Amendment 001 - PRA-ROCR 3A6.pdf
PDF 2 MB Posted
- Attached to
- Rock Creek & Potomac Parkway Federal contract opportunity
- Solicitation number
- DTFH71-10-B-00015
About this file
The purpose of this Amendment is to 1) Replace the Solicitation Page B-10 to adjust quantities. 2) Revise the Plans to modify information related to quantities lighting and riprap and to delete inlet details. 3) Provide a summary of responses to question/clarifications asked by potential bidders. 4) The Bid Opening date has been extended to July 15 2010 at 2 00 pm EST.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 003 - PRA-ROCR 3A6.pdf | ||
| Amendment 002 - PRA-ROCR 3A6.pdf | ||
| Geotechnical Report | — | |
| IFB Solicitation - PRA-ROCR 3A6.pdf | ||
| ARRA Sign Placement Guidance NPS.pdf | ||
| REV__SB subcontract plan revised.doc | DOC document | |
| Geotechnical Report | — | |
| ADV_Bidder's Qualifications Form.doc | DOC document | |
| FP03_Eng .pdf | ||
| Plans_Adv Sheets J1 to T25.pdf | ||
| Plans_Adv Sheets A1 to H20.pdf | ||
| FP03 Errata.pdf | ||
| ARRA Sign Pictographs.pdf | ||
| Synopsis PRA-ROCR 3A6.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTFH7110B00015
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
PRA-ROCR 3A607/06/2010001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/10/2010
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to:
1) Replace the Solicitation Page B-10 to adjust quantities.
2) Revise the Plans to modify information related to quantities, lighting, and riprap, and to delete inlet details.
3) Provide a summary of responses to question/clarifications asked by potential bidders.
4) The Bid Opening date has been extended to July 15, 2010 at 2:00 pm EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment No. 001 Amendment Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 001 Project PRA-ROCR 3A6
Rock Creek Park Solicitation: DTFH71-10-B-00015
The purpose of this Amendment is to:
1) Replace the Solicitation Page B-10 to adjust quantities.
2) Revise the Plans to modify information related to quantities, lighting, and riprap, and to delete inlet details.
3) Provide a summary of responses to question/clarifications asked by potential bidders.
Solicitation Provision changes
1. Delete Solicitation Bid Schedule page B-10 and substitute the amended Bid Schedule page B-
10.
Plan Sheet changes
1. Delete Plan Sheets B.14, BJ.1, H.16, R1, and S.57, and substitute amended Plan Sheets B.14, BJ.1, H.16, R1, and S.57.
2. Delete Plan Sheets S.20, S.21, and S.22. Plan Sheets S.20, S.21, and S.22 are not required for this project.
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
B- 10 Amendment 0001
63502-2600 TEMPORARY TRAFFIC CONTROL, MOVING TEMPORARY CRASH
CUSHION
EACH $_______________ $___________________
63502-2800 TEMPORARY TRAFFIC CONTROL, REPLACEMENT BARRELS FOR CRASH
CUSHION
EACH $_______________ $___________________
63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
1,550
LNFT $_______________ $___________________
63503-0500 TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE BARRIER
3,200
LNFT $_______________ $___________________
63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
115,800
LNFT $_______________ $___________________
63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL
10,300
LNFT $_______________ $___________________
63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
1,000
LNFT $_______________ $___________________
63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE FOR LOD STAKE-OUT
12,191
LNFT $_______________ $___________________
63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
