The purpose of this Amendment is to 1) Replace the Solicitation B Pages to add delete and correct bid items. 2) Revise the Special Contract Requirements (J Pages) as follows a)Section 104 to revise the hauling limit requirements. 3) Revise the Plans to modify information related to quantities and the retaining wall. 4) Provide a summary of responses to question/clarifications asked by potential bidders. 5) Bid Opening Dtae remains July 15 2010 at 2 00 pm EST.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 003 - PRA-ROCR 3A6.pdf | ||
| Amendment 001 - PRA-ROCR 3A6.pdf | ||
| REV__SB subcontract plan revised.doc | DOC document | |
| Geotechnical Report | — | |
| ADV_Bidder's Qualifications Form.doc | DOC document | |
| FP03_Eng .pdf | ||
| ARRA Sign Pictographs.pdf | ||
| Plans_Adv Sheets J1 to T25.pdf | ||
| Plans_Adv Sheets A1 to H20.pdf | ||
| FP03 Errata.pdf | ||
| Geotechnical Report | — | |
| IFB Solicitation - PRA-ROCR 3A6.pdf | ||
| ARRA Sign Placement Guidance NPS.pdf | ||
| Synopsis PRA-ROCR 3A6.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTFH7110B00015
x x
0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
PRA-ROCR 3A607/13/2010002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/10/2010
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to:
1) Replace the Solicitation B Pages to add, delete, and correct bid items.
2) Revise the Special Contract Requirements (J Pages) as follows:
a) Section 104 to revise the hauling limit requirements.
3) Revise the Plans to modify information related to quantities and the retaining wall.
4) Provide a summary of responses to question/clarifications asked by potential bidders.
5) Bid Opening Date remains July 15, 2010 at 2:00 pm EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment No. 002 Amendment Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 002 Project PRA-ROCR 3A6
Rock Creek Park Solicitation: DTFH71-10-B-00015
The purpose of this Amendment is to:
1) Replace the Solicitation B Pages to add, delete, and correct bid items.
2) Revise the Special Contract Requirements (J Pages) as follows:
a) Section 104 to revise the hauling limit requirements.
3) Revise the Plans to modify information related to quantities and the retaining wall.
4) Provide a summary of responses to question/clarifications asked by potential bidders.
Solicitation Provision changes
1. Delete Solicitation Bid Schedule pages B-1 through B-12 and substitute the amended Bid
Schedule pages B-1 through B-12.
Special Contract Requirement changes
1. Delete the first two paragraphs of Subsection 104.05 of the Special Contract Requirements, page J-6, and substitute the following:
When hauling on NPS roads, do not exceed the local jurisdiction load limits.
Plan Sheet changes
1. Delete Plan Sheets B.11 and R2, and substitute amended Plan Sheets B.11 and R2.
Project: PRA-ROCR 3A6
ROCK CREEK AND POTOMAC PARKWAY
B- 1 Amendment No. 002
Bid Schedule
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
15101-0000 MOBILIZATION
ALL Lump Sum $___________________
15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL Lump Sum $___________________
15401-0000 CONTRACTOR TESTING
ALL Lump Sum $___________________
15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
ALL Lump Sum $___________________
15705-0100 SOIL EROSION CONTROL, SILT FENCE WIRE BACKED SUPER SILT
FENCE
4,235
LNFT $_______________ $___________________
15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
LNFT $_______________ $___________________
15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
EACH $_______________ $___________________
15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE
EACH $_______________ $___________________
15706-2200 SOIL EROSION CONTROL, FILTER BAG
EACH $_______________ $___________________
20102-0000 CLEARING AND GRUBBING
ALL Lump Sum $___________________
20301-1200 REMOVAL OF HEADWALL
EACH $_______________ $___________________
Project: PRA-ROCR 3A6
Bid Schedule A
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
B- 2 Amendment No. 002
20301-1300 REMOVAL OF INLET GRATE
EACH $_______________ $___________________
20301-1400 REMOVAL OF INLET
