Plans_-_AR_ERFO_FSR_2011-1(1).pdf
PDF 13 MB Posted
- Attached to
- Ozark-St. Francis National Forest Federal contract opportunity
- Solicitation number
- DTFH71-13-B-00030
About this file
Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_001_-_AR_ERFO_FSR_2011-1(1).pdf | ||
| Bidder's_Qualifications_Form.doc | DOC document | |
| FP03_Errata.pdf | ||
| IFB_Solicitation_-_AR_ERFO_FSR_2011-1(1).pdf | ||
| FP03_Eng_.pdf | ||
| VETS-100A-Form.pdf | ||
| Synopsis_-_AR_ERFO_FSR_2011-1(1).doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS FOR PROPOSED
PLANS PREPARED BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
Project Manager Lead Designer
N
TEXARKANA
PINE BLUFF
MS
LA
TX
MO
FAYETTEVILLE
FORT SMITH CONWAY
JACKSONVILLE
TN
30 65
JONESBORO
WEST MEMPHIS
0 5025
SCALE IN MILES
SPRINGS
HOT ROCK
LITTLE
STATE OF ARKANSAS
KEY MAP
Disaster No.: AR2011-1-FS
SCALE IN MILES
0 10 20
Nilesh Makwana
A1
A1
A2
Title Sheet
Location Map
Tabulation of Quantities
SHEET
NO
DESCRIPTION
INDEX TO SHEETS
Symbols And Abbreviations
Typical Roadway Sections
DESCRIPTION OF PROJECT
IMPROVEMENT:
SPECIFICATIONS:
PROJECT LENGTH:
ADT (2020)
ADT (2013)
DESIGN DESIGNATION:
<50
D 50/50
Length of Work
Number of Lanes
Road Width
<50
14ft
0%
%Truck
%Buses
V (MPH)
e(max)
1%
N
Fort Smith
Paris
Clarksville
Russellville
West Fork
FOREST
OZARK NATIONAL
533 lnft
21309
B1-B2
PROJECT AR ERFO FSR 2011-1(1)
Yanina Kirtley
PROJECT AR ERFO FSR 2011-1(1)
AR ERFO FSR 2011-1(1)
PROJECT
NEWTON COUNTY, ARKANSAS
Gobblers Knob Road (FSR 1458)
A1 36
REG STATE PROJECT
AR AR ERFO FSR 2011-1(1)
NO.
SHEET
SHEETS
TOTAL
N/A
0.10 Lane MileLANE MILE:
0.10 Mile
A3
D1-D3 Plan and Profile
S1-S12
M1 Erosion & Sediment Control Narrative
Survey Information
Standards and Details
T1-T6 Roadway Cross Sections
K1 Drainage Profile
C2-C4 Summaries and Schedules
C1
M2 Erosion & Sediment Control Plan
N1 Temporary Traffic Control Plan
A4-A5
OZARK-ST. FRANCIS NATIONAL FORESTS
STRUCTURE AND ROAD RECONSTRUCTION
REPLACEMENT OF LOW WATER CROSSING
Know what’sbelow.
before you dig.Call
R
2012 for box culvert design.
Use AASHTO LRFD Bridge Design Specifications
FP-03 U.S.Customary Units.
Roads and Bridges on Federal Highway Projects", "Standard Specifications for Construction of improvements, and other miscellaneous work.
aggregate road reconstruction, grading, drainage with box culverts, concrete pavement construction, Project includes replacement of existing pipe culverts
APRIL, 2013
M
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D A 1-
A R
F S
R
(1 tt l.
d g n
-A p r -2
:3
P
R/W R/W
R/W R/W
P/E C/E
No Symbol
TB or TP
P P or
UD UD
W W
P/E C/E
No Symbol
TB or TP
P P or or
UD UD
W W
FOUND
36 31
6 1
36 31
6 1
No Symbol
No Symbol
FOUND
36 31
6 1
36 31
6 1
400 No Symbol x 99.9
T-45
2,645.9
T-3 x 99.9
T-45
2,645.9
T-3
26 25 69426 25 694 c
Average daily traffic ADT
Alternate alt.
Ahead AH
Aggregate aggr.
Abutment Abut.
Footing ftg.
Flange flg.
Finish fin.
Inside diameter ID
West W
Expansion joint exp. jt.
Excavation exc.
Equation EQ or eq.
End section ES
Embankment emb.
[El. 94.16]
Elevation with number El. 94.161
Elevation elev.
Edge of pavement EP or EOP
East E
Gage(gauge) ga.
Galvanized galv.
High water HW
Hexagon hex.
Headwall hdwl.
Joint jt.
North N
Normal crown NC or NCR
Route Rte.
Roadway Rdwy.
Right-of-way R/W
Right Rt., rt.or RT
Required reqd.
Reinforcement (reinforced) reinf.
Range R.
Radius R
Symmetrical sym.
Superelevation rate e
Structure struc.
Stringer stgr.
Stiffener stiff.
Station Sta.
Standard std.
Spiral central angle s
Spacing, spaces or spaced spa.
South S
Section Sec.
Vertical point of intersection VPI
Vehicle per hour vph
PAVEMENT REMOVAL/ROADWAY OBLITERATION
LAKE, POND or RESERVOIR; MARSHLAND
SLOPE STAKE
PROPOSEDEXISTING
PROJECTED
INTERSTATE U.S. STATE
AREA PATTERN
TREELINE; TREE
BUILDING
UNDERDRAIN
BOX CULVERT
CULVERT with DROP INLET
PIPE CULVERT with HEADWALL
PIPE CULVERT with END SECTION
PIPE CULVERT (arrow shows flow)
BRIDGE
STREET LIGHT
TELEPHONE BOOTH or PEDESTAL
SUPPORT POLE with ANCHOR
RETAINING WALL
SIGNS
PORTABLE
POST MOUNTED
GUARDRAIL
CATTLEGUARD
GATE with FENCE
FENCE
MATERIAL SOURCE
NORTH ARROW
EXISTING PROPOSED
wall facewall face
TB or TP or
P/LP/L
MEDIAN & SIDE (CONCRETE) BARRIER
FOREST BOUNDARY
NATIONAL PARK or
SECTION LINE16
SECTION LINE4
SECTION LINE
COUNTY BOUNDARY
CITY BOUNDARYCITY BOUNDARY
NATIONAL BOUNDARY
STATE BOUNDARY
TOWNSHIP or RANGE LINE
PROPERTY LINE
BRASS CAP
STEEL PIN
Top of Triangle Points North
TRAVERSE POINT (Horizontal & Vertical)
TRAVERSE POINT (Horizontal)
COORDINATE GRID TICK
SPOT ELEVATION
HUB & TACK
BORING LOCATION
RIPRAP/CULVERT RIPRAP
CHECK DAM
DIVERSION BERM
SILT FENCE
MILL AND OVERLAY
SIDEWALK ASPHALT/CONCRETE
FULL DEPTH PAVEMENT
OVERLAY
SECTION CORNER
SECTION CORNER4
SECTION16
PROPERTY CORNER
PARCEL NUMBER
EASEMENT (Permanent - Construction)
ROUTE NUMBERS
RIGHT-OF-WAY LINE
with MONUMENT
RIGHT-OF-WAY LINE
TOP OF CUT
TOE OF FILL
TRANSITION
SINGLE TRACK
ROADWAY, EXISTING
INTERMITTENT DRAINAGE/ SMALL CREEK
SPRING
LARGE CREEK/RIVER
RAILROAD
TRAIL
MULTIPLE TRACK
N
FO=Fibre optics
T=Telephone, E&T=Joint Electrical and Telephone
E=Electrical for distribution line
P=Electrical for transmission line
OVERHEAD(POWER POLE) UTILITIES
E=electrical, FO=fiber optics SS=storm sewer, T=telephone, W=water G=gas, O=oil, P=power, SA=sanitary sewer, UNDERGROUND UTILITIES
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:-
DIVERSION CHANNEL
TEST PIT
B-1
TP-1
ABBREVIATIONS
SYMBOLS AND
EOP
EOG
embankment
Mechanically stabilized MSE
Monument mon. or MON
Minimum min.