SQFT $_______________ $___________________
63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
HOUR $_______________ $___________________
63610-0000 CONDUIT 3/4 INCH FLEXIBLE LIQUID TIGH
LNFT $_______________ $___________________
63610-2200 CONDUIT, 3-INCH, PVC
1,900
LNFT $_______________ $___________________
Project: PRA-ROCR 3A6
ROCK CREEK AND POTOMAC PARKWAY
Bid Schedule A
Number
Pole
Pole
Type of
Length
Mast Arm or Face of Curb
Setback, from Face of Guard Rail
Wattage
Luminaire
Base
Type of Pole Location Number
Pole
Pole
Type of
Length
Mast Arm or Face of Curb
Setback, from Face of Guard Rail
Wattage
Luminaire
Base
Type of Pole Location
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
ROADWAY LIGHTING
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
8 Feet
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
Pendant-30’
6 Feet
6 Feet
6 Feet
6 Feet
6 Feet
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Sta 701+93, L Shoreham
Sta 704+08, L Shoreham
Sta 705+24, R Shoreham
Sta 706+45, R Shoreham
Sta 707+64, L Shoreham
Sta 708+84, L Shoreham
Sta 710+04, L Shoreham
Sta 900+34 R Cathedral
Sta 902+80 L Cathedral
47+37, R
47+37, L
901+31, R location
Pullbox
Number
Pullbox
Breakaway
Breakaway
Breakaway
Breakaway
Anchor
Anchor
Anchor
Anchor
Anchor
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Anchor
Anchor
Anchor
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Anchor
Breakaway
Anchor
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Anchor
Anchor
Anchor
Anchor
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Breakaway
Sta 34+20, L RC&PP
Sta 35+80, R RC&PP
Sta 37+10 R, RC&PP
Sta 38+31, R RC&PP
Sta 39+41, R RC&PP
Sta 40+56, R RC&PP
Sta 41+97, R RC&PP
Sta 43+08, R RC&PP
Sta 44+13, R RC&PP
Sta 500+51, R NB RC&PP
Sta 501+60, L NB RC&PP
Sta 502+78, R NB RC&PP
Sta 504+10, L NB RC&PP
Sta 505+30, L NB RC&PP
Sta 506+63, R NB RC&PP
Sta 507+70, L NB RC&PP
Sta 509+05, R NB RC&PP
Sta 510+08, L NB RC&PP
Sta 511+28, R NB RC&PP
Sta 513+65, R NB RC&PP
Sta 514+98, L NB RC&PP
Sta 516+06, R NB RC&PP
Sta 517+07, L NB RC&PP
Sta 518+44, R NB RC&PP
Sta 519+66, L NB RC&PP
Sta 64+93, R SB RC&PP
Sta 63+93, L SB RC&PP
Sta 62+85, R SB RC&PP
Sta 61+60, L SB RC&PP
Sta 60+35, R SB RC&PP
Sta 59+19, L SB RC&PP
Sta 58+12, R SB RC&PP
Sta 56+67, L SB RC&PP
Sta 54+23, L SB RC&PP
Sta 53+16, R SB RC&PP
Sta 1002+00, R SB Waterside
Sta 1003+25, R SB Waterside
Sta 51+90, L SB RC&PP
Sta 50+84, R SB RC&PP
Sta 1004+70, R SB Waterside
Sta 49+35, L SB RC&PP
Sta 48+35, R SB RC&PP
Sta 47+12, L SB RC&PP
Sta 45+98, R SB RC&PP
Sta 44+88, L SB RC&PP
Sta 520+85, R NB RC&PP
Sta 522+09, R NB RC&PP
Sta 523+32, R NB RC&PP
Sta 525+61, R NB RC&PP
Sta 527+85, R NB RC&PP
Sta 529+87, R NB RC&PP
Sta 532+10, R NB RC&PP
Sta 66+23, L SB RC&PP
Sta 67+38, L SB RC&PP
Sta 69+14, L SB RC&PP
Sta 71+22, L SB RC&PP
Sta 73+55, L SB RC&PP
Sta 75+60, L SB RC&PP
Sta 79+22, R RC&PP
Sta 81+34, R RC&PP
Sta 82+09, L RC&PP
Sta 83+42, R RC&PP
Sta 85+85, R RC&PP
Sta 88+13, R RC&PP
Sta 90+13, R RC&PP
Sta 92+01, L RC&PP
Sta 92+89, R RC&PP
Sta 93+75, L RC&PP
Sta 94+75, R RC&PP
Sta 95+80, L RC&PP
Sta 96+59, R RC&PP
6 34+11, L
Utility Pullbox
44+88, L
47+12, L location
Pullbox
Number
Pullbox
Junction Box
6"x6"x8" Galvanized Steel
PROJECT PRA-ROCR 3A6
SCHEDULE OF LIGHTING POLES
Pendant-30’ 8 Feet 6 Feet 400 Breakaway Sta 700+83, L Shoreham
Sta 98+52, R RC&PP1
BJ.1
TN
its information
Added pole number 72 and 7/02/10
STERLING, VIRGINIA
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
F I L
E
B Y
P L
O T
T E
D D
A T
E
U
S E
R N
A M
E
F I L
E
U.S. DEPARTMENT OF TRANSPORTATION
AMENDMENT 001
DESCRIPTIONNo. By Date
REVISIONS
DC
REG STATE PROJECT
SHEET
NO.
