The purpose of this Amendment is to 1) Replace the Solicitation Page B-10 to adjust quantities. 2) Revise the Plans to modify information related to quantities lighting and riprap and to delete inlet details. 3) Provide a summary of responses to question/clarifications asked by potential bidders. 4) The Bid Opening date has been extended to July 15 2010 at 2 00 pm EST.

View the file

Other files for this federal contract opportunity

Other files attached to Rock Creek & Potomac Parkway, newest first.
File Type Posted
Amendment 003 - PRA-ROCR 3A6.pdf PDF
Amendment 002 - PRA-ROCR 3A6.pdf PDF
Geotechnical Report —
IFB Solicitation - PRA-ROCR 3A6.pdf PDF
ARRA Sign Placement Guidance NPS.pdf PDF
REV__SB subcontract plan revised.doc DOC document
Geotechnical Report —
ADV_Bidder's Qualifications Form.doc DOC document
FP03_Eng .pdf PDF
Plans_Adv Sheets J1 to T25.pdf PDF
Plans_Adv Sheets A1 to H20.pdf PDF
FP03 Errata.pdf PDF
ARRA Sign Pictographs.pdf PDF
Synopsis PRA-ROCR 3A6.doc DOC document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7110B00015

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

PRA-ROCR 3A607/06/2010001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/10/2010

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment is to:

1) Replace the Solicitation Page B-10 to adjust quantities.

2) Revise the Plans to modify information related to quantities, lighting, and riprap, and to delete inlet details.

3) Provide a summary of responses to question/clarifications asked by potential bidders.

4) The Bid Opening date has been extended to July 15, 2010 at 2:00 pm EST.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Amendment No. 001 Amendment Info Page 1 of 1

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 001 Project PRA-ROCR 3A6

Rock Creek Park Solicitation: DTFH71-10-B-00015

The purpose of this Amendment is to:

1) Replace the Solicitation Page B-10 to adjust quantities.

2) Revise the Plans to modify information related to quantities, lighting, and riprap, and to delete inlet details.

3) Provide a summary of responses to question/clarifications asked by potential bidders.

Solicitation Provision changes

1. Delete Solicitation Bid Schedule page B-10 and substitute the amended Bid Schedule page B-

10.

Plan Sheet changes

1. Delete Plan Sheets B.14, BJ.1, H.16, R1, and S.57, and substitute amended Plan Sheets B.14, BJ.1, H.16, R1, and S.57.

2. Delete Plan Sheets S.20, S.21, and S.22. Plan Sheets S.20, S.21, and S.22 are not required for this project.

Pay Item No.

Estimated Quantity Unit Bid Price Amount Bid

B- 10 Amendment 0001

63502-2600 TEMPORARY TRAFFIC CONTROL, MOVING TEMPORARY CRASH

CUSHION

EACH $_______________ $___________________

63502-2800 TEMPORARY TRAFFIC CONTROL, REPLACEMENT BARRELS FOR CRASH

CUSHION

EACH $_______________ $___________________

63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER

1,550

LNFT $_______________ $___________________

63503-0500 TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE BARRIER

3,200

LNFT $_______________ $___________________

63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

115,800

LNFT $_______________ $___________________

63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL

10,300

LNFT $_______________ $___________________

63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

1,000

LNFT $_______________ $___________________

63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE FOR LOD STAKE-OUT

12,191

LNFT $_______________ $___________________

63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

SQFT $_______________ $___________________

63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

HOUR $_______________ $___________________

63610-0000 CONDUIT 3/4 INCH FLEXIBLE LIQUID TIGH

LNFT $_______________ $___________________

63610-2200 CONDUIT, 3-INCH, PVC

1,900

LNFT $_______________ $___________________

Project: PRA-ROCR 3A6

ROCK CREEK AND POTOMAC PARKWAY

Bid Schedule A

Number

Pole

Pole

Type of

Length

Mast Arm or Face of Curb

Setback, from Face of Guard Rail

Wattage

Luminaire

Base

Type of Pole Location Number

Pole

Pole

Type of

Length

Mast Arm or Face of Curb

Setback, from Face of Guard Rail

Wattage

Luminaire

Base

Type of Pole Location

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

ROADWAY LIGHTING

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

8 Feet

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

Pendant-30’

