Amendment_0001_-_PR_ST_ER_191(001).pdf

PDF 269 KB Posted

Attached to
El Yunque National Forest 191(001) Federal contract opportunity
Solicitation number
DTFH71-15-B-00019
Issued by
Department of Transportation Federal Highway Administration

About this file

The Bid Opening date of August 13 2015 at 2 00 pm EST will remain the same.

View the file

Other files for this federal contract opportunity

Other files attached to El Yunque National Forest 191(001), newest first.
File Type Posted
Bid_Opening_Schedule_A_-_PR_ST_ER_191(001).pdf PDF
Amendment_0002_-_PR_ST_ER_191(001).pdf PDF
Plans_-_PR_ST_ER_191(001).pdf PDF
Report_GCP_Application.pdf PDF
Synopsis_-_PR_ST_ER_191(001).pdf PDF
Categorical_Exclusion_Form_(NEPA).pdf PDF
VETS-100A-Form.pdf PDF
Report_Boring_Logs.pdf PDF
FP03_Errata.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
FP03_Eng_.pdf PDF
IFB_Solicitation_-_PR_ST_ER_191(001).pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7115B00019

x x

0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

SEE BLOCK 1008/05/20150001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/14/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PR ST ER 191(001)

The purpose of this Amendment is to:

1) Revise Section 604 of the Special Contract Requirements (J Pages) to modify manhole and pipe requirements.

2) Revise the Plans to correct the diameter of the concrete pipe culverts and clarify manhole designations.

The Bid Opening date of August 13, 2015, at 2:00 p.m. will remain the same.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0001

Info Page 1 of 1

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project PR ST ER 191(001) El Yunque National Forest

Solicitation: DTFH71-15-B-00019

The purpose of this Amendment is to:

1) Revise Section 604 of the Special Contract Requirements (J Pages) to modify manhole and pipe requirements.

2) Revise the Plans to correct the diameter of the concrete pipe culverts and clarify manhole designations.

The Bid Opening date of August 13, 2015, at 2:00 p.m. will remain the same.

Plan Sheet changes

Delete Plan Sheet K01 and substitute the amended Plan Sheet K01.

Updated Sheet K01 (Drainage Cross Section Site 2) to revise the diameter of the concrete pipe culverts to 30 inches and clarify which manhole was referred to as type 1 and which one as type 2.

SCR_Changes Page 1 of 1

Special Contract Requirement (J Pages) changes

1. Add the following to Section 604 of the Special Contract Requirements, page J-23:

604.01. Add the following:

This work also includes the design of Type 1 and Type 2 concrete manhole structures.

604.04. Add the following:

Install supplemental concrete pipe ties on the last downstream pipe-to-pipe joint and at the downstream pipe-to-end section joint, if present, as shown in the plans.

2. Delete Subsection 604.04 of the Special Contract Requirements, page J-23 and substitute the following:

604.04. Delete the second sentence of the first paragraph and substitute the following:

Submit design drawings and details with supporting calculations for cast-in-place or precast concrete manholes performed by a Professional Engineer licensed in the Commonwealth of Puerto Rico meeting all federal, state, and local standards, regulations, and contract requirements to the CO according to Subsection 104.03.

Amendment 1 info.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001
Project PR ST ER 191(001)
Solicitation: DTFH71-15-B-00019

File details come from the government source that posted it. Updated .