TOTAL
SHEETS
NPS
NC100425
PRA-ROCR 3A6
ROCK CREEK PARK
STERLING, VIRGINIA
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
F I L
E
B Y
P L
O T
T E
D D
A T
E
U
S E
R N
A M
E
F I L
E
U.S. DEPARTMENT OF TRANSPORTATION
AMENDMENT 001
DESCRIPTIONNo. By Date
REVISIONS
DC
REG STATE PROJECT
SHEET
NO.
PRA-ROCR 3A6
ROCK CREEK PARK
SP
R
IN
G
" 3
N 40 ° 13’ 3
7.79" E
N 50° 02’ 37.29" E
P T
S
A
.7
+50
C
A
.7
+50
A
.4
+50 100 +50 101
A
.4
+50
+50
A
.0
PCC STA. 750
+83.08
P T
S T
A . 7
1+10
.8
E
N
Beach Dr.
M A
T
H
L I N
E
A . 9
M A
T
H
A . 1
S t a b l e n t r a n c e
20 20 400
HORIZONTAL SCALE IN FEET
STA.
+6
M
ATCH
LI
NE
C O
N C
E L E C
C o n n e c t i c u t
A v e n u e
R
STA. 97+50 TO STA. 102+50
ROADWAY LIGHTING
72 30’-20"x8’
Sta. 98+52 R
N 1297875.1 E 456908.2 A 10G2 3",8’
H.16
PRA-ROCR 3A6
END PROJECT
TN 7/02/10Removed street light symbol
DTREE
24"STONE
DTREE
ELEC
SPEED LIMIT
ELEC
DO NOT ENTER
EDGE WATER
2" 2"
4" 18
4"
" 24
P
A . 4
.4
P
A . 4
.0
P
A . 4
.5
A . 5
.0
P R
A . 5
1+
.7
STERLING, VIRGINIA
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
F I L
E
B Y
P L
O T
T E
D D
A T
E
U
S E
R N
A M
E
F I L
E
U.S. DEPARTMENT OF TRANSPORTATION
AMENDMENT 001
DESCRIPTIONNo. By Date
REVISIONS
DC
REG STATE PROJECT
SHEET
NO.
PRA-ROCR 3A6
ROCK CREEK PARK
RIP-RAP SECTION
Potomac Pkwy.
SB Rock Creek &
B ConstructionL
Not to Scale rip-rap
Top of proposed of wall
Front face
Ground Line at Curb
Proposed finished
Varies m i n
Class 4 rip-rap
Geotextile, Type IV-C
Rock creek stream bed
1V:1.5H
+50
A . 1
.5
A . 1
.7
+50
A . 10
.0
100+00
SB Rock Creek &
103+00 +50 102+00 101+00+50
Datum EL. 00.00
RCK-6
RCK-5
RCK-4
SCALE: 1" = 20’
PLAN
SCALE: 1" = 20’
ELEVATION
GENERAL NOTES:
EL. 13.00
EL. 22.48(+)-
EL. 13.00
EL. 16.50
EL. 28.84(+)-
Potomac ParkwayWB-3 WB-2
WB-1
Outlet spacing
Drain pipe
Top of Coping
Joint
Contraction
Bottom of Footing
Drain
Drain
Joint
Expansion
Joint
Contraction
Joint
Expansion
Outlet (Typ.)
Drain pipe
EL. 9.75
Joint
Contraction elevation at curb
Proposed Roadway face of retaining wall
Proposed elevation at front
335’-0"
103+00 +50 102+00 +50 101+00 +50
Expansion connection Standard 617-64 (Typ.)
timber guardrail with TL-2
Transition to steel-backed
(Typ.)
T y p
(Typ.) (Typ.)
(Typ.)
