CA-BLM5910(1)-100_plans.pdf
PDF 7 MB Posted
- Attached to
- CA-BLM-5910(1) Federal contract opportunity
- Solicitation number
- DTFH6815B00003
About this file
Plans for CA BLM 5910(1) E. Fork Kaweah River Bridge.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Tabulation_Report.pdf | ||
| Bid_Tabulation_Report.pdf | ||
| Kaweah_Bid_Summary.pdf | ||
| Amendment_A001.pdf | ||
| QA.pdf | ||
| FY13_Kaweah_River_Bridge_Inspection_Report.pdf | ||
| FY13_Kaweah_Flume_Bridge_Inspection_Report.pdf | ||
| DTFH6815B00003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet and Description
S2
Bid Schedule
A0050 15101-0000 MOBILIZATION LPSM ALL
A0100 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL
A0150 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0200 15401-0000 CONTRACTOR TESTING LPSM ALL
A0250 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0300 15705-0100 SOIL EROSION CONTROL, SILT As directed by CO
FENCE LNFT 100
A0350 15705-1400 SOIL EROSION CONTROL, FIBER As directed by CO
ROLL LNFT 60
A0400 20304-2000 REMOVAL OF BRIDGE LPSM All ALL
A0450 20801-0000 STRUCTURE EXCAVATION CUYD 45 45
A0500 20803-0000 STRUCTURAL BACKFILL CUYD 25 25
A0550 40301-0000 ASPHALT CONCRETE PAVEMENT Replace existing asphalt at approaches. See SCR
TON 10 403
A0600 55201-0200 STRUCTURAL CONCRETE, CLASS A
(AE) CUYD 9 9
A0650 55401-1000 REINFORCING STEEL LB 800 800 Contract Quantity
A0700 55504-0000 PRE-FABRICATED STEEL BRIDGE
(55'-0" x 12' modular steel vehicular bridge) LPSM All ALL
A0750 62012-1000 STONE MASONRY WALL (Removal and Repair) CUYD 2 2
A0800 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 18
A0850 62201-3000 HYDRAULIC EXCAVATOR HOUR 18
A0900 62301-0000 GENERAL LABOR HOUR 18
A0950 63308-3000 OBJECT MARKER, TYPE 3 EACH 4
A1000 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 4
A1050 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 47
SUMMARY OF QUANTITIES - Schedule A
-J an
-2
:1
A M
N
C A \5
0(
1) \R oa dw ay \C
A D
D _S he et s\ B -S um m
\S pr ea ds he et s\ [S ch ed
A .x ls m
]S he e t
MileStone: 100% Date Completed: 01/26/15 Report Date: 01/26/15
A M E N D
Line Item No.
Pay Item Number
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
STATE PROJECT
CA BLM 5910(1)
Kaweah River Bridge
B1CA
NO.
SHEET
Sheet and Description
S11
Bid Schedule
X0050 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL
X0100 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0150 20302-0150 REMOVAL OF BRIDGE RAILING LNFT 30 30
X0200 20303-0200 REMOVAL OF BRIDGE DECK
(Timber) SQYD 30 30
X0250 20801-0000 STRUCTURE EXCAVATION CUYD 4 4 Contract Quantity
X0300 55601-1300 BRIDGE RAILING, TIMBER LNFT 32 32
X0350 55701-2000 STRUCTURAL TIMBER AND LUMBER,
TREATED MFBM 0.4 0.4
X0400 55703-2000 STRUCTURAL TIMBER AND LUMBER,
TREATED, DECKING SQYD 25 25
X0450 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 2
X0500 62201-3000 HYDRAULIC EXCAVATOR HOUR 2
X0550 62301-0000 GENERAL LABOR HOUR 2
X0600 63308-3000 OBJECT MARKER, TYPE 3 EACH 4
SUMMARY OF QUANTITIES - Option X
-J an
-2
:1
A M
N
C A \5
0(
1) \R oa dw ay \C
A D
D _S he et s\ B -S um m
\S pr ea ds he et s\ [O pt io n X .x ls m
]S he e t
MileStone: 100% Date Completed: 01/26/15 Report Date: 01/26/15
A M E N D
Line Item No.
