Project Description_GrangemontRd.pdf

PDF 29 KB Posted

Attached to
ID PFH CDP 67(2), GRANGEMONT ROAD Federal contract opportunity
Solicitation number
DTFH70-09-B-00016
Issued by
Department of Transportation Federal Highway Administration

About this file

Project Description

View the file

Other files for this federal contract opportunity

Other files attached to ID PFH CDP 67(2), GRANGEMONT ROAD, newest first.
File Type Posted
AMD A001_grangemont.pdf PDF
http //www.wfl.fhwa.dot.gov/contracting/construction/plans/grangemont/ —
IFB_SOL_Grangemont.pdf PDF
PlanRequestForm_Grangemont.pdf PDF
Call for HUBZone interest_GrangemontRd.pdf PDF
PreliminaryPlans_Grangemont Road Project.pdf PDF
Prelim Letter_Grangemont.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID PFH CDP 67(2), GRANGEMONT ROAD, Clearwater County, Idaho

This project is being solicited under two bid schedules designated A and B.

Schedules A and B represent alternate amounts of work (Schedule A includes 2 ½ inches of asphalt; Schedule B includes 3 inches). One schedule will be awarded.

Both schedules include asphalt pulverizing, cement aggregate stabilizing of base, paving, ditching reconditioning, guardrail installation and striping, and other small items of work.

Project length: 18.8 Miles (both schedules)

Fixed Completion Date: September 17, 2010 (both schedules)

Estimated Price Range: $7 million to $10 million

Location: 3 Miles NE of Orofino, Idaho

DESCRIPTION OF WORK in US CUSTOMARY UNITS

DIVISION 150 –Project Requirements 152 Construction Survey & Staking X YES NO 153 Contractor Quality Control and Assurance X YES NO 154 Contractor Sampling & Testing X YES NO 155 Schedules for Construction Contracts (construction schedules) X YES NO 157 Soil Erosion Control Devices (erosion control devices) 1000 lnft 158 Watering for Dust Control 3000 MGAL

DIVISION 300 –Aggregate Courses 303 Road Reconditioning (In-place pulverizing) 290,044 SQYD 303 Cement aggregate stabilization 290,044 SQYD 304 Cement 2,402 TON

DIVISION 400 –Asphalt Pavements & Surface Treatments 401 Superpave Hot Asphalt Concrete Pavement Sche A:39,279 TON

Sche B: 47,134 TON 411 Asphalt Prime Coat (asphalt surface treatment) 169 TON 412 Asphalt Tack Coat (asphalt surface treatment) 15 TON

DIVISION 600 –Incidental Construction 617 Guardrail 3,427 LNFT 622 Rental Equipment X YES NO 633 Permanent Traffic Control Devices (traffic control devices)

(signs) 400 SQFT 634 Permanent Pavement Markings (traffic pavement markings) 374,000 LNFT 635 Temporary Traffic Control (traffic control –flaggers & pilot cars)

Flagger: Hours:1000 Pilot Car: Hours: 350

File details come from the government source that posted it. Updated .