Plans_PRA-NATR_2B6.pdf
PDF 5 MB Posted
- Attached to
- Natchez Trace Parkway 2B6 Federal contract opportunity
- Solicitation number
- DTFH71-15-R-00005
About this file
Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0002_-_PRA-NATR_2B6.pdf | ||
| Amendment_0001-_PRA-NATR_2B6.pdf | ||
| FP03_Errata.pdf | ||
| Cert_Prog_for_Bridge_Temp_Works.pdf | ||
| FP03_Eng_.pdf | ||
| VETS-100A-Form.pdf | ||
| Bridge_Inspection_Report.pdf | ||
| ADV_Offeror's_Qualifications_Form.doc | DOC document | |
| ADV_Subcontracting_Plan.doc | DOC document | |
| As_Builts_Report.pdf | ||
| RFP_-_Solicitation_PRA-NATR_2B6.pdf | ||
| Categorical_Exclusion_Form_(NEPA).pdf | ||
| Synopsis_PRA-NATR_2B6.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Structure Number
-D e c -2
:4
A M
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
STATE PROJECT
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6
NATCHEZ TRACE PARKWAY
5570-028P
Dan WestonJJO JJO BRP-1213
212396
109198
PCB
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
December 2014
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
R01
A C
T U
A L F I L E R
N A
T R
B
G N .D
G N
GENERAL NOTES:
SPECIFICATIONS:
Construction:
MATERIALS:
Reinforcing Steel:
Design:
AASHTO LRFD Bridge Design Specifications, Sixth Edition, 2012, 2013 Interim Revision.
(U.S. Customery Units).
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03.
SCOPE OF WORK:
Utilities:
Concrete:
Design Stresses:
All Concrete:
f’c = 5,000 psi at 28 days
Reinforcing steel:
f’c = 60,000 psi.
DESIGN LOADING:
Live Loads:
Miscellaneous:
Contact National Park Service, Natchez Trace Parkway.
H 20 Truck
DRAWING TITLE
INDEX OF DRAWINGS
Verify locations of utilities in field prior to any work.
Verify all dimensions and locations in field prior to ordering materials.
Jacking Operations:
DRAWING NO.
Furnish reinforcing steel conforming to AASHTO M 31, Grade 60.
GENERAL NOTES AND INDEX
C StructureL
KEY
No scale
Wingwall A Wingwall C
Wingwall B Wingwall D
Abutment 2
Abutment 1
6.
5.
4.
3.
2.
1.
placing bridge back into service.
boat traffic under during jacking operations. Secure spans before
Do not allow roadway or pedestrian traffic on top of the structure or
" unless otherwise dimensioned. 4 3Chamfer exposed corners of strip seal joint assembly.
Furnish Fast Setting concrete for column repair and for the intallation aggregate for pier concrete repairs.
Furnish Class A (AE) concrete with AASHTO M 43 #67 or #7
Clean and seal all pier caps and abutments.
Extend drainage system on both ends of all finger joints.
Replace all plate joints with strip seal joints with steel plate cover.
Repair deteriorated column concrete at Pier 34.
Repair pier cap concrete under west bearing at Piers 18 & 21.
jacking operations.
Install temporary support at Piers 18 & 21 for superstructure
Abutment Sealing Details
Pier Cap Sealing Details - 2
Pier Cap Sealing Details - 1
Finger Joint Drainage System Extension
Plate Expansion Joint Replacement Details - 2
Plate Expansion Joint Replacement Details - 1
Concrete Repair - Pier 34
Concrete Repair - Pier 21
Concrete Repair - Pier 18
Plan and Elevation
General Notes and Index
NO.