Mile[Kilometer] post M.P[K.P.]
Maximum max.
Material matl.
Mainline M.L.
Point on tangent POT
Point on spiral POS
Point on curve POC
Point of tangent to spiral PS or TS
Point of tangent PT
Point of spiral to tangent PST or ST spiral
Point of spiral to reverse SRS
Point of spiral to curve PSC or SC
Point of intersection PI
Point of curve to spiral PCS or CS
Point of curve PC
Point of compound curve PCC
Plate pl.
PHTPhoto monument
Pavement pvmt.
Bench mark BM
Beginning beg.
Bearing brg.
Balance point BP
Back BK
Drop Inlet DI
Drawing(s) dwg(s), or drwg(s)
Distance dist.
Diaphragm diaph.
Diameter D, dia., or
Diagonal diag.
Design speed V
Design hourly volume DHV
Low water LW
Longitudinal(longitude) long.
Length of spiral Ls
(spiral curve transition)
Length of curve Lc
Length of curve(simple curve) L
Left lt., Lt. or LT
Latitude lat.
Lamination lam.
Typical typ.
Township T.
Thread thd.
easement
Temporary construction TCE
Temporary benchmark TBM
(spiral curve transition)
Tangent distance Ts
(tangent length)
Tangent distance T
On centers o. c.
Outside diameter OD
Out to out o. to o.
Original ground OG
(curve delta or deflection)
Curve total angle
(spiral curve transitions)
Curve central angle
Culvert culv.
Corrugated metal pipe CMP
Continuous cont.
Construction joint Constr. jt.
Connection conn.
Column col.
Clear clr.
Centers ctrs.
Center to center cc, c-c or c. to c.
Centerline C L
A2
ROADWAY EXCAVATION
LOW WATER CROSSINGLWC
ORDINARY HIGH WATEROHW
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D A -A
R
(1 s y m .d g n
1-
M a r -2
:4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
OZARK-ST. FRANCIS NATIONAL FORESTS
LOCATION MAP
A3
NOT TO SCALE
15+33
End Project
10+00
Begin Project
(FSR 1458)
Gobblers Knob Rd Project site
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D A
R
(1 lo c .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
T
NAIL
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
TBAR
PK4008
X
10527
TBAR
NAIL
TBAR
TBAR
TBAR
TBAR
BIG PINEY CREEK
BIG PINEY CREEK
G O
B B L E R S K
N O
B R
D
G O
B B
L E
R S K
N O
B R
D
9.6’
.1
.4
A Z
.4
AZ
.8
AZ 289.1°
D
IT
C H
FENCE
61’
AZ 99.3°
.1
A Z
.4
A Z
.6
.3
.2
A Z
.9
F E
N C E
F E
N C
E
.3
A Z
AZ 285.7°
5.7’
A Z 126.8°
5.1’
A Z
.9
.9
TBAR
TBAR
TBAR
TBAR
10527
TBAR
NAIL
A Z
.4
.1
A Z
.1
.2
.3
A Z .3
F E
N C E
LWC
LWC
LWC
10527
A Z
.8
.7
AZ 105°
64.1’
AZ 282.2°
66.5’
F E
N C E
NAIL
DITCH
D
ITC
H
.4
A Z
.5
NAIL
SCALE IN FEET
0 40 80
NTS NTS NTS
NTS
NTS
FENCE (TYP)
TBAR
TO CP#4013
EDGE
CONC
FEN COR
FEN COR
CMP
2-24"
(TYP)
WATER
EDGE
(TYP)
DIRT RD
EDGE OF
2-24"CMP
GATERGR
GATE
(TYP)
GRAVEL RD
EDGE OF
SURVEY INFORMATION
A4
CONC LWC
GATE
PROJECT DATUM INFORMATION
Geoid03 (CONUS)GEOID:
NAVD 1988VERT. DATUM:
NAD 1983 (CONUS)HOR. DATUM:
ARKANSAS 0301 (NORTHERN)ZONE:
US STATE PLANE 1983COORDINATE SYSTEM:
SURVEY FEETUNIT:
PROJECT CONTROL POINTS
1007.826
1013.122
1013.408
1014.104
1011.983
1012.245
1009.454
1009.112
1008.110
1009.906
1007.195
1008.512
1016.400
1036.834
1025.275
1007.508
ELEV.