Notes:
30’-0" 30’-0" 30’-0" 30’-0"
8’-0"
30’-0" 30’-0" 30’-0" 30’-0"
5’-0" 5’-0"
10’-0"
30’-0" 25’-0"
100+00
Contraction
B Construction
SB Rock Creek &
Potomac Pkwy.
End Retaining Wall
Sta. 103+35.00
Offset 2’-0", Lt.
Front face of
Retaining Wall
Concrete Design: Service Load design method, fc = 1800 psi.
Reinforcing steel Design: fs = 24,000 psi.
Minimum cover for any bar shall be 2" unless otherwise noted, with the exception of bars at the bottom and sides of all footings which shall have a 3" minimum cover.
ONLY GRADE 60 CAN BE USED ON THIS PROJECT.
EL. 11.50
EL. 10.25
Drain pipe (Typ.)
+50 +50 +50
+50
+50
47+00 46+00
45+00
44+00
502+00
+50
+50
501+00
500+00 and Bridges on Federal Highway Projects, FP-03.
Standard Specifications for construction of Roads
4,500 pound per square inch 28-day compressive strength.
All retaining wall concrete shall be class A(AE) with a minimum
The work shall be Class B Masonry consisting of stone veneer
(4" Min., 6" Max.) with dovetail anchors and rustic mortar joints
R1 two per coping piece minimum, set 1" minimum into coping stone.
with 1/2" diameter x 4" long stainless steel dowels at 1’-0" c/c, 2’-0" minimum vertical spacing. Coping stones shall be secured galvanized metal corrugated dovetail anchor straps at metal at 2’-0" c/c minimum horizontal spacing with 1" wide 8 gauge
Section 620. Dovetail slots shall be 24 gauge minimum galvanized to the concrete wall. Construction of stone facing shall follow
(see note)
Wall curve adjacent tangent lines.
2’-0" offset with a five degree maximum deflection angle between
The wall structure may be a series of tangent lines that maintain
The offset line curve for the wall at 2’-0" offset R = 523.00’.
The Base Line curve at face of curb R = 525.00’.
Retaining Wall curve data:
EL. 24.00 EL. 24.30
EL. 24.71
EL. 25.11
EL. 25.65
EL. 26.32 EL. 27.05
EL. 28.80
EL. 27.78
EL. 29.11
EL. 29.74
5°0’0" (Max.)
EL. 30.09 +( )-
Reinforcing steel shall conform to A 615, Grade 60.
Light pole base (typ.)
Class 4 rip-rap
Turf establishment (typ.)
Rip-rap:
Stone Facing:
Steel:
Reinforcing
Concrete:
Specifications:
Coping to be 6" minimum thickness quarried field stone doweled for placement of rip-rap.
horizontal extent of class 4 rip-rap. Refer to Stream Diversion Plan
Refer to plan view and roadway cross-sections 44+00 to 47+00 for
Limits of shoring and bracing
1’-6"
Limits of shoring and bracing
20’-0" 20’-0"
Joint
Contraction to match other walls within the park as directed by the CO.
N62°11’04.52"W
Begin Retaining Wall
Sta. 100+00.00
Offset 2’-0", Lt.
Sta. 43+88.00
Offset 24.4’, Rt. =
20 20 400
HORIZONTAL SCALE IN FEET
TNRevised slope notation 7/02/10
GENERAL PLAN & ELEVATION
STA. 100+00 TO STA. 103+35
SB ROCK CREEK & POTOMAC PARKWAY
RETAINING WALL ON
F
L
E
B Y
P L
O T
T E
D D
A T
E
U
S E
R N
A M
E
F I L
E
REG STATE PROJECT
SHEET
NO.
