GCP_Application_Report.pdf

PDF 39 MB Posted

Attached to
El Yunque National Forest Federal contract opportunity
Solicitation number
DTFH71-15-B-00018
Issued by
Department of Transportation Federal Highway Administration

About this file

GCP Application Report

View the file

Other files for this federal contract opportunity

Other files attached to El Yunque National Forest, newest first.
File Type Posted
Amendment_0001_-_PR_ERFO_FS_2014-1(1).pdf PDF
IFB_Solicitation_-_PR_ERFO_FS_2014-1(1).pdf PDF
Categorical_Exclusion_Form_(NEPA).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Boring_Logs_Report.pdf PDF
VETS_100_Form.pdf PDF
Plans_PR_ERFO_FS_2014-1(1).pdf PDF
FP03_Eng_.pdf PDF
FP03_Errata.pdf PDF
Synopsis_-_PR_ERFO_FS_2014-1(1).doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PEDIDO PARA PERMISO GENERAL CONSOLIDADO

APPLICACIÓN DE PERMISO GENERAL

Para:

Número de Proyecto PR ERFO FS 2014-1(1) Reparación de Deslizamiento en la carretera PR 191 km 9.0, 11.4 y km 11.6

El Yunque National Forest

Preparado por:

Federal Highway Administration

Eastern Federal Lands Highway Division 21400 Ridgetop Circle

Sterling, VA 20166

Kevin S. Rose

(571) 434-1541

Kevin.Rose@dot.gov

Dirección Física: Ave. Ponce de León 1308, Carr. Estatal 8838, Sector el Cinco, Río Piedras, PR 00926 Dirección Postal: Apartado 11488, Santurce, PR 00910-1488 Tel. (787) 767-8181 • Fax (787) 767-1962

Forma PGC-002

GOBIERNO DE PUERTO RICO

OFICINA DEL GOBERNADOR

JUNTA DE CALIDAD AMBIENTAL

Área de Calidad de Agua

SOLICITUD DE PERMISO GENERAL CONSOLIDADO

1 NUEVA

1 MODIFICACION NUM. PERMISO: _______________________

1 RENOVACION

1 TRANSFERENCIA

I. IDENTIFICACION DE PERSONAS Y ENTIDADES RESPONSABLES

Entidad Nombre y Seguro Social

Patronal Dirección Física Dirección Postal

Dueño

SS ______ - ______ - _____

Correo Electrónico

Teléfono:

Fax:

Agente o

Representante Autorizado

Correo Electrónico

Contratista

Correo Electrónico

Inspector

Correo Electrónico

II. INFORMACION DEL PROYECTO

A. Nombre del Proyecto:_____________________________________________________________________________________

B. Localización Física:_______________________________________________________________________________________

(Calle o Carretera) (Num. o Km)

(Barrio) (Pueblo)

C. Número de Catastro:_______________________________

D. Localización del proyecto en Coordenadas Lambert (Stateplane NAD83): x:_________.____ y:_________.____

E. Cuerpo(s) de agua receptor(es) de la escorrentía del proyecto: __________________________________.

F. Número de Documento Ambiental: _________________________

G. Tipo(s) de obra(s) a realizarse en el proyecto: 1 Construcción 1 Demolición

H. Fecha estimada: Inicio de obras: ____/____/____ Terminación de las obras: ____/____/____

(Día / Mes / Año) (Día / Mes / Año)

I. Área Total: Lugar del proyecto: _______________ m 2 Obras a realizarse: _______________ m 2

J. Volumen total de componentes de la corteza terrestre a: remover __________ m3 rellenar ___________ m3 almacenar ________ m3 disponer __________ m3 extraer __________ m3

K. Cantidad total de desperdicios sólidos a generarse en el proyecto: ___________ yd3

L. Volumen de material a generarse en la demolición: _______________ m3

M. En casos de construcción indicar tipo de facilidad y número de unidades: _____________________

N. Distancia lineal de la instalación de tuberías y/o cables soterrados a ser instalados en áreas previamente construidas, fuera de los límites de la propiedad: ___________pies

Dirección Física: Ave. Ponce de León 1308, Carr. Estatal 8838, Sector el Cinco, Río Piedras, PR 00926

Tel. (787) 767-8181 • Fax (787) 767-1962

Forma PGC-001

REQUISITOS PARA EL PERMISO GENERAL CONSOLIDADO

PGC-____-______-_______-____

PARA USO OFICIAL

Anejos Documentos Solicitados Sometido (Solicitante)

Recibido (Uso Oficial)

1. Formulario de Solicitud de Permiso General Consolidado debidamente completado (Un original y una copia) (Forma PGC-002)

1 1

2.

Evidencia de haber cumplido con el Artículo 4. B(3) de la Ley Sobre Política Pública Ambiental (Ley Número 416 del 22 de septiembre de 2004, según enmendada)

1 1

3. Plano Topográfico en escala de 1 en 20,000 identificando el proyecto 1 1

4. Identificación de accesos o vías públicas desde o hacia el lugar del proyecto (Mapa, Croquis o Escrito)

1 1

5. Documento de Plan CES (firmado y sellado en original por el proyectista) que incluya:

a) Memorial Explicativo

b) Localización y representación gráfica de las áreas afectadas y colindantes

c) Plano de niveles actuales y niveles propuestos (Firmado y sellado en original por el profesional licenciado que lo preparó)

d) Plano de drenaje que incluya la localización de los sistemas de drenajes existentes o partes de éste (naturales o hechos por el hombre), cálculos de escorrentías, cuerpos de agua (perennes e intermitentes) y sistemas naturales (humedales, sumideros y otros) (Firmado y sellado en original por el profesional licenciado que lo preparó)

e) Plano Pluvial con la localización del sistema de drenaje final incluyendo sus puntos de descarga (Firmado y sellado en original por el profesional licenciado que lo preparó)

f) Plano del proyecto con las medidas de control de erosión y prevención de la sedimentación a implantarse en el predio (Plano CES) (Firmado y sellado en original por el profesional licenciado que lo preparó)

g) Descripción de medidas de control de erosión y prevención de la sedimentación provisionales y permanentes, incluyendo diseño, especificaciones e itinerario de mantenimiento

h) Identificación del lugar donde se almacenarán los componentes de la corteza terrestre (Si Aplica)

i) Estimado de costos de Implantación y Mantenimiento

j) Documento escrito donde se detalle las actividades de forestación y/o la estabilización de las áreas impactadas

