Plans_FTNP-GWMP_1A109.pdf
PDF 16 MB Posted
- Attached to
- George Washington Memorial Parkway 1A109 Federal contract opportunity
- Solicitation number
- DTFH71-15-B-00012
About this file
Plans FTNP-GWMP 1A109
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pavement_Recommendation.pdf | ||
| VETS-100A-Form.pdf | ||
| ADV_Subcontracting_Plan.doc | DOC document | |
| FP03_Errata.pdf | ||
| IFB_Solicitation_Book_FTNP-GWMP_1A109.pdf | ||
| Categorical_Exclusion_Form_(NEPA).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| FP03_Eng_.pdf | ||
| Synopsis_FTNP-GWMP_1A109.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R/W
R/W
C/E P
UD
W
C/E P or
UD
W
36 31
6 1
No Symbol
36 31
6 1
26 25 69426 25 694 c
Average daily traffic ADT
Alternate alt.
Ahead AH
Aggregate aggr.
Abutment Abut.
Footing ftg.
Flange flg.
Finish fin.
Inside diameter ID
West W
Expansion joint exp. jt.
Excavation exc.
Equation EQ or eq.
End section ES
Embankment emb.
[El. 94.16]
Elevation with number El. 94.161
Elevation elev.
Edge of pavement EP or EOP
East E
Gage(gauge) ga.
Galvanized galv.
High water HW
Hexagon hex.
Headwall hdwl.
Joint jt.
North N
Normal crown NC or NCR
Route Rte.
Roadway Rdwy.
Right-of-way R/W
Right Rt., rt.or RT
Required reqd.
Reinforcement (reinforced) reinf.
Range R.
Radius R
Symmetrical sym.
Superelevation rate e
Structure struc.
Stringer stgr.
Stiffener stiff.
Station Sta.
Standard std.
Spiral central angle s
Spacing, spaces or spaced spa.
South S
Section Sec.
Vertical point of intersection VPI
Vehicle per hour vph
PAVEMENT REMOVAL/ROADWAY OBLITERATION
LAKE, POND or RESERVOIR; MARSHLAND
SLOPE STAKE
PROPOSEDEXISTING
PROJECTED
INTERSTATE U.S. STATE
AREA PATTERN
TREELINE; TREE
BUILDING
UNDERDRAIN
BOX CULVERT
CULVERT with DROP INLET
PIPE CULVERT with HEADWALL
PIPE CULVERT with END SECTION
PIPE CULVERT (arrow shows flow)
BRIDGE
STREET LIGHT
TELEPHONE BOOTH or PEDESTAL
SUPPORT POLE with ANCHOR
RETAINING WALL
SIGNS
PORTABLE
POST MOUNTED
GUARDRAIL
CATTLEGUARD
GATE with FENCE
FENCE
MATERIAL SOURCE
NORTH ARROW
EXISTING PROPOSED
wall facewall face
TB or TP or
P/LP/L
MEDIAN & SIDE (CONCRETE) BARRIER
FOREST BOUNDARY
NATIONAL PARK or
SECTION LINE16
SECTION LINE4
SECTION LINE
COUNTY BOUNDARY
CITY BOUNDARYCITY BOUNDARY
NATIONAL BOUNDARY
STATE BOUNDARY
TOWNSHIP or RANGE LINE
PROPERTY LINE
BRASS CAP
STEEL PIN
Top of Triangle Points North
TRAVERSE POINT (Horizontal & Vertical)
TRAVERSE POINT (Horizontal)
COORDINATE GRID TICK
SPOT ELEVATION
HUB & TACK
BORING LOCATION
RIPRAP/CULVERT RIPRAP
CHECK DAM
DIVERSION BERM
SILT FENCE
MILL AND OVERLAY
SIDEWALK ASPHALT/CONCRETE
FULL DEPTH PAVEMENT
OVERLAY
SECTION CORNER
SECTION CORNER4
SECTION16
PROPERTY CORNER
PARCEL NUMBER
EASEMENT (Permanent - Construction)
ROUTE NUMBERS
RIGHT-OF-WAY LINE
with MONUMENT
RIGHT-OF-WAY LINE
TOP OF CUT
TOE OF FILL
TRANSITION
SINGLE TRACK
ROADWAY, EXISTING
INTERMITTENT DRAINAGE/ SMALL CREEK
SPRING
LARGE CREEK/RIVER
RAILROAD
TRAIL
MULTIPLE TRACK
N
FO=Fibre optics
T=Telephone, E&T=Joint Electrical and Telephone
E=Electrical for distribution line
P=Electrical for transmission line
OVERHEAD(POWER POLE) UTILITIES
E=electrical, FO=fiber optics SS=storm sewer, T=telephone, W=water G=gas, O=oil, P=power, SA=sanitary sewer, UNDERGROUND UTILITIES
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:-
DIVERSION CHANNEL
TEST PIT
B-1
TP-1
ABBREVIATIONS
SYMBOLS AND
EOP
EOG
embankment
Mechanically stabilized MSE
Monument mon. or MON
Minimum min.
Mile[Kilometer] post M.P[K.P.]
Maximum max.
Material matl.
Mainline M.L.
Point on tangent POT
Point on spiral POS
Point on curve POC
Point of tangent to spiral PS or TS
Point of tangent PT
Point of spiral to tangent PST or ST spiral
Point of spiral to reverse SRS
Point of spiral to curve PSC or SC
Point of intersection PI
Point of curve to spiral PCS or CS
Point of curve PC
Point of compound curve PCC
Plate pl.
PHTPhoto monument
Pavement pvmt.
Bench mark BM
Beginning beg.
Bearing brg.
Balance point BP
Back BK
Drop Inlet DI
Drawing(s) dwg(s), or drwg(s)
Distance dist.
Diaphragm diaph.
Diameter D, dia., or
Diagonal diag.
Design speed V
Design hourly volume DHV
Low water LW
Longitudinal(longitude) long.
Length of spiral Ls
(spiral curve transition)
Length of curve Lc
Length of curve(simple curve) L
Left lt., Lt. or LT
Latitude lat.
Lamination lam.
Typical typ.
Township T.
Thread thd.
easement
Temporary construction TCE
Temporary benchmark TBM
(spiral curve transition)
Tangent distance Ts
(tangent length)
Tangent distance T
On centers o. c.
Outside diameter OD
Out to out o. to o.
Original ground OG
(curve delta or deflection)
Curve total angle
(spiral curve transitions)
Curve central angle
Culvert culv.
Corrugated metal pipe CMP
Continuous cont.
Construction joint Constr. jt.
Connection conn.
Column col.
Clear clr.