TOTAL
SHEETS
2 DC
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAILDETAIL APPROVED FOR USE XX/XX
S.20
WATER QUALITY INLET DETAIL
WATER QUALITY INLET SCHEDULE
MOD. S-31.01 WQ BASIN
MOD. S-31.01 WQ BASIN
MOD. S-31.01 WQ BASIN
MOD. S-31.01 WQ BASIN
MOD. S-31.01 WQ BASIN
MOD. S-31.01 WQ BASIN
MOD. S-31.01 WQ BASIN
MOD. S-31.01 WQ BASIN
MOD. S-31.01 WQ BASIN
MOD. S-31.01 WQ BASIN
DETAIL
I-39300R
I-37015R
I-36160R
I-35888R
I-32951R
I-30680L
I-29075L
I-19000R
I-16665L
I-8170L
BeachDrive
BeachDrive
BeachDrive
BeachDrive
BeachDrive
BeachDrive
BeachDrive
BeachDrive
BeachDrive
BeachDrive
393+01.1
370+15.6
361+57.1
358+94.5
329+52.9
306+79.1
290+66.1
189+99.9
166+68.4
81+65.3
10.0
66.8
97.1
10.0
70.5
84.3
10.0
10.1
19.8
67.9
RT
RT
RT
RT
RT
LT
LT
RT
LT
RT
192.12
157.34
155.65
161.79
151.12
146.42
139.46
59.20
54.05
37.38
189.12
154.34
152.65
158.79
148.12
143.42
136.46
56.2
51.05
34.38
0.19
0.27
0.16
0.23
0.32
0.27
0.19
0.22
0.15
0.34
STRUCTURE ID BASELINE STATION OFFSET DIRECTION
INLET TYPE
WATER QUALITY
TOP ELEV.
INVERT ELEV.
PIPE OUT
BOTTOM ELEV.
WQ CHAMBER
TREATED [AC.]
IMPERVIOUS AREA
REVISED: 10/09
195.69
160.95
159.63
165.34
155.23
150.47
143.05
62.72
57.82
42.39
PRA-ROCR 3A6
E604-D
AMENDMENT 001
DESCRIPTION By
REVISIONS
Date
Plan sheet deleted from project TN 7/06/10
L
E
B Y
P L
O T
T E
D D
A T
E
U
S E
R N
A M
E
F I L
E
REG STATE PROJECT
SHEET
NO.
TOTAL
2 DC
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAILDETAIL APPROVED FOR USE XX/XX
S.21
WATER QUALITY INLET DETAIL
DETAIL
REVISED: 10/09
PRA-ROCR 3A6
E604-E
AMENDMENT 001
SHEETS
DESCRIPTION By
REVISIONS
L
E
B Y
P L
O T
T E
D D
A T
E
U
S E
R N
A M
E
F I L
E
REG STATE PROJECT
SHEET
NO.
TOTAL
2 DC
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAILDETAIL APPROVED FOR USE XX/XX
S.22
WATER QUALITY INLET DETAIL
DETAIL
REVISED: 10/09
PRA-ROCR 3A6
E604-F
AMENDMENT 001
SHEETS
DESCRIPTION By
REVISIONS
covers, painted black with ground and nut
Transformer base type
PENDANT POLE
SCALE: NONE
painted black
Octaflute tapered pole, o r a s d i r e c t e d
SECTION A-A
SCALE: NONE
A A
Span adapter as required pole top and pole top
Standard removable cast
R i s e
SCALE: NONE
TRANSFORMER BASE
0.5 2.0
.7
7.0
SS POP rivets
3/16" Dia. holes for
STEEL HINGE
316 STAINLESS
1/8"
Tapered 1/2 - 13
.0
1.125 0.625
.7 retainer
Grounding Nut
GROUNDING NUT RETAINER
stop
Latch
7 Ga.
FRONT VIEW OF BASE
hex nut. h.d. galvanized hex hd lock washer and heavy
4 pcs 1"-8 un x 4" long A325 connecting hardware.
Base to be furnished with
LATCH
head SS tamper resistant screw
1/2-13 x 2" Allen button
13/16"
SHIMS
DETAIL OF CLEATS
R 2.50
R 0.75
2.938
.0
.0
R 1.375
7 1/2"
.7
SCALE: NONE
BOTTOM VIEW OF BASE
SCALE: NONE
TOP VIEW OF BASE
13 1/4"
9 1/2" Dia.
11 1/2" Dia.
