| Galley_Deck_Repairs_SOW.pdf | ||
| Galley_Deck_T&C.pdf | ||
| SF1449.pdf | ||
| ATTCH_CLAUSES.pdf | ||
| wage_determination_Solono_Co_2005_rev_18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| TS Golden Bear - Galley Deck Repairs--Quote Sheet | Estimated costs - Labor | Estimated costs - Material | Total Estimated costs |
| Item #1 - Remove following to allow room for deck removal - Soup pots (3); Soup pot foundation; Drain tray in front of soup pots; Grease Trap; all foundation below all these items; drain pipe from steamer; heat box in serving area; Other areas that are deemed necessary by awarded contractor | |||
| Item #2 - Cover all cabinets and galley equipment to protect from removal of top coat and underlayment and scaling of steel | |||
| Item #3 - Ballast tank covers - Modify to include new outside ring to allow for cover over the manhole cover; Details to be supplied during the ship check walk thru; 2 locations = fabricate new ring SS material to allow 3/4" seating area | |||
| Item #4 - Remove present top coat and underlayment tile and dispose of same; Do Not remove underlayment below tile until all tile removed and inspection by COR and CE and Chief Mate | |||
| Item #5 - Inspect the underlayment below the tile and report same via CFR as to condition and useability for new top coat and list total areas good and bad | |||
| Item #7 - Provide costs to do the following: (1) Remove 400 sq ft of the underlayment orignally set below the removed tile under Item #5; (2) Add underlayment to height of remaining underlayment for the 400sq ft including the mechanical scaling of steel to SP3 in preparation to priming same- approximately 400 square feet | |||
| Item #8 - Fabricate and install new soup pot foundation using pipe and mild steel shaped to fit bottom of soup pots and grease trap and rectangular soup pot. Make arrangement to allow for access to apply underlayment and top coat. Coat with 2 coats of primer and 2 coats of top coat per Chief Mate specifications | |||
| Item #9 - Apply proper amount of underlayment and coving to make up height to fit new ballast tank covers | |||
| Item #10 Apply Phoenix One-Step to all areas to maximum allowable manufacturer's specifications - cove all sides | |||
| Item #11 Apply 2 layers clear coat to all areas with non-skid | |||
| Item #12 Reinstall Soup Pots and Grease trap and drain and other equipment removed for access | |||
| Item #13 Remove all dust protection and clean up to satisfaction of Chief Mate and Chief Engineer | |||
| Supplementary Labor -- 60hrs @ $80/hr | |||
| Supplementary Material -- $10,000 | $ 10,000.00 | ||