Centers ctrs.
Center to center cc, c-c or c. to c.
Centerline C L
A2
UD
W
UD
W
No Symbol
TB or TP
P or
No Symbol
TB or TP
P or
R/W
R/W
P/EP/E
FOUND
36 31
6 1
No Symbol
FOUND
36 31
6 1
No Symbol x 99.9
T-45
2,645.9
T-3 x 99.9
T-45
2,645.9
T-3
Also see Subsection 101.03 Abbreviations.
DROP INLET
RGS
SDW
SBW
SSY
SSW
ESAL
NMSA
SACP
(R)igid (G)alvanized (S)teel
(S)ingle (D)otted (W)hite
(S)ingle (B)roken (W)hite
(S)ingle (S)olid (Y)ellow
(S)ingle (S)olid (W)hite
(E)quivalent (S)ingle (A)xle (L)oads
(N)ominal (M)aximum (S)ize (A)ggregate
(S)uperpave (A)sphalt (C)oncrete (P)avement
M
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D a -g w m p 1a s y m .d g n
:4
1:
P
-O c t-
:4
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228
FTNP-GWMP 1A109
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D a -g w m p 1a lo c .d g n
:2
:1
A M
-O c t-
:2
A
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228
LOCATION MAP
A3
SHEET 1 OF 3
M A T C
H L
IN
E
BRIDGE
HUMPBACK
BRIDGE
14TH STREET
SCALE IN FEET
1500 300
BRIDGE
METRORAIL
N
INTERSTATE
RIVER
POTOMAC
POINT
GRAVELLY
E G
R O
E G
NOTGNIHSA
W
LAIROMEM
Y A
W K
R
AP
BIRD SANCTUARY
ROACHES RUN
M e m o ri a l B ri d g e .1 m il e s at existing pavement change
Begin 4" mill and overlay
570+76.80
BEGIN PROJECT
(587+00 Northbound)
Begin 1 1/2" mill and overlay
End 4" mill and overlay
(586+10 Southbound)
End 4" mill and overlay
(588+70 Southbound)
Begin 1 1/2" mill and overlay
(typ.)
limit
Paving
BRIDGE
RF&P RAILROAD
(614+50 to 614+70)
(614+10 to 614+30)
Grout injection areas
(586+10 to 588+70 Southbound)
Reconstruction area
(See note 1) changeable message sign
Install portable
Notes:
1.
on the southbound Parkway at a location designated by the CO.
Install an additional portable changeable message sign north of this location
(574+00) replacement median guardrail
Begin
LOCATION MAP
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D a -g w m p 1a lo c .d g n
:2
:3
-O c t-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228 A4
SHEET 2 OF 3
M A T C
H L
IN
E
N
AIRPORT
NATIONAL
REAGAN
SCALE IN FEET
1500 300
EGROEG
NOTGNIHSAW
LAIROMEM
YAWKRAP
Daingerfield Island turnaround, 1.65 miles
M A
T C
H L I N
E
End 1 1/2" mill and overlay at existing pavement change
655+42
F H
F H
F H
F H
F H
F H
F H
F H
F H
F H
F H
F H
E
N
P I
D
U
C
LOCATION MAP
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D a -g w m p 1a lo c .d g n
:2
:4
-O c t-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228 A5
SHEET 3 OF 3
N
SCALE IN FEET
1500 300
M A
T C
H L I N
E
FACILITY
MAINTENANCE
GWMP
AIRPORT
NATIONAL
REAGAN
EGROEG
NOTGNIHSAW
LAIROMEM
YAWKRAP
A
IR
P O
R T A
C C
E S S R
O A
D guardrail replacement
End median
675+15
END PROJECT
Notes:
1.
on the northbound Parkway at a location designated by the CO.
Install an additional portable changeable message sign south of this location sign (See note 1) changeable message
Install portable
O
A K
O
A K1 O
A K
O
A K
"O
AK
NEW TREE1"
L
L P
L P
L P
L
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D a -g w m p 1a s ta g in g .d g n
:0
:0
-O c t-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NC
NPS NO.
NO.
PMIS
STAGING AREA PLAN
A6
SCALE IN FEET
0 15 30
210976
124228
VA FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
STAGING AREA
STAGING AREA
E619-09 and Sections 159 and 619.
96-in height. See Detail
Install chain link fence, N
140’
50’
See Subsection 159.04.
chain link gate.
Install an 8-foot high 21-foot wide Silt fence (typical)
See Detail E157-01.
construction entrance.
Construct stabilized approval from the CO for the final staging area locations.
construction entrances shown are approximate only. Obtain
The locations of the chain link fence, gates, and stabilized contours and conditions.
with the area of construction entrances to the approximate existing
At the completion of the project, restore the staging areas along
See Detail E157-01.
construction entrance.
Construct stabilized
See Subsection 159.04.
chain link gate.
Install an 8-foot high 21-foot wide
Silt fence (typical)
159 and 619.
E619-09 and Sections
96-in height. See Detail
Install chain link fence, 100’
60’
SOUTHBOUND GEORGE WASHINGTON MEMORIAL PARKWAY
NORTHBOUND
G
EORGE WASHINGTON
M
EMORIAL PARKWAY
Stockpile and replace any excavated existing topsoil.
See Section 625 for topsoil and turf establishment requirements.
See Section 159 for additional staging area requirements.
the staging areas.
All work and materails shown on this sheet are considered part of5.
4.
3.
2.
1.
Notes:
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D b 1-g w m p 1a ty p .d g n
:0
:1
-O c t-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
SOUTHBOUND GWMP
NORTHBOUND GWMP
B1
TYPICAL SECTIONS
Match existing Match existing remain in place (typ.)
Existing curb to 2 1/2’’ SACP, 3/4" NMSA, 0.3 to <3 million ESAL
Asphalt tack coat
Mill 4" existing asphalt concrete pavement
Match existing
Existing ground
Match existing remain in place (typ.)
Existing curb to
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Not to Scale
GWMP
BL
Notes:
Asphalt tack coat
2 1/2’’ SACP, 3/4" NMSA, 0.3 to <3 million ESAL
Asphalt tack coat
Mill 4" existing asphalt concrete pavement
Asphalt tack coat
(See note 1)
Variable width
(min)
40"
4.5"
(min)
4’
3.
2.
Match existing Match existing remain in place (typ.)
Existing curb to 2 1/2’’ SACP, 3/4" NMSA, 0.3 to <3 million ESAL
Asphalt tack coat
Mill 4" existing asphalt concrete pavement
Match existing
Existing ground
Match existing remain in place (typ.)
Existing curb to
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Asphalt tack coat
2 1/2’’ SACP, 3/4" NMSA, 0.3 to <3 million ESAL
Asphalt tack coat
Mill 4" existing asphalt concrete pavement
Asphalt tack coat
Note:
Variable width
1.
(See note 2) timber guardrail, type A
Install median steel-backed
(See note 1) timber guardrail, type A
Install median steel-backed
PROPOSED
PROPOSED
PROPOSED
PROPOSED
EXISTING
EXISTING
8"+/- Asphalt
4"+/- Aggregate base
8"+/- Asphalt
4"+/- Aggregate base
EXISTING
8"+/- Asphalt
4"+/- Aggregate base
EXISTING
8"+/- Asphalt
4"+/- Aggregate base
Provide turf establishment
(578+36.50 to 584+78.00 Northbound)
(578+36.50 to 584+78.00 Southbound)
MILL AND OVERLAY
GEORGE WASHINGTON MEMORIAL PARKWAY
(570+76.80 to 578+36.50 Northbound)
(570+76.80 to 578+36.50 Southbound)
MILL AND OVERLAY
GEORGE WASHINGTON MEMORIAL PARKWAY
median sidewalk with 4" Bed course.
Install 4" Portland cement concrete
Remove existing asphalt median.
median sidewalk with 4" Bed course.
Install 4" Portland cement concrete
Remove existing asphalt median.
match between the outside face of the guardrail and the vertical face of the existing curb.
same alignment as the existing guardrail adjusting the alignment to maintain a vertical
Remove and replace guardrail. Replace median asphalt with concrete. Install guardrail along the
Existing guardrail, median, and sidewalk from 570+76.80 to the south face of the I-395 bridge to remain.
match between the outside face of the guardrail and the vertical face of the existing curb.
same alignment as the existing guardrail adjusting the alignment to maintain a vertical
Remove and replace guardrail. Replace median asphalt with concrete. Install guardrail along the and replace all median asphalt with concrete.
the back of the northbound curb and the edge of the concrete median sidewalk. Remove
Where median width allows, provide turf establishment a minimum 4-foot wide between
(type I pavement roughness)
" NMSA, 0.3 to <3 million ESAL8
31 1/2’’ SACP,
(type I pavement roughness)
" NMSA, 0.3 to <3 million ESAL8
31 1/2’’ SACP,
(type I pavement roughness)
" NMSA, 0.3 to <3 million ESAL8
31 1/2’’ SACP,
(type I pavement roughness)
" NMSA, 0.3 to <3 million ESAL8
31 1/2’’ SACP,
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D b 1-g w m p 1a ty p .d g n
:1
-O c t-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
B2
Match existing Match existing remain in place (typ.)
Existing curb to 2 1/2’’ SACP, 3/4" NMSA, 0.3 to <3 million ESAL
Asphalt tack coat
Mill 4" existing asphalt concrete pavement
Match existing
Existing ground
Match existing remain in place (typ.)
Existing curb to
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Not to Scale
GWMP
BL
Notes:
Asphalt tack coat
2 1/2’’ SACP, 3/4" NMSA, 0.3 to <3 million ESAL
Asphalt tack coat
Mill 4" existing asphalt concrete pavement
Asphalt tack coat
(See note 1)
Variable width
2.
(See note 2) timber guardrail, type A
Install median steel-backed
(min)
4’ 40"
PROPOSEDPROPOSED
EXISTING
8"+/- Asphalt
4"+/- Aggregate base
EXISTING
8"+/- Asphalt
4"+/- Aggregate base
Remove guardrail median sidewalk with 4" Bed course.
Install 4" Portland cement concrete
(584+78.00 to 587+00.00 Northbound)
(584+78.00 to 586+10.00 Southbound)
MILL AND OVERLAY
GEORGE WASHINGTON MEMORIAL PARKWAY
Existing ground
Match existingMatch existing
8" Aggregate base, grading C or D
Asphalt tack coat
GWMP
BL
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies
(type I pavement roughness)
" NMSA, 0.3 to <3 million ESAL8
31 1/2’’ SACP,
0.3 to <3 million ESAL
2 1/2’’ SACP, 3/4" NMSA,
Asphalt tack coat
0.3 to <3 million ESAL
4’’ SACP, 1" NMSA,
Geotextile, type II-B
Roadway excavation
PROPOSED
EXISTING
5"+/- Asphalt
4"+/- Aggregate base Removal of asphalt
(586+10.00 to 588+70.00 Southbound)
RECONSTRUCTION
GEORGE WASHINGTON MEMORIAL PARKWAY
Provide turf establishment.
Remove existing asphalt median.
face of the guardrail and the vertical face of the existing curb.
concrete adjacent to the southbound median curb to maintain a vertical match between the outside
Remove and replace guardrail. Replace median asphalt with concrete. Install guardrail and median inches of topsoil in the existing asphalt median removal areas receiving turf establishment.
the back of the northbound curb and the edge of the concrete median sidewalk. Provide 4
Where median width allows, provide turf establishment a minimum 4-foot wide between
(type I pavement roughness)
" NMSA, 0.3 to <3 million ESAL8
31 1/2’’ SACP,
(type I pavement roughness)
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D b 1-g w m p 1a ty p .d g n
:3
-O c t-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228 B3
TYPICAL SECTIONS
Not to Scale
Match existing Match existing Match existing
Existing ground
Match existing remain in place (typ.)
Existing curb to
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies
GWMP
BL
(See note 1)
Variable width
Asphalt tack coat
Mill 1 1/2’’ existing asphalt concrete pavement
(type I pavement roughness)
" NMSA, 0.3 to <3 million ESAL8
31 1/2’’ SACP,
Asphalt tack coat
Mill 1 1/2’’ existing asphalt concrete pavement
(type I pavement roughness)
(min)
4’ 40"
Install median steel-backed
PROPOSED
PROPOSED
EXISTING
5"+/- Asphalt
4"+/- Aggregate base
EXISTING
5"+/- Asphalt
4"+/- Aggregate base
Notes:
2.
1.
median sidewalk with 4" Bed course.
Install 4" Portland cement concrete Remove guardrail
(587+00.00 to 628+50.00 Northbound)
(588+70.00 to 628+50.00 Southbound)
MILL AND OVERLAY
GEORGE WASHINGTON MEMORIAL PARKWAY
Match existing Match existing Match existing
Existing ground
Match existing remain in place (typ.)