6 Feet

6 Feet

6 Feet

6 Feet

6 Feet

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Sta 701+93, L Shoreham

Sta 704+08, L Shoreham

Sta 705+24, R Shoreham

Sta 706+45, R Shoreham

Sta 707+64, L Shoreham

Sta 708+84, L Shoreham

Sta 710+04, L Shoreham

Sta 900+34 R Cathedral

Sta 902+80 L Cathedral

47+37, R

47+37, L

901+31, R location

Pullbox

Number

Pullbox

Breakaway

Breakaway

Breakaway

Breakaway

Anchor

Anchor

Anchor

Anchor

Anchor

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Anchor

Anchor

Anchor

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Anchor

Breakaway

Anchor

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Anchor

Anchor

Anchor

Anchor

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Breakaway

Sta 34+20, L RC&PP

Sta 35+80, R RC&PP

Sta 37+10 R, RC&PP

Sta 38+31, R RC&PP

Sta 39+41, R RC&PP

Sta 40+56, R RC&PP

Sta 41+97, R RC&PP

Sta 43+08, R RC&PP

Sta 44+13, R RC&PP

Sta 500+51, R NB RC&PP

Sta 501+60, L NB RC&PP

Sta 502+78, R NB RC&PP

Sta 504+10, L NB RC&PP

Sta 505+30, L NB RC&PP

Sta 506+63, R NB RC&PP

Sta 507+70, L NB RC&PP

Sta 509+05, R NB RC&PP

Sta 510+08, L NB RC&PP

Sta 511+28, R NB RC&PP

Sta 513+65, R NB RC&PP

Sta 514+98, L NB RC&PP

Sta 516+06, R NB RC&PP

Sta 517+07, L NB RC&PP

Sta 518+44, R NB RC&PP

Sta 519+66, L NB RC&PP

Sta 64+93, R SB RC&PP

Sta 63+93, L SB RC&PP

Sta 62+85, R SB RC&PP

Sta 61+60, L SB RC&PP

Sta 60+35, R SB RC&PP

Sta 59+19, L SB RC&PP

Sta 58+12, R SB RC&PP

Sta 56+67, L SB RC&PP

Sta 54+23, L SB RC&PP

Sta 53+16, R SB RC&PP

Sta 1002+00, R SB Waterside

Sta 1003+25, R SB Waterside

Sta 51+90, L SB RC&PP

Sta 50+84, R SB RC&PP

Sta 1004+70, R SB Waterside

Sta 49+35, L SB RC&PP

Sta 48+35, R SB RC&PP

Sta 47+12, L SB RC&PP

Sta 45+98, R SB RC&PP

Sta 44+88, L SB RC&PP

Sta 520+85, R NB RC&PP

Sta 522+09, R NB RC&PP

Sta 523+32, R NB RC&PP

Sta 525+61, R NB RC&PP

Sta 527+85, R NB RC&PP

Sta 529+87, R NB RC&PP

Sta 532+10, R NB RC&PP

Sta 66+23, L SB RC&PP

Sta 67+38, L SB RC&PP

Sta 69+14, L SB RC&PP

Sta 71+22, L SB RC&PP

Sta 73+55, L SB RC&PP

Sta 75+60, L SB RC&PP

Sta 79+22, R RC&PP

Sta 81+34, R RC&PP

Sta 82+09, L RC&PP

Sta 83+42, R RC&PP

Sta 85+85, R RC&PP

Sta 88+13, R RC&PP

Sta 90+13, R RC&PP

Sta 92+01, L RC&PP

Sta 92+89, R RC&PP

Sta 93+75, L RC&PP

Sta 94+75, R RC&PP

Sta 95+80, L RC&PP

Sta 96+59, R RC&PP

6 34+11, L

Utility Pullbox

44+88, L

47+12, L location

Pullbox

Number

Pullbox

Junction Box

6"x6"x8" Galvanized Steel

PROJECT PRA-ROCR 3A6

SCHEDULE OF LIGHTING POLES

Pendant-30’ 8 Feet 6 Feet 400 Breakaway Sta 700+83, L Shoreham

Sta 98+52, R RC&PP1

BJ.1

TN

its information

Added pole number 72 and 7/02/10

STERLING, VIRGINIA

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

F I L

E

B Y

P L

O T

T E

D D

A T

E

U

S E

R N

A M

E

F I L

E

U.S. DEPARTMENT OF TRANSPORTATION

AMENDMENT 001

DESCRIPTIONNo. By Date

REVISIONS

DC

REG STATE PROJECT

SHEET

NO.

TOTAL

SHEETS

NPS

NC100425

PRA-ROCR 3A6

ROCK CREEK PARK

STERLING, VIRGINIA

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

F I L

E

B Y

P L

O T

T E

D D

A T

E

U

S E

R N

A M

E

F I L

E

U.S. DEPARTMENT OF TRANSPORTATION

AMENDMENT 001

DESCRIPTIONNo. By Date

REVISIONS

DC

REG STATE PROJECT

SHEET

NO.

PRA-ROCR 3A6

ROCK CREEK PARK

SP

R

IN

G

" 3

N 40 ° 13’ 3

7.79" E

N 50° 02’ 37.29" E

P T

S

A

.7

+50

C

A

.7

+50

A

.4

+50 100 +50 101

A

.4

+50

+50

A

.0

PCC STA. 750

+83.08

P T

S T

A . 7

1+10

.8

E

N

Beach Dr.

M A

T

H

L I N

E

A . 9

M A

T

H

A . 1

S t a b l e n t r a n c e

20 20 400

HORIZONTAL SCALE IN FEET

STA.

+6

M

ATCH

LI

NE

C O

N C

E L E C

C o n n e c t i c u t

A v e n u e

R

STA. 97+50 TO STA. 102+50

ROADWAY LIGHTING

72 30’-20"x8’

Sta. 98+52 R

N 1297875.1 E 456908.2 A 10G2 3",8’

H.16

PRA-ROCR 3A6

END PROJECT

TN 7/02/10Removed street light symbol

DTREE

24"STONE

DTREE

ELEC

SPEED LIMIT

ELEC

DO NOT ENTER

EDGE WATER

2" 2"

4" 18

4"

" 24

P

A . 4

.4

P

A . 4

.0

P

A . 4

.5

A . 5

.0

P R

A . 5

1+

.7

STERLING, VIRGINIA

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

F I L

E

B Y

P L

O T

T E

D D

A T

E

U

S E

R N

A M

E

F I L

E

U.S. DEPARTMENT OF TRANSPORTATION

AMENDMENT 001

DESCRIPTIONNo. By Date

REVISIONS

DC

REG STATE PROJECT

SHEET

NO.

PRA-ROCR 3A6

ROCK CREEK PARK

RIP-RAP SECTION

Potomac Pkwy.

SB Rock Creek &

B ConstructionL

Not to Scale rip-rap

Top of proposed of wall

Front face

Ground Line at Curb

Proposed finished

Varies m i n

Class 4 rip-rap

Geotextile, Type IV-C

Rock creek stream bed

1V:1.5H

+50

A . 1

.5

A . 1

.7

+50

A . 10

.0

100+00

SB Rock Creek &

103+00 +50 102+00 101+00+50

Datum EL. 00.00

RCK-6

RCK-5

RCK-4

SCALE: 1" = 20’

PLAN

SCALE: 1" = 20’

ELEVATION

GENERAL NOTES:

EL. 13.00

EL. 22.48(+)-

EL. 13.00

EL. 16.50

EL. 28.84(+)-

Potomac ParkwayWB-3 WB-2

WB-1

Outlet spacing

Drain pipe

Top of Coping

Joint

Contraction

Bottom of Footing

Drain

Drain

Joint

Expansion

Joint

Contraction

Joint

Expansion

Outlet (Typ.)

Drain pipe

EL. 9.75

Joint

Contraction elevation at curb

Proposed Roadway face of retaining wall

Proposed elevation at front

335’-0"

103+00 +50 102+00 +50 101+00 +50

Expansion connection Standard 617-64 (Typ.)

timber guardrail with TL-2

Transition to steel-backed

(Typ.)

T y p

(Typ.) (Typ.)

(Typ.)

Notes:

30’-0" 30’-0" 30’-0" 30’-0"

8’-0"

30’-0" 30’-0" 30’-0" 30’-0"

5’-0" 5’-0"

10’-0"

30’-0" 25’-0"

100+00

Contraction

B Construction

SB Rock Creek &

Potomac Pkwy.

End Retaining Wall

Sta. 103+35.00

Offset 2’-0", Lt.

Front face of

Retaining Wall

Concrete Design: Service Load design method, fc = 1800 psi.

Reinforcing steel Design: fs = 24,000 psi.

Minimum cover for any bar shall be 2" unless otherwise noted, with the exception of bars at the bottom and sides of all footings which shall have a 3" minimum cover.

ONLY GRADE 60 CAN BE USED ON THIS PROJECT.

EL. 11.50

EL. 10.25

Drain pipe (Typ.)

+50 +50 +50

+50

+50

47+00 46+00

45+00

44+00

502+00

+50

+50

501+00

500+00 and Bridges on Federal Highway Projects, FP-03.

Standard Specifications for construction of Roads

4,500 pound per square inch 28-day compressive strength.

All retaining wall concrete shall be class A(AE) with a minimum

The work shall be Class B Masonry consisting of stone veneer

(4" Min., 6" Max.) with dovetail anchors and rustic mortar joints

R1 two per coping piece minimum, set 1" minimum into coping stone.

with 1/2" diameter x 4" long stainless steel dowels at 1’-0" c/c, 2’-0" minimum vertical spacing. Coping stones shall be secured galvanized metal corrugated dovetail anchor straps at metal at 2’-0" c/c minimum horizontal spacing with 1" wide 8 gauge

Section 620. Dovetail slots shall be 24 gauge minimum galvanized to the concrete wall. Construction of stone facing shall follow

(see note)

Wall curve adjacent tangent lines.

2’-0" offset with a five degree maximum deflection angle between

The wall structure may be a series of tangent lines that maintain

The offset line curve for the wall at 2’-0" offset R = 523.00’.

The Base Line curve at face of curb R = 525.00’.

Retaining Wall curve data:

EL. 24.00 EL. 24.30

EL. 24.71

EL. 25.11

EL. 25.65

EL. 26.32 EL. 27.05

EL. 28.80

EL. 27.78

EL. 29.11

EL. 29.74

5°0’0" (Max.)

EL. 30.09 +( )-

Reinforcing steel shall conform to A 615, Grade 60.

Light pole base (typ.)

Class 4 rip-rap

Turf establishment (typ.)

Rip-rap:

Stone Facing:

Steel:

Reinforcing

Concrete:

Specifications:

Coping to be 6" minimum thickness quarried field stone doweled for placement of rip-rap.

horizontal extent of class 4 rip-rap. Refer to Stream Diversion Plan

Refer to plan view and roadway cross-sections 44+00 to 47+00 for

Limits of shoring and bracing

1’-6"

Limits of shoring and bracing

20’-0" 20’-0"

Joint

Contraction to match other walls within the park as directed by the CO.

N62°11’04.52"W

Begin Retaining Wall

Sta. 100+00.00

Offset 2’-0", Lt.

Sta. 43+88.00

Offset 24.4’, Rt. =

20 20 400

HORIZONTAL SCALE IN FEET

TNRevised slope notation 7/02/10

GENERAL PLAN & ELEVATION

STA. 100+00 TO STA. 103+35

SB ROCK CREEK & POTOMAC PARKWAY

RETAINING WALL ON

F

L

E

B Y

P L

O T

T E

D D

A T

E

U

S E

R N

A M

E

F I L

E

REG STATE PROJECT

SHEET

NO.

