DTSL55-16-B-0200A0001(2).pdf
PDF 43 KB Posted
- Attached to
- Hands Free Mooring System Building and Utilities Federal contract opportunity
- Solicitation number
- DTSL5516B0200
About this file
Amendment of Solicitation Standard Form 30. This form must be signed dated and returned with bid.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DTLS55-16-B-0200A0002(2).pdf | ||
| Plan_Holder's_Listing.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
DTLS55-16-B-0200A0001
3. EFFECTIVE DATE
09/08/2016
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
U.S. Department of Transportation Saint Lawrence Seaway Development Corporation Contracting Office 180 Andrews Street Massena, New York 13662
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION
NO.
DTLS55-16-B-0200
9B. DATED (SEE ITEM 11)
August 18, 2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE
PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is two-fold. First, it serves to extend the bid opening date from 2:00 pm(EST) Monday, 09/19/2016 to 2:00 pm(EST) Thursday, 09/22/2016 and add one required site visit at 1:00 pm(EST) on Wednesday, September 14, 2016. Arrangements for site visits must be made with the Office of Engineering and Maintenance, phone 315-764-3265.
Second, it serves to include all questions asked by prospective offerors and the answers provided by the Contracting Officer's Representative.
Continued on Page 2 (Q&A)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
DTLS55-16-B-0200A0001
Questions and Answers
1. Q: Please clarify the type of doors required for this project. Insulated Sectional or Rolling Steel Doors?
A: It needs to be a roll-up door with one row of windows.
2. Q: Clarification to question(s) related to confined spaces
A: The contractor(s) is responsible for submitting a safety and health plan that is specific to this project. The contractor must make their own determination as to whether any of the anticipated work spaces would be considered permit-required confined spaces during the project per OSHA regulations. The contractor shall be responsible for all labor, equipment and materials needed to support any permit requirements, if deemed necessary. For informational purposes only, the SLSDC does not currently designate any anticipated work spaces for this project as permit-required confined spaces.
File details come from the government source that posted it. Updated .