912623.888
912846.392
912435.150
912414.645
912468.331
912983.543
912750.324
912641.921
911964.144
912122.684
912240.372
912325.769
912872.970
912438.849
912669.837
912543.665
EASTING
530852.632
530641.343
530977.939
530923.370
530858.591
530610.163
530717.893
530733.083
530683.528
530666.885
530680.740
530700.547
530553.141
530634.374
530609.447
530730.296
NORTHING
NAME
TBAR
TBAR
TBAR
TBAR
NAIL
TBAR
TBAR
NAIL
PK;X
PK
TBAR
TBAR
TBAR
TBAR
TBAR
NAIL
TYPE
Note:
48.4’ = DISTANCE (FT)
AZ 53.8° = AZIMUTH (DEG) TO CP
N N
N
N N
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D A
R
(1
S u r in f o .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
A5
TRANSIT NOTE
SURVEY INFORMATION
Course from PT GOBLR RD-2 to PC GOBLR RD-3 S 31°43’ 13.08" E Dist 150.7498
Chord Bear = S 39°36’ 04.03" E
Ahead = S 31°43’ 13.08" E
Back = S 47°28’ 54.98" E
C.C. N 530,748.5889 E 912,424.7954
P.T. Station 12+45.71 N 530,803.7951 E 912,514.1110
P.C. Station 12+16.82 N 530,825.9807 E 912,495.7567
Mid. Ord. = 0.9917
Long Chord = 28.7937
External = 1.0011
Radius = 105.0000
Length = 28.8847
Tangent = 14.5341
Degree = 54°34’ 02.67"
Delta = 15°45’ 41.91" (RT)
P.I. Station 12+31.36 N 530,816.1582 E 912,506.4693
Curve GOBLR RD-2
Curve Data
Course from PT GOBLR RD-1 to PC GOBLR RD-2 S 47°28’ 54.98" E Dist 51.1645
Chord Bear = S 32°51’ 39.17" E
Ahead = S 47°28’ 54.98" E
Back = S 18°14’ 23.36" E
C.C. N 530,937.9506 E 912,529.0066
P.T. Station 11+65.66 N 530,860.5588 E 912,458.0452
P.C. Station 11+12.07 N 530,905.0861 E 912,429.2823
Mid. Ord. = 3.4003
Long Chord = 53.0093
External = 3.5141
Radius = 105.0000
Length = 53.5890
Tangent = 27.3917
Degree = 54°34’ 02.67"
Delta = 29°14’ 31.63" (LT)
P.I. Station 11+39.46 N 530,879.0707 E 912,437.8558
Curve GOBLR RD-1
Course from 1000 to PC GOBLR RD-1 S 18°14’ 23.36" E Dist 112.0699
Point 1000 N 531,011.5250 E 912,394.2050 Sta 10+00.00
Beginning chain GOBLR RD description
1000 CUR GOBLR RD-1 CUR GOBLR RD-2 CUR GOBLR RD-3 1001
Chain GOBLR RD contains:
DESCRIBE CHAIN GOBBLERS KNOB ROAD
Ending chain GOBLR RD description
Point 1001 N 530,616.6297 E 912,710.8810 Sta 15+33.60
Course from PT GOBLR RD-3 to 1001 S 81°46’ 58.09" E Dist 35.7841
Chord Bear = S 56°45’ 05.59" E
Ahead = S 81°46’ 58.09" E
Back = S 31°43’ 13.08" E
C.C. N 530,736.5533 E 912,692.0436
P.T. Station 14+97.81 N 530,621.7442 E 912,675.4642
P.C. Station 13+96.46 N 530,675.5636 E 912,593.3712
Mid. Ord. = 10.8951
Long Chord = 98.1621
External = 12.0244
Radius = 116.0000
Length = 101.3556
Tangent = 54.1687
Degree = 49°23’ 34.49"
Delta = 50°03’ 45.01" (LT)
P.I. Station 14+50.63 N 530,629.4863 E 912,621.8516
Curve GOBLR RD-3
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D A
R
(1
S u r in f o .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
TYPICAL SECTIONS
NOT TO SCALE
LC
Box Culvert
Travel Way
Aggregate Surface Course, 6-inch depth
Limits of Work
Varies
LC
Embankment Construction (No Pay)
3%
14’
3%
B1
Existing Ground
Proposed Profile Grade
1V:2H 1V:
2H
1V:1.5H
1V:
1.
5H
Varies
Aggregate Surface Course, 6-inch depth
1V:
1V:2H
Travel Way
14’ Varies
Limits of Work
Varies
1V:
2H
3%3%
CL
Proposed Profile Grade
Existing Ground ty p
10+00 to 12+30
Surface Course
13+80 to 15+33
Surface Course
General Notes:
12+69.33 to 13+30.67
Box Culvert Typical
Existing Ground
Proposed Profile Grade
5’ 5’
Limit of Work e m b e d m e n t d e p th
See Detail E609-A
Depth Varies Roadway Excavation (typ.)
Depth Varies Roadway Excavation (typ.)
14’Travel Way
16’ ty p
Erosion Control Product (typ.)
Type 3B Temporary Rolled
2’
2’
2’
Erosion Control Product (typ.)
Type 3B Temporary Rolled
0.5%
0.5%
(S ee n ot e 4)
(S ee n ot e 4) between 11+25 to 11+75 and 14+75 to 15+33.
the CO on right side near private property fence line
Adjust ditch back slope in cut to 1V:1H or as directed by4.
work for clearing and grubbing limits.
Exclude existing gravel roadway width from limits of 3.
at culvert.
length to runoff 3% normal crown to 0.5% section
25 feet or as directed by the CO. Use 25 feet transition project. Transition to proposed 3% cross slope within
Match existing cross slope at beginning and end of the 2.
travel way in accordance with Sections 624 and 625.
Provide turf establishment on all disturbed areas except 1.
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D B
R
(1 ty p .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
TYPICAL SECTIONS
1V:2H Slope or Flatter
.5
8"
4"
12"
12"
(See Details ET 501-1 and ET 501-2)
Smoothness/Roughness
Reinforced Rigid Pavement, 8-inch depth, Type C
Travel Way
LC
Depth Varies
Roadway Excavation, 5’
Proposed Profile Grade
Geotextile Type II-B
Aggregate Base Grading C or D, 6-inch depth
1V:2 H o r Fl att er Existing Ground
Key Slope Wall
See Slope Wall Detail (Typ.)
Place #4 rebar 2’ on centers
Aggregate Base Grading C or D, 6-inch depth a minimum of 2.5’ deep.
and key slope wall with the existing ground
Intersect the slope wall
6" x 6" Wire Mesh
3% 3% 1V:2H or Flatter
14’
B2
5’
Varies Varies
Limits of Work
Existing Ground
Slope Wall Detail
Travel Way
LC
Proposed Profile Grade
Geotextile Type II-B
Aggregate Base Grading C or D, 6-inch depth
3% 3%
14’ Varies
Limits of Work
Existing Ground
1V:2H 1V:
2H
1V:1.5H
1V:
13+30.67 to 13+80
12+45 to 12+69.33
Rigid Pavement Slab
8"
1’-0"
4"
Finish Grade
#4 REBAR @ 1’-0" C.C.
Key Wall Detail
12+30 to 12+45
Rigid Pavement Slab
Detail (typ.)
See Key Wall
Smoothness/Roughness (See Details ET 501-1 and ET 501-2)
Reinforced Rigid Pavement, 8-inch depth, Type C
Smoothness/Roughness (See Details ET 501-1 and ET 501-2)
Reinforced Rigid Pavement, 8-inch depth, Type C
Embankment Construction (typ.) (No Pay)
Depth Varies
Roadway Excavation (typ.)
General Notes:
ty p
2’
2’
Erosion Control Product (typ.)
Type 3B Temporary Rolled
(See Details ET 501-1 and ET 501-2)
Smoothness/Roughness
Reinforced Rigid Pavement, 6-inch depth, Type C work for clearing and grubbing limits.
Exclude existing gravel roadway width from limits of 3.
to 0.5% section at culvert.
Use 25 feet transition length to runoff 3% normal crown 2.
travel way in accordance with Sections 624 and 625.
Provide turf establishment on all disturbed areas except 1.