Pay Item Number
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
STATE PROJECT
CA BLM 5910(1)
Kaweah River Bridge
B2CA
'-0
'-0
'-0
L
B e g in E x is ti n g B r id g e
E n d E x is ti n g B r id g e
PLAN
2'-0" 3'-5"
New Bridge Length = 55'-0"
Existing Bridge Length = 49'-7"
B e g in N e w B r id g e
E n d N e w B r id g e
C existing bridge & new bridge
To Mineral King Road
K a w e a h R iv e r
E a s t
F o r k
" = 1'-0"8
ABUTMENT 1
ABUTMENT 2
N
Drawing No. Description
BRIDGE DRAWING INDEX
RG3000-A
RG3000-B
RG3000-C
RG3000-D EXISTING PIER 1
EXISTING PIER 2
TYPICAL SECTION
ABUTMENT 1
ABUTMENT 2
A1
S1
K. EIKERMANN
& Case Mountain
To 6 Mile Flume Bridge to be removed timber deck superstructure
Existing steel rail car with
WALL A
WALL B WALL D
WALL C
(typ. both sides)
Thrie Beam Bridge Railing RG3000-E
RG3000-F
RG3000-G
RG3000-H
FOUNDATION PLAN
GENERAL NOTES
RG3000-I REBAR LIST
ELEVATION @ C BRIDGEL
Grade = 0%
Profile Grade (at top of timber glulam deck panel)
Sheet pile endwall (typ.). based on field measurements.
Dimensions shown for existing elements are
Plans for the existing bridge are not available.
21'-0"
Existing cement bag wall place (typ.).
parapet and wall to remain in
Existing grouted stone masonry
EXPFIX
HYDRAULIC DATA
ft /sec
Q
10600
13700 interval
Recurrence depth (ft)
Normal water
2 yr
50 yr
100 yr
500 yr
6.1
19.3
21.5 w id th p a ra p e t point of channel
Est. upstream low
WS Elev.
Est. Q50
Existing sign "Weight Limit
10 Tons" to be removed.
Existing sign "Weight Limit
10 Tons" to be removed.
D. GERMANI
BRIDGE PLAN & ELEVATION
BRIDGE PLAN & ELEVATION
timber glulam deck panels.
with steel girders and
Modular steel bridge
Object Marker (typ @ all
4 corners). See Rdwy. Plans for details.
on the plans.
Normal depth is measured from estimated low point shown
The above water surface values are estimated.
Note:
SCHEDULE A
KARL EIKERMANN
PROJECTSTATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.DATEBRIDGE DRAWING
PROJECT TEAM LEADERSCALE
CHECKED BY
DRAWN BYDESIGNED BY
REVISIONS
BY
DATENO.
1/
N
C A \5
(1
B r id g e \R
G \C
A D
F il e s \D
G N
F il e s \r g d e c k .d g n
CA
R. WEHNER
RG3000-
KAWEAH RIVER BRIDGE
CA BLM 5910(1)
REPLACEMENT
EAST FORK KAWEAH RIVER BRIDGE
CASE MOUNTAIN ROAD
TULARE COUNTY, CALIFORNIA
of 9 JANUARY 2015
GENERAL NOTES
NONEK. EIKERMANN 2 B
S2
D. GERMANI
N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \R
G g n .d g n
CA BLM 5910(1)
REPLACEMENT
EAST FORK KAWEAH RIVER BRIDGE
CASE MOUNTAIN ROAD
" = 1'-0"4 1Scale:
N
WALL A
WALL C
1'-0"
New Bridge Length = 55'-0"
B e g in N e w B r id g e
E n d N e w B r id g e
K a w e a h R iv e r
E a s t
F o r k
WALL D
WALL B
LC existing bridge & new bridge
SECTION A-A
e m b e d in to r o c k
Pier 1 stemwall.