Certificación, firmada y sellada en original, suscrita por el proyectista que preparó el Documento y el Plano de Plan CES y copia de sus respectivas k) l) de sus licencias (Forma PGC-003)

Certificación, firmada y sellada en original, suscrita por el (los) profesional(es) a cargo de la preparación de cualquier otro documento o planos que sea incluido como parte del Plan CES y copia respectivas licencias (Si Aplica) (Forma PGC-004)

6.

General para recibir material de la corteza terrestre (Si Aplica) (Forma PGC-005)

1 1 Certificación de que el lugar de disposición de componentes de la corteza terrestre fuera del proyecto tiene vigente un Permiso CES, Permiso Consolidado o Permiso

REQUISITOS PARA EL PERMISO GENERAL CONSOLIDADO

PAGINA 2

PGC-____-______-_______-____

Anejos Documentos Solicitados Sometido (Solicitante)

Recibido (Uso Oficial)

7.

Copia de la Resolución o Permiso de la Agencia gubernamental con jurisdicción primaria (ARPE, Junta de Planificación, Municipio Autónomo u otros)

1 1

8. Documento escrito de Plan de Operación que incluya:

a) Área donde se realizará la actividad y duración de ésta

b) Tipo y cantidad de desperdicios sólidos que se anticipa generar

c) Procedimientos, equipo y personal que será utilizado para la recolección y almacenamiento de los desperdicios sólidos

d) Procedimientos para la disposición final y lugar donde se efectuará

e) Copia del Permiso para Operar Servicios de Recolección o

Transportación de Desperdicios Sólidos No Peligrosos (DS-1)

f) Carta de Aceptación de la disposición final de los Desperdicios Sólidos

No Peligrosos

g) Copia del manifiesto para la disposición de desperdicios sólidos

h) En casos de demolición, se deberá incluir una Certificación donde indique que la estructura a demolerse está libre de materiales con asbesto y pintura con contenido de plomo. Esta certificación deberá ser firmada y sellada por el profesional licenciado que la preparó y deberá someter la Forma PGC-004. (Si Aplica)

9. Documento escrito en el que se describa la actividad u obras a realizarse que emite contaminantes atmosféricos, tipo de contaminante y medida de mitigación a utilizarse para controlar el mismo

1 1

10. Documento escrito estableciendo razones de no-aplicabilidad de cualquier información requerida en los anejos y/o en la Solicitud de Permiso (Forma PGC-

002) (Si Aplica)

1 1

11. Copia del Permiso vigente que interesa renovar, modificar o transferir (Si Aplica) 1 1

12. Evidencia de pago de cuotas de radicación (Forma PGC-008) 1 1

ARA USO OFICIAL P

Recibido por: _____________________________________ echa d Prese tación: __ F e n _____/_____/___ Representante autorizado JCA que recibe el documento (Día/ Mes/ Año)

ANEJO 1

Dirección Física: Ave. Ponce de León 1308, Carr. Estatal 8838, Sector el Cinco, Río Piedras, PR 00926

Tel. (787) 767-8181 • Fax (787) 767-1962

Forma PGC-002

GOBIERNO DE PUERTO RICO

SOLICITUD DE PERMISO GENERAL CONSOLIDADO

1 NUEVA

1 MODIFICACION NUM. PERMISO: _______________________

1 RENOVACION

1 TRANSFERENCIA

I. IDENTIFICACION DE PERSONAS Y ENTIDADES RESPONSABLES

Entidad Nombre y Seguro Social

Patronal Dirección Física Dirección Postal

Dueño

Correo Electrónico

Agente o

Representante Autorizado

Correo Electrónico

Contratista

Correo Electrónico

Inspector

Correo Electrónico

II. INFORMACION DEL PROYECTO

A. Nombre del Proyecto:_____________________________________________________________________________________

B. Localización Física:_______________________________________________________________________________________

(Calle o Carretera) (Num. o Km)

C. Número de Catastro:_______________________________

D. Localización del proyecto en Coordenadas Lambert (Stateplane NAD83): x:_________.____ y:_________.____

E. Cuerpo(s) de agua receptor(es) de la escorrentía del proyecto: __________________________________.

F. Número de Documento Ambiental: _________________________

G. Tipo(s) de obra(s) a realizarse en el proyecto: 1 Construcción 1 Demolición

H. Fecha estimada: Inicio de obras: ____/____/____ Terminación de las obras: ____/____/____

(Día / Mes / Año) (Día / Mes / Año)

I. Área Total: Lugar del proyecto: _______________ m 2 Obras a realizarse: _______________ m 2

J. Volumen total de componentes de la corteza terrestre a: remover __________ m3 rellenar ___________ m3 almacenar ________ m3 disponer __________ m3 extraer __________ m3

K. Cantidad total de desperdicios sólidos a generarse en el proyecto: ___________ yd3

L. Volumen de material a generarse en la demolición: _______________ m3

M. En casos de construcción indicar tipo de facilidad y número de unidades: _____________________

N. Distancia lineal de la instalación de tuberías y/o cables soterrados a ser instalados en áreas previamente construidas, fuera de los límites de la propiedad: ___________pies

Dirección Física: Ave. Ponce de León 1308, Carr. Estatal 8838, Sector el Cinco, Río Piedras, PR 00926

Tel. (787) 767-8181 • Fax (787) 767-1962

Forma PGC-004

GOBIERNO DE PUERTO RICO

CERTIFICACIÓN DE OTRO PROFESIONAL QUE PREPARÓ PLANOS Y DOCUMENTOS

RELACIONADOS CON EL PERMISO GENERAL PARA OTRAS OBRAS

(Deberá completarse en letra de molde o impresa)

NUM. PERMISO: _________________________

Yo, ______________________________, mayor de edad, ________________, y vecino de_______________________ (Nombre, Inicial, Apellido) (Estado Civil) (Municipio)

Certifico que:

1. Mi nombre y demás circunstancias personales son las antes indicadas.

2. Estoy autorizado para ejercer la profesión de____________________en Puerto Rico con Licencia Número________ (Ingeniero, Arquitecto)

3. He preparado y/o revisado el ___________________________________que está incluido como parte de la solicitud (documento o plano) de Permiso General Consolidado para el Proyecto _________________________________________________ ubicado en ________________________________________.

