_LND
DATAMAR
(Refer to Se mments
GA_SOA_RE
GA_ANNUAL
table
GA_MONTHL
S table
GA_MONQU
TS table
P
MANCE_REP
_ALLOTMEN
VFA_WEEKL
S table
VFA_FEE_RE
e
_APPROPRIA
DR_PAYMEN
TAMART tab
DR_PAYMEN
RT_DTL tabl ection 3.4.2)
EPO
L_
LY
UAR
OR
NT
LY
EP
ATI
NT_
ble
NT_
le
23 Lend Asso
24 Aud
25 Aud
26 Prog
27 Prog Defi
28 Scho
29 Claim
30 FFE
31 GA
32 Lend Coh Rate
33 GA
Reas Figu
34 AMF
der ociation dit dit Deficiency gram Review gram Review iciency ool ms
EL Loans
Load Edits der Annual ort Default es
Annual sonability ures
F e Source System
PEPS
PEPS
y PEPS
PEPS
PEPS
PEPS
NSLDS
NSLDS
NSLDS
NSLDS
NSLDS
NSLDS
Target Syste m
FPDM L
m
FPDM L
m
FPDM L
m
FPDM L
m
FPDM L
m
FPDM L
m
FPDM L
m
FPDM L
m
FPDM L
m
FPDM E
FPDM E
FPDM E
Frequenc /Timing
Constrain
Last Day of th month.
Last Day of th month.
Last Day of th month.
Last Day of th month.
Last Day of th month.
Last Day of th month.
Last Day of th month.
Last Day of th month.
Last Day of th month.
End of year.
End of year.
End of year.
cy g nts
C he 4000 appro ubmi recei mont he 1600 appro ubmi recei mont he he he he he 2 Mi recor appro ubmi recei mont annu he he
Capacity
0 records oximately/s ittal ived every th
00 records oximately/s ittal ived every th illion rds oximately/s ittal ived every th and ually
Co f_lndr_asso f_entity_au f_entity_au ld f_entity_pg d
F_entity_pg cy.txthold f_closed_sc dmclaim.tx dmffelloan.
dmvfa.txtho dmlenderf.t dmgasum.tx dmamf.txt mments oc.txthold udit.txthold udit_dfcncy.tx gm_review.txt gm_review_d ch.txthold xthold
.txthold old txt xt xtho thol dfcn
35 TIVA
• Th
• Th
(ET
• Th
The Fede
AS
he productio he database here are 201
TL).
he ETL jobs he current E eral Student e Source System
NSLDS
on database i contains 531 DataStage J s process 43 ETL processi
Aid ADM S
Target Syste m
FPDM B
is currently 3 1 tables.
Jobs perform million reco ng time is ap
Solution cons
Frequenc /Timing
Constrain
Bi-monthly
3.4 TB in siz
ming data ex ords a month pproximately sists… cy g nts
C
49 M appro
83 M recor inclu
DLS
10/03
This poten incre the in data to the for-p servi Octo ze.
xtraction, tran h.
y 38 hours.
Capacity
Million oximately
Million rds with the usion of S effective 3/2011 might ntially ease with nclusion of pertaining e three Not-profit icers on ober 31, 1.
nsformation
Co
Nslds_fpdm s and loadin mments m.txt ng
File details come from the government source that posted it. Updated .