DTRT5716R20008_-_Amendment_No._A0001.pdf
PDF 2 MB Posted
- Attached to
- Capital Investment Analysis Support (CIAS) Federal contract opportunity
- Solicitation number
- DTRT5716R20008
About this file
Amendment No. A0001 to Solicitation No. DTRT5716R20008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DTRT5716R20008_-_Amendment_No._A0002.pdf | ||
| DTRT5716R20008_SOLICITATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTRT5716R20008
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
V221
Cambridge MA 02142-1001 55 Broadway, V-221 Off-Site Eng & R&D Contracts Branch U.S. DOT/Volpe Center
V221
Cambridge MA 02142-1001 55 Broadway, V-221 Off-Site Eng & R&D Contracts Branch U.S. DOT/Volpe Center
09/15/2016A0001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/26/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1. The purpose of this Amendment is to provide the Capital Investment Analysis Support
(CIAS) Small Business Set-Aside Procurement Pre-Proposal Conference Webinar Slides and the
List of Attendees at the CIAS Pre-Proposal Conference Webinar. See Attachments.
2. Please acknowledge receipt of this Amendment with the submission of your proposal.
3. All other terms and conditions of the Solicitation remain unchanged.
RECOVERY: NON-RECOVERY
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Elizabeth A. Segal
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Pre-Proposal Conference Capital Investment Analysis Support (CIAS)
Solicitation No. DTRT5716R20008 Small Business Set-Aside
The National Transportation Systems Center
Advancing transportation innovation for the public good
U.S. Department of Transportation Office of the Assistant Secretary for Research and Technology John A. Volpe National Transportation Systems Center
September 14, 2016
Today’s Agenda
Introduction
Ground Rules and Logistics
Volpe Center Overview
CIAS Overview and Procurement Objectives
RFP Highlights
Cost and Business Proposal
Technical Proposal
Proposal Submission Reminders
Ground Rules and Logistics
This Pre-Proposal Conference Webinar will be recorded No verbal or written questions will be answered relative to the solicitation during the Pre-Proposal Conference Webinar Any statements, remarks, or explanations made during this
Pre-Proposal Conference Webinar shall not alter the terms and conditions of the solicitation
The terms and conditions of the solicitation shall remain unchanged unless an amendment to the solicitation is issued that incorporates any changes discussed or alluded to during today’s Pre-Proposal Conference Webinar
A copy of today’s presentation and the list of attendees will be provided as an amendment to the solicitation
Ground Rules and Logistics – cont’d
Any questions, clarification requests, or other inquires pertaining to the solicitation must be submitted, via e-mail, no later than 4:30 p.m., Eastern Time, on Friday, September 30, 2016
Written questions received after September 30, 2016 will be answered by amendment only if determined by the CO to be in the best interest of the Government.
An amendment will be issued providing responses to written questions received by the CO
Today’s Presenters
Elizabeth A. Segal, Contracting Officer, Office of Acquisitions, V-221
Anthony J. Rufo, Contract Specialist, Office of Acquisitions, V-221
Michael Versage, Program Manager, Aviation Facilities and Business Services Division, V-344
Volpe Center Overview
Michael Versage Program Manager
About Volpe Background Volpe established in 1970 Part of U.S. Department of
Transportation (DOT) Office of Research and Technology
Named after former DOT Secretary and Massachusetts Governor John A. Volpe
Volpe supports DOT goals Safety State of good repair Economic competitiveness Livable communities Environmental sustainability
Who we are
Our Purpose: Advancing transportation innovation for the public good
Our Mission: Improve the nation’s transportation system by serving as a center of excellence for informed decision making, anticipating emerging transportation issues, and advancing technical, operational, and institutional innovations
Our Values:
Public service Innovative solutions Professional excellence Collaboration and partnering
What makes us unique
Multimodal, world-class resource
Decades of experience and expertise in every mode of transportation
Institutional knowledge of the global transportation system and its stakeholder perspectives
Experience in responding to large-scale global and national transportation challenges
Cross-disciplinary expertise
Knowledge in the full spectrum of technologies and disciplines relevant to transportation system improvements
Experience in assembling interdisciplinary teams to address technology and public policy innovations
Multimodal, world-class resource
Decades of experience and expertise in every mode of transportation
Institutional knowledge of the global transportation system and its stakeholder perspectives
Experience in responding to large-scale global and national transportation challenges
Cross-disciplinary expertise
Knowledge in the full spectrum of technologies and disciplines relevant to transportation system improvements
Experience in assembling interdisciplinary teams to address technology and public policy innovations
Entrepreneurial, objective, efficient