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D B
R
(1 ty p .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
TABULATION OF QUANTITIES
C1
M
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D C
R
(1
S u m m a r ie s .d g n
-A p r -2
:4
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
C2
SUMMARIES AND SCHEDULES
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D C
R
(1
S u m m a r ie s .d g n
-A p r -2
:4
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
C3
M
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D C
R
(1
S u m m a r ie s .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
C4
M
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D C
R
(1
S u m m a r ie s .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
10527
TBAR
NAIL
6T B
A R
5T B
A R
NAIL
0T B
A R
NAIL
1T B
A R
5T B
A R
TBAR
TBAR
T
TBAR
TB
A R
T
TBAR
B
IG
P
IN
E Y C
R E E
K
BIG
PI
NEY C
REEK
G O
B B
LE
R S K
N O
B R
D
N o.
8)
P O
T
.0
P C
.0
P T
.6
P C
.8
P T
.7
P C
.4
P T
.8
P O T
.6
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D D 1-
D
R
(1
P
P .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
D1
GOBBLERS KNOB ROAD
PLAN
SCALE IN FEET
0 25 50
Project slope stake limit
General Note:
Begin Project
E 912394.21
N 531011.53
10+00
Remove and Reset Fence
125’ –
Curve = GOBLR_RD-3
PI 14+50.63
D
R = 116.00’
T = 54.17’
L = 101.36’
Curve = GOBLR_RD-2
PI 12+31.36
D
R = 105.00’
T = 14.53’
L = 28.88’
Curve = GOBLR_RD-1
PI 11+39.46
D
R = 105.00’
T = 27.39’
L = 53.59’
N
End Project
E 912710.88
N 530616.63
15+33.60
Roadway Excavation
See note 1 Project slope stake limit
Remove and Reset Fence
59’ –
Remove existing concrete LWC, 130’–
(Removal Of Structure)
(typ.)
(OM3-L) or (OM3-R)
Install Object Marker
Curve Data
Pavement, 8" depth
Construct Reinforced Rigid
12+30 to 12+69.33, Pavement, 8" depth
Construct Reinforced Rigid
13+30.67 to 13+80,
1004.33 Invert In elev.
7@ 8’X4’ RCB, 13+00
with new box culverts two 24" existing pipe culverts Remove & replace the CO for approval prior to removing and replacing culverts.
minimum of 2’ cutoff wall at Upstream and Downstream to
Submit detailed drawings of box culvert installation and2.
ground contours as directed by the CO.
Remove sediment and restore area to the approximate original1.
ground contours as directed by the CO.
Remove sediment and restore area to the approximate original1.
10+00 TO 15+33.60
,0
.7
V P I
E L
,0
.5
-4.346%
-0.296%
41’ VC
K = 10
V P I
E L
,0
.3
-0.296%
-4.579%
51’ VC
K = 12
SSD = 278’
V P I
E L
,0
.0
-4.579%
+0.000%
78’ VC
K = 17
V P I
E L
,0
.0
+0.000%
.0
%61’ VC
K = 4
V P I
E L
,0
.1
.0
-4.145%
63’ VC
K = 3
SSD = 83’
,0
.3
10+00 11+00 12+00 13+00 14+00 15+00
16+00
50 50 50 50 50 50
-A p r -2
:2
P
M M
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D D 1-
D
R
(1
P
P .d g n
STERLING, VIRGINIA
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
D2
REG STATE PROJECT SHEET NO.
S AR AR ERFO FSR 2011-1(1)
OZARK-ST. FRANCIS NATIONAL FORESTS
PROFILE
GOBBLERS KNOB ROAD
PLAN
Cutoff wall embedded to bedrock or to a minimum depth of 2’
End Project
Begin Project
10+00 elev. 1015.76
15+33.60 elev. 1022.31
Existing Ground Profile (typ.)
Proposed Profile Grade (typ.)
Install 7 box culverts (8’ span x 4’ rise)
@ 13+00, Length =16’–
Invert elev. =1004.29
No skew
10+00 TO 15+33.60
10+00 TO 15+33.60
Embedment material, min. 2’ depth
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D D
R
(1
P
P .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
SECTION A-A
SECTION B-B
A
A
B B
Concrete wingwall (typ.)
PLAN VIEW
Slope wall
Reinforced rigid pavement, 8-inch depth, Type C
Aggregate base grading C or D, 6-inch depth
12"
12" 12"
D3
G O
B B
LE
R S K
N O
B R
D
N o.
8)
Reinforced Rigid Pavement and concrete slope wall (typ.)
(See Typical Section and Slope Wall Detail)
Concrete wingwall
Embankment Construction (typ.) (No Pay)
Key slope wall
(See typical section)
Match slope to match Slope Wall Detail
NOT TO SCALE
EOP
Seven-8’ span x 4’ rise box culverts
Concrete wingwall
GOBBLERS KNOB ROAD
PLAN
Existing ground (typ.)
2’ on centers
Place #4 rebar n e a r w in g w a ll lo p e w a ll h e ig h t
Note:
near wingwall
Match slope wall width
Subsection 601.04.
See Special Contract Requirement *
10+00 to 15+33.60
0 1010 2020 3030 40405060
8 AR K1
-A p r -2
:3
P
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D K 1-
R
(1 x s s .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
DRAINAGE PROFILE
REG STATE PROJECT
NO.
SHEET
OZARK-ST. FRANCIS NATIONAL FORESTS
2011-1(1)
AR ERFO FSR
GOBBLERS KNOB ROAD
13+00.00
L RoadC
Elevation view at Outlet of culvert
CL Culvert and wrap it on each side along entire length of the barrel
Install Geotextile, Type II-B underneath a layer of #57 Stone
Existing Ground
13+00
Remove and replace existing two pipe culverts with
Seven - 8’ span x 4’ rise box culverts, Length= 16’–
Skew angle = 0°
Invert elev.= 1004.29’
Cut -off wall
OHW=1007’
Note:
seven - 8’ span x 4’ rise box culverts
Place 12" thick layer of #57 stone, underneath
Invert In elev.= 1004.33’
Offset= 8.0’ Rt.Offset= 8.0’ Lt.
elev.= 1004.25’
Invert Out
Grade to drain (typ.)
OHW=1007’
0.5%
Construct concrete Cut -off wall
2’ min. below bottom of culvert or embedded to bedrock (typ.)
min. of 2’ depth (typ.)
Embedment material (Select Topping) material (Select Topping) or as directed by the CO.
Use excavated river bed material as embedment
Embedment material (Select Topping) min. of 2’ depth
CONTROL NARRATIVE
EROSION & SEDIMENT
M1
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
it becomes 0.5 ft deep at the fence.
becomes damaged, repair or replace as necessary. Remove sediment from behind the silt fence when
Silt fence - inspect for buildup of excess sediment, undercutting, sags, and other failures. If the fabric end of the day.
0.25 inches or more, and daily during wet weather. Repair and replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
Remove all other perimeter controls when directed by the CO.
Remove silt fence only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas
Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization stagingareas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and stockpiles remaining in place longer than 14 days within 7 days of stockpiling.
Provide silt fence around all stockpiled excavated roadway material. Apply temporary turf establishment to are stabilized (with vegetation, riprap, or pavement) before routing drainage through completed culverts.
Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade and runoff.
At the end of each day�s grading operations, shape earthwork to minimize and control erosion from storm within 7 days. Apply permanent turf establishment to the finished slopes according to Section 624 and 625.
Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar days downstream to the CO for approval prior to removing and replacing culverts.
Submit detailed drawings of box culvert installation and minimum of 2’ cutoff wall at upstream and removing and replacing culverts.
Submit detailed drawings, layout and limits of temporary diversion channels to the CO for approval prior to as called out in the Erosion and Sediment Control plans. Install filter berms in ditches along the roadway.
Apply intermediate controls during rough grading operations. Install silt fence in areas surrounding the culverts
Phase II Intermediate Controls construction limits.
does not leave the project site. Perimeter controls include silt fence and other approved measures outside the
Prior to any clearing, grubbing, and excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting
Requirements.
for Construction of Roads and Bridges on Federal Highway Projects, FP-03, (English) and the Special Contract measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion and Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous water materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Regularly inspect and maintain all mechanized equipment used in or near surface water to prevent
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
The additional storm water will be treated as sheet flow.
The Runoff Coefficient prior to construction and after construction will remain the same.
No new significant impervious surface will be created by the reconstructed roadway.
area for the project is approximately 0.11 acres. The receiving body of water is Big Piney Creek.
Soil disturbing activities will include clearing and grubbing and roadway grading. The total disturbed drainage improvements, and other miscellaneous work.
the removal and replacement of an existing low water crossing structure, grading, aggregate surface course, This project consists of the reconstruction of a 0.10 mile segment of the roadway. This work includes
Project Description
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D M 1-
R
(1
E s c
N a r r a ti v e .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
10527
TBAR
NAIL
6T B
A R
5T B
A R
NAIL
0T B
A R
NAIL
1T B
A R
5T B
A R
TBAR
TBAR
T
TBAR
TB
A R
T
TBAR
B
IG
P
IN
E Y C
R E E
K
BIG
PI
NEY C
REEK
G O
B B
LE
R S K
N O
B R
D
N o.
8)
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D M
R
(1
E s c .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
10+00 TO 15+70
SCALE IN FEET
0 25 50
M2
Check dam (typ.)
CONTROL PLAN
EROSION & SEDIMENT
Notes:
End Project 15+33.60
Begin Project 10+00
OHW elevation is 1007’.3.
by the CO.
Adjust locations of check dam as directed all cut/fill slopes and drainage ditches.
Use Rolled Erosion Control Product for 2.
as directed by the CO.
Adjust locations and limits of silt fence 1.
OHW =1007’
N
Install 75– lnft of Turbidity Barrier
(See Detail E157-5A)
Channel as directed by the CO
Install 75– lnft of Temporary Diversion
Install silt fence (typ.)
N1
(FSR 1458)
Gobblers Knob Rd Project site
Notes:
Cover all signs in conflict with this signing plan.4.
Place Type 3 barricades as directed by the CO.3.
barricades.
Place "Road Closed" (R11-2) signs on Type 3 2.
by the CO.
changed to fit field conditions as approved
Final location and spacing of signs may be 1.
W20-3
AHEAD
CLOSED
ROAD
R11-2CLOSED
ROAD
CONTROL PLAN
TEMPORARY TRAFFIC
N
MILE5.5
CLOSED
ROAD
W20-3 (Modified)
W20-3 (Modified)
6.5 MILE
CLOSED
ROAD
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D N 1-
R
(1 tt c .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STANDARD APPROVED FOR USE 6/2005
REVISED: 6/2007
m in m in m in
6" min. trench
4" min.
SILT FENCE
157-1
6 ft. (max.) spacing without fence support.
10 ft. (max.) spacing with fence support.
S1
NOTE:
ELEVATION
PLAN
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Flow
Fi ll slo pe
Flow
T o e o f s lo p e
Flow
Flow
(undisturbed)
Existing ground
Limits of clearing
Geotextile, type V-A
Support mesh
Steel or wood post
See Note 4 for spacing
Backfilled and compacted soil around the end of the silt fence prevent water from flowing
Provide sufficient length to fo r s p a c in g
S e e n o te
See Note 1
SILT FENCE INSTALLATION IN A DRAINAGE DITCH
around the ends.
of silt fence upgrade to prevent water from running
Install silt fence along ground contours. Curve ends does not slide down, supporting posts.
types must ensure silt fence remains attached to, and recommendations for installation procedures. All dimensions are satisfied. Follow manufacturer’s type V-B) will be allowed as long as specified
Alternate preassembled silt fence options (geotextile, only when specified on Erosion Control Plan.
Use drainage ditch installation for low flow conditions
4.
3.
2.
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D S td -D e t\
S 1_ s t1 1.
d g n
1-
M a r -2
AR AR ERFO FSR 2011-1(1)8
NO SCALE
DIVERSION CHANNELS
TEMPORARY
2’2’2’2’ and secure with sandbags (typ.)
Bury plastic liner 6" deep
S2
DETAIL
E157-5A
U.S. CUSTOMARY DETAIL
A
A
B B
Flow
SECTION A-A SECTION B-B
SECTION A-A
SECTION B-B
W
SS
SS
B
D
Flow
Flow
Flow embankment
Roadway embankment
Roadway
NOTES:
W
SS
SS
B
D
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
W
B
DSS SS
Flow
SSSS D
B
W
T
Riprap lining
Geotextile, type IV-E
Sandbags
SECTION B-B
TEMPORARY CULVERT
PLAN
DIVERSION CHANNEL
when scheduled)
Silt fence (typ.
Plastic linerSandbagsPlastic liner temporary barrier
Use sandbags to construct
Permanent culvert
Roadway centerline when scheduled)
Silt fence (typ.
Permanent natural channel backflow into natural channel
Use sandbags to prevent
Earthwork limits
Subgrade
Temporary culvert backfill
Bedding
Natural ground
Geotextile, type IV-E Riprap lining with plastic liner or riprap
Temporary diversion channel when scheduled)
Silt fence (typ.
T
See Note 5
Ø
204.11(a).
one of the methods listed in Subsection
Compact temporary culvert backfill using embankment with temporary culvert.
the diversion channel through the roadway
5. When specified replace the portion of and secure with riprap or sandbags.
edge of the liner a minimum of 6" deep if using a plastic liner. Bury the upstream
4. Do not construct with longitudinal joints of 0.5 percent.
3. Construct channel at a minimum grade diversion channel.
entire length and width of the temporary
2. Use plastic liner or riprap along the to the CO for approval.
diameter, riprap class, channel dimensions
1. Submit detail for temporary culvert
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t1
.d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
E157-6A
U.S. CUSTOMARY DETAIL
NO SCALE
DETAIL
SPACING(S)
CHECK DAM
2%
3%
4%
5%
6%
75 ft
50 ft
40 ft
30 ft
25 ft
GRADE (G)
DITCH
WITH EROSION CONTROL MAT
CHECK DAM
V DITCH
CROSS SECTION
TRAPEZOIDAL DITCH
CROSS SECTION
(S)
Ditch Gra de (G)
PROFILE VIEW
DITCH
24’’
2:
(t yp
Ponded Water
Class I riprap
Check Dam Spacing
Class I riprap
Class I riprap
S3
Erosion Control Product Type 3B Temporary Rolled
Erosion Control Product Type 3B Temporary Rolled
Erosion Control Product Type 3B Temporary Rolled
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t1 d e ta il .d g n
-M a r -2
:4
A
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL
DIVERSION METHODS
TEMPORARY IN-STREAM
E157-08
OPTION B
24"
OPTION C
OPTION D
12" 12"
OPTION A
Existing Abutment or Pier min.