REGION
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6212396
109198
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
Dan WestonJJO JJO PCB
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
NATCHEZ TRACE PARKWAY
5570-028P
BRP-121311
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
December 2014
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6
NATCHEZ TRACE PARKWAY
5570-028P
Dan WestonJJO JJO BRP-1213
212396
109198
PCB
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
December 2014
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
925’-0"
275’-0" 275’-0"375’-0"
Continuous
ContinuousContinuousContinuous Continuous
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
Abutment 1 Abutment 2
2 Spa.@ 80’-0" 4 Spa.@ 125’-0"
=500’-0"=160’-0"
3 Spa.@ 125’-0"
Continuous
=525’-0"
3 Spa.@ 175’-0"
=525’-0"
4 Spa.@ 125’-0"
Continuous
=500’-0"
Continuous
4 Spa.@ 80’-0"
Continuous
=320’-0"350’-0" Min. clr.
A2
4955’-0"
T y p
T y p
350’-0"
Min. clr.
PLAN AND ELEVATION
Key:
Pier number
Span number
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A C
T U
A L F I L E R
N A
T R
B P
E .D
G N
Tennessee River
N Bridge Length: 4955’-0"
C Structure C Natchez Trace Parkway L L
A1 2 5 8 25 28 31 3412 15 18 21
Plate joint over pier #
Finger joint over pier #
A# Plate joint over abutment #
Expansion joints cap concrete
Repair pier cap concrete
Repair pier concrete
Repair column
See Note 1 See Note 2
Notes:
Dolphin (Typ.)Navigation lights
(Typ.)
R02
See Note 3
No scale
=300’-0"
Continuous
=300’-0"
3 Spa.@ 100’-0"3 Spa.@ 100’-0"
=300’-0" =300’-0" =300’-0"
Continuous Continuous
3 Spa.@ 100’-0"3 Spa.@ 100’-0"3 Spa.@ 100’-0"
E F E E E F E E E F E E E F E E E E F E E E F E E E E E EF
F E E E F E E E F E E E E E EF E F E E
F
E
Fixed
Expasion
4. Navigation lights and Dolphins for illustration only.
3. Clean and seal all pier caps (37 total) and abutments (2 total).
See "FINGER JOINT DRAINAGE SYSTEM EXTENSION" sheet.
2. Extend gutter system on both ends of all finger joints (4 total).
"PLATE EXPANSION JOINT REPLACEMENT DETAILS - 2" sheets.
See "PLATE EXPANSION JOINT REPLACEMENT DETAILS - 1" and
1. Replace all plate joints (9 total).
NO.
REGION
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6212396
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
NATCHEZ TRACE PARKWAY
5570-028P
BRP-121311
OVER TENNESSEE RIVER
-J a n -2
:5
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s R
N A
T R
B
C O
N C . R
E P
IR
P
IE
R
.D
CONCRETE REPAIR - PIER 18
"4 37’-9 "4
37’-9
"2 114’-4
20’-0"30’-0"
"2
12"
6’-0"
"4 311’-3
16’-0"
C StructureL
A
A
ELEVATION VEIW A-A
MECHANICAL SPLICE DETAIL
"8 35’-9 "4
18’-5 "8 35’-9
6’-0"
12"
"4
L
LL
L
C Bearing (Span 18)C Bearing (Span 19)
Existing bar New bar
L
As shown 3
R03 repair area Limit of
" 1
"2 12’-2
2’-7"
1’-10" 1’-2"
B B
VIEW B-B
C Pier
C Pier
L
C Pier L
C Pier A
C T
U A
L F I L E R
N A
T R
B
C O
N C
R E P
A I R P I E
R
.D
G N
" = 1’-0"16 3Scale: " = 1’-0"16
3Scale:
" = 1’-0"4 1Scale:
" = 1’-0"4 1Scale:
#11 Bars
#11 Bars
#4 Bars
#11 Bars
#6 Bars
#5 Bars
Notes:
1.
2.
concrete
Limit of Unsound
Repair area
5"
(Min.)
CONCRETE REPAIR DETAIL
" = 1’-0"4 1Scale:
REINFORCEMENT
EXISTING PIER CAP
bolt (Typ.)
" Anchor2
L
L
C Bearings (Span 19)
C Bearings (Span 18)
Not to scale
(TYP.)
and masonry plates Reuse bearings
2" x 2’-51
2"
Anchor bolts
(See Note 5)
(Typ.)
coupler * Mechanical
New concrete bars* Epoxy coated for clarity. (See Note 3 & 4) Not all reinforcement shown shown for illustration only.
* Reinforcement and couplers concrete Sound pier
3.
#5 epoxy bars
Replace stirrups with
Mechanical coupler of repair area Approximate limit
4.
5.
6.
(See Note 6) manufacturer’s recommendations.
Bonding agent as specified by
6"
6’-6"
"2 11’-8 concrete Repair
6" during application.
surfaces. Have a manufacturer representative on-site
Use bonding agent between all new and existing concrete
Replace existing anchor bolts in the repair area.
manufacturer’s recommendation.
Furnish mechanical couplers. Install in accordance with the new epoxy bar using a mechanical coupler.
5 inches of adequate bar cross section and connect it to the is broken or cracked. Chip concrete to expose a minimum of or more of the original cross section area or if existing bar
Place new epoxy coated rebars when existing bar has lost 25% of the girders.
jack or place supports below the beams immediately after the lifting
Lift both girders on each span at the same time. Lock the Hydraulic without exceeding the maximum anticipated lifting displacement.
safety factor of 2.0. Lift all girders on both sides of the pier according to Section 104. Use Hydraulic Jacks with a minimum
Design the lifting system and submit to the CO for approval
"4 1Maximum lifting displacement: â are any differences from the repair limits shown.
work. Notify the CO and recommend a corrective measure if there to sound concrete. Verify concrete condition before performing any
Repair area is approximate, remove loose and deteriorated concrete
NO.
REGION
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6212396
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
NATCHEZ TRACE PARKWAY
5570-028P
BRP-121311
OVER TENNESSEE RIVER
-J a n -2
:5
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s R
N A
T R
B
C O
N C . R
E P
IR
P
IE
R
1.
D
CONCRETE REPAIR - PIER 21
26’-0" 15’-0"
6’-0"
"8 512’-6
16’-0"
"8 77’-6 "4
110’-10 "8 77’-6 "16
74’-0 "8 16’-11 "16
74’-0
"2
12" 12"
"4
5’-0"
A B
A
L
LL C Bearing (Span 21)C Bearing (Span 22)
C Pier
1’-4" 11"
B
Repair concrete
MECHANICAL SPLICE DETAIL
Existing bar New bar
L
L
C PierL repair area Limit of
C Bearings (Span 21)L
C Pier L
VIEW B-B
" = 1’-0"4 1Scale:
bolt (Typ.)
" Anchor2
" 6
2’-0"
2’-6" 2’-0"
C Pier L
" = 1’-0"4 1Scale:
#11 Bars
#11 Bars
#4 Bars
#6 Bars
#5 Bars
REINFORCEMENT
EXISTING PIER CAP
Notes:
1.
2.
3.
concrete
Limit of Unsound
5"
(Min.)
Repair area
CONCRETE REPAIR DETAIL
" = 1’-0"4 1Scale:
As shown
A C
T U
A L F I L E R
N A
T R
B
C O
N C .R
E P
A I R
.D
G N
R04
VIEW A-A
" = 1’-0"4 1Scale: " = 1’-0"4
1Scale:
ELEVATION
Not to scale
(TYP.)
and masonry plates Reuse bearings
2 2" x 2’-51 "
Anchor bolts
(See Note 5)
Mechanical coupler
(Typ.)
coupler * Mechanical
New concrete bars* Epoxy coated for clarity. (See Note 3 & 4) Not all reinforcement shown shown for illustration only.
* Reinforcement and couplers
#5 epoxy bar Replace stirrups with of repair area Approximate limit
C StructureL
4.
5.
6.
6"
Bonding agent as specified by manufacturer’s recommendations
(See Note 6) concrete Sound pier
C Bearings (Span 22)
6’-6"
6" during application.
surfaces. Have a manufacturer representative on-site
Use bonding agent between all new and existing concrete
Replace existing anchor bolts in the repair area.
manufacturer’s recommendation.
Furnish mechanical couplers. Install in accordance with the new epoxy bar using a mechanical coupler.
5 inches of adequate bar cross section and connect it to the is broken or cracked. Chip concrete to expose a minimum of or more of the original cross section area or if existing bar
Place new epoxy coated rebars when existing bar has lost 25% of the girders.
jack or place supports below the beams immediately after the lifting
Lift both girders on each span at the same time. Lock the Hydraulic without exceeding the maximum anticipated lifting displacement.
safety factor of 2.0. Lift all girders on both sides of the pier according to Section 104. Use Hydraulic Jacks with a minimum
Design the lifting system and submit to the CO for approval
"4 1Maximum lifting displacement: â are any differences from the repair limits shown.
work. Notify the CO and recommend a corrective measure if there to sound concrete. Verify concrete condition before performing any
Repair area is approximate, remove loose and deteriorated concrete
NO.
REGION
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6212396
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
NATCHEZ TRACE PARKWAY
5570-028P
BRP-121311
OVER TENNESSEE RIVER
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6
NATCHEZ TRACE PARKWAY
5570-028P
Dan WestonJJO JJO BRP-1213
212396
109198
PCB
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
December 2014
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Depth of concrete repair
1’’ Saw cut concrete
Face of existing
(f’c = 5,000 psi min.)
Contract Requirements as specified in the Special
Fast setting concrete except top cut
" Under cut all sides2
REPAIR DETAIL
SURFACE CONCRETE
’’ Min.2
1’’ Saw cut concrete
Face of existing
2"x 2", w2 x w2
Stainless welded wire fabric
(f’c = 5,000 psi min.)
Contract Requirements as specified in the Special
Fast setting concrete
2" Clr.
Depth of concrete repair
’’ Min.2 bars
Existing bars
Existing
REPAIR DETAIL
PARTIAL CONCRETE
As shown 5
A C
T U
A L F I L E R
N A
T R
B
C O
N C
R E P
A I R P I E
R
.D
G N
CONCRETE REPAIR - PIER 34
R05
20’-0" 10’-0"
32’-0"
Repair concrete
Repair concrete
B B
C C
4’-0"
4’-4"
4’-0"
"2
12"
"4
12"
A
A
ELEVATION
" = 1’-0"4 1Scale: " = 1’-0"4
1Scale:
VIEW A-A
Note:
concrete repair
Limit of
#5 Ties
"2 17’-3 concrete repair
Limit of "4
37’-11
#5 Ties
Concrete Repair Procedures:
" = 1’-0"4 3Scale:
VIEW B-B
" = 1’-0"4 3Scale:
VIEW C-C
areas as directed by CO.
Depth of rebars may vary. Locate all removal
1. Location of concrete repair is approximate.
Not to scale Not to scale
= 300 lbs.
direction. Min. pull out tension anchor @ max. spacing of 12" on each
" Stainless steel headed concrete8 except top cut
" Under cut all sides2
(20) - #11 Bars
(20) - #11 Bars concrete surfaces.
Use bonding agent between all new and existing by the CO.
texture of existing concrete, as approved
Cure and finish surface to match color and manufacturer’s recommendations.
Fill cavity with fast setting concrete per reinforcement/concrete with machine bolts.
Fasten stainless welded wire fabric to existing all reinforcement if the section loss is 25% or more.
Epoxy coat existing reinforcing steel. Replace abrasive blasting, or water jetting as required.
Clean existing steel and concrete by wire brush, damage to structural steel.
existing reinforcement without incurring any concrete or to a depth of at least 1’’ clear of
Remove loose and deteriated concrete to sound approved by the CO.
perimeter around the designated repair area as
Saw cut 1’’ deep along a square or rectangular
8.
7.
6.
5.
4.
3.
2.
1.
(See Note 8) manufacturer’s recommendations
Bonding agent as specified by
(See Note 8) manufacturer’s recommendations
Bonding agent as specified by
NO.
REGION
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6212396
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
NATCHEZ TRACE PARKWAY
5570-028P
BRP-121311
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
December 2014 x x
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6
NATCHEZ TRACE PARKWAY
5570-028P
Dan WestonJJO JJO BRP-1213
212396
109198
PCB
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
December 2014
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
"4
CLExp. joint
2"
Face of existing steel beam
4"4"
(Typ.)
1" Sawcut removal (Typ.)
Limits of concrete bolts (Typ.)
Remove existing concrete
Remove concrete
Remove
4"4"
(Typ.)
1" Sawcut removal (Typ.)
Limits of concrete concrete
Remove concrete
Remove bolts (Typ.)
Remove existing
2" x 10"
Plate
AT ABUTMENTAT PIER
No scale Scale: 3" = 1’-0"
C StructureL
"2 114’-10 "2
114’-10"2 11’-8 "4
"4
" x 5" Plate4
C StructureL
NEW EXPANSION JOINT PLAN
NEW EXPANSION JOINT SECTION
Scale: 1"=1’-0"
Scale: 1"=1’-0"
NEW EXPANSION JOINT ELEVATION
"2 11’-8
AT PIER AT ABUTMENT
AT PIER AT ABUTMENT
Notes:
curb
Concrete parapet
Concrete
"4 11’-4 steel beams
Faces of existing curb
Concrete
STEEL LOCKING RAIL
STRIP SEAL
3"
"16
"4 curb facing
Existing aluminum curb facing
Existing aluminum
As shown 6
R06
EXISTING EXPANSION JOINTS
beam
Steel beam
Steel face
Backwall beam
Steel
Steel beam beam
Steel strip seal
Neoprene
(Typ.)
" x 5" Plate4
" x 1" Bar2
Not to scale
Not to scale rail
Steel locking
(Typ.)
#5 Bars between lines line and staggered
@ 6" centers each
" x 6" Studs2
121.1° reinforcement
Remove existing reinforcement
Remove existing concrete
Fast Setting
"2 12’-1
2’-8"
1’-21 2"
9.
8.
7.
6.
5.
4.
3.
2.
1.
Pre-paint steel cover plate according to Section 563.
with the manufacturer’s recommendations.
Install expansion joint sealing system in accordance end to end.
Provide expansion joint seal that is continuous from
Provide studs that conform to ASTM A 108.
weathering steel conforming to ASTM A 588M.
Provide steel locking rails that are high strength loading and allow for 2" range of movement.
the plans and specifications that will support the design
Provide new expansion joint system conforming with the next.
Complete installation of expasion joint before removing one lane open at all time.
Sawcut existing concrete in stages in order to keep reinforcement.
existing transverse reinforcement with new transverse
Keep existing longitudinal reinforcement and replace joint seal.
Verify dimensions before fabrication of expansion
"4
" x 10" Plate2
" x 10" Plate2
JOINT #
Abut. 1
Abut. 2
(Deg.)
TEMPERATURE AT INSTALLATION
JOINT SETTING TABLE
2"
2"
2"
2"
2"
2"
2"
2"
2"
"4
"2
"8
"4
"4
"4
"8
"4
"8
"4
"4
"8
"8
"4
"4
"8
"8
"8
"4
"4
"8
"8
"8
"4
"4
"8
"8
"4
"2
"8
"4
"4
"8
"8
"4
"8
REPLACEMENT DETAILS - 1
PLATE EXPANSION JOINT
A C
T U
A L F I L E R
N A
T R
B P
L A
T E J
T
D E
T .D
G N
D
"D"
NO.
REGION
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6212396
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
NATCHEZ TRACE PARKWAY
5570-028P
BRP-121311
OVER TENNESSEE RIVER
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6
NATCHEZ TRACE PARKWAY
5570-028P
Dan WestonJJO JJO BRP-1213
212396
109198
PCB
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
December 2014
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Scale: 2"=1’-0" Scale: 2"=1’-0"
DETAIL A DETAIL B
rail
Steel locking rail
Steel locking curb facing
Cut existing aluminum
As shown 7
R07
" x 10" Plate2
" x 10" Plate2
A
VIEW A-A
B
B
VIEW B-B
D D
"=1’-0"2 1Scale: 1
SECTION C-C
SECTION D-D
Scale: 2"=1’-0"
Scale: 2"=1’-0"
Scale: 2"=1’-0"
F
F
E
E
Scale: 2"=1’-0" Scale: 2"=1’-0"
SECTION E-E SECTION F-F
NEW CURB EXPANSION JOINT ELEVATION
Scale: 3"=1’-0"AT PIER AT ABUTMENT
Detail A Detail B
" x 4" Plate4
"2
" x 4" Plate4
"4
1’-1""4 14 4" 41
4" 4"
(Typ.)
Studs
1’-1"
C u r b
D e c k
F u ll D e p th
D e c k
F u ll D e p th
C u r b"
D D
"4
"4
G
G
"4 31 "4
37"2
"4
SECTION G-G SECTION H-H
""=1’-0"2 1Scale: 1 ""=1’-0"2
1Scale: 1
H
H
1’-1""4 14 4"
"4 11’-4
Studs (Typ.)
T y p
"4 31’-2
D
"2
1’-1"
C
C
V a r ie s
O v e r h a n g
Plate
" x 1"2
Plate (Typ.)
" x 5"4
Slidding plate
" x 10"2
Plate
"x1"2
Slidding plate
" x 10"2
Slidding plate
" x 10"2
Plate
"x1"2 plate (Typ.)
" Interior 4
" Interior plate4
" Interior plate4
" Interior plate4
Plate
" x 5"4
Plate
" x 5"4
"4 1"4
"4
P a r a p e t
C u r b
"4
"4
"4 1 "4
Limit of full width saw cut
(See Note 1 & 2)(See Note 1 & 2) width saw cut Limit of full between lines. (Typ.)
line and staggered @ 6" centers each between lines. (Typ.)
line and staggered @ 6" centers each
(Typ.)
#4 Bars (Typ.)
#4 Bars
A C
T U
A L F I L E R
N A
T R
B P
L A
T E J
T
D E
T .D
G N
REPLACEMENT DETAILS - 2
PLATE EXPANSION JOINT
Plate
" x 5"4
Plate
" x 10"2
(See Note 3) coat the ends.
3. Cut exposed reinforcement flush with concrete and epoxy saw cut, at the overhang.
same width and depth as on the deck concrete removal.
1. Remove concrete on curb maintaning the
Notes:
NO.
REGION
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6212396
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
NATCHEZ TRACE PARKWAY
5570-028P
BRP-121311
OVER TENNESSEE RIVER
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6
NATCHEZ TRACE PARKWAY
5570-028P
Dan WestonJJO JJO BRP-1213
212396
109198
PCB
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
December 2014
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
3" 5 spa. @ 6" = 2’-6"
Scale: 3" = 1’-0"
Scale: 3" = 1’-0" Scale: 3" = 1’-0"
Scale: 3" = 1’-0"
8"
Pier 18
"4
"4 plate x 4" steel8 plate
" x 4" steel8
"4
12" Pier 15
8"
Pier 12 & 21
"4
"4
6"
SECTION A-A
Pie r 1
2 &
9"
Pie r 1
5 = 1’-
1"
Pie r 1
8 = 8"
A
A
END PLATE DETAIL
"4
"4 1 "4
12"
Pier 18
Pier 15
Pier 12 & 21
8"
8"
Anchor bolt Anchor bolt
ANCHOR BOLT
system
Existing drainage
EXTENSION
STEEL DRAINAGE SYSTEM
"4
B
B
8"
Pier 18
12" Pier 15
8"
Pier 12 & 21
"4
"8
6"
"8 5L 7" x 4" x "8
5L 7" x 4" x
Pie r 1
2 &
9"
Pie r 1
5 = 1’-
11"
Pie r 1
8 = 8" m in
" bar4 12" x
" bar4 12" x
Scale: 3" = 1’-0"
8"
Pier 18
"4
"4 plate x 4" steel8 plate
" x 4" steel8
12" Pier 15
8"
Pier 12 & 21
"4
"8
6"
SECTION B-B
Pie r 1
2 &
9"
Pie r 1
5 = 1’-
11"
Pie r 1
8 = 8"
Anchor bolt Anchor bolt
" bar4 12" x
"2
Notes:
2.