Fee-for-service; no direct appropriations Flexibility and responsiveness of a consultant A trusted, objective advisor focused on safety and the public good
Federal advantage
Guided by a deep understanding of federal responsibilities, objectives, and practices
Accessibility of a federal in-house resource that can partner on strategy, tactics, policy, and acquisitions
Driven by public interest—not profit
Operations OfficesTechnical Centers
Safety Management and Human Factors Stephen Popkin
Policy, Planning, and Environment
Gregg Fleming
Air Traffic Systems and Operations
Gregg Fleming, acting
Infrastructure Systems and Technology
Luisa Paiewonsky
Chief Financial Officer William Henrikson
Chief Counsel Monica Conyngham
EEO Officer Karen Kowalewski
Director Anne Aylward
Human Resources
Susan Connors
Acquisitions Mary Doherty
Information Technology
Eric Frykenberg
Facilities Management David Duncan
Communication and Knowledge Management
Cassandra Allwell
Strategic Management Rachel Winkeller
Deputy Director for Research and Technology
Anne Aylward, acting
Deputy Director for Operations Robert Dorer, acting
Organizational Culture and Work Life Helen Blackman
Multimodal Programs and Partnerships Michael Dinning
Senior Technical Advisor Richard John
Research Infrastructure and Operations
Robert Dorer
Strategic Initiatives Ellen Bell
Technical Organizations
Safety Management and Human
Factors
Policy, Planning, and Environment
Safety Information
Systems
Safety Measurement and Analysis
Aviation Safety
Management Systems
Surface Transportation Human Factors
Aviation Human Factors
Economic Analysis
Transportation Planning
Organizational Performance
Environmental Measurement and Modeling
Environmental Science and Engineering
Energy Analysis
CAFE
Program
Office
Infrastructure Systems and
Technology
Air Traffic Systems and Operations
Aviation Systems
Engineering
Situational Awareness and
Logistics
Systems Safety and Engineering
Structures and Dynamics
Advanced Vehicle
Technology
Air Navigation and
Surveillance
Air Wakes and
Weather
Infrastructure Engineering and Deployment
Air Traffic Management
Systems
Aviation Facilities and Business Services
NextGen Program
Office
Innovative Research Program
Office
Technology Innovation and Policy
Focus Development of aviation systems that alleviate air traffic congestion, improve safety, and mitigate environmental impacts
Planning, testing, research, and evaluation in support of the Next Generation Air Transportation System (NextGen)
Real-time operational communication, navigation, surveillance, and decision support systems
Example projects Aircraft wake turbulence and aircraft separation – FAA Remotely piloted aircraft technology assessments – FAA NextGen surveillance systems (ADS-B) – FAA NextGen modeling and simulation – FAA Air traffic facilities support – FAA
Technical Overview
Michael Versage Program Manager
CIAS Small Business Set-Aside Overview and Procurement
Objectives
Background
A large component of the Volpe Center’s work is providing transportation-related support to the U.S. DOT and other federal organizations.
The Volpe Center is supporting the Federal Aviation Administration’s (FAA) Capital Expenditures Program Office (ABP-300).
Located at Washington, DC Headquarters with several FTEs throughout the country.
ABP-300 achieves FAA performance goals providing business and financial oversight.
Facilities and Equipment (F&E) appropriation $2.855 billion in 2016.
FAA’s Research, Engineering, and Development (R,E&D) appropriation $166 million in 2016.
The Contractors will be an important part of the Volpe Center’s resources working closely with Volpe Center staff.
Objective:
Acquire the services of Contractors to provide technical support to research, define, execute, and enhance projects in the 13 technical work areas of the Statement of Work
Technical Overview - Statement of Work Contractors will support the following task areas:
1. Budget Planning
2. Cost Accounting and Financial Reporting Systems
3. Delphi Financial Management System
4. Financial Analysis
5. Financial Capitalization
6. Reimbursable Agreements
7. Business Process Re-Engineering
8. Corporate Work Plan
9. Information Assurance
10. Program and Technical Management
11. Systems Engineering
12. Acquisition
13. Administrative
Task Area 1 - Budget Planning
Conduct OMB-300 analysis and draft reports
Assist with resource planning documents
Provide support for OST, OMB, and President’s budget processes
Work Products include:
Program formulation assessments Track execution worksheets Scorecards on program priorities Budget briefings
Task Area 2 - Cost Accounting and Financial Reporting
Technical assistance to extract and analyze information
Maintenance of financial related systems
Develop and maintain project accounting structures
Work Products include:
Aging funds reports Purchase Requisition (PR)
Summary Invoice Summary Project Authorization
Summary
Task Area 3 - Delphi Financial Management System
Support Delphi issues working groups
Provide support in aligning key internal FAA business processes with Delphi definitions
Use Delphi to improve predictability, effectiveness, control, and accuracy of operations
Work Products include:
Process descriptions Flowcharts Delphi extracts to Microsoft
Office tools.
Subject Matter Expertise
Training to FAA Program Offices.
Task Area 4 - Financial Analysis
Provide Financial Analysis to Capital Investment Teams
Assist with preparation of 5 and 10 year plans
Assist with process descriptions
Work Products include:
White papers Funding scenario case studies Presentations Classroom exercises
Task Area 5 - Financial Capitalization
Provide technical support maintaining capital asset documentation
Provide support for tools for maintenance of Facility and Equipment project accounting structures
Forecast future capital assets and coordinate with regional staff for timing and accuracy
Work Products include:
Forecast reports Quarterly accruals Capital Package
Documentation Tracking reports
Task Area 6 - Reimbursable Agreements (RA)
Reviewing RA requests to ensure all accounting and coding citations are properly identified
Auditing existing agreements Managing, tracking, and monitoring RAs from inception through implementation and close-out
Work Products include:
Variance reports Aging reports Draft policy guidance Policy compliance findings
Task Area 7 - Business Process Re-Engineering
Conduct requirements analysis of applications and system needs
Analyze network logic and inconsistencies
Model and test work functions Provide recommendations for improvement
Work Products include:
Requirements documents Flowcharts Facilitated conferences Implementation Plans Briefings
Task Area 8 - Corporate Work Plan (CWP)
Provide improvement and support to nation-wide work planning system
Identify core processes, sub-processes and linkage
Support CWP data integrity
Work Products include:
Requirements documents Module interaction validation Schedule anomalies analysis Project aging reports Communication of resource trends Training metrics
Task Area 9 - Information Assurance
Provide database analysis, data queries, and reporting support for FAA financial information systems
Provide Oracle software consulting support as needed to maintain interfaces between FAA financial systems and other FAA Oracle-based systems
Provide training to Government employees on FAA financial and business management systems and processes
Work Products include:
Training packages Requirements documents Attendance at Change Control
Board meetings Meeting minutes actions
Task Area 10 - Program and Technical Management
Review program plans, schedules, cost estimates, and benefits to identify gaps in support
Review GAO, OIG, and OMB reports related to FAA acquisition programs and draft responses
Assist in development of program metrics and baseline parameters for tracking program progress
Work Products include:
Cost Estimates Benefits assessments Draft responses to
Government inquiries Baseline Variance Reports
Task Area 11 - Systems Engineering
Conduct special studies that cover strategic issues that range from corporate level financial planning and budget narratives, to workforce planning
Assist in drafting the financial portion of the FAA Annual Report to Congress
Provide schedule management support for major programs, linking interdependencies to new capabilities as programs move through decision points
Work Products include:
White papers Special studies Draft Congressional correspondence.
Baseline analysis reports
Task Area 12 - Acquisition
Support FAA’s Acquisition Management System
Support development of acquisition-related databases.
Support development of business cases for investment decisions
Work Products include:
Policy review Draft Policy Orders EVM Reports Acquisition Baseline Reporting Briefing Packages for the Joint
Resource Council
Task Area 13 - Administrative
Collect, Correlate, and Distribute Budget and Planning Data
Update Program Milestones. Data Entry into Financial Management System (FMS)
Broadcasts of Planning Information
Facilitate Passback Meetings
Maintain Enterprise Risk Register
Tracking Additions and Deletions of User Lists and Training Metrics. Tracking User Email Communications
Assembling Reports for Expiring Funds
Work Products include:
Data Entry Reports Documents Agendas Schedules
Section I – Contract Clauses
Reference: FAR 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)
(b) Applicability. This clause applies only to -
(3) Orders set aside for small business or 8(a) concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for—
(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
Cost of contract performance incurred for personnel refers to direct labor cost and any applicable indirect burdens (i.e., Fringe, Overhead, and G&A), excluding other direct costs, fees, or profit https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%208_4.html#wp1096389 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2016_5.html#wp1095799
Procurement Summary
DTRT5716R20008 is a competitive solicitation for Capital Investment Analysis Support (CIAS)
Small Business Set-Aside Procurement The North American North American Industry Classification System
(NAICS) code for this acquisition is 541611 - Administrative Management and General Management Consulting Services, with a small business size standard of $15.0 million
Two to four Indefinite Delivery/Indefinite Quantity (ID/IQ) Master Contract awards are anticipated
Multiple Award Master Contracts will provide for the issuance of Firm-Fixed-Price (FFP), Cost-Plus-Fixed-Fee (CPFF) completion-type and CPFF term-type task orders
Cost and Business Proposal Requirements The Government intends to award the contracts based on initial offers and does not anticipate holding discussions as provided in FAR 52.215-1(f)(4). However, the Government reserves the right to hold discussions if determined necessary.
All information related to cost or pricing data must be included in Volume I of the proposal. Under no circumstances shall cost or pricing data be included in the Technical Proposal (Volume II).
The Offeror is advised that inclusion of cost and pricing data in the Technical Proposal may result in the elimination of its offer.
Offerors are required to demonstrate consistency between the labor costs shown in the Cost and Business Proposal and the salaries of the persons whose resumes are submitted in the Technical Proposal. See Section L, Paragraph L.2.D.
The Offeror is advised that failure to follow the instructions, provide the required schedules, and include supporting documentation may result in the rejection of its offer. A proposal that is incomplete may be eliminated from consideration or be assigned a higher risk level.
A Prime Offeror is not eligible to receive a Cost-Plus-Fixed-Fee
(Completion or Term) task order unless its accounting system has been reviewed by a Federal Government audit agency, such as the Defense Contract Audit Agency (DCAA) and determined to be adequate for determining costs under a cost-reimbursement contract.
Consent will not be given for a CPFF subcontractor unless that particular subcontractor’s accounting system has been reviewed by the DCAA and determined to be adequate for determining costs under a cost-reimbursement contract.
The Contracting Officer relies on the information provided by the DCAA or other cognizant Federal agency to determine the adequacy of a Contractor’s accounting system.
The Offeror’s Cost and Business Proposal (Volume I) shall be submitted in three sections as follows:
Section I - Solicitation Documents Completed and signed Standard Form (SF) 33 (Page 1 of the Solicitation) Acknowledgment of any Solicitation Amendments Representations, Certifications, and Other Statements of Offerors or Respondents
Section II - Information Other Than Cost and Pricing Data Signed Proposal Cover Sheet (Schedule 1) Completed Cost and Business Proposal Schedules Information other than cost and pricing data
Section III - Business Proposal Contract Cost Control Plan Subcontract Consent
Section II – Information Other Than Cost and Pricing Data
All costs, rates, factors, assumptions, and calculations must be shown and supporting rationale and documentation included.
A narrative must be provided addressing each cost element and methodology.
Subcontracts - Section II – Information Other Than Cost and Pricing Data
Prime Offeror must address all aspects of anticipated subcontract consent Prime Offeror should consider what type of consent each subcontractor is eligible for:
o Cost-Plus-Fixed-Fee, Time and Materials, or Labor Hour
It is the responsibility of the Prime Offeror to thoroughly review and evaluate all subcontractor proposals
Prime Offeror shall show written evidence of its review and evaluation of all subcontractor proposals
Subcontracts - Section II – Information Other Than Cost and Pricing Data
Cost-Plus-Fixed-Fee CPFF subcontractors must complete Schedule 1, Schedule 2, Schedule 5, Schedule 6, and Schedule 8 Show calculations used to compute proposed direct labor rates o Basis and rationale for the proposed labor rates o For example, current salary data, bidding rates, survey data
Indirect Rates o Information used to develop the proposed indirect rates o Provide a copy of the latest letter to the DCAA and/or from the
DCAA with Forwarding Pricing Rates submission and/or approval
Subcontracts - Section II – Information Other Than Cost and Pricing Data
Time and Materials (T&M) or Labor Hour Follow procedures specified in FAR Subpart 16.6 T&M or Labor Hour subcontractors must complete Schedule 1 and
Schedule 2 Acceptance of Billing Rates
1. Rate build-up (cost element and profit). Build-up must be shown and each cost element supported.
2. Commerciality. Convincing statistical information on hours, billings, and customers in the last 12 months must be provided.
Signed statement that proposed rates are the “Most Favored Customer Rates” or reason why they are not.
Cost Business Proposal Schedules - Section II – Information Other Than Cost and Pricing Data
Schedule 1 – Proposal Cover Sheet Schedule 2 – Summary of Proposed Costs and Fixed Fee Schedule 3 – Summary of Proposed Costs and Profit Schedule 4 – Establishment of Maximum Factors and
Calculation of Proposed Amounts for Fixed Fee and Profit Schedule 5 – Summary of Proposed Labor Cost and
Distribution of Labor Cost Between Cost Plus Fixed Fee and Firm Fixed Price
Cost Business Proposal Schedules - Section II – Information Other Than Cost and Pricing Data
Schedule 6 – Labor Cost Realism Information Schedule 7 – Allocation of Labor Hours Schedule 8 – Indirect Rates and Factors Schedule 9 – Subcontract Information
Exhibit A – Resume Checklist
Schedule 1 - Proposal Cover Sheet
To be completed by Prime Offeror and all Subcontractors Blocks 2a – 3d o Company name, address, point of contact
– Telephone number, Fax number
Block 4 – Type of contract (e.g. Firm-Fixed-Price, Cost-Plus-Fixed-Fee, Other) Block 5 – Select either Prime Offeror or Subcontractor (include Company name) Block 6 o A. Estimated Cost (Equals total costs and cost of money from Schedule 2 and Schedule 3) o B. Fixed Fee (Fee proposed to cost-type contract) o C. Profit (Profit proposed to fixed price type contract) o D. Total Price (bottom line from Schedule 2 and Schedule 3)
Block 7 – information of Cognizant Government Administrative agency and Cognizant Government audit agency
Blocks 8a and 8b – Name and Title of authorized official Block 9 – Name of firm Blocks 10 and 11 – Signature of official and date of submission
Schedule 2 - Summary of Proposed Costs and Fixed Fee To be completed by Prime Offeror and all Subcontractors Include cost type contract cost elements
Direct Labor (from Schedule 6) Fringe Benefits – include rate Overhead – include rate List any Subcontract’s total dollar amounts (80% of Subcontract costs) Subcontract Burden (indirect rate[%] applied to subcontract[s]) – include rate Other Direct Costs (ODCs) o RFP-stipulated Travel o RFP-stipulated Miscellaneous o Offeror-estimated ODCs
General and Administrative (G&A) – include rate Cost of Money – include, if applicable Fixed Fee (from Schedule 4; excludes Cost of Money) Total proposed Cost and Fixed Fee – Cost-type contracts
Schedule 3 - Summary of Proposed Price and Profit To be completed by Prime Offeror Include Fixed Price cost elements
Direct Labor (from Schedule 6) Fringe Benefits – include rate Overhead – include rate List Subcontract’s total dollar amounts (20% of Subcontract costs) Subcontract Burden (indirect rate[%] applied to subcontract[s]) – include rate Other Direct Costs o RFP-stipulated Travel o RFP-stipulated Miscellaneous o Offeror-estimated ODCs
General and Administrative (G&A) – include rate Cost of Money – include, if applicable Profit (from Schedule 4; excludes Cost of Money) Total proposed Cost and Profit – Fixed-Price type contracts
Schedule 4 - Establishment of Maximum
Factors and Calculation of Proposed Amounts for Fixed Fee and Profit
Schedule 4 –To be completed by Prime Offeror for proposed fixed fee and profit o Fixed Fee (Cost-type contracts)
– Complete table entering values for cost contract data from Schedule 2 o Profit (Fixed Price-type contracts)
– Complete table entering values for fixed price and time and materials contract pricing data
Instructions from Schedule 4 (to reiterate):
(1) "Subcontracts, Equipment, and Travel Cost” should not include any Prime indirect burden.