NOTES:
Limit of work zone
Limit of work zone
Limit of work zone
2-year water surface elev
2-year water surface elev
2-year water surface elev
2-year water surface elev
Min. Top Berm Elev
Min. Top Berm Elev
Min. Top Berm Elev
NO SCALE
6" min.
min.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
(anchoring method to be approved by CO)
Waterproof membrane
Existing ground
Concrete barrier
Sandbag (Typ.)
min.
4’- 6"
Concrete barrier
Sandbag (Typ.)
Waterproof membrane
Existing ground
Concrete barrier
Sandbag (Typ.)
Waterproof membrane
Existing ground
Waterproof membrane
Sandbag (Typ.)
Existing ground a t ti m e o f c o n ts r u c ti o n
D iv e r te d w a te r l e v e l a t ti m e o f c o n s tr u c ti o n
D iv e r te d w a te r l e v e l a t ti m e o f c o n s tr u c ti o n
D iv e r te d w a te r l e v e l a t ti m e o f c o n s tr u c ti o n
D iv e r te d w a te r l e v e l
(Rt#)
Site (cfs)
Q
TABLE 1
of Diversion Berm
Approx. Height w.s.e
2 yr.
DETAIL APPROVED FOR USE
Place a maximum of one diversion in the stream at any given time.
as needed after rainfall events or as directed by the CO.
While in use, inspect and maintain the temporary diversion berm daily. Repair
Construct temporary diversion according to Subsection 157.09.
temporary stream diversion to the CO for approval prior to installation.
minimum height equivalent to the 2-year flow elevation. Submit plans for berms, dams, etc.). As a minimum, provide a temporary diversion berm with a diverting the stream (including any approved prefabricated or portable diversion construction operations. The Contractor may choose an alternate means of
The options shown are suggested configurations for diverting the stream during
4.
3.
2.
1.
APPROVED : FEBRUARY 2013
S4
1458 3580 1012.44 5.5’ to 6.5’
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t1 d e ta il .d g n
1-
M a r -2 ty p ic a l c le a r typical
2" clear typical
2" clear centers transverse.
centers long and 12" bars space at 9" wire mesh or No. 2
W5.5/W5.5- 6" x 12"
Slab reinforcement
(or approved two-piece connectors)
#5 tie bars x 3’-0" at 2’-6" centers
CONCRETE PAVEMENT
PORTLAND CEMENT
Lap transverse reinforcement not less than 9-inches.
Lap longitudinal reinforcement not less than 13-inches.
ET 501-1
sealing details.
See Detail ET 501-2 for joint details and joint than 20 foot intervals.
and for plain concrete pavement or base at not more concrete pavement at not more than 40 foot intervals
Space transverse contraction joints for reinforced feet.
Space transverse expansion joints at a minimum of 280
APPROVED: MAY 2011
DETAIL APPROVED FOR USE DETAIL
S5
Longitudinal construction joint
Transverse contraction jointTransverse expansion joint
PLAN
NOTE:
7.
6.
5.
4.
3.
2.
1.
as shown for joints in reinforced pavement.
for joints in plain portland cement concrete pavement
Provide the same type of dowel assemblies and tie bars concrete pavement or base is required.
steel, wire, or bars where plain portland cement
Eliminate all longitudinal and transverse reinforcing
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t5
1_ E
F L T
E M
P .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
(max.)
3"
8"
(min.)
1"
Fixed end
9" c le a r c le a r c le a r
"4
"4 long at 12" centers
1" plain dowels 18" long at 12" centers
1" plain dowels 18"
Free end
9"
(or approved two-piece connectors)
#5 tie bars x 3’-0" at 2’-6" centers
CONCRETE PAVEMENT JOINTS
PORTLAND CEMENT
require larger openings.
transverse expansion and contraction joints field conditions
" for 4 3" for longitudinal contraction joints and 8
3W=
Space expansion joints a minimum of 280 feet.
" keyway (if in existing)2 1 x 13
T wire mesh or #6 bars
6" x 12" W5.5 X W5.5 joints only)
(new 3 T" x 4
Initial saw cut t o
ET 501-2
wire mesh or #6 bars
6" x 12" W5.5 x W5.5 wire mesh or #6 bars
6" x 12" W5.5 x W5.5
S6
Fixed end
TRANSVERSE EXPANSION JOINT
TRANSVERSE CONTRACTION JOINT
Joint Sealing Details)
Contraction joint, (See Concrete
Joint Sealing Details)
Contraction joint (See Concrete
JOINT DETAILS
REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT
LONGITUDINAL CONSTRUCTION JOINT
JOINT
EXPANSION
JOINT SEALING DETAILS
REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT
sealer
Joint ty p
D
W W
T
Joint sealer
Backer rod
Pavement surface
Backer rod
W
T
T
T
T material expansion
Premolded
(Method A - Saw cut)
JOINT
CONTRACTION
(Method B - Formed Joint)
JOINT
CONTRACTION
NOTES:
with epoxy resin adhesive.
Anchor tie bars and dowels into existing concrete pavement factor is 1:2.
silicone sealant is used, the width to depth (W:D) shape
Maintain joint sealant shape factor of 1:1 except that when 4.
3.
2.
1.
T Sleeve
Grease free end
Grease free end
Construction joint
Concrete Joint Sealing Details)
Expansion joint (See
Joint filler
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t5
E
F L T
E M
P .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
E609-A
S7
CURBING DETAIL
DETAIL
CURBING ELEVATION DETAIL PARALLEL TO CENTERLINE
ELEVATION DETAIL PERPENDICULAR TO CENTERLINE
Face of curb
(typ.)" Chamfer4
C u r b
" U Bar @ 2’-0" C.C.2
1" PVC Sleeve (Grouted)
"2 -17
" U Bar @ 2’-0" C.C.2
Culvert
Top of Box
#4 Rebar (typ.)
6" X 20" Scupper @ 8’-0" C.C
#4 Rebar(typ.)
" Expansion Board2
Top of Box Culvert
12"
22" 24" (typ.)
ty p
20"
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D S td -D e t\
S -s t6 a d e ta il .d g n
-M a r -2
1:
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
E621-A
Pipe
" Continuous weld4
SECTION A-A
DEPTH MARKER DETAIL
Fill pipes with concrete or grout
A A
TYPICAL DEPTH MARKER
.5
.5
2’ Wide x 2’ Wide
2"
1’-0"
" Preformed joint filler2
" Steel plate8 34" x
4" Steel plate
Aggregate base
2" Dia. holes
Concrete pavement
S8
2" Chamfer (typ.)