EACH $_______________ $___________________
20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE
9,300
LNFT $_______________ $___________________
20302-1400 REMOVAL OF GUARDRAIL, TIMBER
1,700
LNFT $_______________ $___________________
20302-2100 REMOVAL OF PIPE CULVERT
LNFT $_______________ $___________________
20303-1600 REMOVAL OF PAVEMENT, ASPHALT
8,300
SQYD $_______________ $___________________
20303-3000 REMOVAL OF SIDEWALK, ASPHALT
SQYD $_______________ $___________________
20303-3100 REMOVAL OF SIDEWALK, BRICK
SQYD $_______________ $___________________
20315-0000 SAWCUTTING PAVEMENT
1,100
LNFT $_______________ $___________________
20401-0000 ROADWAY EXCAVATION
1,500
CUYD $_______________ $___________________
20402-0000 SUBEXCAVATION
CUYD $_______________ $___________________
20410-0000 SELECT BORROW
CUYD $_______________ $___________________
Project: PRA-ROCR 3A6
Estimated Quantity Unit Bid Price Amount Bid
B- 3 Amendment No. 002
20701-0800 EARTHWORK GEOTEXTILE, TYPE II-B
4,250
SQYD $_______________ $___________________
20701-1300 EARTHWORK GEOTEXTILE, TYPE IV-B
SQYD $_______________ $___________________
20701-1400 EARTHWORK GEOTEXTILE, TYPE IV-C
1,500
SQYD $_______________ $___________________
20801-0000 STRUCTURE EXCAVATION
2,000
CUYD $_______________ $___________________
20803-0000 STRUCTURAL BACKFILL
1,140
CUYD $_______________ $___________________
20810-0000 SHORING AND BRACING
ALL Lump Sum $___________________
25102-4000 PLACED RIPRAP, CLASS 4
2,500
TON $_______________ $___________________
30102-0100 AGGREGATE BASE GRADING C, 4-INCH DEPTH
SQYD $_______________ $___________________
30102-0200 AGGREGATE BASE GRADING C, 6-INCH DEPTH
4,400
SQYD $_______________ $___________________
30502-1000 AGGREGATE-TOPSOIL COURSE, 6-INCH DEPTH
1,100
SQYD $_______________ $___________________
40101-0200 SUPERPAVE PAVEMENT, 3/8-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL (TYPE V PAVEMENT
ROUGHNESS)
6,100
TON $_______________ $___________________
40101-0200 SUPERPAVE PAVEMENT, 3/8-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL (TYPE VII PAVEMENT
SMOOTHNESS/ROUGHNESS)
TON $_______________ $___________________
Project: PRA-ROCR 3A6
Estimated Quantity Unit Bid Price Amount Bid
B- 4 Amendment No. 002
40101-1000 SUPERPAVE PAVEMENT, 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
3,440
TON $_______________ $___________________
40102-0200 SUPERPAVE PAVEMENT, 3/8-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL, WEDGE AND LEVELING COURSE
TON $_______________ $___________________
40401-0000 MINOR HOT ASPHALT CONCRETE
TON $_______________ $___________________
41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
SQYD $_______________ $___________________
41301-0800 ASPHALT PAVEMENT MILLING, 3-INCH DEPTH
31,300
SQYD $_______________ $___________________
41501-0000 PAVING GEOTEXTILE - TYPE VI - JOINT FABRIC
12,000
SQYD $_______________ $___________________
55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) FOR RETAINING WALL
CUYD $_______________ $___________________
55201-0800 STRUCTURAL CONCRETE, CLASS D (AE) FOR REPAIRS
CUYD $_______________ $___________________
55401-1000 REINFORCING STEEL
76,820
LB $_______________ $___________________
56501-0300 DRILLED SHAFTS, 30-INCH DIAMETER
LNFT $_______________ $___________________
56501-0400 DRILLED SHAFTS, 36-INCH DIAMETER
2,240
LNFT $_______________ $___________________
60103-4000 CONCRETE, FOUNDATION, LIGHT POLE
EACH $_______________ $___________________
Project: PRA-ROCR 3A6
Estimated Quantity Unit Bid Price Amount Bid
B- 5 Amendment No. 002
60201-0400 12-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-0500 15-INCH PIPE CULVERT
1,280
LNFT $_______________ $___________________
60201-0600 18-INCH PIPE CULVERT
1,700
LNFT $_______________ $___________________
60201-0800 24-INCH PIPE CULVERT
LNFT $_______________ $___________________
60210-0500 END SECTION FOR 15-INCH PIPE CULVERT
EACH $_______________ $___________________
60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
EACH $_______________ $___________________
60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
EACH $_______________ $___________________