Existing curb to
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies
GWMP
BL
(See note 1)
Variable width
Asphalt tack coat
Mill 1 1/2’’ existing asphalt concrete pavement
Asphalt tack coat
Mill 1 1/2’’ existing asphalt concrete pavement
Notes:
(See note 4)
(type I pavement roughness)
" NMSA, 0.3 to <3 million ESAL8
31 1/2’’ SACP,
(See note 4)
(type I pavement roughness)
" NMSA, 0.3 to <3 million ESAL8
31 1/2’’ SACP,
4.
3.
2.
1.
Install median steel-backedPROPOSED
PROPOSED
EXISTING
5"+/- Asphalt
4"+/- Aggregate base
EXISTING
5"+/- Asphalt
4"+/- Aggregate base median sidewalk with 4" Bed course.
Install 4" Portland cement concrete Remove guardrail
(614+50.00 to 614+70.00 Northbound)
(614+10.00 to 614+30.00 Northbound)
(614+50.00 to 614+70.00 Southbound)
(614+10.00 to 614+30.00 Southbound)
GROUT INJECTION
GEORGE WASHINGTON MEMORIAL PARKWAY
Provide turf establishment.
Remove existing asphalt median.
Provide turf establishment.
Remove existing asphalt median.
to recreate a smooth roadway surface within the reconstruction limits.
(southbound and northbound) have settled adjacent to the Roaches Run Box Culvert
After the grout injection, add an additional volume of SACP to fill voids where the roadways lanes to stabilize settlement.
side of the Roaches Run Box Culvert across the southbound lanes, median, and Northbound
Inject Polyurethane grout 20 feet (614+10 to 614+30 and 614+50 to 614+70) on each face of the guardrail and the vertical face of the existing curb.
concrete adjacent to the southbound median curb to maintain a vertical match between the outside
Remove and replace guardrail. Replace asphalt median with concrete. Install guardrail and median inches of topsoil in the existing asphalt median removal areas receiving turf establishment.
the back of the northbound curb and the edge of the concrete median sidewalk. Provide 4
Where median width allows, provide turf establishment a minimum 4-foot wide between face of the guardrail and the vertical face of the existing curb.
concrete adjacent to the southbound median curb to maintain a vertical match between the outside
Remove and replace guardrail. Replace asphalt median with concrete. Install guardrail and median inches of topsoil in the existing asphalt median removal areas receiving turf establishment.
the back of the northbound curb and the edge of the concrete median sidewalk. Provide 4
Where median width allows, provide turf establishment a minimum 4-foot wide between to remain in place (typ.)
614+10 to 614+70)
Existing curb (excluding curb (typ.)
Remove and replace
SOUTHBOUND GWMPNORTHBOUND GWMP
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D b 1-g w m p 1a ty p .d g n
:4
1:
-O c t-
:4
A
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228 B4
TYPICAL SECTIONS
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Match existing
Existing ground
Match existing
Asphalt tack coat remain in place (typ.)
Existing curb to
Match existingMatch existing
Asphalt tack coat remain in place (typ.)
Existing curb to
Mill 1 1/2’’ existing asphalt concrete pavement
Mill 1 1/2’’ existing asphalt concrete pavement
(type I pavement roughness)
" NMSA, 0.3 to <3 million ESAL8
31 1/2’’ SACP,
(type I pavement roughness)
" NMSA, 0.3 to <3 million ESAL8
SOUTHBOUND GWMPNORTHBOUND GWMP
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Travel Lane
12’ and varies
Existing ground remain in place (typ.)
Existing curb to remain in place (typ.)
Existing curb to
GWMP
BL
(See note 1)
Variable width
(See note 1)
Variable width
(min)
4’ 40"
Install median steel-backed
PROPOSED
PROPOSED
Notes:
Notes:
2.
1.
Remove guardrail median sidewalk with 4" Bed course.
Install 4" Portland cement concrete
Remove guardrail median sidewalk with 4" Bed course.
Install 4" Portland cement concrete
3.
2.
1.
(628+50.00 to 655+42.00 Northbound, excluding bridge over National Airport Access Road)
(628+50.00 to 655+42.00 Southbound, excluding bridge over National Airport Access Road)
MILL AND OVERLAY
GEORGE WASHINGTON MEMORIAL PARKWAY
(See note 2 and 3) timber guardrail, type A
Install median steel-backed
(655+42.00 to 675+15.00 Northbound)
(655+42.00 to 675+15.00 Southbound)
GUARDRAIL ONLY
GEORGE WASHINGTON MEMORIAL PARKWAY
Provide turf establishment.
Remove existing asphalt median.
For guardrail installation over the National Airport Access Road bridge deck, see Detail E617-A.
face of the guardrail and the vertical face of the existing curb.
concrete adjacent to the southbound median curb to maintain a vertical match between the outside
Remove and replace guardrail. Replace median asphalt with concrete. Install guardrail and median inches of topsoil in the existing asphalt median removal areas receiving turf establishment.
the back of the northbound curb and the edge of the concrete median sidewalk. Provide 4
Where median width allows, provide turf establishment a minimum 4-foot wide between
Provide turf establishment.
Remove existing asphalt median.
face of the guardrail and the vertical face of the existing curb.
concrete adjacent to the southbound median curb to maintain a vertical match between the outside
Remove and replace guardrail. Replace median asphalt with concrete. Install guardrail and median inches of topsoil in the existing asphalt median removal areas receiving turf establishment.
the back of the northbound curb and the edge of the concrete median sidewalk. Provide 4
Where median width allows, provide turf establishment a minimum 4-foot wide between
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D b 1-g w m p 1a ty p .d g n
:1
-O c t-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228 B5
Travel Lane
14’ and varies remain in place (typ.)
Existing curb to
RAMP (TYPICAL)
Match existing
Asphalt tack coat
Mill 1 1/2’’ existing asphalt concrete pavement
(type IV pavement roughness)
" NMSA, 0.3 to <3 million ESAL8
31 1/2’’ SACP,
Existing ground
PROPOSED
EXISTING
5"+/- Asphalt
4"+/- Aggregate base
No.
Sign
No.
Text Sign Text
NOTES:
TEXT SIZE
Station Side
LOCATION
in in in in in in
PANEL SIZE
Series
Color
Combination Quantity inin
Total
Area Remarks BorderCorner Margin
WidthWidthRadii Case
LowerUpper
Case NumbersAreaHeightWidth
Subtotal 44 sqft sqft
G20-2 See Note 2 1836 8 144.00
See Note 3
Orange on
Black
4.50
W4-2
See Note 2 36 36
See Note 3
Orange on
Black 4 36.00
M P H.. .
W13-1P See Note 2 24 24 8 32.00 See Note 3
Orange on
Black
4.00 and the 2004 FHWA Standard Signs Manual including supplements.