DETAIL
Concrete or grout
3" Dia. Steel Pipe (Typ.)
3" Dia. Steel Pipe (Typ.)
safety yellow epoxy enamel or equal.
blast the markers, prime, and paint with
3. After fabrication of depth marker, sand
CO.
the concrete slope wall as directed by the and adjacent to edge of rigid pavement in
2. Install depth marker next to box culvert by the CO.
pre-fabricated depth markers as approved opposite sides and facing to traffic. Use at the low point. Number marker at
1�-0� increments above the top of the slab
3-inch reflectorized numerals painted in
1. Construct depth marker as shown, with
Notes:
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D S td -D e t\
S -s t6
1a d e ta il .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
E629-01
DETAILDETAIL APPROVED FOR USE
with Ground Fasteners (See Detail A)
Stake at 36" to 60" intervals into triangular shape
1" X 3" stock cut
Wood Stakes
12" to 18"
Each fastener on 12" center
Double row of fasteners at erosion stop
Overlap edges by 3" at 50 ft intervals (up slope face)
6’’ deep x 6’’ wide transverse trench over lower blanket and anchor
Overlap matting ends 6", upper blanket
APPROVED : MAY 2011
WITH MATTING
SLOPE STABILIZATION
S9
A
Matting
Erosion Stop (Check Slot) Detail
SECTION A-A
Typical Ground Fasteners
DETAIL A
DETAIL FOR STABILIZING SLOPES WITH MATTING
Erosion stop (check slot)
No. 11 gauge wire
Typical staples
Backfill with soil and tamp
Matting Fastener top of slope. Do not stretch matting face (in direction of flow). Anchor at
2. Unroll and lay matting out down slope flush with the ground. Do not track slope face which will prevent the matting from laying
Remove rocks, trash, and other material
1. Grade, smooth, and compact slope.
(See Detail A)
3. Secure matting with wood or metal fasteners manufacturers recommendations
4. Apply seed and fertilizer per
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t6
1_ d e ta il .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
DETAILDETAIL APPROVED FOR USE
E629-02 along length of ditch trench at 50 ft intervals
6" deep X 6" wide traverse
Place each fastener on 12-inch centers
Double row of fasteners at erosion stop
4" Overlap (typ.)
Step 1:
trench 6" or more in depth.
Bury the top end of the mat strip in a
WITH MATTING
DITCH STABILIZATION
1.
placing matting.
contract requirements, before directed in the plans and special
Apply seed, fertilizer, and mulch, as
NOTE:
d=24" from the trench.
row of fasteners: 6" spacing, 4" down
Tamp the trench full of soil. Secure withStep 2:
Step 3:
and (2). Overlap end of top strip 4" and fasten.
Overlap- bury upper end of lower strip as in (1)
See Section A-A fasten with double row of fasteners.
bury fold of mat in slit trench and tamp;
Erosion stop (check slot): Every 50 ft, Step 4:
APPROVED : MAY 2011
S10
Staple
CROSS SECTION THROUGH V AND FLAT BOTTOM DITCHES
DETAIL FOR PERMANENTLY STABILIZING DITCHES WITH MATTING
Typical Ground Fasteners
DETAIL A
Erosion Stop (Check Slot) Detail
SECTION A-A
A
A and up the side slopes as follows:
Install matting along the bottom of all ditches
Equal depth of matting on both sides and fertilizer.
Before matting is installed, apply seed
Matting
Side slope
Fastener
Erosion stop (check slot)
Backfill with soil and tamp
Fastener Matting
Wood Stakes
No. 11 gauge wire
Typical staples
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t6 d e ta il .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
NOTES:
E633-01
SIGN
STRUCTURES
D (min.)
CHART A
(Inch)
Post Size
6 x 6 (Wood)
4 x 6 (Wood)
4 x 4 (Wood)
3’
4’
4’
Single Post Double Post
Triple Post
Quadruple Post
(sq. ft.)
Maximum Sign Area
NO SCALE
DOUBLE POST
TRIPLE POST
CHART B
Post Size
4’’ x 4’’
4’’ x 6’’
6’’ x 6’’
6’’ x 8’’
Hole Diameter
None Required
1.5’’
3’’
2’’
WITH BATTEN
FASTENER DETAIL
WITHOUT BATTEN
NO SHOULDER
ROADSIDE SIGN RURAL DISTRICT
pavement
Edge of t le s s t h a n f t than less
Not
2’-0" t le s s t h a n f t
6 ft
Not less than
6 ft
Not less than pavement
Edge of t le s s t h a n f t
SPEED PLAQUE RURAL DISTRICT
WARNING SIGN WITH ADVISORY
WITH SHOULDER
ROADSIDE SIGN RURAL DISTRICT
Shoulder
6 ft
Not less than t le s s t h a n f t
1 (typ.)
1’’ x 3’’ Wood batten Sign panel
* See note 6
QUADRUPLE POST
W
W 5
W 5 3W
H m a m a
Sign panel
Wood post (fixed)
Traffic and CHART A
D
BREAKAWAY SUPPORT DETAIL
1.
2.
3.
4.
5.
6.
to exceed 30-inches.
Use wood battens bolted to post at vertical spacings not
(MUTCD), latest edition.
on uniform Traffic Control Devices for Streets and Highways’
Locations and height to be in accordance with the ’Manual latest edition.
’’Standard Highway Signs’’ as specified in the MUTCD, For sign punching details, see the blank standards in the
H
W
W 4
W 4 W 4
W
W 6
W
W
W of non-breakaway signs.
or shield with approved barrier. Do not place holes in posts apart. Place non-breakaway signs outside the clearzone required and posts cannot be spaced a minimum of 7 feet are considered to be non-breakaway if multiple posts are
For signs requiring posts sizes 6’’ x 6’’ and greater, signs
APPROVED : MAY 2011
as approved by the CO.
aluminum or galvanized steel or equal
M10 bolt, hexnut and washer, 2024-T4
RESIDENTIAL DISTRICT
ROADSIDE SIGN BUSINESS OR
by the CO. D(min.) is given in CHART A.
Luminaires, and Traffic Signals’, latest edition or as directed
’Specifications for Structural Supports for Highway Signs, latest edition, Section 2A.21 and the AASHTO manual
Traffic Control Devices for Streets and Highways’ (MUTCD), Depth, D, is to be in accordance with the ’Manual on Uniform
Holes (See Chart B) than 10 square feet.
Use double posts if W is over 3 feet or the sign is larger
See note 6
See note 6
S11
M
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t6
1_ d e ta il .d g n
1-
M a r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
U.S. CUSTOMARY DETAIL
SPEED
LIMIT
STOP
M PH
E635-01
CONSTRUCTION TRAFFIC
CONTROL SIGN MOUNTING
NO SCALE
NOTES:
All lumber dimensions are nominal.