(2) “All Other Costs” should include all remaining costs from Schedule 2 and Schedule 3 except cost of money, if proposed.
(3) “Percentage” is the fee or profit percentage the Offeror uses to develop fixed fee and profit. The percentages will be incorporated into Section H, Paragraph H.9 of a resultant contract and will be used to calculate maximum fixed fee or profit that an Offeror may propose at the task order level.
Offerors may always bid less than the calculated maximum.
(4) Fixed Fee on Schedule 2 and Profit on Schedule 3 should be calculated on the tables above. 49
Schedule 5 - Summary of Proposed Labor
Costs To be completed by Prime Offeror and Subcontractors
State labor hours proposed for each labor category in ‘Hours’ column State the unburdened labor rates for each labor category in ‘Unburdened Rate’ column State labor cost for each labor category (number of labor hours multiplied by unburdened labor rate)
Bottom two rows are to be completed by the Prime Offeror Apportion labor costs to Schedule 2 – 80% of total direct labor Apportion labor costs to Schedule 3 – 20% of total direct labor
Subcontractors shall include 100% of direct labor costs on Schedule 2
Schedule 6 - Labor Cost Realism
Schedule 7 - Allocation of Labor Hours
Schedule 6 - To be completed by Prime Offeror and Cost-type subcontractors included in proposal Complete for resumed individuals only o List employee name with current hourly rate in each corresponding labor category o Also include labor escalation rate expected in Contract Year One
Schedule 7 - To be completed by Prime Offeror Allocate labor hours by labor category to Prime Offeror and subcontractors
(input total hours in corresponding column/row) o Please replace “Prime”, “Sub A”, “Sub B”, etc. with actual company names
Offerors are required to use labor hours as indicated in the table
Schedule 8 - Indirect Rates and Factors
To be completed by Prime Offeror and Cost-type subcontractors Complete table with current indirect rates (edit table if necessary) o Include proposed rate/factor (background information should be included within the proposal [see RFP page 90]) and Allocation Base (cost elements indirect rates shall apply to).
Indirect Rates » Fringe Benefits (if separate from Overhead) » Overhead » Subcontract Burden, if applicable » ODC Burden » General and Administrative (G&A) » Cost of Money, if applicable » Please specify any additional indirect rates included in the
Cost proposal on Schedule 8
Schedule 9 - Subcontract Information
To be completed by Prime Offeror Fill in table with proposed subcontractor names along with contract type (e.g., CPFF, T&M, FFP, or Labor Hour).
o Individual subcontract values o Individual subcontract technical hours o Include total subcontract amount and total subcontract hours.
Proposal instructions require that labor be priced out for evaluation purposes assuming a performance period of only one (1) year
46,620 Professional labor hours represents the total estimated annual requirement
Offeror’s Professional Compensation Plan (FAR 52.222.46)
Include information on Uncompensated Overtime (FAR 52.237-10)
Section III – Business Proposal
Subcontract Consent
Offerors are reminded that FAR Clause 52.219-14 LIMITATIONS ON SUBCONTRACTING requires that the Prime Small Business perform at least 50 percent of the cost of contract performance for personnel. A proposal that fails to meet that threshold may be eliminated from consideration
Proposal Requirements:
Technical Proposal
Elizabeth A. Segal Contracting Officer
The Offeror’s Technical Proposal shall consist of the following:
Volume II: Written Technical Proposal o Part A - Staffing o Part B - Past Performance o Part C: Oral Presentation Slides/Visual Aids to be provided by the Offeror on the day of the Oral Presentation
Part A – Staffing Purpose:
Evaluate the qualifications of the Offeror’s personnel proposed for this contract in terms of the technical expertise, experience, education, and qualifications relevant to the task area requirements of this contract
Staffing Plan and Approach Staffing Matrix Resumes o No more than 20 (inclusive of Program Manager and other labor categories as required in the RFP) o Not to exceed three pages o Representative of, and consistent with, the Prime Offeror’s proposed labor cost presented in the Cost and Business Proposal
Exhibit A - Resume Checklist No. of Resumes
Program Manager 1 Senior Financial Cost Analyst 3 Financial Cost Analyst 1 Lead Financial Management Systems Analyst 2 Financial Management Systems Analyst 2 Principal Systems Engineer 1 Senior Systems Engineer 3 Systems Engineer 2 Business Process Reengineering Specialist 2 Change Management Facilitator 1 Senior Program Management Analyst 1 Administrative Support II 1
TOTAL 20
Part B – Past Performance Purpose:
Illustrate the Offeror's relevant past performance history under existing and prior contracts and/or task orders.
Relevant Past Performance History (within the past five years) on tasks of the type and complexity described in the SOW.
If the Offeror has no relevant past performance history, it must affirmatively so state. Offerors that state they have no relevant past performance history and Offerors that are unable to provide past performance reports after making all reasonable efforts will not be evaluated favorably or unfavorably under this criteria in accordance with
FAR 15.305.
If the Offeror does not include past performance history or does not affirmatively state that no past performance history exists or can be obtained, the Offeror’s proposal will be rated Unacceptable.
Offerors must send a Client Authorization Letter (Exhibit C) for Non- Federal, and Federal agencies that are not currently using CPARS, for references listed in the five most relevant sources.
Part C - Oral Presentation The Oral Presentation consists of two separate sections:
o Technical Understanding o Management Approach
It is expected that the Oral Presentations will begin approximately 18 calendar days after the closing date for receipt of proposals.
Offerors will receive notification at least 10 calendar days in advance of the date of the Oral Presentation.
Offerors will provide slides/visual aids to the Government on the assigned date of their Oral Presentation, and not in the Technical Proposal.
The Government will not consider the slides/visual aids as stand-alone documents or evaluate the information on the slides, except as visual aids to the presentation.
Part C – Oral Presentation
Technical Understanding Offerors shall use the Technical Understanding presentation to address: (1) the Offeror's technical understanding of the SOW (Section C of the RFP); (2) the Offeror’s understanding of key issues and risks inherent in the tasks of the SOW; and (3) the Offeror’s ability to describe techniques and methodologies it would utilize in satisfying the requirements of the SOW.
Discuss critical technical issues in the SOW.
Part C – Oral Presentation
Management Approach Offerors shall use the Management Approach presentation to describe its capability to effectively and efficiently manage the work represented by this contract. The Offeror shall describe its (1) approach to managing task order contracts; (2) its approach to forming teams as task orders arise, ensuring task requirements are successfully accomplished, activities are kept on schedule, and tasks are completed within budget, including its approach to managing changes that impact cost and schedule; and (3) organizational structure; the roles and responsibilities of individuals, Prime Contractor, and subcontractors; and lines of communication.
ORAL PRESENTATION SCHEDULE
Evaluation Criteria Topic Time Limit Presenters
N/A Introduction 5 minutes Program Manager and/or any of the Senior-level staff members
Technical Understanding
Presentation of Technical Understanding
45 minutes Program Manager and, at a minimum, three Senior-level staff members
Technical Understanding
Structured Questions and Answers on Technical Understanding
30 minutes Program Manager and, at a minimum, three Senior-level staff members
Break Management Approach
Presentation of Management Approach
15 minutes Program Manager and/or any of the Senior-level staff members
Management Approach
Structured Questions and Answers on Management Approach
30 minutes Program Manager and, at a minimum, three Senior-level staff members
N/A Conclusion 5 minutes Program Manager and/or any of the Senior-level staff members
Oral Presentation - Participants and Attendees:
The Offeror’s Oral Presentation must be made by the proposed Program Manager and individuals identified as Senior-level staff members in the work areas for whom resumes have been provided.
The Offeror may bring no more than eight persons to the Oral Presentation, including no more than two non-presenting Offeror officials or employees.
In order to protect the integrity of the oral evaluation process, employees of firms that are included as subcontractors under more than one proposal for this procurement shall not be allowed to participate.
Oral Presentations
The order of Oral Presentations will be determined by the drawing of lots by the CO after the receipt of proposals
Offerors will be notified in writing via e-mail of the date and time of the scheduled presentation
Offerors must confirm their scheduled presentation via e-mail to the CO
Request to reschedule presentations will not be honored Oral Presentations are tentatively scheduled to commence at the end of November 2016
Reminder for Oral Presentations at the Volpe Center
Due to the expiration of extensions granted by the U.S.
Department of Homeland Security, Driver’s Licenses from the following states and jurisdiction are NOT permitted as a form of identification for entry into the Volpe Center:
• Illinois
• Missouri
• Minnesota*
• Washington*
• American
Samoa
• New Hampshire
• New York
• Louisiana
*The Volpe Center will permit Enhanced Driver’s Licenses from these states.