Remove existing
Grade
Roadway
Existing m in
2'-0"1'-6"
Pay Limits for Structure Excavation
End New Bridge
End Existing Bridge
Grade
Roadway
Existing
1'-6"
Structure Excavation
Pay Limits for
SECTION B-B
Approx. rock surface
FOUNDATION PLAN
3K. EIKERMANN
A A B B
FOUNDATION PLAN
C
S353'-0"
C brg. Abut. 1L
C brg. Abut. 2L ty p
2'-0"
Exist. cement bag wall
2'-0" 1'-6"
2'-0"
1'-6"
Begin New Bridge
V a r ie s to be partially removed
Existing Pier 2 stemwall
1'-0"
2'-0"
S h e e t p il e w a ll l e n g th and wall to remain in place (typ.).
Existing grouted stone masonry parapet
S h e e t p il e w a ll l e n g th
Sheet pile endwall.
Provide sheets at specified length and field cut ends to fit against inside face of masonry walls (typ.).
to be removed
Existing Pier 1 stemwall
STRUCTURE EXCAVATION
of existion Pier 2
Remove this portion
Remove this portion of cement bag wall to accomodate new bridge.
2'-0"2'-0" 1'-6"
UNLESS NOTED
" = 1'-0"8
Begin Existing Bridge excavation limits of structure
Maximum pay excavation limits of structure
Maximum pay
D. GERMANI
Part 1926, Subpart P, Excavation).
per OSHA Safety Regulations (29CFR, Short term back slope ratios (V:H)
Part 1926, Subpart P, Excavation).
per OSHA Safety Regulations (29CFR, Short term back slope ratios (V:H)*
W a ll A
W a ll B
Potential existing wall impact area (typ. @ all 4 corners).
Base of existing stone masonry wall or supporting elements may be in conflict with new bridge foundations. Partial removal and repairs may be required. See Foundation
Excavation Notes.
FOUNDATION EXCAVATION NOTES:
Excavate material as necessary to construct new bridge foundations, taking care not to damage or disturb any portions of existing stone masonry retaining wall or supporting elements of the retaining walls encountered during excavation. See Section 208 Special Contract
Requirements.
If portions of existing stone masonry walls or supporting elements are encountered within the excavation and are determined to be necessary for removal, leave in place and submit wall removal and repair work plan for CO approval per Section 620 Special
Contract Requirements.
not provided.
short term backslope ratio is than 30 days or if the required back slope will be open more may be required if short term
Excavation back slope. Shoring as necessary.
within new abutment
Remove portions to remain in place.
Existing Pier 1 footing
SCHEDULE A
ratio is not provided.
if the required short term backslope will be open more than 30 days or be required if short term back slope
Excavation back slope. Shoring may
N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g f o u n d a ti o n .d g n
CA BLM 5910(1)
REPLACEMENT
EAST FORK KAWEAH RIVER BRIDGE
CASE MOUNTAIN ROAD
" = 1'-0"2
EXISTING PIER 1
5'-0"
L railing (typ.)
" Ø Steel tubular 2
3 x 12 (typ.)
3 x 12 timber running planks
C Rdwy. & C Exist. BridgeL
3 x 12 timber deck plank
3 x 8 x 10 timber plank
@ 5'-4" spa. (min.)
Steel Diaphragms
(typ.)
curb timber
6 x 6
A
A
2'-0"5'-0"5'-0"2'-0"
Top of 6" timber curb running plank
Top of 3 x 12 timber deck plank
Top of 3 x 12 timber
1'-6" 6"
2'-9"
K. EIKERMANN 4 D
S4
" = 1'-0"8 3Scale:
(typ.)
parapet and wall to remain in place
Existing grouted stone masonry
VIEW A-A
Begin Existing Bridge
5'-0"
Approx. rock surface
Approx. rock surface
D. GERMANI
UNLESS NOTED
FRONT ELEVATION EXISTING PIER 1
of material for construction of new foundations.
Structure Excavation limits (inside face to inside face of parapets) parapet and wall to remain in place.
Existing grouted stone masonry
N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g e x p ie r .d g n
CA BLM 5910(1)
REPLACEMENT
EAST FORK KAWEAH RIVER BRIDGE
CASE MOUNTAIN ROAD
2'-0"5'-0"5'-0"2'-0"
5'-0"
L railing (typ.)
" Ø Steel tubular 2
3 x 12 (typ.)
EXISTING PIER 2
3 x 12 timber running planks
C Rdwy. & C Exist. BridgeL
3 x 12 timber deck plank
3 x 8 x 10 timber plank
@ 5'-4" spa. (min.)