Install signs in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition, Adjust actual locations of signs as directed by the CO.
Install sign post supports according to Det. E635-01.
3.
2.
1.
ROAD WORK
END
W4-2
All stages
Stages 2, 4, and 6
Stages 3, 5, and 7
See Note 2 36 36
See Note 3
Orange on
Black 4 36.00
All stages
GEORGE WASHINGTON MEMORIAL PARKWAY
C2
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC210976 850
124228
SCHEDULE
CONSTRUCTION SIGN
9.00
9.00
STOP
BUMPW8-1
R1-1
TRUCK
CROSSINGW8-6
See Note 2 36 36
See Note 3
4 36.009.00
Red on
White
At locations as per CO
See Note 2 36 36
See Note 3
Orange on
Black 4 36.009.00
See Note 2 36 36
See Note 3
Orange on
Black 4 36.009.00
At locations as per CO
At locations as per CO8
R4-9
W5-1 Shoulder work with minor encroachment
Shoulder work with minor encroachment
Shoulder work with minor encroachment
Shoulder work with minor encroachment
STAY
IN
LANE
See Note 2 24 36
See Note 3
4 24.006.00
Orange on
Black
ROAD
NARROWS
See Note 2 36 36
See Note 3
Orange on
Black 4 36.009.00
(MILL AND OVERLAY / MEDIAN WORK)
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D c -g w m p 1a s ig n c .d g n
:3
1:
-O c t-
:3
A
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
W20-1 WORK
1 MILE
ROAD
See Note 2 36 36 4 36.00 See Note 3
Orange on
Black
9.00 All stages
W20-5 See Note 2 36 36 4 36.00
See Note 3
Orange on
Black
9.00CLOSED
MILE2
LEFT LANE Stage 1
RIGHT
TWO LANES
CLOSED
MILE2
W20-5a See Note 2 36 36 4 36.00 See Note 3
Orange on
Black
9.00 Stages 2, 4, and 6
See Note 2 36 36 4 36.00 See Note 3
Orange on
Black
9.00 Stages 3, 5, and 7
LEFT
TWO LANES
CLOSED
MILE2
W20-5a
No.
Text Sign Text
NOTES:
TEXT SIZE
Station Side
LOCATION
in in in in in in
PANEL SIZE
Series
Color
Combination Quantity inin
Total
Area Remarks BorderCorner Margin
WidthWidthRadii Case
LowerUpper
Case NumbersAreaHeightWidth
Subtotal 24 sqft sqft and the 2004 FHWA Standard Signs Manual including supplements.
Install signs in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition, Adjust actual locations of signs as directed by the CO.
Install sign post supports according to Det. E635-01.
3.
2.
1.
GEORGE WASHINGTON MEMORIAL PARKWAY
C3
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC210976 850
124228
SCHEDULE
CONSTRUCTION SIGN
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D c -g w m p 1a s ig n c .d g n
:3
1:
-O c t-
:3
A
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228
FTNP-GWMP 1A109
W20-110 WORK
1 MILE
ROAD
Shoulder work with minor encroachment See Note 2 36 36 4 36.00
See Note 3
Orange on
Black
9.00
(MILL AND OVERLAY / MEDIAN WORK)
Shoulder work with minor encroachmentSee Note 2 36 36 4 36.00 See Note 3
Orange on
Black
9.00W21-515 SHOULDER
WORK
No.
Text Sign Text
NOTES:
TEXT SIZE
Station Side
LOCATION
in in in in in in
PANEL SIZE
Series
Color
Combination Quantity inin
Total
Area Remarks BorderCorner Margin
WidthWidthRadii Case
LowerUpper
Case NumbersAreaHeightWidth
Subtotal sqft sqft
See Note 2 78 2 144.00 Orange on
Black and the 2004 FHWA Standard Signs Manual including supplements.
Install signs in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition, Adjust actual locations of signs as directed by the CO.
Install sign post supports according to Det. E635-01.
3.
2.
1.
GEORGE WASHINGTON MEMORIAL PARKWAY
C4
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC210976 850
124228
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D c -g w m p 1a s ig n c .d g n
:3
1:
-O c t-
:3
A
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228
FTNP-GWMP 1A109
(RAMP CLOSURES)
Modified
G95-2
NOTICE
RAMP TO
395 SOUTH
CLOSED
USE DETOUR
132 81.12 0.63 0.38
D
D
D
D
D
See Note 2 78 2 144.00 Orange on
Black
Modified
G95-2
NOTICE
RAMP TO
CLOSED
USE DETOUR
132 81.12 0.63 0.38
D
D
D
D
D
See Note 2 78 2 144.00 Orange on
Black
Modified
G95-2
NOTICE
RAMP TO
CLOSED
USE DETOUR
132 81.12 0.63 0.38
D
D
D
D
D
See Note 2 78 2 144.00 Orange on
Black
Modified
G95-2
NOTICE
RAMP TO
PKWY NORTH
CLOSED
USE DETOUR
132 81.12 0.63 0.38
D
D
D
D
D
PKWY SOUTH
14TH ST NORTH
M3-1 ORTHN See Note 2 24 12 24 48.00 See Note 3
White on
Black
2.00
OUTHSM3-3 See Note 2 24 12 37 74.00 See Note 3
White on
Black
2.00
PARKWAY
14TH ST
M4-1
M4-1
M4-1
See Note 2 24 12 27 54.00 See Note 3
Brown on
White
2.00
See Note 2 24 12 24 48.00 See Note 3
2.00
See Note 2 24 12 10 20.00 See Note 3
2.00
72.00
72.00
72.00
72.00
White on
Black
White on
Black
No.
Text Sign Text
NOTES:
TEXT SIZE
Station Side
LOCATION
in in in in in in
PANEL SIZE
Series
Color
Combination Quantity inin
Total
Area Remarks BorderCorner Margin
WidthWidthRadii Case
LowerUpper
Case NumbersAreaHeightWidth
Subtotal sqft sqft
See Note 2 1224 57 114.00
See Note 3
Orange on
Black
2.00
27 See Note 2 30 24
See Note 3
Orange on
Black 4 20.00
See Note 2 24 12 27 54.00 See Note 3
Orange on
Black
2.00 and the 2004 FHWA Standard Signs Manual including supplements.
Install signs in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition, Adjust actual locations of signs as directed by the CO.
Install sign post supports according to Det. E635-01.
3.
2.
1.