Section M - Evaluation Factors for Award
Elizabeth A. Segal Contracting Officer
Section M.1.A. Basis for Award
Award will be made to those responsive and responsible Offerors whose offers provide the best value to the Government based on the Technical Proposal, the Cost and Business Proposal, and other factors as listed elsewhere in Section M.
The Government intends to make a total of two to four awards awards but reserves the right to make fewer or more awards if it is in the best interest of the Government.
M.1.B. Order of Importance
Each technical proposal will be evaluated based on the criteria in Section M.
The technical evaluation factors that are addressed in the Technical Proposal (see Section L and below), when combined, are significantly more important than cost in the selection of a Contractor for award.
Offerors are cautioned not to minimize the importance of the Cost and Business Proposal. As the difference in ratings of submitted Technical Proposals decreases, the importance of evaluated cost will increase. When the Technical Proposals are evaluated as essentially equal, cost may become the determining factor in making an award.
M.2 Technical Proposal Evaluation
The Offerors’ Technical Proposals will be evaluated in accordance with the criteria described below:
The first factor, Technical Understanding, is of the most importance. Management Approach, Staffing, and Past Performance, are of equal importance, but each is of lesser importance than Technical Understanding, but when combined are greater than Technical Understanding.
M.3 Cost and Business Proposal Evaluation
The Cost and Business Proposal will not be numerically scored. Proposed costs, fixed fee, and profit will be evaluated to establish that they are fair and reasonable and that they demonstrate cost realism. Cost realism, as discussed in FAR 15.404-1(d), will be conducted. The Government will calculate probable cost that shall be used to determine best value and will be used in the selection decision.
M.3 Cost and Business Proposal Evaluation
The following factors are additional Cost and Business Proposal considerations, not necessarily in order of importance:
Competitiveness of the proposed fixed fee and profit;
(A proposal that includes fixed fee in excess of the statutory limits may be eliminated from consideration);
Compensation of professional employees will be evaluated in accordance with Section L, FAR 52.222-46;
Uncompensated Overtime, if any, will be evaluated in accordance with Section L, FAR 52.237-10;
Acceptability of the contract cost control plan; and Risks associated with a proposal that fails, or partially fails, to satisfactorily and convincingly support its proposal.
Important Dates
Any questions, clarification requests, or other inquiries pertaining to the solicitation must be submitted no later than September 30, 2016 at 4:30 p.m., Eastern Time
Questions must be submitted in writing via e-mail to Elizabeth.Segal@dot.gov and Anthony.Rufo@dot.gov
Proposals are due no later than 3:00 p.m., Eastern Time, on November 3, 2016
Oral Presentations are estimated to take place during the week(s) of November 28, 2016 and December 5, 2016 mailto:Elizabeth.Segal@dot.gov mailto:Anthony.Rufo@dot.gov
Reminders
Please read Section C, Section L, and Section M more than once
The terms and conditions of the Solicitation remain unchanged unless an Amendment is issued
It is important that each Offeror be fully responsive in providing its best offer initially since there may be no opportunity to revise the proposal at a later date
A copy of today’s presentation and the list of Webinar participants will be provided as an Amendment to the Solicitation
Thank you for your attendance at today’s Pre-Proposal Conference Webinar
PRE-PROPOSAL CONFERENCE WEBINAR ATTENDEES
CAPITAL INVESTMENT ANALYSIS SUPPORT (CIAS)
SOLICITATION NO. DTRT5716R20008
SEPTEMBER 14, 2016
FIRST NAME LAST NAME E-MAIL ADDRESS COMPANY
Karen Corcoran athena_llc@msn.com Athena, LLC
Jocelyn Whittington jocelyn.whittington@6ksystems.com 6K
Shelly Gerhardt shelly.gerhardt@changeis.com Changeis, Inc.
Trisha Cassel trisha.ctr.cassel@faa.gov Ascent Consulting Company
Varun Malhotra varun@changeis.com Changeis, Inc
Arthur Chiles arthur.chiles@us.pwc.com PwC
David Halstead dhalstead@lynchconsultants.com Lynch Consultants
Devon Musselman devon.musselman@cexec.com CEXEC, Inc
Hervey Tuba htuba@tubagroup.com Tuba Group
Jennifer Melchior jennifer.melchior@us.pwc.com PwC
Matt Symons matt.symons@aderas.com Aderas, Inc.
Paul Handy paul@rigil.com Rigil Corporation
William Briggs wbriggs@tubagroup.com Tuba Group Inc.
David Shuping david.shuping@indigotechnology.net Indigo Technology, Inc.
GAIL PARMENTIER gail.parmentier@cexec.com CEXEC, Inc.
Hannah Thornton hannah.l.thornton@us.pwc.com PwC
Rick Dodson rdodson@mariekeconsulting.com Marieke Consulting
Katherine Burns katherine.burns@us.pwc.com PwC Public Sector LLP
Douglas Robert drobert@evansincorporated.com Evans Incorporated
Randall Senn rsenn@tubagroup.com Tuba Group
Robert Tucker robert@proposalhelper.com ProposalHelper
FIRST NAME LAST NAME E-MAIL ADDRESS COMPANY
Silas Manuel silas.manuel@indigotechnology.net Indigo Technology, Inc.
Ashley Tolub atolub@evansincorporated.com Evans Incorporated
CHRIS FERRELL chris.ferrell@jta-atc.com
JERRY THOMPSON &
ASSOCIATES, INC.
David Scali dscali85@comcast.net DS Consulting
Jeff Greene jeffrey.greene@changeis.com Changeis, Inc.
Elizabeth Lilik elizabeth.lilik@digitalibiz.com DIGITALiBiz
Crystal Pierce crystalpierce@ascent-consult.com Ascent Consulting
Sherif Said sherifsaid@ascent-consult.com Ascent Consulting Company
Doug Wilson dougwilson@ascent-consult.com Ascent Consulting
Brandon Gruskiewicz brandon.j.gruskiewicz@us.pwc.com PwC
April Rowson aprilrowson@ascent-consult.com Ascent Consulting Company
Karen Heine kheine@1994.usna.com Marieke Consulting, Inc.
Les Bell lesbell@ascent-consult.com Ascent Consulting
Reena Bhatia bhatia@proposalhellper.com ProposalHelper
Grant Baesman grantbaesman@gmail.com Base CFO
Steven Kramer steven.kramer@cexec.inc CEXEC, Inc.
| Attachments for Amendment No. A0001.pdf | |
| Slide Number 1 | |
| Today’s Agenda | |
| Ground Rules and Logistics | |
| Ground Rules and Logistics – cont’d | |
| Today’s Presenters | |
| Volpe Center Overview | |
| About Volpe | |
| Who we are | |
| What makes us unique | |
| What makes us unique | |
| What makes us unique | |
| What makes us unique | |
| Technical Organizations | |
| What makes us unique | |
| Technical Overview | |
| CIAS Small Business Set-Aside Overview and Procurement Objectives� | |
| Technical Overview | |
| Technical Overview | |
| Technical Overview - Statement of Work | |
| �Task Area 1 - Budget Planning | �� |
| �Task Area 2 - Cost Accounting and Financial Reporting �� | |
| �Task Area 3 - Delphi Financial Management System �� | |
| �Task Area 4 - Financial Analysis �� | |
| �Task Area 5 - Financial Capitalization�� | |
| �Task Area 6 - Reimbursable Agreements (RA)�� | |
| �Task Area 7 - Business Process �Re-Engineering �� | |
| �Task Area 8 - Corporate Work Plan (CWP)�� | |
| Task Area 9 - Information Assurance | |
| �Task Area 10 - Program and Technical Management�� | |
| �Task Area 11 - Systems Engineering�� | |
| �Task Area 12 - Acquisition �� | |
| �Task Area 13 - Administrative �� | |
| Section I – Contract Clauses | |
| Slide Number 34 | |
| Procurement Summary | |
| Cost and Business Proposal Requirements | |
| Cost and Business Proposal Requirements | |
| Cost and Business Proposal Requirements | |
| Cost and Business Proposal Requirements | |
| Cost and Business Proposal Requirements | |
| Cost and Business Proposal Requirements | |
| Cost and Business Proposal Requirements | |
| Cost and Business Proposal Requirements | |
| Cost and Business Proposal Requirements | |
| Cost and Business Proposal Requirements | |
| Cost and Business Proposal �Schedule 1 - Proposal Cover Sheet | |
| Cost and Business Proposal �Schedule 2 - Summary of Proposed Costs and Fixed Fee | |
| Cost and Business Proposal �Schedule 3 - Summary of Proposed Price and Profit | |
| Cost and Business Proposal�Schedule 4 - Establishment of Maximum Factors and Calculation of Proposed Amounts for Fixed Fee and Profit� | |
| Cost and Business Proposal�Schedule 5 - Summary of Proposed Labor Costs | |
| Cost and Business Proposal �Schedule 6 - Labor Cost Realism Schedule 7 - Allocation of Labor Hours | |
| Cost and Business Proposal �Schedule 8 - Indirect Rates and Factors | |
| Cost and Business Proposal�Schedule 9 - Subcontract Information | |
| Cost and Business Proposal Requirements | |
| Cost and Business Proposal Requirements | |
| ��Proposal Requirements:�Technical Proposal | |
| Technical Proposal | |
| Technical Proposal | |
| Technical Proposal | |
| Technical Proposal | |
| Technical Proposal | |
| Technical Proposal | |
| Technical Proposal | |
| Technical Proposal | |
| Technical Proposal | |
| Oral Presentations | |
| Reminder for Oral Presentations at the Volpe Center | |
| Slide Number 68 | |
| Section M.1.A. Basis for Award | |
| M.1.B. Order of Importance | |
| M.2 Technical Proposal Evaluation | |
| M.3 Cost and Business Proposal Evaluation | |
| M.3 Cost and Business Proposal Evaluation | |
| Important Dates | |
| Reminders |
File details come from the government source that posted it. Updated .