Amendment_SF_30_0001_Shore_Power_Connection_Box.pdf

PDF 30 KB Posted

Attached to
Shore Power Connection Box Federal contract opportunity
Solicitation number
EA0133M-16-RQ-0632
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

Amendment 0001 SF-30

View the file

Other files for this federal contract opportunity

Other files attached to Shore Power Connection Box, newest first.
File Type Posted
RFQ_Combined_Synopsis_Solicitation_-_Shore_Power_Connection_Box.pdf PDF
Revised_Connection_Box_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code Page of Pages 1 1

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable) 0001 7/27/2016

6. Issued By Code AJ930073 7. Administered By (If other than Item 6) Code NOAA/Eastern Acquisition Division 200 Granby Street, Suite 815 Norfolk, VA 23510

See Block 6

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

X

EA-133M-16-RQ-0632

9B. Date (See Item 11)

10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amend Soliciation EA-133M-16-RQ-0632 as follows:

A. A questions and answers document is posted below.

B. The deadline for submission of quotes is extended through 4:00 PM EST on July 30, 2016.

1. For the kilowatt/hour meter, do you have any preference as to Analog style or digital type?

A digital meter is preferred.

2. For the power consumption meter do you require communication capability through an Ethernet connection?

Yes, communication capability through Ethernet is required.

3. In your Bill of Material, you list a Crompton #077-12PA-P2C6 Phase Sequence Meter. This is a panel mount meter that does not show up in the pictures. Is this a new device for the revised distribution box?

Yes, this is a new device for the revised distribution box.

4. Upon review of the pictures you sent with the solicitation, we can see the Red push button and White pilot light as listed in the Bill of Materials (BOM). However, we also noted what looks like a Green pilot light. Is this part of the package?

Yes, it is required. This is the Power Available light. Two are required.

5. The specs call for two (2) 90 degree potted receptacles. Can you accept the receptacles wired with single conductors and not potted?

Not potting the receptacles is acceptable as long as an electrical coating is applied to prevent corrosion due to the salt water environment.

6. Specs mention GE lights and Pushbuttons. Will any brand name panel be acceptable?

Any manufacturer of electrical parts is acceptable as long as they are made for a marine environment.

7. Can you provide more information regarding the Vicknair cover?

The vicknair cover is a clear plastic waterproof cover that goes over the shore power totalizer meters and associated indicator lights. Any waterproof plastic cover that is heavy duty and will not deteriorate or discolor due to UV (sun) exposure is acceptable.

8. The Crompton items listed on the material list are they 480 VAC and 60 hertz?

Yes, they are 480 VAC and 60 Hz.

9. Is there a wiring diagram for this design or the existing Shore Power box?

We do not have an electrical drawing of the interior of the shore power box.