PORTABLE SIGNS
FIXED ROADWAY SIGNS
RURAL AREA
URBAN AREA BREAKAWAY SUPPORT DETAIL
Post Size
4’’ x 4’’
4’’ x 6’’
6’’ x 6’’
6’’ x 8’’
1.5’’
3’’
2’’
None Required
D
4’
4’
5’
5’
Diameter
Hole
10 20
1 Post 2 Post 3 Post 4 Post
Maximum Sign Area (Sq. ft.)
165125
FIXED SIGNS 4’’ X 6’’ AND GREATER POSTS)(
Sign panel
Traffic
Wood post (fixed)
Holes (See table)
M in
M in
Note:
Roadway
M in
Roadway
2’-0’’
M in
D
M
2’-0’’
Roadway
Sidewalk
M
6’ to 12’
6’-0’’
M
APPROVED : MAY 2011
utility poles may be used for sign mounting.
When approved by the CO and the Utility Company, non-breakaway sign.
or be shielded by barrier. Do not place holes in posts of spacing, the sign should be placed outside the clearzone
Detail. If breakaway design cannot be used due to post
For posts 6’’ x 6’’ and greater, see the Breakaway Support a minimum of 7 feet apart.
required and the posts cannot be spaced non-breakaway if multiple posts are greater, signs are considered to be
For signs requiring 6’’ x 6’’ posts and surface.
mount the sign a minimum of 7 feet above the pavement
When parking is permitted within 200 feet of the sign, of NCHRP-350 for crashworthiness.
all portable sign supports meet the requirements lower than fixed signs when approved by the CO. Ensure face in a vertical plane. Portable signs may be mounted portable signs, however, sign mounts shall hold the sign
The Contractor may submit alternate details for than 10 square feet on double posts.
Mount signs that are wider than 3-feet or larger
(See notes 3 and 4)
6.
5.
4.
3.
2.
1.
S12
ROAD
AHEAD
WORK
DETOUR
AHEAD
M PH.. .
M PH.. .
ROAD
CLOSED
DETOUR 35
M PH.. .
M PH.. .
CLOSED
RIGHT LANE
AHEAD
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t6
1_ d e ta il .d g n
1-
M a r -2
:5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
AR AR ERFO FSR 2011-1(1)
00 1010 2020 3030
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
00 1010 2020 3030
1005 1005
1010 1010
1015 1015
1020 1020
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
8 AR T1
OZARK-ST. FRANCIS NATIONAL FORESTS
GOBBLERS KNOB ROAD
10+00.00 TO 10+75.00
2011-1(1)
AR ERFO FSR
1-
M a r -2
IM
E
M
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D T
R
(1 x s s .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
CROSS SECTIONS
REG STATE PROJECT
NO.
SHEET
CL_SG
Sta. 10+00.00 R 1
Des. Grade = 1,015.8
Subgrade = 1,015.3
Orig. Grnd. = 1,015.8
CL
20SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG 1:1.5
SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:1 .5
CL_SG
Sta. 10+25.00 R 1
Des. Grade = 1,014.7
Subgrade = 1,014.2
Orig. Grnd. = 1,014.6
CL
20SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:1.5
SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:1 .5
CL_SG
Sta. 10+50.00 R 1
Des. Grade = 1,013.8
Subgrade = 1,013.3
Orig. Grnd. = 1,013.8
CL
20SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG1:1.5
SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:1 .5
CL_SG
Sta. 10+75.00 R 1
Des. Grade = 1,013.5
Subgrade = 1,013.0
Orig. Grnd. = 1,014.4
CL
20SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG 1:1.5
SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:1 .5
1-
M a r -2
IM
E
M
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D T
R
(1 x s s .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
CROSS SECTIONS
REG STATE PROJECT
NO.
SHEET
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
00 1010 2020 3030
1000 1000
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
1000 1000
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
8 AR T2
OZARK-ST. FRANCIS NATIONAL FORESTS
GOBBLERS KNOB ROAD
11+00.00 TO 11+75.00
2011-1(1)
AR ERFO FSR
CL_SG
Sta. 11+00.00 R 1
Des. Grade = 1,013.4
Subgrade = 1,012.9
Orig. Grnd. = 1,013.8
CL
20SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG 1:1.5
SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:1 .5
CL_SG
Sta. 11+25.00 R 1
Des. Grade = 1,013.2
Subgrade = 1,012.7
Orig. Grnd. = 1,013.3
CL
20SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:
11:1.5
CL_SG
Sta. 11+50.00 R 1
Des. Grade = 1,012.4
Subgrade = 1,011.9
Orig. Grnd. = 1,012.8
CL
20SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:
11:1.5
CL_SG
Sta. 11+75.00 R 1
Des. Grade = 1,011.3
Subgrade = 1,010.8
Orig. Grnd. = 1,012.3
CL
20SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:
11:1.5
M a r -2
IM
E
M
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D T
R
(1 x s s .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
CROSS SECTIONS
REG STATE PROJECT
NO.
SHEET
1000 1000
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
1000 1000
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
00 1010 2020 3030
1000 1000
1005 1005
1010 1010
1015 1015
1020 1020
1000 1000
1005 1005
1010 1010
1015 1015
8 AR T3
OZARK-ST. FRANCIS NATIONAL FORESTS
GOBBLERS KNOB ROAD
12+00.00 TO 12+75.00
2011-1(1)
AR ERFO FSR
Finished grade
CL_SG
Sta. 12+00.00 R 1
Des. Grade = 1,010.2
Subgrade = 1,009.7
Orig. Grnd. = 1,011.4
CL
20SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:1.5
SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:1 .5
CL_SG
Sta. 12+25.00 R 1
Des. Grade = 1,009.4
Subgrade = 1,008.9
Orig. Grnd. = 1,010.1
CL
20SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:1.5
SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
1:1 .5
CL_SG
Sta. 12+50.00 R 1
Des. Grade = 1,009.1
Subgrade = 1,008.6
Orig. Grnd. = 1,008.7
CL
20SG_HG
-3.0%
1:2
SHLD_SGFM_SSG
BDTHPC
SSCCP_SG
SG_HG
-3.0%
1:2
CP_SGSSF
Sta. 12+75.00 R 1
Des. Grade = 1,009.0
Orig. Grnd. = 1,008.2
CL
M a r -2
IM
E
M
P R
O J E
C T
S F
S A
R -1 (1
P r o j
D e v C
A D
D T
R
(1 x s s .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
CROSS SECTIONS
REG STATE PROJECT
NO.
SHEET
1000 1000
1005 1005
1010 1010
1015 1015
1000 1000
1005 1005
1010 1010
1015 1015
1000 1000
1005 1005
1010 1010
1015 1015
00 1010 2020 3030
1000 1000
1005 1005
1010 1010
1015 1015
1020 1020
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
8 AR T4
OZARK-ST. FRANCIS NATIONAL FORESTS
GOBBLERS KNOB ROAD
13+00.00 TO 14+00.00
2011-1(1)
AR ERFO FSR
Finished grade
Finished grade
Sta. 13+00.00 R 1
Des. Grade = 1,009.0
Orig. Grnd. = 1,008.2
CL
Sta.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .