A004.pdf
PDF 2 MB Posted
- Attached to
- CA FLAP SR36(13) State Route 36 Federal contract opportunity
- Solicitation number
- DTFH6817B00004
About this file
Amendment A004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Tabs.pdf | ||
| CA_FLAP_SR36_Bid_Opening_Summary.pdf | ||
| SR36_Phase_2_SWPPP.pdf | ||
| A005.pdf | ||
| QnA_4.24.17.pdf | ||
| A003.pdf | ||
| QnA_4.20.17.pdf | ||
| QnA_4.18.17.pdf | ||
| Sign-in_Sheet.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| QnA_4.11.17.pdf | ||
| QnA_4.4.17.pdf | ||
| CA_FLAP_SR36(13)_Plans.pdf | ||
| DTFH6817B00004.pdf | ||
| CA_FLAP_SR_36(13)_Final_Pavement_and_Materials_Report.pdf | ||
| CA.FLAP.SR36(13).State_Road_36_Humboldt_County.Final_Geotech.2016.pdf | ||
| Van_Duzen_CA_sr36(1)_Final_Hydraulic_Report__December_2014.pdf | ||
| CA_FLAP_SR36(13)_X-Sections.pdf | ||
| CA.FLAP.SR36(13).State_Road_36_Humboldt_County.GDR.2014.pdf | ||
| CA.FLAP.SR36(13).State_Road_36_Humboldt_County.Geophysical_Rpt.2014.pdf | ||
| SR36_ISA_FINAL.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Sheet and Description
B11 B12 B13 - B18 B19 B20 B22 - B24 B25 - B28 B29 B30 B31 - B32
Grading Summary
Surfacing Summary
Drainage Summary
Surveying Summary
Erosion Control
Summary
Removals Summaries
Miscellaneous Summaries
Permanent Traffic Control
Summaries
Pavement Markings
Summaries
Temporary Traffic Control
Summaries ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15206-0000 SLOPE, REFERENCE, AND CLEARING
AND GRUBBING STAKE STA 192.390 192.390
A0060 15214-2000 SURVEY AND STAKING, RETAINING WALL LPSM ALL ALL
A0080 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 48 48
A0100 15216-2000 SURVEY AND STAKING, GRADE
FINISHING STAKES STA 384.780 384.780
A0120 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0140 15401-0000 CONTRACTOR TESTING LPSM ALL
A0160 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0180 15703-2500 SOIL EROSION CONTROL, MULCHING,
HYDRAULIC METHOD ACRE 38.9 1.1 40.0
A0200 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 19,512 488 20,000
A0220 15705-0300 SOIL EROSION CONTROL, SLOPE DRAINS LNFT 485 15 500
A0240 15705-1400 SOIL EROSION CONTROL, SEDIMENT LOG LNFT 44,926 2,074 47,000
A0260 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 637 13 650
A0280 15706-1100 SOIL EROSION CONTROL, INLET
PROTECTION TYPE A EACH 24 1 25
A0300 15706-1600 SOIL EROSION CONTROL, STABILIZED
CONSTRUCTION ENTRANCE EACH 4 4
A0320 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0340 20101-0000 CLEARING AND GRUBBING ACRE 55.6 0.4 56.0
A0360 20304-1000 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS LPSM ALL ALL
A0380 20401-0000 ROADWAY EXCAVATION CUYD 342,529 17,471 360,000
A0400 20441-0000 WASTE CUYD 27,459 1,541 29,000
A0420 20701-1300 EARTHWORK GEOTEXTILE, TYPE IV-B
(WOVEN) SQYD 113,783 6,217 120,000
A0440 20703-1000 GEOGRID, UNIAXIAL (TYPE VII-A) SQYD 44,771 2,229 47,000
A0460 20703-1000 GEOGRID, UNIAXIAL (TYPE VII-B) SQYD 41,079 2,421 43,500
A0480 20802-0000 FOUNDATION FILL (REINFORCED) CUYD 470 20 490
A0500 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 31,823 1,177 33,000
A0520 25101-2000 PLACED RIPRAP, CLASS 2 CUYD 380 20 400
A0540 25101-3000 PLACED RIPRAP, CLASS 3 CUYD 95 5 100
A0560 25101-4000 PLACED RIPRAP, CLASS 4 CUYD 305 15 320
A0580 25101-5000 PLACED RIPRAP, CLASS 5 CUYD 201 9 210
A0600 25201-0000 SPECIAL ROCK EMBANKMENT CUYD 21,517 1,983 23,500
A0620 25205-0000 ROCK BUTTRESS CUYD 12,011 1,189 13,200
-A pr -2
9:
A M
N
C A \s r3 6(
R oa dw ay
\C A D
D _S he et s\ B -S um m
\S pr ea ds he et s\ [E st im at e-
_S ch ed ul e_
A.
xl sx ]S he et
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
FLAP SR 36(13)CA
SHEET
NUMBER
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
DTFH6817B00004
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
03/24/2017
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
HFLCPM1700000093PR
6. PROJECT NO.
CA FLAP SR 36(13)
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
Ryan Phillips, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-03, U.S. CUSTOMARY UNITS
7. SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-03 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 4/25/17 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53-236-1(e)
X
X
X
X
X
A-1 dment A004
4/28/17
Amen ryan.d.phillips Line
B I D S C H E D U L E Schedule A Account: ALL
Project No: CA FLAP SR 36(13)
Name: STATE ROUTE 36 CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
20441-0000 Line A0400 29,000 CUYD $ $
20701-1300 Line A0420 120,000 SQYD $ $
20703-1000 Line A0440 47,000 SQYD $ $
20703-1000 Line A0460 43,500 SQYD $ $
20802-0000 Line A0480 490 CUYD $ $
21101-1000 Line A0500 33,000 SQYD $ $
25101-2000 Line A0520 400 CUYD $ $
25101-3000 Line A0540 100 CUYD $ $
25101-4000 Line A0560 320 CUYD $ $
25101-5000 Line A0580 210 CUYD $ $
25201-0000 Line A0600 23,500 CUYD $ $
25205-0000 Line A0620 13,200 CUYD $ $
25501-1000 Line A0640 8,000 SQFT $ $
25901-0000 Line A0660 11,400 LNFT $ $
30101-0000 Line A0680 41,000 TON $ $
30501-0000 Line A0700 1,850 TON $ $
40101-5600 Line A0720 21,100 TON $ $
40105-3000 Line A0740 220 TON $ $
40301-0000 Line A0760 4,200 TON $ $
ROCK BUTTRESS
MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE
SOIL NAIL
WASTE
EARTHWORK GEOTEXTILE, TYPE IV-B (WOVEN)
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, CLASS 2
PLACED RIPRAP, CLASS 3
PLACED RIPRAP, CLASS 4
PLACED RIPRAP, CLASS 5
SPECIAL ROCK EMBANKMENT
GEOGRID, UNIAXIAL (TYPE VII-A)
GEOGRID, UNIAXIAL (TYPE VII-B)
FOUNDATION FILL (REINFORCED)
ANTISTRIP ADDITIVE, TYPE 3
HOT ASPHALT CONCRETE PAVEMENT
AGGREGATE BASE
AGGREGATE-TOPSOIL COURSE
SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
A-10 Amendment A004
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| Amendment AA01 NV FTNP LAKE 114(1) Plan Sheets.pdf |
| A01_TTL w-DDR-006.pdf |
| A05_TYP_01-001.pdf |
| A06_TYP_02-002.pdf |
| A07_TYP_03-003.pdf |
| A08_TYP_04-004.pdf |
| A09_TYP_05-005.pdf |
| T20 Change.pdf |
| A01 |
| A02 |
| A03 |
| A04 |
| A05 |
| A06 |
| A07 |
| A08 |
| B1-5 |
| B6-9 |
| B10 |
| B11 |
| B12 |
| B13 |
| B14 |
| B15 |
| B16 |
| B17 |
| B18 |
| B19 |
| B20 |
| B21 |
| B22 |
| B23 |
| B24 |
| B25 |
| B26 |
| B27 |
| B28 |
| B29 |
| B30 |
| B31 |
| B32 |
| B33 |
| C1 |
| C2 |
| C3A |
| C3B |
| C4 |
| C5 |
| C6 |
| C7 |
| C8A |
| C8B |
| C9 |
| C10 |
| C11 |
| C12 |
| C13 |
| C14 |
| C15 |
| D1 |
| D2 |
| D3 |
| D4 |
| D5 |
| D6 |
| D7 |
| D8 |
| D9 |
| D10 |
| D11 |
| E1 |
| E2 |
| E3 |
| E4 |
| E5 |
| E6 |
| E7 |
| E8 |
| E9 |
| E10 |
| E11 |
| E12 |
| E13 |
| E14 |
| E15 |
| E16 |
| E17 |
| E18 |
| E19 |
| E20 |
| E21 |
| E22 |
| E23 |
| E24 |
| E25 |
| E26 |
| E27 |
| E28 |
| E29 |
| E30 |
| E31-36 |
| F01 |
| F02 |
| F03 |
| F04 |
| G01 |
| G02 |
| G03 |
| G04 |
| G05 |
| G06 |
| G07 |
| G08 |
| G09 |
| G10 |
| K01 |
| K02 |
| S01 |
| T01-05 |
| T06 |
| T07-10 |
| T11 |
| T12 |
| T13-20 |
| T21 |
| T22-27 |
| T28 |
| T29-36 |
| T37 |
| T38-42 |
| T43 |
| T44 |
| U01 |
| U02 |
| U03 |
| U04 |
| U05 |
| U06 |
| U07 |
| U08 |
| U09 |
| U10 |
| U11 |
| U12 |
| U13 |
| U14 |
| U15 |
| U16 |
| U17 |
| U18 |
| U19 |
| U20 |
| U21 |
| U22 |
| U23 |
| U24 |
| U25 |
| U26 |
| V01-V03 |
| V04 |
| V05 |
| V06 |
| V07-16 |
| W01 |
| W02 |
| W03-09 |
| A1-9.pdf |
| A1 |
| A2 |
| A3 |
| A4 |
| A5 |
| A6 |
| A7 |
| A8 |
| A9 |
| T20 Change.pdf |
| A01 |
| A02 |
| A03 |
| A04 |
| A05 |
| A06 |
| A07 |
| A08 |
| B1-5 |
| B6-9 |
| B10 |
| B11 |
| B12 |
| B13 |
| B14 |
| B15 |
| B16 |
| B17 |
| B18 |
| B19 |
| B20 |
| B21 |
| B22 |
| B23 |
| B24 |
| B25 |
| B26 |
| B27 |
| B28 |
| B29 |
| B30 |
| B31 |
| B32 |
| B33 |
| C1 |
| C2 |
| C3A |
| C3B |
| C4 |
| C5 |
| C6 |
| C7 |
| C8A |
| C8B |
| C9 |
| C10 |
| C11 |
| C12 |
| C13 |
| C14 |
| C15 |
| D1 |
| D2 |
| D3 |
| D4 |
| D5 |
| D6 |
| D7 |
| D8 |
| D9 |
| D10 |
| D11 |
| E1 |
| E2 |
| E3 |
| E4 |
| E5 |
| E6 |
| E7 |
| E8 |
| E9 |
| E10 |
| E11 |
| E12 |
| E13 |
| E14 |
| E15 |
| E16 |
| E17 |
| E18 |
| E19 |
| E20 |
| E21 |
| E22 |
| E23 |
| E24 |
| E25 |
| E26 |
| E27 |
| E28 |
| E29 |
| E30 |
| E31-36 |
| F01 |
| F02 |
| F03 |
| F04 |
| G01 |
| G02 |
| G03 |
| G04 |
| G05 |
| G06 |
| G07 |
| G08 |
| G09 |
| G10 |
| K01 |
| K02 |
| S01 |
| T01-05 |
| T06 |
| T07-10 |
| T11 |
| T12 |
| T13-20 |
| T21 |
| T22-27 |
| T28 |
| T29-36 |
| T37 |
| T38-42 |
| T43 |
| T44 |
| U01 |
| U02 |
| U03 |
| U04 |
| U05 |
| U06 |
| U07 |
| U08 |
| U09 |
| U10 |
| U11 |
| U12 |
| U13 |
| U14 |
| U15 |
| U16 |
| U17 |
| U18 |
| U19 |
| U20 |
| U21 |
| U22 |
| U23 |
| U24 |
| U25 |
| U26 |
| V01-V03 |
| V04 |
| V05 |
| V06 |
| V07-16 |
| W01 |
| W02 |
| W03-09 |
| A1-9.pdf |
| A1 |
| A2 |
| A3 |
| A4 |
| A5 |
| A6 |
| A7 |
| A8 |
| A9 |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 5 |
| Text3: |
| 0: A004 |
| 1: 4/24/2017 |
| 2: |
| 0: |
| 1: CA FLAP SR36(13) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: RYAN PHILLIPS
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH681B00004 |
| 1: 3/24/2017 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Off |
| 1: |
| 0: |
| 0: Yes |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: |
BID DUE DATE HAS BEEN EXTENDED TO 4/28/17. SEE ATTACHED SF1442 FOR DETAILS.
PLANS
Remove and replace pages B1 and B26 with attached corresponding pages.
BID SCHEDULE
Remove and replace page A10 with attached corresponding page.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .