The file's text, extracted by GovTribe without its formatting.
| 2018 Vessel and Dive Support Services | Services Operational Area |
| Vessel Charter | |
Includes: Dive Safety Equipment, Weights and all other costs specifically associated with vessel charter: Excludes Fuel
| (Fuel will be paid on an actual cost basis per task as an Other Direct Cost). Prices are applicable only to the proposed contract. | | Eastern PR | Western PR | Southern PR | Northern PR | Vieques | Culebra | Mona | St. Croix | St. Thomas | St. John | Florida | |
| Example Vessel Support | | | | | | | | | | | | |
| Skiff (15'-25') | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Small Dive Vessel (25' -35') | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Medium Dive Vessel (35' - 50') | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 50' - 60' Dive Vessel | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Barge w/Crane | | | | | | | | | | | | |
(70 ton capacity)
| Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Example Personnel Support (Hourly)* | | | | Rental Items | $0.00 | Rental Items | $0.00 |
| Vessel Captain | $0.00 | Marine Scientist 1 (Junior) | $0.00 | Small Portable Generator (capable of powering hand tools and small electronics) | $0.00 | Kayak (double) | $0.00 |
| Deckhand | $0.00 | Marine Scientist 2 (Support) | $0.00 | Cement Mixer (3.5 - 5 cu.ft.) | $0.00 | Kayak (single) | $0.00 |
| Dive Master | $0.00 | Marine Scientist 3 (Mid-Level) | $0.00 | Corded Drill for Cement Mixing | $0.00 | Circular Saw - Metal Cutting | $0.00 |
| Support Diver | $0.00 | Marine Scientist 4 (Senior) | $0.00 | Digital SLR Camera and UW Housing | $0.00 | Portable Surface Supplied Air (2 divers) | $0.00 |
| Safety Diver | $0.00 | Coastal Restoration/ Terrestrial Scientist 1 (Junior) | $0.00 | U/W Video Equipmet | $0.00 | Underwater Scooter | $0.00 |
| Scientific Diver | $0.00 | Coastal Restoration/ Terrestrial Scientist 2 (Support) | $0.00 | Nitrox Tank Rental | $0.00 | U/W Pneumatic Drill | $0.00 |
| Commercial Diver | $0.00 | Coastal Restoration/ Terrestrial Scientist 3 (Mid-Level) | $0.00 | Air Tank Refills | $0.00 | Lift Bag ~100lb capacity | $0.00 |
| Task Order Project Manager | $0.00 | Coastal Restoration/ Terrestrial Scientist 4 (Senior) | $0.00 | Nitrox Tank Refills | $0.00 | Lift Bag ~250lb capacity | $0.00 |
| Project Manager | $0.00 | Laboratory Support | $0.00 | | | Lift Bag ~350lb capacity | $0.00 |
| | Data Analysis | $0.00 | | | Lift Bag ~500lb capacity | $0.00 |
| * At a minimum provide example personnel for each category including qualifications as a supplemental document. | | | | Other Direct Costs (ODC's) will be reimbursed at cost. The ODC's may include but are not limited to: Bags of Sand and Cement, Epoxy, Buckets, Rebar, Marker Bouys, Small Hand Tools, PVC Pipe, Masonary Nails, Measuring Tapes, Limestone Boulders, Contruction Supplies. | | | |
| 2019 Vessel and Dive Support Services | Services Operational Area |
| Vessel Charter | |
Includes: Dive Safety Equipment, Weights and all other costs specifically associated with vessel charter: Excludes Fuel
| (Fuel will be paid on an actual cost basis per task as an Other Direct Cost). Prices are applicable only to the proposed contract. | | Eastern PR | Western PR | Southern PR | Northern PR | Vieques | Culebra | Mona | St. Croix | St. Thomas | St. John | Florida | |
| Example Vessel Support | | | | | | | | | | | | |
| Skiff (15'-25') | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Small Dive Vessel (25' -35') | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Medium Dive Vessel (35' - 50') | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 50' - 60' Dive Vessel | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Barge w/Crane | | | | | | | | | | | | |
(70 ton capacity)
| Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Example Personnel Support (Hourly)* | | | | Rental Items | | Rental Items | |
| Vessel Captain | $0.00 | Marine Scientist 1 (Junior) | $0.00 | Small Portable Generator (capable of powering hand tools and small electronics) | $ - 0 | Kayak (double) | $ - 0 |
| Deckhand | $0.00 | Marine Scientist 2 (Support) | $0.00 | Cement Mixer (3.5 - 5 cu.ft.) | $ - 0 | Kayak (single) | $ - 0 |
| Dive Master | $0.00 | Marine Scientist 3 (Mid-Level) | $0.00 | Corded Drill for Cement Mixing | $ - 0 | Circular Saw - Metal Cutting | $ - 0 |
| Support Diver | $0.00 | Marine Scientist 4 (Senior) | $0.00 | Digital SLR Camera and UW Housing | $ - 0 | Portable Surface Supplied Air (2 divers) | $ - 0 |
| Safety Diver | $0.00 | Coastal Restoration/ Terrestrial Scientist 1 (Junior) | $0.00 | U/W Video Equipmet | $ - 0 | Underwater Scooter | $ - 0 |
| Scientific Diver | $0.00 | Coastal Restoration/ Terrestrial Scientist 2 (Support) | $0.00 | Nitrox Tank Rental | $ - 0 | U/W Pneumatic Drill | $ - 0 |
| Commercial Diver | $0.00 | Coastal Restoration/ Terrestrial Scientist 3 (Mid-Level) | $0.00 | Air Tank Refills | $ - 0 | Lift Bag ~100lb capacity | $ - 0 |
| Task Order Project Manager | $0.00 | Coastal Restoration/ Terrestrial Scientist 4 (Senior) | $0.00 | Nitrox Tank Refills | $ - 0 | Lift Bag ~250lb capacity | $ - 0 |
| Project Manager | $0.00 | Laboratory Support | $0.00 | | | Lift Bag ~350lb capacity | $ - 0 |
| | Data Analysis | $0.00 | | | Lift Bag ~500lb capacity | $ - 0 |
| * At a minimum provide example personnel for each category including qualifications as a supplemental document. | | | | Other Direct Costs (ODC's) will be reimbursed at cost. The ODC's may include but are not limited to: Bags of Sand and Cement, Epoxy, Buckets, Rebar, Marker Bouys, Small Hand Tools, PVC Pipe, Masonary Nails, Measuring Tapes, Limestone Boulders, Contruction Supplies. | | | |
| 2020 Vessel and Dive Support Services | Services Operational Area |
| Vessel Charter | |
Includes: Dive Safety Equipment, Weights and all other costs specifically associated with vessel charter: Excludes Fuel
| (Fuel will be paid on an actual cost basis per task as an Other Direct Cost). Prices are applicable only to the proposed contract. | | Eastern PR | Western PR | Southern PR | Northern PR | Vieques | Culebra | Mona | St. Croix | St. Thomas | St. John | Florida | |
| Example Vessel Support | | | | | | | | | | | | |
| Skiff (15'-25') | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Small Dive Vessel (25' -35') | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Medium Dive Vessel (35' - 50') | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 50' - 60' Dive Vessel | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Barge w/Crane | | | | | | | | | | | | |
(70 ton capacity)
| Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Example Personnel Support (Hourly)* | | | | Rental Items | | Rental Items | |
| Vessel Captain | $0 | Marine Scientist 1 (Junior) | $0 | Small Portable Generator (capable of powering hand tools and small electronics) | $ - 0 | Kayak (double) | $ - 0 |
| Deckhand | $0 | Marine Scientist 2 (Support) | $0 | Cement Mixer (3.5 - 5 cu.ft.) | $ - 0 | Kayak (single) | $ - 0 |
| Dive Master | $0 | Marine Scientist 3 (Mid-Level) | $0 | Corded Drill for Cement Mixing | $ - 0 | Circular Saw - Metal Cutting | $ - 0 |
| Support Diver | $0 | Marine Scientist 4 (Senior) | $0 | Digital SLR Camera and UW Housing | $ - 0 | Portable Surface Supplied Air (2 divers) | $ - 0 |
| Safety Diver | $0 | Coastal Restoration/ Terrestrial Scientist 1 (Junior) | $0 | U/W Video Equipmet | $ - 0 | Underwater Scooter | $ - 0 |
| Scientific Diver | $0 | Coastal Restoration/ Terrestrial Scientist 2 (Support) | $0 | Nitrox Tank Rental | $ - 0 | U/W Pneumatic Drill | $ - 0 |
| Commercial Diver | $0 | Coastal Restoration/ Terrestrial Scientist 3 (Mid-Level) | $0 | Air Tank Refills | $ - 0 | Lift Bag ~100lb capacity | $ - 0 |
| Task Order Project Manager | $0 | Coastal Restoration/ Terrestrial Scientist 4 (Senior) | $0 | Nitrox Tank Refills | $ - 0 | Lift Bag ~250lb capacity | $ - 0 |
| Project Manager | $0 | Laboratory Support | $0 | | | Lift Bag ~350lb capacity | $ - 0 |
| | Data Analysis | $0 | | | Lift Bag ~500lb capacity | $ - 0 |
| * At a minimum provide example personnel for each category including qualifications as a supplemental document. | | | | Other Direct Costs (ODC's) will be reimbursed at cost. The ODC's may include but are not limited to: Bags of Sand and Cement, Epoxy, Buckets, Rebar, Marker Bouys, Small Hand Tools, PVC Pipe, Masonary Nails, Measuring Tapes, Limestone Boulders, Contruction Supplies. | | | |
| 2021 Vessel and Dive Support Services | Services Operational Area |
| Vessel Charter | |
Includes: Dive Safety Equipment, Weights and all other costs specifically associated with vessel charter: Excludes Fuel
| (Fuel will be paid on an actual cost basis per task as an Other Direct Cost). Prices are applicable only to the proposed contract. | | Eastern PR | Western PR | Southern PR | Northern PR | Vieques | Culebra | Mona | St. Croix | St. Thomas | St. John | Florida | |
| Example Vessel Support | | | | | | | | | | | | |
| Skiff (15'-25') | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Small Dive Vessel (25' -35') | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Medium Dive Vessel (35' - 50') | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| 50' - 60' Dive Vessel | | | | | | | | | | | | |
| | Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| | Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Barge w/Crane | | | | | | | | | | | | |
(70 ton capacity)
| Proposed Vessel | | | | | | | | | | | |
| Rates: | 1/2 Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Full Day | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Multi-Day (daily rate for more then 3 days of operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Weather Day (for multi-day operations) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Example Personnel Support (Hourly)* | | | | Rental Items | | Rental Items | |
| Vessel Captain | $0 | Marine Scientist 1 (Junior) | $0 | Small Portable Generator (capable of powering hand tools and small electronics) | $ - 0 | Kayak (double) | $ - 0 |
| Deckhand | $0 | Marine Scientist 2 (Support) | $0 | Cement Mixer (3.5 - 5 cu.ft.) | $ - 0 | Kayak (single) | $ - 0 |
| Dive Master | $0 | Marine Scientist 3 (Mid-Level) | $0 | Corded Drill for Cement Mixing | $ - 0 | Circular Saw - Metal Cutting | $ - 0 |
| Support Diver | $0 | Marine Scientist 4 (Senior) | $0 | Digital SLR Camera and UW Housing | $ - 0 | Portable Surface Supplied Air (2 divers) | $ - 0 |
| Safety Diver | $0 | Coastal Restoration/ Terrestrial Scientist 1 (Junior) | $0 | U/W Video Equipmet | $ - 0 | Underwater Scooter | $ - 0 |
| Scientific Diver | $0 | Coastal Restoration/ Terrestrial Scientist 2 (Support) | $0 | Nitrox Tank Rental | $ - 0 | U/W Pneumatic Drill | $ - 0 |
| Commercial Diver | $0 | Coastal Restoration/ Terrestrial Scientist 3 (Mid-Level) | $0 | Air Tank Refills | $ - 0 | Lift Bag ~100lb capacity | $ - 0 |
| Task Order Project Manager | $0 | Coastal Restoration/ Terrestrial Scientist 4 (Senior) | $0 | Nitrox Tank Refills | $ - 0 | Lift Bag ~250lb capacity | $ - 0 |
| Project Manager | $0 | Laboratory Support | $0 | | | Lift Bag ~350lb capacity | $ - 0 |
| | Data Analysis | $0 | | | Lift Bag ~500lb capacity | $ - 0 |
| * At a minimum provide example personnel for each category including qualifications as a supplemental document. | | | | Other Direct Costs (ODC's) will be reimbursed at cost. The ODC's may include but are not limited to: Bags of Sand and Cement, Epoxy, Buckets, Rebar, Marker Bouys, Small Hand Tools, PVC Pipe, Masonary Nails, Measuring Tapes, Limestone Boulders, Contruction Supplies. | | | |