60401-0000 MANHOLE
EACH $_______________ $___________________
60403-0100 INLET, TYPE 1
EACH $_______________ $___________________
60403-1800 INLET, TYPE 6A MODIFIED - DOUBLE TYPE 6A-6
EACH $_______________ $___________________
60406-0000 INLET ADJUSTMENT
EACH $_______________ $___________________
60407-0000 CAPPING INLETS AND MANHOLES
EACH $_______________ $___________________
Project: PRA-ROCR 3A6
Estimated Quantity Unit Bid Price Amount Bid
B- 6 Amendment No. 002
60409-0700 INLET TOP, METAL FRAME AND GRATE TYPE 6A
EACH $_______________ $___________________
60501-0000 STANDARD UNDERDRAIN SYSTEM
LNFT $_______________ $___________________
60520-0000 GRANULAR BACKFILL
CUYD $_______________ $___________________
60703-0000 CLEANING CULVERTS IN PLACE
LNFT $_______________ $___________________
60707-0100 LINING 12-INCH PIPE CULVERT
LNFT $_______________ $___________________
60707-0200 LINING 15-INCH PIPE CULVERT
LNFT $_______________ $___________________
60707-0300 LINING 18-INCH PIPE CULVERT
LNFT $_______________ $___________________
60707-0500 LINING 24-INCH PIPE CULVERT
LNFT $_______________ $___________________
60902-0800 CURB AND GUTTER, CONCRETE, 10-INCH DEPTH
9,300
LNFT $_______________ $___________________
60902-1100 CURB AND GUTTER, CONCRETE, 13-INCH DEPTH
LNFT $_______________ $___________________
61501-0100 SIDEWALK, CONCRETE
SQYD $_______________ $___________________
61504-1000 ACCESSIBILITY RAMP, CONCRETE
SQYD $_______________ $___________________
Project: PRA-ROCR 3A6
Estimated Quantity Unit Bid Price Amount Bid
B- 7 Amendment No. 002
61509-0000 DETECTABLE WARNING PANELS
SQYD $_______________ $___________________
61701-3900 GUARDRAIL SYSTEM SBTA
1,960
LNFT $_______________ $___________________
61701-3900 GUARDRAIL SYSTEM SBTA (MEDIAN GUARDRAIL SYSTEM)
1,110
LNFT $_______________ $___________________
61702-0000 TERMINAL SECTION SBTA TL-2 CONNECTION TO STONE MASONRY
GUARDWALL
EACH $_______________ $___________________
61702-0000 TERMINAL SECTION SBTA TL-2 TRANSITION TO STRAIGHT OR CURVED
END STRUCTURE
EACH $_______________ $___________________
61702-0510 TERMINAL SECTION, TYPE SBT-FAT
EACH $_______________ $___________________
61711-5000 IMPACT ATTENUATOR, QUADGUARD
EACH $_______________ $___________________
62001-0800 CLASS B MASONRY, COURSE POINTED FINISH
CUYD $_______________ $___________________
62011-0100 STONE MASONRY HEADWALL FOR 12-INCH PIPE CULVERT
EACH $_______________ $___________________
62011-0200 STONE MASONRY HEADWALL FOR 15-INCH PIPE CULVERT
EACH $_______________ $___________________
62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT
EACH $_______________ $___________________
62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
EACH $_______________ $___________________
Project: PRA-ROCR 3A6
Estimated Quantity Unit Bid Price Amount Bid
B- 8 Amendment No. 002
62025-1000 REMOVE AND RESET STONE MASONRY
CUYD $_______________ $___________________
62030-0000 REPOINT STONE MASONRY
2,330
LNFT $_______________ $___________________
62035-0000 CLEAN STONE MASONRY SURFACES
SQYD $_______________ $___________________
62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
2,900
SQYD $_______________ $___________________
62401-0400 FURNISHING AND PLACING TOPSOIL, 6-INCH DEPTH
SQYD $_______________ $___________________
62501-0000 TURF ESTABLISHMENT
2.0
ACRE $_______________ $___________________
63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
SQFT $_______________ $___________________
63305-1700 POSTS, WOOD, 4-INCH X 4-INCH
1,300
LNFT $_______________ $___________________
63308-0000 OBJECT MARKER FOR TREE SAVE/PROTECTION
EACH $_______________ $___________________
63313-0000 RUMBLE STRIP
2,800
LNFT $_______________ $___________________
63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
57,300
LNFT $_______________ $___________________
63401-0800 PAVEMENT MARKINGS, TYPE D, BROKEN
18,300
LNFT $_______________ $___________________
Project: PRA-ROCR 3A6
Estimated Quantity Unit Bid Price Amount Bid
B- 9 Amendment No. 002
63405-1300 PAVEMENT MARKINGS, TYPE D, TURN ARROW
EACH $_______________ $___________________
63406-0400 RAISED PAVEMENT MARKER TYPE D
EACH $_______________ $___________________
63406-0500 RAISED PAVEMENT MARKER TYPE E
EACH $_______________ $___________________
63502-0200 TEMPORARY TRAFFIC CONTROL, ADVANCE WARNING ARROW PANEL,
TYPE B
EACH $_______________ $___________________
63502-0500 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2
EACH $_______________ $___________________
63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
EACH $_______________ $___________________
63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
EACH $_______________ $___________________
63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE
SIGN
EACH $_______________ $___________________
63502-2200 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION, INERTIAL BARREL
SYSTEM
EACH $_______________ $___________________
63502-2600 TEMPORARY TRAFFIC CONTROL, MOVING TEMPORARY CRASH
CUSHION
EACH $_______________ $___________________
63502-2800 TEMPORARY TRAFFIC CONTROL, REPLACEMENT BARRELS FOR CRASH
CUSHION
EACH $_______________ $___________________
Project: PRA-ROCR 3A6
Estimated Quantity Unit Bid Price Amount Bid
B- 10 Amendment No. 002
63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
1,550
LNFT $_______________ $___________________
63503-0500 TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE BARRIER
3,200
LNFT $_______________ $___________________
63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
115,800
LNFT $_______________ $___________________
63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL
10,300
LNFT $_______________ $___________________
63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
1,000
LNFT $_______________ $___________________
63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE FOR LOD STAKE-OUT
12,191
LNFT $_______________ $___________________
63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
SQFT $_______________ $___________________
63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
HOUR $___43.30_________ $__10,392.00_______
63610-0000 CONDUIT 3/4 INCH FLEXIBLE LIQUID TIGH
LNFT $_______________ $___________________
63610-2200 CONDUIT, 3-INCH, PVC
1,900
LNFT $_______________ $___________________
63610-2300 CONDUIT, 3-INCH, RIGID GALVANIZED STEEL (BORED)
LNFT $_______________ $___________________
63610-2900 CONDUIT, 4-INCH, RIGID GALVANIZED STEEL (BORED)
LNFT $_______________ $___________________
Project: PRA-ROCR 3A6
Estimated Quantity Unit Bid Price Amount Bid
B- 11 Amendment No. 002
63611-0100 WIRE, ELECTRICAL CONDUCTORS, 14 AWG LOOP WIRE ENCASED IN
FLEXIBLE TUBING
LNFT $_______________ $___________________
63611-0100 WIRE, ELECTRICAL CONDUCTORS, 14 AWG - SAWCUT FOR SIGNAL
(LOOP DETECTOR)
LNFT $_______________ $___________________
63611-0300 WIRE, ELECTRICAL CONDUCTORS, 10 AWG
11,000
LNFT $_______________ $___________________
63611-0300 WIRE, ELECTRICAL CONDUCTORS, 10 AWG FURNISH AND INSTALL
STRANDED BARE COPPER GROUND WIRE
5,500
LNFT $_______________ $___________________
63612-0100 LUMINAIRE, TYPE A (400 WATT METAL HALIDE)
EACH $_______________ $___________________
63620-0000 POLE - FURNISH AND INSTALL GROUND ROD - 3/4 INCH DIAMETER x 10
FOOT LENGTH
EACH $_______________ $___________________
63620-0100 POLE, TYPE A (30 FOOT PENDANT POST, WITH BREAKAWAY
TRANSFORMER BASE)
EACH $_______________ $___________________
63620-0200 POLE, TYPE B (30 FOOT PENDANT POST, ANCHOR BASE)
EACH $_______________ $___________________
63621-1000 UTILITY BOX, PULLBOX
EACH $_______________ $___________________
63621-3000 UTILITY BOX, JUNCTION BOX
EACH $_______________ $___________________
63641-0100 RELOCATE LUMINAIRE - REMOVE AND DISPOSE OF LIGHTING
STRUCTURE
EACH $_______________ $___________________
Project: PRA-ROCR 3A6
Estimated Quantity Unit Bid Price Amount Bid
B- 12 Amendment No. 002
63701-0000 FIELD OFFICE
EACH $_______________ $___________________
$_____________________TOTAL
Submitted by:
Name of Bidder
Project: PRA-ROCR 3A6
Amendment 002 Questions/Clarifications Page 1of 2
Questions/Clarifications
The following questions and issues were submitted via email at eflhd.contracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for the better clarity.
1. Is pay item 15702-1000 (Soil Erosion Control – Temporary Diversion Channel) referring to plan sheet M.16 (Stream Diversion Plan)? Should we use the detail shown for “Sandbag Dam” on that plan sheet for Diversion Channel?
Response: Yes.
2. Pay item 55201-0800 “Structural Concrete, Class D (AE) for Repair”: which plan sheet shows the details and the nature of repairs? Please provide some details.
Response: This work is to be done as directed by the CO as needed at the existing retaining walls, concrete headwalls, and bridge decks.
3. Pay item 55401-1000 “reinforcing steel”: does this item include both the retaining wall and the drill shafts rebars?
Response: Reinforcing steel for drilled shafts is included in Pay Items 56501-0300 and 56501-0400.
4. Pay item 55221-0000 “Expansion Joint Repair”: which plans sheet shows the extent and location of these repairs? This item is Lump Sum and more detail is required pertaining to the volume of work involved.
Response: The expansion joint repair (Pay Item 55221-0000) does not apply to this project and will be deleted by amendment.
5. Would you please provide more information regarding the retaining wall veneer stone and the coping? Pay item 62001-0800, “Class B Masonry, Course Pointed Finish”: which plan sheet shows the detail of the structure where this type of masonry material will be used for?
Response: The veneer and the coping details are located on Plan Sheets R1 and R2.
The veneer is to be paid under Class B Masonry, Course Pointed Finish (Pay Item 62001-0800); see Section 620 for additional work requirements. See Plan Sheets R1 and R2.
6. Would you please clarify that the weight limits stated on section 104.05 of the IFB book apply to Rock Creek and Potomac Parkway within the project limits and the parkway section leading to the project site?
Amendment 002 Questions/Clarifications Page 2of 2
Response: The hauling limits will be deleted by an amendment.
7. The Contractor Sampling and Testing section is not very clear as to the extent of tests required throughout the project. Would you please clarify what materials you specifically require testing for and what is the frequency of required tests?
Response: Refer to Subsections 154.02 and 154.03 for Contractor Sampling and Testing. The sampling and testing requirements for each pay item is provided at the end of the Section that describes the work. For example, Pay Item 20410-0000 Select Borrow: for the work described in Section 204, the sampling and testing requirements are provided at the end of the Section in Table 204-1.
8. I have a request for Information, regarding Rip Rap. There are two different line items for Rip Rap and I am wondering what the difference and where are each used for I could not find them on the drawings.
Item 25101-4000 Placed Rip Rap Class 4 1,190 Cu Yd Item 25102-4000 Placed Rip Rap Class 4 2,500 Tons
Response: Placed Rip Rap Class 4 (Pay Item 25101-4000) by the CUYD is included on the plans by mistake and will be deleted by an amendment.
9. The specification for Bid Item 63612-0100 Luminaire, Type A (400w Metal Halide) is in conflict with the written specification, Sect. 721 (f) (1) which indicates 250w High Pressure Sodium. Also, the “Furnish aluminum detachable reflectors with ethylene terpolymer gaskets” is not clear.
Response: The pay item and description is correct as indicated [63612-0100 LUMINAIRE, TYPE A (400 WATT METAL HALIDE)]. The FP Subsection 721.02(f) is superseded by the SCR’s (pages J-65 and 66) which direct you to the DDOT specs, so the 250watt HPS luminaries and reflector/gasket specs would not apply.
10. Please refer to Sheet No. R2. Please confirm that the thickness for Pay Item 62001-0800 will be 6". There is a mention on this page of 4" as well. It is not possible to install this type of stone in a 4" thickness.
Response: See Plan Sheet R2 which includes a 4-inch minimum thickness and a 6-inch maximum thickness. If the stone veneer cannot be installed in a 4-inch thickness, it should be installed with a 6-inch thickness.
Any questions received after this time will be answered on an individual response basis, unless another amendment is required.