4. Toda la información contenida en el mismo es cierta, correcta y completa a mi mejor saber y entender, y en cumplimiento con el Reglamento para la Certificación de Planos y Documentos ante la Junta de Calidad Ambiental y otras leyes aplicables.

5. Reconozco las consecuencias de incluir y someter información falsa o incompleta en dichos planos y documentos.

Y para que así conste, firmo y sello la presente certificación en ______________________________ de Puerto Rico, hoy, __________ de _______________ de ___________________.

Firma y Sello (en original)

Nota : Deberá someter evidencia de que se encuentra al día en el pago de sus cuotas de colegiación.

ANEJO 2

Determinación de Cumplimiento Ambiental mediante Exclusión Categórica

Oficina de Gerencia de Permisos P O Box 41118 San Juan, Puerto Rico 00940 Página 1 de 2

Núm. Caso

2015-312336-DEC-60492

PR ERFO FS 2014-1(1)

Datos de localización

De conformidad con las disposiciones contenidas en las leyes y los reglamentos vigentes, se expide la presente Determinación de Cumplimiento Ambiental mediante Exclusión Categórica, Comercial, Privado para las acción(es) antes descrita(s):

Dirección Física:

PR-191 km. 9.0, 11.4, 11.6, 12.0 El Yunque National Forest Bo. Mameyes 2, Rio Grande

Calificación:

Calificación: Bosque Accesos: Publico Distrito en el Mapa de Inundabilidad: Zona AE

Dueño(s):

Num. de Catastro:

000-000-000-00

Datos de determinación

Exclusión Categórica Número conforme a la Resolución R-11-17: 46

Fecha de emisión

20 de enero de 2015

Condiciones generales

De acuerdo con la solicitud de esta Determinación, se certificó cumplimiento con los siguientes requisitos, cuyo incumplimiento podrá repercutir en la revocación de esta Determinación:

1. Las actividades de uso o, de construcciones livianas de nuevas estructuras no podrán estar ubicadas o desarrolladas en:

a) Áreas susceptibles a inundaciones, derrumbes o marejadas;

b) Áreas donde la Junta de Calidad Ambiental haya determinado que existe un grado de contaminación que excede el permitido por los reglamentos vigentes;

c) Áreas ecológicamente sensitivas o protegidas, según establecido por el Departamento de Recursos Naturales y Ambientales

(DRNA), en donde existan especies únicas de fauna o flora, o que estén en peligro de extinción, o donde puedan afectarse ecológicamente sistemas naturales o artificiales, directa o indirectamente;

d) Áreas donde existan problemas de infraestructura o de deficiencias en los sistemas de servicios de suministro de agua potable, disposición de las aguas sanitarias, suministro de energía eléctrica o capacidad vial para el manejo adecuado del tránsito de vehículos de motor;

e) Áreas que constituyan yacimientos minerales, conocidos o potenciales;

f) Áreas donde existen yacimientos arqueológicos o de valor cultural, según determinado por el Instituto de Cultura Puertorriqueña;

g) Áreas de topografía escarpada, en cuencas hidrográficas donde se puedan afectar fuentes de abasto de agua potable;

h) No deberán descargar contaminantes a cuerpos de agua; ni generar desperdicios peligrosos o emisiones al aire que excedan dos

(2) toneladas al año de contaminantes de aire criterio, o cinco (5) toneladas de cualquier combinación de contaminantes criterios; ni emitir al aire contaminantes peligrosos o tóxicos u olores objetables.

2. No podrán ser aquellas acciones que sean financiadas mediante el otorgamiento de fondos federales, incluyendo, pero sin limitarse a, aquellas del programa de Fondos Rotatorios de Agua Limpia y Agua Potables.

3. La disposición o descarga de las aguas usadas se debe realizar mediante acometidas a un sistema sanitario existente; lo cual requerirá la obtención del endoso de la Autoridad de Acueductos y Alcantarillados (AAA) previo a la solicitud de permisos de construcción.

4. Deberá existir la infraestructura necesaria (agua potable y alcantarillado sanitario suministrado por la AAA, energía eléctrica, alcantarillado pluvial, vías de acceso) para servir a la operación del proyecto o actividad propuesta, con excepción de los proyectos agrícolas que se ubican por regla general en áreas rurales así como las residencias unifamiliares, donde las instalaciones de esta naturaleza son limitadas.

5. La operación de la actividad no afectará áreas residenciales o de tranquilidad por contaminación sónica o vibraciones, según establecido por el Reglamento para el Control de la Contaminación por Ruido.

6. Los desarrollos de instalaciones comerciales, industriales, de servicios, institucionales, y los desarrollos de terrenos para uso turístico y proyectos recreativos, no excederán de 5,000 pies cuadrados de construcción en área total de ocupación y área bruta de piso, y cumplirán con las condiciones de ubicación y operación establecidas por la Junta de Planificación de Puerto Rico y la Oficina de

Determinación de Cumplimiento Ambiental mediante Exclusión Categórica

Oficina de Gerencia de Permisos P O Box 41118 San Juan, Puerto Rico 00940 Página 2 de 2

Núm. Caso

2015-312336-DEC-60492

Gerencia, según sean aplicables.