1.
SYSTEM SECTION
EXISTING DRAINAGE
SYSTEM EXTENSION
FINGER JOINT DRAINAGE
A C
T U
A L F I L E R
N A
T R
B F I N
G E
R J
T
D R
A I N
D G
N
R08
As shown
Not to scale
"4 33’-
" hole2 11"x 4 " hole2
11"x 4 " hole2 11"x 4" hole2
11"x 4 steel girder
Existing plate
End
Varies
Existing finger joint plates
Existing finger joint plates
Existing finger joint plates
Epoxy adhesive anchor bolt
Anchor bolt
(Typ.)
paint after installation.
Pre-paint drainage system extension and apply touch-up system extension.
Verify all dimensions before fabrication of drainage
NO.
REGION
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6212396
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
NATCHEZ TRACE PARKWAY
5570-028P
BRP-121311
OVER TENNESSEE RIVER
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6
NATCHEZ TRACE PARKWAY
5570-028P
Dan WestonJJO JJO BRP-1213
212396
109198
PCB
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
December 2014
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
32’-0"
16’-0" 16’-0"
"8 51’-0
4’-0"
4’-0"
Notes:
16’-0" 16’-0"
16’-0" 16’-0"
32’-0"
5’-0"
5’-0"
8’-0"
8’-0"
"4 31’-0
C PierLC PierL
C PierLC PierL
C PierL
C PierL
C PierLC PierL
C PierL
" = 1’-0"4 1Scale: " = 1’-0"4
1Scale:
" = 1’-0"4 1Scale:
PLAN
VIEW A-A
(Pier caps: 1-8 & 25-37)
ELEVATION
" = 1’-0"4 1Scale:
ELEVATION
(Pier caps: 12 & 21)
" = 1’-0"4 1Scale:
(Pier caps: 12 & 21)
" = 1’-0"4 1Scale:
(Pier caps: 12 & 21)
PLAN
VIEW B-B
(Pier caps: 1-8 & 25-37) (Pier caps: 1-8 & 25-37)
" = 1’-0"4 1Scale:
PLAN
" = 1’-0"4 1Scale: " = 1’-0"4
1Scale:
ELEVATION VIEW C-C
C
C
B
B
A
A
R09
9As shown
A C
T U
A L F I L E R
P I E
R C
A P D
E T .D
G N
"8 32’-1
Clean and seal
KEY
’-8
"8 314’-11
"4 114’-11
’-8
’-6
"8 513’-10
(Pier caps: 16,17)
(Pier caps: 16,17) (Pier caps: 16,17)
DETAILS -1
PIER CAP SEALING
recommendations.
2. Furnish sealer according to manufacturer’s repairs are completed and bearings are placed.
1. Clean and seal pier caps after all concrete
NO.
REGION
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6212396
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
NATCHEZ TRACE PARKWAY
5570-028P
BRP-121311
OVER TENNESSEE RIVER
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6
NATCHEZ TRACE PARKWAY
5570-028P
Dan WestonJJO JJO BRP-1213
212396
109198
PCB
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
December 2014
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
4’-6"
6’-0"
5’-0"
"8 51’-3
1’-10"
16’-0" 16’-0" 4’-6"
16’-0" 16’-0"
16’-0" 16’-0"
5’-0"
6’-0"
C PierL C PierL
C PierL C PierL
C PierLC PierL
C PierL
C PierL
C PierL
" = 1’-0"4 1Scale:
ELEVATION
" = 1’-0"4 1Scale:
VIEW E-E
(Pier caps: 9-11 & 22-24)
" = 1’-0"4 1Scale:
(Pier caps: 9-11 & 22-24)
PLAN
(Pier caps: 9-11 & 22-24)
" = 1’-0"4 1Scale:
ELEVATION
" = 1’-0"4 1Scale:
VIEW D-D
(Pier caps: 13,14 & 19,20) (Pier caps: 13,14 & 19,20)
"8 31’-10
" = 1’-0"4 1Scale:
(Pier caps: 13,14 & 19,20)
PLAN
32’-0"
Notes:
D
D
E
E
F
F
" = 1’-0"4 1Scale:
ELEVATION
" = 1’-0"4 1Scale:
VIEW F-F
(Pier caps: 15 & 18) (Pier caps: 15 & 18)
" = 1’-0"4 1Scale:
(Pier caps: 15 & 18)
PLAN
R10
A C
T U
A L F I L E R
P I E
R C
A P D
E T
.D
G N
As shown
Clean and seal
KEY
’-1
0"
"8 514’-1
’-5
"8 314’-8
’-1
14’-2"
DETAILS - 2
PIER CAP SEALING
recommendations.
2. Furnish sealer according to manufacturer’s
1. Clean and seal pier caps after all concrete
NO.
REGION
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6212396
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
NATCHEZ TRACE PARKWAY
5570-028P
BRP-121311
OVER TENNESSEE RIVER
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6
NATCHEZ TRACE PARKWAY
5570-028P
Dan WestonJJO JJO BRP-1213
212396
109198
PCB
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
December 2014
-D e c -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
43’-0"
43’-0"
"2 135’-2 at north wingwall
Existing ground at south wingwall
Existing ground at south wingwall
Existing ground at north wingwall
Existing ground
"2 135’-2
"2 135’-2
(Abutment 1 shown; Abutment 2 similar)
ELEVATION ELEVATION
PLAN
(Abutment 1) (Abutment 2)
WINGWALL A & B
WINGWALL C & D
" = 1’16
R11
A C
T U
A L F I L E R
N A
T R
B A
B U
T
D E
T
D G
N
Notes:
See Note 3.
See Note 3.
Clean and seal
KEY
DETAILS
ABUTMENT SEALING
the elevation of the existing ground.
3. Before cleaning and sealing the abutments verify recommendations.
2. Furnish sealer according to manufacturer’s
1. Clean and seal abutments after all concrete
NO.
REGION
NPS
NO.
PMIS NO.
SE AL PRA-NATR 2B6212396
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
NATCHEZ TRACE PARKWAY
5570-028P
BRP-121311
OVER TENNESSEE RIVER
| PRA-NATR 2B6 - PLANS 100%.pdf |
| R01 |
| R02 |
| R03 |
| R04 |
| R05 |
| R06 |
| R07 |
| R08 |
| R09 |
| R10 |
| R11 |
| PRA-NATR 2B6 - PLANS 100%.pdf |
| R01 |
| R02 |
| R03 |
| R04 |
| R05 |
| R06 |
| R07 |
| R08 |
| R09 |
| R10 |
| R11 |
| PRA-NATR 2B6 - PLANS 100%.pdf |
| R01 |
| R02 |
| R03 |
| R04 |
| R05 |
| R06 |
| R07 |
| R08 |
| R09 |
| R10 |
| R11 |
| PRA-NATR 2B6_adv_plans.pdf |
| PRA-NATR 2B6 - PLANS 100%.pdf |
| R01 |
| R02 |
| R03 |
| R04 |
| R05 |
| R06 |
| R07 |
| R08 |
| R09 |
| R10 |
| R11 |
| PRA-NATR 2B6 - PLANS 100%.pdf |
| R01 |
| R02 |
| R03 |
| R04 |
| R05 |
| R06 |
| R07 |
| R08 |
| R09 |
| R10 |
| R11 |
| PRA-NATR 2B6 - PLANS 100%.pdf |
| R01 |
| R02 |
| R03 |
| R04 |
| R05 |
| R06 |
| R07 |
| R08 |
| R09 |
| R10 |
| R11 |
File details come from the government source that posted it. Updated .