Steel Diaphragms
5'-0"
(typ.)
curb timber
6 x 6
A
A
B
B
" = 1'-0"4 1Scale:
Top of 6" timber curb running plank
Top of 3 x 12 timber deck plank
Top of 3 x 12 timber
Top of 6" timber curb running plank
Top of 3 x 12 timber deck plank
Top of 3 x 12 timber
" = 1'-0"4 1Scale:
" = 1'-0"2 bag wall cement
Existing
6'-0"
6" 1'-6"
1'-6" 6"
6'-0"
Approx. ground line Approx. ground line
5 E
S5
K. EIKERMANN
End Existing Bridge End Existing Bridge
D. GERMANI
UNLESS NOTED
VIEW A-A VIEW B-B
FRONT ELEVATION EXISTING PIER 2
of material for construction of new foundations.
Structure Excavation limits (inside face to inside face of parapets) parapet to remain in place
Existing grouted stone masonry parapet to remain in place
Existing grouted stone masonry parapet to remain in place (typ.)
Existing grouted stone masonry as noted on RG3000-C.
to remain in place except
Existing cement bag wall
N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g e x p ie r .d g n
CA BLM 5910(1)
REPLACEMENT
EAST FORK KAWEAH RIVER BRIDGE
CASE MOUNTAIN ROAD
2'-0"5'-0"5'-0"2'-0"
4'-9"
L railing (typ.)
" Ø Steel tubular 2
(typ.)2 14 x 3 x
"4 1" x 288
L
6'-0"6'-0" "4
"4
TYPICAL SECTION
(4 per side) railing brace
Steel tubular
4 x 4 timber (typ.)
3 x 12 timber running planks
C Rdwy. & C Exist. BridgeL
3 x 12 timber deck plank
3 x 8 x 10 timber plank
@ 5'-4" spa. (min.)
Steel Diaphragms
4'-9"
" x 24" (typ.)16
(typ.)
curb timber
6 x 6
Steel railing post (typ.)
C Existing Bridge = C New BridgeL
Structural Steel Diaphragm planks (typ.)
timber
3 x 12
K. EIKERMANN 6
S6
(10 ga.) (typ.)
Thrie-Beam Bridge Railing
Provide 3 gdrs. minimum.
Rolled steel girder (typ.)
EXISTING TYPICAL SECTION @ MIDSPAN
F glulam deck panel
" timber 8
Grade
Roadway
Existing
RAILING ELEVATION @ ENDS
" = 1'-0"2
Flared Thrie Beam End Section to remain in place Masonry Parapet Existing Stone
Bridge Railing Thrie Beam head bolt (typ.)
No Scale manufacturer.
elastomeric bearing pad per bridge Anchor bolts, bearing plate, and
0%(typ.)
timber running planks
2"x12" rough sawn clip (typ.)
Steel deck
0%
TYPICAL SECTION @ MIDSPAN
splice at diaph.
Optional field bolted
D. GERMANI
Countersink hole @ bolt head.
Stagger transversely.
2'-0" max. along the girders.
Note: Space deck connections at
DECK CONNECTION DETAIL
New Bridge
Begin or End Existing Bridge
Begin or End deck panel
" timber glulam8
3'-0" 1'-6" 1'-6" 3'-0"
UNLESS NOTED
N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g ty p ic a l.
d g n
CA BLM 5910(1)
REPLACEMENT
EAST FORK KAWEAH RIVER BRIDGE
CASE MOUNTAIN ROAD
Structural Backfill
Pay limits for
Structural Backfill
Pay limits for
" = 1'-0"4 1Scale
3'-0"1'-6"1'-6"3'-0"
L
6'-0"6'-0" "4
"4
C Existing Bridge = C New BridgeL
A
A
ABUTMENT 1
2%
Taper @ ends
" glulam deck8
L
SECTION A-A
post (typ.)
Steel railing
G
S7 running planks
2 x 12 timber
2'-0"
Grade
Roadway
Existing m in e m b c k
Cut steps as necessary to maintain min. embed. into rock m in e m b c k new concrete.
between existing and
Place bond breaker
STRUCTURAL BACKFILL SECTION A-A
e m b c k sheet pile endwall
Galvanized steel
2'-0"
V a r ie s
V a r ie s
1'-6"
Grade
Existing Roadway
Begin Existing Bridge
Begin New Bridge
Begin New Bridge m in
2'-0"
Backfill
Structural
Limits of endwall.
sheet pile
Bottom of
B
B
Backfill
Structural
Limits of
(typ.)
3" Ø weephole
D. GERMANI
SECTION B-B
2'-0"
V a r ie s
1'-6"
Grade
Existing Roadway Begin New Bridge fill slope4 31:1
3" 1'-0"3 eq. spa. = 3'-2" 1'-0"3 eq. spa. = 3'-2" 3 eq. spa. = 3'-2" 3"
4-#4A4
4-#4A7
2-#4A4
#5A3
4-#4A7 b.f. (typ.)
#4A bars
& 2-#4A5
2-#4A4 b.f.
& 2-#4A5
2-#4A6 b.f.
rock surface
Approx.
rock surface
Approx.
surface rock
Approx.
c lr
1'-8" min. splice (typ.)
G. MAY
2-#5A1 2-#5A2 2-#5A3
4-#4A4 w/ drain grate
C 3" Ø weephole
UNLESS NOTED
" = 1'-0"2 b.f. = both faces o.f. = other face f.f. = fill face
Abbreviations:
FRONT ELEVATION ABUT. 1
2'-0" 4'-0"4'-0" 2'-0"
Approx.
rock surface as necessary.
within new abutment
Remove portions to remain in place.
Existing Pier 1 footing
N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g a b u t.
d g n
CA BLM 5910(1)
REPLACEMENT
EAST FORK KAWEAH RIVER BRIDGE
CASE MOUNTAIN ROAD
2'-0"2'-0"1'-6"1'-6"
" = 1'-0"4 1Scale
3'-0"1'-6"1'-6"3'-0"
L
6'-0"6'-0" "4
C Existing Bridge = C New BridgeL
A
A
ABUTMENT 2
2'-0"2'-0"1'-6"
2% 6
Taper @ ends
2 x 12 timber running planks
" glulam deck8
SECTION A-A
L
H8
F o o ti n g
A b u t.
C a p post (typ.)
Steel railing S8 bag wall cement
Existing
Grade
Roadway
Existing
End New Bridge End Existing Bridge
End New Bridge
Grade
Roadway
Existing
3'-5"
D. GERMANI
endwall sheet pile
Galvanized steel
SECTION A-A
STRUCTURAL BACKFILL
endwall.
sheet pile
Bottom of
B
B
End New Bridge
Grade
Roadway
Existing
SECTION B-B
Backfill
Structural
Limits of
1:2 fill slope
(typ.)
3" Ø weephole w/ drain grate
C 3" Ø weephole fill slope4 31:1 elevation
Final berm
1'-6"2'-0"2'-0"1'-6"1'-6"
Structural Backfill
Pay limits for
Structural Backfill
Pay limits for
3" 3"
#5A8 #5A9 c lr
6"
G. MAY
12-#4A10
4-#4A10
2-#4A10 #5A11
6-#4A10 #5A8 & #5A9 (typ.)
#5A12 (typ.)
11 eq. spa. = 11'-6", #5A8, #5A9, #5A11, & #5A12
4-#4A10
#5A11
#4A10
#5A12
UNLESS NOTED
" = 1'-0"2 b.f. = both faces o.f. = other face f.f. = fill face
Abbreviations:
4'-0" 4'-0"2'-0" 2'-0"
FRONT ELEVATION ABUT. 2
Backfill
Structural
Limits of
N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g a b u t.
d g n
CA BLM 5910(1)
REPLACEMENT
EAST FORK KAWEAH RIVER BRIDGE
CASE MOUNTAIN ROAD
REBAR LIST
9 ID. GERMANIR. WEHNER NONE
Dimensions in bending diagrams are out-to-out of bars
NOTES
b.f. = both faces o.f. = other face f.f. = fill face
Abbreviations:
REINFORCING STEEL SCHEDULE DIMENSION TABLE
BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R
ABUTMENT 1
V or N
817 0'-3ƒ" 2'-4" 1'-8" 2'-4"6'-4"#5A1 535 Stirrups
817 0'-3ƒ" 2'-9" 1'-8" 2'-9"7'-2"#5A2 605 Stirrups
817 0'-3ƒ" 3'-1" 1'-8" 3'-1"7'-10"#5A3 655 Stirrups
10STR 11'-8"11'-8"#4A4 784 Horiz. top
4STR 5'-6"5'-6"#4A5 154 Horiz.