7. El uso de edificios o estructuras existentes para facilidades comerciales, almacenes y usos industriales, o de servicios no excederán de

100,000 pies cuadrados en área total de ocupación y área bruta de piso. Dicha operación deberá cumplir con las condiciones de ubicación y operación establecidas por la Junta de Planificación de Puerto Rico y la Oficina de Gerencia, según sean aplicables y las establecidas para las exclusiones categóricas en este Reglamento.

8. La zonificación del área deberá estar acorde o compatible con el uso propuesto.

9. Para la ejecución o desarrollo de las acciones aprobadas como exclusiones categóricas, se requerirá la obtención de los permisos aplicables de las agencias gubernamentales para las etapas de construcción y operación.

10. La acción no podrá ser fragmentada o segmentada para fines de la evaluación y será determinación de la agencia proponente, de si la misma satisface o no los requisitos para ser considerada y ejecutada bajo una exclusión categórica.

11. Esta determinación no será una revisable, hasta tanto se emita una determinación de cumplimiento ambiental, cuyo componente sea la presente determinación.

Aviso

Si luego de haberse aquí dado cumplimiento con el Artículo 4(B) de la Ley Núm. 416 surgieran variaciones sustanciales en la acción propuesta que requieran la evaluación a los impactos ambientales, habrá que presentar el correspondiente documento ambiental, de conformidad con la Ley sobre Política Pública Ambiental.

Firmas y sellos

Fecha de expedición 20 de enero de 2015

Arq. Alberto Lastra Power

DIRECTOR EJECUTIVO

ANEJO 3

Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

0.5 0 0.50.25 Kilometers

PR ERFO FS 2014-1(1) Project Sites

1:20000

KM 9.0

KM 12.0

KM 11.4

KM 11.6

ANEJO 4

Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

0.5 0 0.50.25 Kilometers

PR ERFO FS 2014-1(1) Project Sites

1:20000

KM 9.0

KM 12.0

KM 11.4

KM 11.6

ANEJO 5

ANEJO 5a

Dirección Física: Ave. Ponce de León 1308, Carr. Estatal 8838, Sector el Cinco, Río Piedras, PR 00926

Tel. (787) 767-8181 • Fax (787) 767-1962

Forma PGC-003

GOBIERNO DE PUERTO RICO

CERTIFICACIÓN DEL PROYECTISTA

PGC-________________________

Yo, ______________________________ mayor de edad, __________________, y vecino de ____________________ (Nombre, Inicial, Apellido) (Estado Civil) (Municipio)

Dirección Postal__________________________________________________________________________________

Teléfonos: Residencial (______) ______- ________ Oficina (______) ______- ________ Ext._________

Fax: (______) ______- ________

2. Estoy autorizado para ejercer la profesión de____________________en Puerto Rico con Licencia Número________.

(Ingeniero, Arquitecto)

3. He preparado el Documento de Plan CES seleccionando todas las Medidas de Control de Erosión y Sedimentación de acuerdo al Manual de Puerto Rico para el Control de la Erosión y Sedimentación en Áreas de Desarrollo, a cualquier especificación relevante del manufacturero y de las mejores prácticas de la ingeniería.

4. Toda la información vertida en los documentos que acompañan esta solicitud es cierta, correcta y completa a mi mejor saber y entender.

5. Afirmo y reconozco las consecuencias de incluir y someter información falsa o incompleta en dichos documentos.

6. He revisado el Plano CES y está de acuerdo con las medidas diseñadas y descritas en el documento de Plan CES.

Y para que así conste, firmo y sello la presente certificación en __________________________de Puerto Rico, hoy (Municipio) día____ de ____________________ de _________.

Nota: Deberá someter evidencia de que se encuentra al día en el pago de sus cuotas de colegiación.

ANEJO 5b

ANEJO 5c

ANEJO 5d

ANEJO 5e

KM 9.0

KM 11.4

KM 11.6

KM 12.0

eric.rothermel Oval eric.rothermel Callout

KM 9.0

eric.rothermel Oval eric.rothermel Callout

KM 11.4

eric.rothermel Oval eric.rothermel Callout

KM 11.6

eric.rothermel Oval eric.rothermel Callout

KM 12.0

ANEJO 5f

ANEJO 5g

J-1

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

SPECIAL CONTRACT REQUIREMENTS

Project PR ERFO FS 2014-1(1) El Yunque National Forest

The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03) U. S. Customary Units, U. S. Department of Transportation, Federal Highway Administration.

J-2

Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT

102.04. Add the following:

Furnish documentary evidence as to the ownership and value of the assets pledged in support of the bond and details of the security interest in the assets by the individual sureties for the apparent low bidder within 14 calendar days after the opening of bids. Failure to submit evidence within the time required will be grounds for declaring the surety unacceptable.

In addition, the CO may, after reviewing the Affidavit of Individual Surety and documentary information on the security interest and the assets pledged, by certified mail to the surety's business or residence address (as shown on the bond), request the surety to provide further information and/or documents with respect to any of the documents provided. The CO may require such information to be furnished under oath. Failure of the surety to accept such mail, or failure of the surety to respond with the requested information or documents within 7 business days of receipt of the request, will be cause for rejection of the surety.

These requirements are in addition to the requirements in FAR Subpart 28.203, except where in conflict with the requirements in the FAR, in which case the FAR controls.

102.06. Add the following after the last paragraph:

Submit the documentary evidence for individual sureties at the same time as the Affidavit of Individual Surety and security interest in assets pledged. A Contractor submitting an unacceptable individual surety in satisfaction of a performance or payment bond before the issuance of the Notice to Proceed will be permitted one opportunity to substitute an acceptable surety or sureties within 7 business days of receipt of notification that the surety is unacceptable.

The Government's right to direct the substitution of sureties to ensure the continuing acceptability of the bonds during the performance of the Contract according to FAR Clause 52.228-2, Additional Bond Security, is not restricted.

These requirements are in addition to the requirements in FAR Subpart 28.203, except where in conflict with the requirements in the FAR, in which case the FAR controls.

Section 104. — CONTROL OF WORK

104.03(a). Add the following to the third paragraph:

Drawings will be reviewed in the order they are received.

J-3

104.03. Add the following:

(c) As-built working drawings. Furnish 2 sets of as-built working drawings. The Government will provide 2 sets of contract drawings to be used exclusively for recording the as-built details of the project.

Keep the as-built working drawings current on a weekly basis and have at least 1 set available on the jobsite at all times. Accurately and neatly record changes from the contract plans, which are made in the work, or additional information, which might be uncovered in the course of construction, as they occur by means of details and notes. Maintain a log of all changes made to the as-built working drawings, and monthly, at the estimate cutoff date, make the as-built working drawings and log available for review by the CO.

Note all additions or revisions to the location, character, and dimensions of the prescribed work shown on the contract drawings. Line out all details shown that are not applicable to the completed work. Use the red-line process (red pencil or red ink) to record on the as-built working drawings and final as-built drawings, as a minimum, but not limited to, the information described below:

(1) Typical section(s)

(a) Revisions in dimensions; and

(b) Revisions in materials.

(2) Plan and profile

(a) Plan

(1) Revisions to the alignment;

(2) Changes in the construction limits;

(3) Revisions in location, type, and grade of road approaches;

(4) Location and type of utilities;

(5) Location, size, and type of underdrains;

(6) Skew of culverts;

(7) Channel changes;

(8) Location of monuments and permanent references;

J-4

(9) Elevations for all aerial and underground crossings of utilities; and

(10) Location, length, and type of fencing.

(b) Profile

(1) Revisions to grades, elevations, and stationing of intersection PIs;

(2) Equations;

(3) Culvert diameter, length, type, and stationing;

(4) Length of culvert extension, and length of existing culvert;

(5) Location, length, stationing, and type of retaining walls; and

(6) Location, length, stationing, and end treatment of guardrail.

(3) Bridge

(a) Stationing of bridge ends;

(b) Elevations including footing, bearing pads, deck, and top of walls;

(c) Pile driving record with pile length, size, type, and tip elevation;

(d) Post-tensioning records including stressing sequence, jacking force, and duct size and layout;

(e) Construction and concrete placement sequences;

(f) Bearing details with orientation;

(g) Expansion joints including actual clearance with atmospheric temperature; and

(h) Any changes in plan or dimensions including any major changes in reinforcing.

(4) Miscellaneous

(a) Revisions to parking areas or turnouts;

(b) Final location, type and length of curbs, sidewalks, etc.;

(c) Fencing type and limits; and

(d) Landscaping and planting.

J-5

(5) Special Contract Procedures

(a) Method of excavation, concrete placement, girder erection, structure repairs, etc.

Prepare final as-built drawings after the completion of each definable feature of work as listed in the Contractor Quality Control Plan (Foundations, Utilities, Structural Steel, etc., as appropriate for the project). The as-built working drawings and final as-built drawings will be jointly reviewed for accuracy and completeness by the CO and the Contractor prior to submission of each monthly pay estimate.

If the monthly review finds that the Contractor is not maintaining the as-built working drawings, payment of the Contractor’s invoice will be withheld until the as-built working drawings are brought up to date.

Furnish the as-built working drawings to the CO before the final inspection. Correct all details found during the final inspection that are not shown on the as-built working drawings and return to the CO within 5 working days for approval.

Once final as-built working drawings have been approved by the CO, provide final as-built drawings in the latest version of Adobe Acrobat (PDF) format (at the time of submission) on two sets of CD-R or DVD-R. Include the latest version Adobe Acrobat reader on the CD-R or DVD-R. Provide the final as-built drawings with a resolution quality such that the redlined drawings and notations are clearly discernable. Final payment per Subsection

109.09 will not be made until the CD-R or DVD-R of the final as-built drawings have been reviewed and approved by the CO.

No direct payment will be made for maintaining and furnishing as-built working drawings.

104.05. Add the following:

Operate loaded vehicles hauling material at speeds not exceeding 40 miles per hour, or the posted speed limit whichever is lower, and spaced at 500-foot minimum intervals. Do not exceed 25 miles per hour, or the posted speed limit whichever is lower, or operate more than 1 loaded hauling vehicle at a time on a bridge.

Section 105. — CONTROL OF MATERIAL

105.01. Delete the third paragraph and substitute the following:

Material may be approved at the source of supply before delivery to the project. Approval of a materials source does not constitute acceptance of materials provided from the source. If an approved source fails to supply acceptable material during the life of the project, further use of that source may be denied.

J-6

105.02(b). Add the following:

If any material is to be excavated from any material source outside the construction limits, other than commercially operated sites, provide a certification from the State Historic Preservation Officer or Indian Tribal Council, if applicable, before work begins that states:

(1) A cultural resource survey (a survey for historical sites and archeological remains) has been performed at the proposed site; and

(2) No significant cultural resources exist in the area that will be disturbed by the Contractor.

Section 106. — ACCEPTANCE OF WORK

106.01. Add the following:

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of the Invitation for Bids (IFB) or Request for Proposal (RFP). Use the Federal Lands Highway Field Materials Manual (FMM) Appendix B, FLH Test Methods in effect on the date of the IFB or RFP. Electronic copies of the FMM are available upon request or can be downloaded from any of the three FLH Division websites.

All specification limits, tolerances, test results, and related calculations are according to ASTM E 29, Absolute Method.

Use prevailing industry standards in the absence of contract requirements or tolerances.

106.03. Delete the first sentence of the second paragraph and substitute the following:

Other than references in or to the FAR or Federal Law, when these Standard Specifications or Supplemental Contract Requirements reference certifications; certificates; or certified documents, equipment, or individuals, these references are not certifications under Section 4301 of Public Law 104-106, National Defense Authorization Act for Fiscal Year 1996.

106.03. Add the following:

Maintain records of required certifications according to Subsections 103.04, 153.04, and 154.04.

Submit certifications to the CO.

Check certifications before incorporating the material into the work to ensure that the requirements of the contract have been met. Mark the certifications with the following information:

• Project name;

J-7

• Project number;

• Contract item number;

• Item description;

• Contractor’s signature; and

• Date.

Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

107.01. Delete the second sentence of the third paragraph and substitute the following:

A partially-completed copy of the General Consolidated Permit application is included with the bid documents. Complete the application and obtain the General Consolidated Permit prior to the start of any construction activities. Pay any required permit fees.

Obtain all additional permits or agreements and modifications to Government-obtained permits or agreements that are required.

107.02. Add the following after the sixth paragraph:

Notify the CO in writing at least 48 hours in advance of any scheduled utility shutdown, investigation, and /or related work.

107.05. Add the following after the second paragraph:

Submit all claims to the insurance company for investigation, regardless of deductible, unless the Contractor has chosen to pay the claim directly. Provide the results of any investigations and subsequent actions to the CO within 1 week of receipt from the insurance company or of action.

Determination by the insurance company that the claim is not covered by the policy is not an adequate basis for the Contractor to fail to meet its obligations under the requirements of this Section.

Add the following after Subsection 107.11:

107.12 Protection of Threatened, Endangered, and Sensitive Wildlife Species. The project may provide habitat for the endangered Puerto Rican boa (Epicrates inornatus). The Puerto Rican boa can be found in a wide variety of habitat types from sea level to about 1,300 feet of elevation. Comply with the following requirements for protecting Puerto Rican boas:

(a) Coordinate a preconstruction meeting with the CO, the Forest Biologist, and the Forest Botanist at least 7 days prior to the beginning of construction. The purpose of this meeting will be to discuss the scope of the project and work restrictions. The United States Forest

J-8

Service (USFS) will also provide information about the Puerto Rican boa, and how to recognize them. Implement an outreach and education plan to inform employees about the conservation of Puerto Rican boas, as well as the penalties for harassing or harming them.

Any person that injures, captures, or kills a Puerto Rican boa is subject to penalties under Federal law of up to $100,000, one year in prison, or a combination of both.

(b) USFS personnel will conduct a survey for Puerto Rican boas at least 2 days prior to the beginning of construction. The USFS will provide the locations of any areas to be protected due to the presence of boas. Do not begin clearing or any ground disturbing activities until the boa survey has been completed.

(c) Before beginning clearing or ground disturbing activities, mark the limits of disturbance and any areas designated to be protected by the USFS on the plans and in the field. Submit the proposed methods for marking these areas in the field to the CO for approval at the preconstruction conference.

(d) Before activities commence each workday during the vegetation clearing phase, ensure that no boas are present within the work area. If boas are found within the working area, immediately stop activities and notify the CO, the Fish and Wildlife Service (FWS), and the Department of Natural and Environmental Resources (DNER). Do not resume work at that site until the boas move out of the area on their own. Activities may continue at other work sites where no boas have been found during boa surveys.

(e) Clear vegetation by hand in areas where boas may be present. Do not operate machinery in these areas until it has been determined that there are no boas.

(f) Before operating or moving equipment and vehicles in staging areas, thoroughly inspect the equipment and any areas within 100 feet of potential boa habitat to ensure that no boas are lodged in the standing equipment or vehicles. If boas are found within vehicles or equipment, immediately notify the CO and the DNER for proper handling and relocation. If relocation of any boas is necessary, authorized personnel of the DNER will relocate the boas to appropriate habitat near the project site.

Section 108. — PROSECUTION AND PROGRESS

108.01. Add the following:

Construction operations are limited as follows:

(a) No work will be permitted on Saturdays, Sundays, or National legal holidays.

J-9

(b) No work will be permitted on the following days:

• July 20, 2015 (Luis Munoz Rivera’s Birthday)

• July 25, 2015 (Constitution Day)

• July 27, 2015 (Jose Celso Barbosa’s Birthday)

• November 19, 2015 (Discovery of Puerto Rico Day)

Section 109. — MEASUREMENT AND PAYMENT

109.08(b). Add the following:

Submit invoices by the 7th day after the closing date. Invoices received after the 16th day following the closing date will not be accepted for payment processing that month. Include late, unprocessed invoice submittals in the following month’s invoice.

109.08(c). Add the following:

The Government’s designated billing office is:

Eastern Federal Lands Highway Division Loudoun Tech Center 21400 Ridgetop Circle Room 200 Sterling, Virginia 20166-6511

ATTN: CONSTRUCTION DIVISION

Section 152. — CONSTRUCTION SURVEY AND STAKING

152.02. Delete the third and fourth sentences of the first paragraph and substitute the following:

The Government will set horizontal and vertical control points, and will furnish the data for use in establishing control for completion of each element of the work.

152.02. Delete the second sentence of the second paragraph and substitute the following:

Reestablish any missing initial reference lines, control points, and stakes set by the Government.

J-10

152.03. Add the following:

Survey the Yokahu Tower parking area within the work limits prior to beginning any excavation, removals, or other activities that would alter the existing conditions. Document the horizontal locations and elevations of all key features such as curbs, gutters, sidewalks, pavement, and drainage structures. Collect sufficient data to permit reconstructing the parking area to match the existing conditions, except where approved otherwise by the CO.

152.03. Delete the text of paragraphs (f), (g), (h), (j), and (k).

152.03(a). Add the following:

Set benchmarks at a maximum spacing of 100 feet along the length of the roadway.

152.03(l)(9) and (10). Delete the Subsections and substitute the following:

(9) Temporary traffic control signs, markings, delineators, object markers, etc.

(10) Excavation limits for various drainage, walls, structures, and other pertinent items.

(11) Landscaping work.

Section 154. — CONTRACTOR SAMPLING AND TESTING

154.03. Add the following:

Furnish test results to the CO immediately after completing the test. The requirements for furnishing test results do not include sample aging or curing time; therefore, reporting times will be extended accordingly.

Submit proposals for using alternate AASHTO or State approved test methods in writing for approval. Alternate methods may be allowed based on documented equivalence to the method specified.

Deliver the Government’s portion of the sample or split sample in an acceptable container suitable for shipment to the CO.

154.04. Add the following:

On a weekly basis, submit a copy of all current Contractor test results and pay factor calculations based on those tests for items accepted under Subsection 106.05. When large quantities are produced, calculate pay factors as soon as possible. Use this information to make any necessary adjustments to operations to achieve acceptable pay factors. The Government may use the Contractor's test results to determine final pay factors for acceptance according to Subsection 154.05.

J-11

Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS

155.02. Add the following after the third paragraph:

155.02A Weather Delays.

(a) Weather Delay Definitions.

(1) Reasonably Predictable Weather. The number of workdays that can expected to be lost in any month due to rainfall based on 10-year historical weather data.

(2) Rain Day. A potentially lost workday on which rainfall is equal to or greater than

0.10 inches.

(3) Drying Day. A work day(s) immediately following a rainfall equal to or greater than

1.00 inch which is potentially lost because of wet ground conditions.

(4) Workday. A day not excluded from work by Section 108 of the Special Contract Requirements.

(5) Unusually Severe Weather. When the number of Actual Workdays Lost is greater than the calculated Total Lost Days for the month in question.

(b) Reasonably Predictable Weather. Determine Reasonably Predictable Weather for this contract by completing Table 155-1. Calculate data for Table 155-1 as follows:

(1) Using the last 10 years of historical weather data from the nearest NOAA weather data collection station, compute the average number of workdays lost (rain days plus drying days) for each month and the standard deviation from the average. Add the average number of workdays lost to the standard deviation.

(2) The Total number of Lost Days (Average Workdays Lost plus 1 Standard Deviation, rounded to whole days) will be considered normal for each month.

(3) Submit a completed Table 155-1 with the initial construction schedule.

(c) Unusually Severe Weather. Under FAR Clause 52.249-10, Default (Fixed-Price Construction), the Contractor can request time for a delay due to Unusually Severe Weather.

The number of Actual Workdays Lost is calculated by first totaling the actual Rain Days plus the actual Drying Days occurring in the month in question. From this total, deduct any workdays meeting the following conditions:

(1) The Rain Day or Drying Day occurred on a non-work weekday such as a holiday.

J-12

(2) Rainfall occurred at a time when no weather dependent work was in progress or occurred during planned or unplanned shutdowns due to other circumstances such as equipment failure, strikes, material supplies, delays, etc.

(3) The Contractor was still working or able to work on weather dependent activities to the extent that less than 50 percent of the workday was lost due to weather.

If the net number of Actual Workdays Lost is greater than the Total Lost Days, then Unusually Severe Weather occurred during the month in question.

(d) Time Adjustments for Rain Delays. If the net number of Actual Workdays Lost to rain is less than the Total Lost Days for the month in question, no time adjustments will be made.

If the net number of Actual Workdays Lost is more, then an excusable time extension may be granted. The Contractor must submit a Weather Time Impact Analysis supporting any alleged delays due to Unusually Severe Weather.

(e) Delays Due To Other Weather Conditions. Delays due to other unusually severe weather conditions (snow, extreme cold or heat, high winds, etc.) must be supported with a Weather Time Impact Analysis using historical weather data.

155.02. Delete the last paragraph and substitute the following:

The Construction Contract Time shown on the construction schedule for contract completion or for any interim completion dates shall be the calendar dates established in the contract.

155.04. Add the following to the first paragraph:

For a computer-generated CPM, use Primavera software or software that is file-compatible with Primavera.

J-13

Add the following at the end of the Subsection:

TABLE 155-1

Project Number__________________________

Location of NOAA Data Collection Station__________________________

Data Years (10-year history): 20___ through 20___

REASONABLY PREDICTABLE WEATHER

MONTH AVERAGE WORKDAYS

LOST

STANDARD

DEVIATION

TOTAL LOST

DAYS

JANUARY

FEBRUARY

MARCH

APRIL

MAY

JUNE

JULY

AUGUST

SEPTEMBER

OCTOBER

NOVEMBER

DECEMBER

Section 156. — PUBLIC TRAFFIC

156.03. Add the following:

Submit a traffic control plan for approval by the CO at least 14 days before intended use.

Schedule and perform the work so as to minimize disruption to public traffic. Work on only one site at a time unless approved otherwise by the CO.

Maintain at least one lane open on Route 191 during the work using flaggers as approved by the CO. Reopen all lanes to traffic during non-work hours.

J-14

Notify the CO and the USFS at least 5 days before beginning hauling or moving heavy equipment on Route 191 within the El Yunque National Forest boundary. Hauling will only be permitted from the nearest point of public access to the work site. Minimize hauling over completed pavement.

156.04. Add the following:

(g) Ensure that all drains and inlets within the project limits are fully functional throughout the duration of the project.

156.06(b). Delete the second sentence and substitute the following:

For shoulder drop-offs in excess of 3 inches, provide a 1V:3H fillet with “Low Shoulder” warning signs.

156.07. Delete the Subsection and substitute the following:

156.07 Nighttime Operations. Nighttime operations are not permitted. Perform construction operations during the hours of daylight (½ hour after sunrise to ½ hour before sunset).

156.08. Delete the second sentence of the first paragraph and substitute the following:

The traffic safety supervisor may be the superintendent.

Section 201. — CLEARING AND GRUBBING

201.03. Add the following:

Comply with the requirements of Subsection 107.12 for protecting Puerto Rican boas.

Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS

203.05(b). Delete the Subsection and substitute the following:

(b) Burn. Burning is prohibited. Dispose of material according to Subsection 203.05(a).

203.05(c). Delete the Subsection and substitute the following:

(c) Bury. Burying debris is prohibited. Dispose of material according to Subsection 203.05(a).

J-15

Section 204. — EXCAVATION AND EMBANKMENT

204.13(d). Add the following:

Flush the exposed faces of rock embankment with soil conserved from the excavation.

Section 212. — LINEAR GRADING

212.01. Delete the Subsection and substitute the following:

212.01 This work consists of site grading outside the roadway prism.

212.03. Delete the Subsection and substitute the following:

212.03 Site Grading. Grade the site to blend with the surrounding topography using existing material. Perform excavation and embankment construction according to Section 204. Do not remove excavated material from the site or bring additional embankment material onto the site.

212.04. Delete the Subsection and substitute the following:

212.04 Grading Tolerance. Adjust the slopes and grading limits as directed or approved by the CO to provide gradual transitions without noticeable breaks. Do not encroach on stream channels or grade in a manner that will adversely affect drainage.

212.05. Delete the first paragraph and substitute the following:

Site grading will be evaluated under Subsections 106.02 and 106.04.

212.06. Add the following:

Measure site grading on a horizontal plane.

Section 253. — GABIONS AND REVET MATTRESSES

253.06. Add the following after the second paragraph:

Hand place the rock for the visible faces of exterior basket cells to ensure an attractive appearance as directed by the CO. Rock in other sections of baskets may be placed by mechanical equipment.

J-16

Section 259. — SOIL NAIL RETAINING WALLS

259.02. Add the following:

Granular backfill 703.03

259.08. Delete the first paragraph and substitute the following:

Proof test a minimum of one production nail per row as selected by the CO. Do not test any nail until the nail grout has cured for at least 72 hours and attained the specified 3-day compressive strength.

259.11. Add the following:

(c) Gabion-faced walls. Construct according to Section 253.

259.12. Delete the Subsection and substitute the following:

259.12 Backfilling Behind Wall Facing. Place a geotextile over the back face of the gabion wall facing. Concurrently with the cell filling operation, backfill the area behind the gabion facing with granular backfill according to Subsection 209.10. Compact each layer according to Subsection 209.11 except use an acceptable lightweight mechanical or vibratory compactor within 3 feet of the gabion facing.

259.13. Add the following:

Structure excavation and granular backfill will be evaluated under Section 209.

259.14. Add the following:

Measure granular backfill under Section 204.

Section 301. — UNTREATED AGGREGATE COURSES

301.03. Add the following after the second paragraph:

Submit the representative 300-pound sample to the EFLHD Central Laboratory in Sevierville, Tennessee.

301.03. Add the following:

If an alternate State gradation is produced as provided in Subsection 703.05, notify the CO in writing. The target values with respect to the State gradation will be the midpoint of the allowable State specification band. The allowable deviation (D) will be ½ the State specification band width, and the maximum allowable pay factor under Subsection 301.10 will be 1.0.

J-17

Section 401. — SUPERPAVE HOT ASPHALT CONCRETE PAVEMENT

401.04. Add the following:

(d) Warm mix asphalt plant modifications.

(1) Modify the mixing plant as required by the manufacturer to introduce the warm mix asphalt technology. Interlock the warm mix asphalt additive delivery system with the automated proportioning system.

(2) Comply with manufacturer’s recommendations for incorporating additives and warm mix asphalt technologies into the mix. Comply with manufacturer’s recommendations regarding delivery and storage of additives.

(3) Modify the plant burner and/or drum flights in order to operate at lower production temperatures.

401.13. Add the following:

Begin paving operations at the furthest location from the asphalt plant and proceed towards the plant.

Place warm mix asphalt at temperatures conforming to the warm mix asphalt technology manufacturer’s guidelines for lift thickness and road surface temperatures.

401.15. Delete the second sentence of the first paragraph and substitute the following:

If drop-offs are left overnight, sign the drop-offs in excess of 2 inches with “Uneven Lanes” warning signs and provide a 1V:3H fillet for drop-offs in excess of 3 inches.

Section 402. — HOT ASPHALT CONCRETE PAVEMENT BY HVEEM OR

MARSHALL MIX DESIGN METHOD

402.01. Delete the first paragraph and substitute the following:

This work consists of constructing one or more courses of Hveem or Marshall hot asphalt concrete pavement using hot or warm mix asphalt.

402.01. Add the following:

Asphalt binder is designated as performance grade PG 64-22.

J-18

402.03. Add the following:

At the option of the Contractor, a State Department of Transportation mixture gradation may be submitted which has the same maximum size aggregate as the specified grading and conforms to the aggregate quality requirements in Subsection 703.07, and design parameters (b); (c)(2) or (d);

and (e) in Table 402-1 for the specified mix Class and the requirements of Table 402-2.

The allowable deviations for an optional State Department of Transportation gradation will be the allowable deviations as shown in Table 703-4 for the gradation specified.

402.03(b). Add the following after the first sentence:

Submit all job-mix formula materials and information to the EFLHD Central Laboratory in Sevierville, Tennessee, with a copy to the CO as directed.

402.03(b). Add the following:

(5) Warm mix technology and additive information.

(a) 1-gallon sample of warm mix asphalt additive and methodology for incorporating into mix design process.

(b) Warm mix asphalt manufacturer’s recommendations for usage and established target rate for the additive.

(c) Documentation of at least three successful warm mix asphalt technology field applications including project type, project owner, tonnage placed, mix design, mixture volumetrics, and performance.

(d) Temperature range for laboratory mixing and compacting.

(e) Asphalt binder performance grade test data over the range of warm mix asphalt additive percentages proposed for use, if applicable.

(f) Compatibility of warm mix asphalt additive with asphalt binder and anti-stripping agent.

(g) Temperature range for field mix production, delivery, lay-down and compaction.

For State Department of Transportation mixes, submit a job-mix formula that is currently approved and has been tested by the State within a year of the date of intended use. Include documentation from a State Department of Transportation official certifying that it is an approved State mix.