7"
/1 6"
15" Bolt circle
R 2"
16"
12 7/8"
SECTION B-B
SCALE: NONE
SECTION C-C
SCALE: NONE
SCALE: NONE
PLAN
3" Conduit
Formed Pedestal
30" as required circle shall be
B.C. "M" Bolt
Ground Rod
TYPICAL POLE FOUNDATION
SCALE: NONE
(IN THE GROUND)
4" projection
Schedule 40 with
3" PVC Conduit foundation around pole
1" Chamfer all
Finished Grade ground terminal to be connected to pole
#10 Copper ground wire
B B
3" Clr.
Equally spaced
8- #7
Concrete
Mix. No. 3
C C
Conduit inside 2" PVC
Ground Rod
30"
Diameter Ground Rod
15’-6"x3/4" Dia.
inside 2" conduit
3/4" Dia. Ground Rod
3" Conduit Manhole
3" Conduit formed pedestal
30" square
13 Tie @ 12" conduit inside 3"
Ground Rod spaced
8- 25 eqyally
U.S. CUSTOMARY DETAIL
DETAIL
BASE DETAILS
LIGHT POLE AND
E636-F
4" bolt projection
1" x 36"
Galvanized Anchor Bolt
1" x 36" x 4"
Anchor Bolts
TN
(see detail)
Cleats
NOTES:2
Revised anchor bolt size
TN 7/02/10
aluminum and painted black.
All transformer bases are designated as steel and painted black.
All poles are designated as galvanized
2.
1.
Added notes
7/02/10
S.57
M
P r o j e c ts r o c r
A ,1 (5 p r o j d e v D is tr ib u
A A m e n d m e n t\
M ic r o S ta ti o n f il e s s t6
1_ d e ta il .d g n
:2
:2
-J u l-
:2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REG STATE PROJECT SHEET NO.
DCNC PRA-ROCR 3A6
AMENDMENT 001
DESCRIPTIONNo. By Date
REVISIONS
Amendment 001 Questions/Clarifications Page 1 of 3
Questions/Clarifications
The following questions and issues were submitted via email at eflhd.contracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for the better clarity.
1. Sheet H.16 – Pole # 72 is not listed on the roadway lighting schedule (sheet BJ.1). Can it be assumed that this is a “ break-away” type installation?
Response: Pole 72 was inadvertently not included on the roadway lighting schedule. It should be installed with a breakaway base.
2. The Sheet H.16 indicates two pole removals, with no replacements. Is this the correct configuration?
Response: The poles as indicated on Sheet H.16 at Sta. 100+25 +/- and Sta. 101+75 +/-are existing lights that should not be removed.
3. Sheet H.5 – Poles #44 & 45 appear to be mounted on the retaining wall. There is a detail for installation of anchor bolts, but not for the actual installation of the pole itself. Do these poles require a transformer base or will they be mounted directly to the top of the retaining wall? If directly, should the poles be fitted with hand holes?
Response: Poles 43 and 45 are to be mounted on the retaining wall with anchor bases as indicated on Sheets H.5, R1, R2 and BJ.1. Hand holes are not required for anchor mounted poles.
4. Sheet B.14 – Tabulation of Quantities- Item #63620-0000 indicates a ¾-inch x 10 feet ground rod. Detail of foundations (sheet S.57) indicates a ¾-inch x 15 feet 6 inches.
Which is correct? The installation of the different size rods require two different configurations, with the short rods being mounted outside the foundation and the longer rods mounted within the foundation. Additionally, ground rods do not come in a 15 feet 6 -inches length, unless a 20 feet rod is modified (standard lengths are 8 feet, 10 feet, 12 feet, 15 feet, and 20 feet).
Response: All ground rods should be ¾-inch x 15-feet and need to be installed in the foundation.
5. S.57 Foundation detail calls for 1-inch x 72-inches anchor bolts in a 7 feet deep foundation. Regular installation for this pole configuration utilizes 1-inch x 40-inches anchor bolts, in a 5 feet deep foundation. Please clarify.
Amendment 001 Questions/Clarifications Page 2 of 3
Detail of anchor bolts on Detail E636-F indicates size to be 1” x 72” appears to be longer than a typically reinforced foundation. Please verify that the intended size is correct?
Response: Foundations should be 7 feet deep with four 1-inch x 36-inch x 4-inch anchor bolts. The size of the anchor bolts shown on Detail E636-F is incorrect. The correct size should be 1-inch x 36-inch x 4-inch. An amendment will be issued to revise Detail E636-F.
6. Some quantities bid item sheets appear to be incorrect, i.e. 63610-2200 3-inches PVC conduit, 1600 linear feet – after adding up the indicated lengths (from the contract drawings) the quantity should be closer to 1,750 linear feet.
Response: The bid quantity for 3-inch PVC Conduit should be 1,900 linear feet. The corrected quantity will be included in an amendment.
7. There are no quantities listed for cable connection kits. Are these costs to be included in the pole price or in the wire price?
Response: Cable connection kits will be installed by PEPCO.
8. The question is regarding the galvanized steel junction boxes listed as 6-inches x 6-inches x 8-inches. We are assuming, from the detail, that the 8-inches measurement is the depth of the box. This not a standard size box and, as such, would be much more expensive to obtain than a standard size (8-inches x 8-inches x 8-inches). Additionally these type of installations are made using a galvanized cast iron box (6-inches x 6-inches x 8-inches) not being standard. Please advise what the authority wishes, pursuant this problem.
Response: 8-inch x 8-inch x 8-inch junction boxes can be substituted for the 6-inch x 6-inch x 8-inch junction boxes indicated on the plans. Galvanized cast iron junction boxes can be substituted for the galvanized steel junction boxes indicated on the plans.
9. Detail of Pendant Pole on E636-F indicates pole and transformer base to be painted black. Is this just Paint only, or are the pole and transformer base to be galvanized and then painted black? No detail is provided in the plans that would indicate that the pole does not sit on a transformer base of any type (steel or aluminum).
Response: All poles are designated as galvanized steel and are to be painted black. All transformer bases are designated as aluminum and are to be painted black. More clarification on the poles and transformer bases will be included in an amendment.
10. Specification for Lighting Poles appears generic. Steel Octaflute Poles were used and installed on an adjacent project. Are poles to be generic round steel or aluminum, or are poles to be Steel Octaflute?
Response: The poles are to be steel octaflute and are to be painted black as shown on Detail E636-F.
Amendment 001 Questions/Clarifications Page 3 of 3
11. Is Type D epoxy that is required for pay items 63401-0700, 63401-0800, 63405-1300, and 63406-0400?
Response: Yes - Type D pavement markings are epoxy with type 1 glass beads as described in Subsections 634.01 and 718.15 of the FP, and are required for pay items 63401-0700, 63401-0800, 63405-1300, and 63406-0400. Please see Subsections 634.06 and 718.23 of the FP for other related construction and material requirements.
12. Bid Item 63620-0100 Pole, Type A (30 Foot Pendant Post, with Breakaway
Transformer Base) appears to be in conflict with detail on E636-F showing a Steel Transformer Base of 7 GA. Steel (as compared to Aluminum) does not meet the Federal Highway Standard for Breakaway?
Response: Light poles that are to be breakaway must have an acceptable breakaway base and be certified by NCHRP 350, TL-3. See the District Department of Transportation DWG 618.05, “Streetlight Transformer Base Details”.
13. Bid Item 63620-0200 Pole, Type B (30 Foot Pendant Post, Anchor Base). No detail is provided in the plans that would indicate that the pole does not sit on a transformer base of any type (steel or aluminum). Please verify that the pole mounts directly to the ground without a transformer base. Please verify that the poles mount directly to the ground without a transformer base?
Response: Yes - Anchor poles are not mounted on a transformer base.
14. Will milling and paving operations be allowed at night?
Response: No night work will be allowed on the project except for work on the hiker/biker trail at P Street as specified in Subsection 156.07 of the FP and SCR’s.
15. We are trying to bid the street lighting portion. We cannot find whether this fixture is
HPS or MH or LED? We are quoting all new street lighting projects as LED and need to confirm if this is acceptable? We cannot find this specified anywhere? MH is an outdated technology. LED is the new technology. What can we do to get this amended?
Response: The intent is to match the existing lighting on the Parkway south of P Street (installed under the 3A5 contract), which are 400 Watt Metal Halide. A change to LED or HPS will not be made during advertisement; the proposed change to the plans would have to be evaluated by the CO (and the owner) during construction.
Any questions received after this time will be answered on an individual response basis, unless another amendment is required.