See Note 2 24 18
See Note 3
Orange on
Black 7 21.00
See Note 2 24 12 16 32.00 See Note 3
Orange on
Black
2.00
See Note 2 24 12 14 28.00 See Note 3
Orange on
Black
2.00
R11-2 See Note 2 48 30 9 90.00 See Note 3
Orange on
Black
GEORGE WASHINGTON MEMORIAL PARKWAY
C5
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC210976 850
124228
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D c -g w m p 1a s ig n c .d g n
1:
-O c t-
1:
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228
FTNP-GWMP 1A109
(RAMP CLOSURES)
M4-8 DETOUR
END
DETOUR
M4-8a
DETOUR
M4-9L
M6-2
M6-2
M6-3
ROAD
CLOSED
3.00
5.00
10.00
Total 332 1820
R:(unding 9
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D d 1-g w m p 1a p ln .d g n
:0
-N o v -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228
CONSTRUCTION PLAN
D1
N
N at existing pavement change
Begin 4" mill and overlay
Station 570+76.80
BEGIN PROJECT
M A T C
H L
IN
E
M A T C
H L
IN
E
M A
T C
H L I N
E
Baseline
DNUOBHTRON P
MWG
DNUOBHTUOS P
MWG
DNUOBHTRON PMWG
DNUOBHTUOS PMWG
Baseline
586+10 to 588+70 area
Reconstruction limits overlay Mill and limits overlay Mill and limits overlay Mill and limit overlay Mill and
INTERSTATE
BRIDGE
14TH STREET
BRIDGE
METRORAIL
SCALE IN FEET
0 100 200
Install silt fence
BIRD SANCTUARY
ROACHES RUN
limit overlay Mill and limit overlay Mill and limit overlay Mill and
1 1/2-inch depth Mill and overlay, 1 1/2-inch depth Mill and overlay, 587+00 Northbound 4-inch depth
Mill and overlay, 587+00 Northbound 1 1/2-inch depth Mill and overlay, 586+10 Southbound 4-inch depth
Mill and overlay, 4-inch depth Mill and overlay, area Staging area Staging
(typical for all ramps) 1 1/2-inch depth Mill and overlay, 1 1 /2-inch depth Mill and overlay, 1 1 /2-inch depth Mill and overlay, (typ.)
pavement Edge of
(typ.)
pavement Edge of
BRIDGE
RF&P RAILROAD
limit overlay Mill and limit overlay Mill and
STRIPING PLANS
See PERMANENT
Notes:
1.
Notes:
median curb. (See note 1) adjacent to the southbound to GWMP Maintenance Facility timber guardrail from I-395 Bridge Install median steel-backed Remove existing guardrail.
median curb. (See note 1) adjacent to the southbound to GWMP Maintenance Facility timber guardrail from I-395 Bridge
Install median steel-backed Remove existing guardrail.
limit overlay Mill and
(570+76.80 TO 620+00)
(See Subsection 617.01) 574+00 guardrail replacement Begin median
3.
2.
1.
Overlay only 586+10 to 588+70.
depth 586+10 Southbound.
Mill and overlay, 1 1/2-inch
(See Detail E617-75A) bridge connections masonry guardwall guardrail terminal
Remove and replace
(See Detail E617-75A) bridge connections masonry guardwall guardrail terminal
Remove and replace
Install silt fence (typ)
See note 3
4"
"2
4"
"2
4"
4"
"2
4""
(614+10 to 614+70) non-mountable curbing
Remove and replace 18-inch 614+50 to 614+70).
and (614+10 to 614+30 stabilization area (See note 2) Polyurethane grout soil for additional guardrail/median construction requirements.
establishment, as shown on the typical sections. See Section 617 and asphalt and install guardrail, concrete sidewalk, and turf metrorail bridge median guardwall. Remove the existing median guardrail Provide turf establishment where shown on the typical sections. Do not remove bridges (full median width from 574+00 to 574+90 and 578+95 to 584+45).
alignment. Remove and replace median asphalt with concrete sidewalk between Install proposed guardrail between bridges along the existing guardrail
See Detail E617-70.
Use the short guardrail assembly for guardrail posts over the culvert.
accordance with Section 270.
polyurethane grout prior to performing mill and overlay work in Repair settlement along pavement and median by injecting high-density guardrail/median construction requirements.
as shown on the typical sections. See Section 617 for additional Install guardrail, concrete sidewalk, and turf establishment, Remove the existing median guardrail and asphalt.
(See Detail E617-75A) guardwall connections to existing median Install masonry guardwall
0 5
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D d 1-g w m p 1a p ln .d g n
:5
-O c t-
:5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228
CONSTRUCTION PLAN
D2
90 deg
N
N
M A
T C
H L
IN
E
M A
T C
H L
IN
E
M A
T C
H L I N
E
DNUOBHTRON PMWG DNUOBHTUOS PMWG
Baseline
Baseline
1 1/2-inch depth Mill and overlay, 1 1/2-inch depth Mill and overlay, DNUOBHTRON PMWG
DNUOBHTUOS PMWG
limit overlay Mill and
1 1/2-inch depth Mill and overlay, M A
T C
H L I N
E
SCALE IN FEET
0 100 200
POINT
GRAVELLY
NATIONAL AIRPORT
REAGAN
limit overlay Mill and limits overlay Mill and limit overlay Mill and
1 1/2-inch depth Mill and overlay, 1 1/2-inch depth Mill and overlay, (typ.)
pavement Edge of
(typ.)
pavement Edge of
655+42 at existing pavement change End 1 1/2" mill and overlay median curb. (See note 1) adjacent to the southbound to GWMP Maintenance Facility timber guardrail from I-395 Bridge
Install median steel-backed Remove existing guardrail.
median curb. (See note 1) adjacent to the southbound to GWMP Maintenance Facility timber guardrail from I-395 Bridge
Install median steel-backed Remove existing guardrail.
Notes:
Notes:
1.
(620+00 TO 662+00)
NATIONAL AIRPORT
A C C E S S
R O
A D
See note 2
’562
L P tsopmal ot pool
(See note 3) loop detector system Remove and replace
3.
2.
1.
636.07, and the NPS specifications located in Appendix A of the Special Contract Requirements.
For loop detector requirements, see LOOP DETECTOR SYSTEM PLAN sheet, 636 details, Subsection sheet drain on bridge deck and approach slabs under the proposed grassed median area.
Airport Access Road Bridge. Install waterproof membrane and geocomposite See Detail E617-A for guardrail installation over the National guardrail/median construction requirements.
as shown on the typical sections. See Section 617 for additional Install guardrail, concrete sidewalk, and turf establishment, Remove the existing median guardrail and asphalt.
guardrail/median construction requirements.
as shown on the typical sections. See Section 617 for additional Install guardrail, concrete sidewalk, and turf establishment, Remove the existing median guardrail and asphalt.
D I
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D d 1-g w m p 1a p ln .d g n
:5
-O c t-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228
CONSTRUCTION PLAN
D3
N
M A
T C
H L I N
E
SCALE IN FEET
0 100 200
NATIONAL AIRPORT
REAGAN
FACILITY
GWMP MAINTENANCE
median curb. (See note 1) adjacent to the southbound to GWMP Maintenance Facility timber guardrail from I-395 Bridge
Install median steel-backed Remove existing guardrail. Notes:
(662+00 TO 675+15)
2.
1.
(See note 2).
guardrail end impact attenuator
Remove and replace guardrail replacement.
End median
Station 675+15
END PROJECT
terminal at the GWMP Maintenance Facility.
See Detail E617-B for the median guardrail impact attenuator additional guardrail/median construction requirements.
as shown on the typical sections. See Section 617 for Install guardrail, concrete sidewalk, and turf establishment, Remove the existing median guardrail and asphalt.
E1
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D e 1-g w m p 1a lo o p d e te c to r p ln .d g n
:4
-O c t-
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228
FTNP-GWMP 1A109
(EXISTING)
SYSTEM PLAN
LOOP DETECTOR
D N
U O
B H
T U
O S
P M
W G
D N
U O
B H
T U
O S
P M
W G
D N
U O
B H
T R
O N
P M
W G
D N
U O
B H
T R
O N
P M
W G
P M
A R
E C
N A
R T
N E
T P
O P
RI
A
L A
N
OI
T A
N
P M
A R
E C
N A
R T
N E
T P
O P
RI
A
L A
N
OI
T A
N
P M
A R
T I
X E
H T
R O
N T
R O
P R I
A L
A N
O I
T A
N
AREA
PARKING
AIRPORT
E T
E R
C N
O C
K L
A W
E D I
S
T N
U O
M N
O N
R E
V L I
A R
T
Loop (typ)
Pull box (typ)
N
Cabinet
SCALE IN FEET
0 10 20
Wood fence
Inlet
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
M1
CONTROL NARRATIVE
EROSION AND SEDIMENT
construction limits.
does not leave the project site. Perimeter controls include silt fence and other approved measures outside the
Prior to any clearing, grubbing, and excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting
Requirements.
for Construction of Roads and Bridges on Federal Highway Projects, FP-03, (English) and the Special Contract measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous water materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Regularly inspect and maintain all mechanized equipment used in or near surface water to prevent
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
The Runoff Coefficient prior to construction is 0.9. The Runoff Coefficient after construction will be 0.9.
No new impervious surface will be created by the reconstructed roadway.
The total disturbed area for the project is approximately 0.4 acres. The receiving water is the Potomac River.
Soil disturbing activities will include roadway reconstruction.
of the southbound GWMP and grout injection adjacent the box culvert at Roaches Run to prevent additional roadway settlement.
replacement from I-395 to the GWMP Maintenance Facility. This work includes the reconstruction of a 260-foot long segment and northbound GWMP from the pavement change (MP 2.700) to I-395 (MP 4.300). The project also includes median guardrail
This project consists of milling and overlaying southbound GWMP from I-395 (MP 10.810) to the pavement change (MP 12.410)
Project Description
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
Inlet protection - inspect after each rain event. Remove debris that is clogging the inlet bag.
it becomes 0.5 ft deep at the fence.
becomes damaged, repair or replace as necessary. Remove sediment from behind the silt fence when
Silt fence - inspect for buildup of excess sediment, undercutting, sags, and other failures. If the fabric end of the day.
0.25 inches or more, and daily during wet weather. Repair and replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
Remove all other perimeter controls when directed by the CO.
Remove silt fence only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas
Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging stockpiles remaining in place longer than 14 days within 7 days of stockpiling.
Provide silt fence around all stockpiled excavated roadway material. Apply temporary turf establishment to culverts.
and are stabilized (with vegetation, riprap, or pavement) before routing drainage through completed
Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade
Install inlet protection prior to diverting water through inlets.
runoff.
At the end of each day�s grading operations, shape earthwork to minimize and control erosion from storm within 7 days. Apply permanent turf establishment to the finished slopes according to Section 624 and 625.
Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar days roadway.
culverts as called out in the Erosion and Sediment Control plans. Install filter berms in ditches along the
Apply intermediate controls during rough grading operations. Install silt fence in areas surrounding the
Phase II Intermediate Controls
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D m 1-g w m p 1a e c n a r .d g n
1:
:5
P
M -O c t-
1:
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D n 1-g w m p 1a tc p .d g n
1:
:0
P
M -O c t-
1:
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228 N2
SCALE IN FEET
0 50 100
Notes:
PLAN
CONTROL AND SIGNING
CONSTRUCTION TRAFFIC
STAGE 1
WORK
1 MILE
ROAD
CLOSED
MILE2
LEFT LANE
MPH
ROAD WORK
END
’0062 ’0061 ’0001
’023 ’001 elbairaV ecaps krow
’001 arrow panel
Advance warning reffuBrepaT
’005
4.
3.
2.
1.
curb
Existing
Drum (typ.)
typ
40’ typ
80’ pavement of
Edges m in
Southbound left lane closure is shown. Repeat signage and devices for northbound left lane closure.
by the CO.
Final location and spacing of signs and devices may be changed to fit field conditions as approved nighttime operating hours only.
For stage 1 in two lane sections (closing both inside lanes), use single lane closures during and Detail E635-05.
For reference, see the Traffic Control Plan General Notes and Sequence of Construction sheet
N
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D n 1-g w m p 1a tc p .d g n
1:
:2
P
M -O c t-
1:
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228 N3
SCALE IN FEET
0 50 100
Notes:
WORK
1 MILE
ROAD
MPH
ROAD WORK
END
’0062 ’0061 ’0001
’001 elbairaV ecaps krow
’001 arrow panel
Advance warning reffuB repaT
’005
4.
3.
2.
1.
curb
Existing
Drum (typ.)320’ typ
80’ repaT 320’
640’ typ
40’ arrow panel
Advance warning
RIGHT
TWO LANES
CLOSED
MILE2
pavement of
Edges
’ m in
N outer lanes closure for stages 4, 6, 8, and 10.
Southbound two outer lanes closure is shown. Repeat signage and devices for northbound two by the CO.
Final location and spacing of signs and devices may be changed to fit field conditions as approved hours only. See Detail E635-05.
For stages 4 and 6 in two lane sections, use single lane closures during nighttime operating
For reference, see the Traffic Control Plan General Notes and Sequence of Construction sheet.
PLAN
CONTROL AND SIGNING
CONSTRUCTION TRAFFIC
STAGES 2, 4, 6, 8, and 10
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D n 1-g w m p 1a tc p .d g n
1:
-O c t-
1:
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228 N4
SCALE IN FEET
0 50 100
Notes:
WORK
1 MILE
ROAD
MPH
ROAD WORK
END
’0062 ’0061 ’0001
’001 elbairaV ecaps krow
’001 arrow panel
Advance warning reffuB repaT
’005
4.
3.
2.
1.
curb
Existing
Drum (typ.)320’ typ
80’ repaT 320’
640’ typ
40’ arrow panel
Advance warning
LEFT
TWO LANES
CLOSED
MILE2
pavement of
Edges
’ m in
N
PLAN
CONTROL AND SIGNING
CONSTRUCTION TRAFFIC
STAGES 3, 5, 7, 9, and 11 inner lanes closure for stages 5, 7, 9, and 11.
Southbound two inner lanes closure is shown. Repeat signage and devices for northbound two by the CO.
Final location and spacing of signs and devices may be changed to fit field conditions as approved hours only. See Detail E635-05.
For stages 5 and 7 in two lane sections, use single lane closures during nighttime operating
For reference, see the Traffic Control Plan General Notes and Sequence of Construction sheet.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228 N5
M
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D n 1-g w m p 1a tc p .d g n
1:
:5
P
M -O c t-
1:
P
M
NOTICE
CLOSED
RAMP TO
USE DETOUR
DETOUR
RAMP CLOSURE DETOUR
SOUTHBOUND 395
TO
SOUTHBOUND GWMP
395 SOUTH
NOT TO SCALE
DETOUR
OUTHS
OUTHS
T H B
R
ID
G E
G E O
R G E
W A S H
IN
G
TO
N
M E
M O
R
IA
L
P A
R K
W A
Y
Ramp closed
N
B U
C K E Y E
D R
IV
E
OHIO
DRIVE
N 7005444.1913
E 11896261.3306
DETOUR
OUTHS
DETOUR
SOUTH
DETOUR
SOUTH
DETOUR
SOUTH
DETOUR
SOUTH
END
DETOUR
DETOUR
SOUTH
DETOUR
SOUTH
DETOUR
SOUTH
DETOUR
SOUTH
DETOUR
SOUTH
DETOUR
SOUTH
Notes:
Close ramp using drums and "ROAD CLOSED" sign mounted on barricade.
by the CO.
Final location and spacing of signs and devices may be changed to fit field conditions as approved
2.
1.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228 N6
RAMP CLOSURE DETOUR
SOUTHBOUND GWMP
TO
SOUTHBOUND 395
M
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D n 1-g w m p 1a tc p .d g n
1:
1:
P
M -O c t-
1:
P
M
N
G E O
R G E
W A S H
IN
G
TO
N
M
EM
O R
IA
L
P A R
K W
A Y
R F P R
A
IL
R O
A D B
R
ID
G E
M E T R
O R
A
IL
B
R
ID
G E
T H B
R
ID
G E
B O
U N
D A
R Y
C H
A N
N E L
DRIVE
END
DETOUR
NOTICE
CLOSED
RAMP TO
USE DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
Ramp closed
NOT TO SCALE
OUTHS
PARKWAY
PARKWAY
OUTHS
OUTHS
PARKWAY
OUTHS
PARKWAY
Notes:
Close ramp using drums and "ROAD CLOSED" sign mounted on barricade.
by the CO.
Final location and spacing of signs and devices may be changed to fit field conditions as approved
2.
1.
PKWY SOUTH
DETOUR
OUTHS
PARKWAY
DETOUR
OUTHS
PARKWAY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228 N7
M
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D n 1-g w m p 1a tc p .d g n
1:
1:
P
M -O c t-
1:
P
M
N
G E O
R G E
W A S H
IN
G
TO
N
M
EM
O R
IA
L
P A R
K W
A Y
R F P R
A
IL
R O
A D B
R
ID
G E
M E T R
O R
A
IL
B
R
ID
G E
T H B
R
ID
G E395
B O
U N
D A
R Y
C H
A N
N E L
DRIVE
Ramp closed
NOT TO SCALE
RAMP CLOSURE DETOUR
NORTHBOUND 14TH STREET
TO
SOUTHBOUND GWMP
NOTICE
CLOSED
RAMP TO
USE DETOUR
DETOUR
DETOUR
DETOUR
END
DETOUR
14TH ST NORTH
ORTHN
14TH ST
ORTHN
14TH ST
ORTHN
14TH ST
Notes:
Close ramp using drums and "ROAD CLOSED" sign mounted on barricade.
by the CO.
Final location and spacing of signs and devices may be changed to fit field conditions as approved
2.
1.
4 DETOUR
ORTHN
14TH ST
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228 N8
M
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D n 1-g w m p 1a tc p .d g n
1:
1:
-O c t-
1:
P
M
N
G E O
R G E
W A S H
IN
G
TO
N
M
EM
O R
IA
L
P A R
K W
A Y
R F P R
A
IL
R O
A D B
R
ID
G E
M E T R
O R
A
IL
B
R
ID
G E
T H B
R
ID
G E
B O
U N
D A
R Y
C H
A N
N E L
DRIVE
Ramp closed
NOT TO SCALE
NOTICE
CLOSED
RAMP TO
USE DETOUR
END
DETOUR
RAMP CLOSURE DETOUR
SOUTHBOUND GWMP
TO
NORTHBOUND 14TH STREET
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
PARKWAY
OUTHS
PARKWAY
OUTHS
PARKWAY
OUTHS
PARKWAY
OUTHS
PARKWAY
OUTHS
PARKWAY
OUTHS
PARKWAY
OUTHS
Notes:
Close ramp using drums and "ROAD CLOSED" sign mounted on barricade.
by the CO.
Final location and spacing of signs and devices may be changed to fit field conditions as approved
2.
PKWY SOUTH
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NPS
NO.NO.
PMIS
VANC FTNP-GWMP 1A109
GEORGE WASHINGTON MEMORIAL PARKWAY
210976 850
124228
M
P R
O J E
C T
S g w m p 1a
P r o j
D e v C
A D
D n 1-g w m p 1a tc p .d g n
1:
:0
P
M -O c t-
1:
P
M
NOT TO SCALE
N9
RAMP CLOSURE DETOUR
NORTHBOUND GWMP
TO
AIRPORT EXIT
DETOUR
ORTHN
PARKWAY
and 2
DETOUR
ORTHN
PARKWAY
DETOUR
ORTHN
PARKW…
This is the start of the file's text. The full file is on GovTribe.