TOTAL

SHEETS

2 DC

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

DETAILDETAIL APPROVED FOR USE XX/XX

S.20

WATER QUALITY INLET DETAIL

WATER QUALITY INLET SCHEDULE

MOD. S-31.01 WQ BASIN

MOD. S-31.01 WQ BASIN

MOD. S-31.01 WQ BASIN

MOD. S-31.01 WQ BASIN

MOD. S-31.01 WQ BASIN

MOD. S-31.01 WQ BASIN

MOD. S-31.01 WQ BASIN

MOD. S-31.01 WQ BASIN

MOD. S-31.01 WQ BASIN

MOD. S-31.01 WQ BASIN

DETAIL

I-39300R

I-37015R

I-36160R

I-35888R

I-32951R

I-30680L

I-29075L

I-19000R

I-16665L

I-8170L

BeachDrive

BeachDrive

BeachDrive

BeachDrive

BeachDrive

BeachDrive

BeachDrive

BeachDrive

BeachDrive

BeachDrive

393+01.1

370+15.6

361+57.1

358+94.5

329+52.9

306+79.1

290+66.1

189+99.9

166+68.4

81+65.3

10.0

66.8

97.1

10.0

70.5

84.3

10.0

10.1

19.8

67.9

RT

RT

RT

RT

RT

LT

LT

RT

LT

RT

192.12

157.34

155.65

161.79

151.12

146.42

139.46

59.20

54.05

37.38

189.12

154.34

152.65

158.79

148.12

143.42

136.46

56.2

51.05

34.38

0.19

0.27

0.16

0.23

0.32

0.27

0.19

0.22

0.15

0.34

STRUCTURE ID BASELINE STATION OFFSET DIRECTION

INLET TYPE

WATER QUALITY

TOP ELEV.

INVERT ELEV.

PIPE OUT

BOTTOM ELEV.

WQ CHAMBER

TREATED [AC.]

IMPERVIOUS AREA

REVISED: 10/09

195.69

160.95

159.63

165.34

155.23

150.47

143.05

62.72

57.82

42.39

PRA-ROCR 3A6

E604-D

AMENDMENT 001

DESCRIPTION By

REVISIONS

Date

Plan sheet deleted from project TN 7/06/10

L

E

B Y

P L

O T

T E

D D

A T

E

U

S E

R N

A M

E

F I L

E

REG STATE PROJECT

SHEET

NO.

TOTAL

2 DC

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

DETAILDETAIL APPROVED FOR USE XX/XX

S.21

WATER QUALITY INLET DETAIL

DETAIL

REVISED: 10/09

PRA-ROCR 3A6

E604-E

AMENDMENT 001

SHEETS

DESCRIPTION By

REVISIONS

L

E

B Y

P L

O T

T E

D D

A T

E

U

S E

R N

A M

E

F I L

E

REG STATE PROJECT

SHEET

NO.

TOTAL

2 DC

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

DETAILDETAIL APPROVED FOR USE XX/XX

S.22

WATER QUALITY INLET DETAIL

DETAIL

REVISED: 10/09

PRA-ROCR 3A6

E604-F

AMENDMENT 001

SHEETS

DESCRIPTION By

REVISIONS

covers, painted black with ground and nut

Transformer base type

PENDANT POLE

SCALE: NONE

painted black

Octaflute tapered pole, o r a s d i r e c t e d

SECTION A-A

SCALE: NONE

A A

Span adapter as required pole top and pole top

Standard removable cast

R i s e

SCALE: NONE

TRANSFORMER BASE

0.5 2.0

.7

7.0

SS POP rivets

3/16" Dia. holes for

STEEL HINGE

316 STAINLESS

1/8"

Tapered 1/2 - 13

.0

1.125 0.625

.7 retainer

Grounding Nut

GROUNDING NUT RETAINER

stop

Latch

7 Ga.

FRONT VIEW OF BASE

hex nut. h.d. galvanized hex hd lock washer and heavy

4 pcs 1"-8 un x 4" long A325 connecting hardware.

Base to be furnished with

LATCH

head SS tamper resistant screw

1/2-13 x 2" Allen button

13/16"

SHIMS

DETAIL OF CLEATS

R 2.50

R 0.75

2.938

.0

.0

R 1.375

7 1/2"

.7

SCALE: NONE

BOTTOM VIEW OF BASE

SCALE: NONE

TOP VIEW OF BASE

13 1/4"

9 1/2" Dia.

11 1/2" Dia.

7"

/1 6"

15" Bolt circle

R 2"

16"

12 7/8"

SECTION B-B

SCALE: NONE

SECTION C-C

SCALE: NONE

SCALE: NONE

PLAN

3" Conduit

Formed Pedestal

30" as required circle shall be

B.C. "M" Bolt

Ground Rod

TYPICAL POLE FOUNDATION

SCALE: NONE

(IN THE GROUND)

4" projection

Schedule 40 with

3" PVC Conduit foundation around pole

1" Chamfer all

Finished Grade ground terminal to be connected to pole

#10 Copper ground wire

B B

3" Clr.

Equally spaced

8- #7

Concrete

Mix. No. 3

C C

Conduit inside 2" PVC

Ground Rod

30"

Diameter Ground Rod

15’-6"x3/4" Dia.

inside 2" conduit

3/4" Dia. Ground Rod

3" Conduit Manhole

3" Conduit formed pedestal

30" square

13 Tie @ 12" conduit inside 3"

Ground Rod spaced

8- 25 eqyally

U.S. CUSTOMARY DETAIL

DETAIL

BASE DETAILS

LIGHT POLE AND

E636-F

4" bolt projection

1" x 36"

Galvanized Anchor Bolt

1" x 36" x 4"

Anchor Bolts

TN

(see detail)

Cleats

NOTES:2

Revised anchor bolt size

TN 7/02/10

aluminum and painted black.

All transformer bases are designated as steel and painted black.

All poles are designated as galvanized

2.

1.

Added notes

7/02/10

S.57

M

P r o j e c ts r o c r

A ,1 (5 p r o j d e v D is tr ib u

A A m e n d m e n t\

M ic r o S ta ti o n f il e s s t6

1_ d e ta il .d g n

:2

:2

-J u l-

:2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

REG STATE PROJECT SHEET NO.

DCNC PRA-ROCR 3A6

AMENDMENT 001

DESCRIPTIONNo. By Date

REVISIONS

Amendment 001 Questions/Clarifications Page 1 of 3

Questions/Clarifications

The following questions and issues were submitted via email at eflhd.contracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for the better clarity.

1. Sheet H.16 – Pole # 72 is not listed on the roadway lighting schedule (sheet BJ.1). Can it be assumed that this is a “ break-away” type installation?

Response: Pole 72 was inadvertently not included on the roadway lighting schedule. It should be installed with a breakaway base.

2. The Sheet H.16 indicates two pole removals, with no replacements. Is this the correct configuration?

Response: The poles as indicated on Sheet H.16 at Sta. 100+25 +/- and Sta. 101+75 +/-are existing lights that should not be removed.

3. Sheet H.5 – Poles #44 & 45 appear to be mounted on the retaining wall. There is a detail for installation of anchor bolts, but not for the actual installation of the pole itself. Do these poles require a transformer base or will they be mounted directly to the top of the retaining wall? If directly, should the poles be fitted with hand holes?

Response: Poles 43 and 45 are to be mounted on the retaining wall with anchor bases as indicated on Sheets H.5, R1, R2 and BJ.1. Hand holes are not required for anchor mounted poles.

4. Sheet B.14 – Tabulation of Quantities- Item #63620-0000 indicates a ¾-inch x 10 feet ground rod. Detail of foundations (sheet S.57) indicates a ¾-inch x 15 feet 6 inches.

Which is correct? The installation of the different size rods require two different configurations, with the short rods being mounted outside the foundation and the longer rods mounted within the foundation. Additionally, ground rods do not come in a 15 feet 6 -inches length, unless a 20 feet rod is modified (standard lengths are 8 feet, 10 feet, 12 feet, 15 feet, and 20 feet).

Response: All ground rods should be ¾-inch x 15-feet and need to be installed in the foundation.

5. S.57 Foundation detail calls for 1-inch x 72-inches anchor bolts in a 7 feet deep foundation. Regular installation for this pole configuration utilizes 1-inch x 40-inches anchor bolts, in a 5 feet deep foundation. Please clarify.

Amendment 001 Questions/Clarifications Page 2 of 3

Detail of anchor bolts on Detail E636-F indicates size to be 1” x 72” appears to be longer than a typically reinforced foundation. Please verify that the intended size is correct?

Response: Foundations should be 7 feet deep with four 1-inch x 36-inch x 4-inch anchor bolts. The size of the anchor bolts shown on Detail E636-F is incorrect. The correct size should be 1-inch x 36-inch x 4-inch. An amendment will be issued to revise Detail E636-F.

6. Some quantities bid item sheets appear to be incorrect, i.e. 63610-2200 3-inches PVC conduit, 1600 linear feet – after adding up the indicated lengths (from the contract drawings) the quantity should be closer to 1,750 linear feet.

Response: The bid quantity for 3-inch PVC Conduit should be 1,900 linear feet. The corrected quantity will be included in an amendment.

7. There are no quantities listed for cable connection kits. Are these costs to be included in the pole price or in the wire price?

Response: Cable connection kits will be installed by PEPCO.

8. The question is regarding the galvanized steel junction boxes listed as 6-inches x 6-inches x 8-inches. We are assuming, from the detail, that the 8-inches measurement is the depth of the box. This not a standard size box and, as such, would be much more expensive to obtain than a standard size (8-inches x 8-inches x 8-inches). Additionally these type of installations are made using a galvanized cast iron box (6-inches x 6-inches x 8-inches) not being standard. Please advise what the authority wishes, pursuant this problem.

Response: 8-inch x 8-inch x 8-inch junction boxes can be substituted for the 6-inch x 6-inch x 8-inch junction boxes indicated on the plans. Galvanized cast iron junction boxes can be substituted for the galvanized steel junction boxes indicated on the plans.

9. Detail of Pendant Pole on E636-F indicates pole and transformer base to be painted black. Is this just Paint only, or are the pole and transformer base to be galvanized and then painted black? No detail is provided in the plans that would indicate that the pole does not sit on a transformer base of any type (steel or aluminum).

Response: All poles are designated as galvanized steel and are to be painted black. All transformer bases are designated as aluminum and are to be painted black. More clarification on the poles and transformer bases will be included in an amendment.

10. Specification for Lighting Poles appears generic. Steel Octaflute Poles were used and installed on an adjacent project. Are poles to be generic round steel or aluminum, or are poles to be Steel Octaflute?

Response: The poles are to be steel octaflute and are to be painted black as shown on Detail E636-F.

Amendment 001 Questions/Clarifications Page 3 of 3

11. Is Type D epoxy that is required for pay items 63401-0700, 63401-0800, 63405-1300, and 63406-0400?

Response: Yes - Type D pavement markings are epoxy with type 1 glass beads as described in Subsections 634.01 and 718.15 of the FP, and are required for pay items 63401-0700, 63401-0800, 63405-1300, and 63406-0400. Please see Subsections 634.06 and 718.23 of the FP for other related construction and material requirements.

12. Bid Item 63620-0100 Pole, Type A (30 Foot Pendant Post, with Breakaway

Transformer Base) appears to be in conflict with detail on E636-F showing a Steel Transformer Base of 7 GA. Steel (as compared to Aluminum) does not meet the Federal Highway Standard for Breakaway?

Response: Light poles that are to be breakaway must have an acceptable breakaway base and be certified by NCHRP 350, TL-3. See the District Department of Transportation DWG 618.05, “Streetlight Transformer Base Details”.

13. Bid Item 63620-0200 Pole, Type B (30 Foot Pendant Post, Anchor Base). No detail is provided in the plans that would indicate that the pole does not sit on a transformer base of any type (steel or aluminum). Please verify that the pole mounts directly to the ground without a transformer base. Please verify that the poles mount directly to the ground without a transformer base?

Response: Yes - Anchor poles are not mounted on a transformer base.

14. Will milling and paving operations be allowed at night?

Response: No night work will be allowed on the project except for work on the hiker/biker trail at P Street as specified in Subsection 156.07 of the FP and SCR’s.

15. We are trying to bid the street lighting portion. We cannot find whether this fixture is

HPS or MH or LED? We are quoting all new street lighting projects as LED and need to confirm if this is acceptable? We cannot find this specified anywhere? MH is an outdated technology. LED is the new technology. What can we do to get this amended?

Response: The intent is to match the existing lighting on the Parkway south of P Street (installed under the 3A5 contract), which are 400 Watt Metal Halide. A change to LED or HPS will not be made during advertisement; the proposed change to the plans would have to be evaluated by the CO (and the owner) during construction.

Any questions received after this time will be answered on an individual response basis, unless another amendment is required.