2STR 7'-8"7'-8"#4A6 104 Horiz. b.f.
4STR 3'-8"3'-8"#4A7 104 Horiz. bot.
291 LBSSUBTOTAL
BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R
ABUTMENT 2
V or N
1217 0'-3ƒ" 3'-8" 2'-10"6'-6"#5A8 815 Vert. f.f.
1217 0'-3ƒ" 3'-2" 2'-10"6'-0"#5A9 755 Vert. o.f.
18STR 11'-6"11'-6"#4A10 1384 Horiz.
1217 0'-3ƒ" 1'-9" 1'-8" 1'-9"5'-2"#5A11 655 Stirrups
12STR 5'-2"5'-2"#5A12 655 Horiz. top footing
424 LBSSUBTOTAL
B
STR
B
C
D
OPTIONAL LEG
TYPE 17
S9
N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g r e b a r .d g n
CA BLM 5910(1)
REPLACEMENT
EAST FORK KAWEAH RIVER BRIDGE
CASE MOUNTAIN ROAD
'-0
C BridgeL
PLAN
" = 1'-0"4
(typ. @ abuts.)
bearing plate
" x 1'-0" steel 4
Grouted CMU wall (typ. @ abuts)
(ty p.)
S tru c tu re
M ile F lu m e
To East Fork of Kaweah Bridge To Case Mountain
A
Existing W12x72 steel girders to remain in place.
New timber glulam deck panel.
New timber bridge railing
Existing 6-mile flume structure
(do not disturb).
ELEVATION
2'-0"3 spa. @ 4'-0" = 12'-0"2'-0"
(typ. both sides)
(measured along gutterline)
Railing post spa.
Drawing No. Description
BRIDGE DRAWING INDEX
TYPICAL SECTION
GENERAL NOTES
BRIDGE PLAN & ELEVATION
BRIDGE RAILING
BRIDGE PLAN & ELEVATION
N
Gutterline
Gutterline
K. EIKERMANN
Existing sign "Weight Limit 10 Tons" to be removed.
Existing sign "Weight Limit 10 Tons" to be removed.
Existing Bridge Length = 20'-0"±
Begin Bridge End Bridge
-4 T im be r
G lu la m D ec k Pa n el s
Existing Bridge Deck to be removed
3x18 timber endwall (typ.).
Provide full length of CMU wall with no more than 2 pieces per side.
"1 (t yp for details.
See Rdwy. plans
4 corners)
(typ. @ all
Object marker
ABUT. 1 ABUT. 2
New 3x18 timber endwall
(typ. @ both ends).
See RG3017-C for details.
Existing grouted CMU abutment wall to remain in place (typ.)
D. GERMANI
Profile grade
RG3017-C
RG3017-D
RG3017-E
BRIDGE ABUTMENTS
to ordering materials.
and submitted to CO for approval prior
Actual dimensions shall be field verified existing plans do not exist.
are based on field measurements as
Dimensions shown for existing elements
S10 for Section A-A.
Note: See RG3017-C
New Bridge Length = 16'-0"±
New timber running planks
(typ.)
A
A
BRIDGE WORK:
K. EIKERMANN
D. GERMANI
RG3017-A
RG3017-B
Grade = 0% limitations.
planning work sequence with regards to construction equipment weight
Consider loading limits of existing bridge (posted at 10 tons) in to ordering material.
revised quantities with the fabrication submittal to CO for approval prior determine timber deck panel and railing layout. Submit drawing with member lengths, spacings, and relative configurations, as necessary to existing steel girders. Prepare plan layout drawing of bridge, noting ordering materials for new timber deck and railing, survey and map the
After the removal of existing timber deck and railing, and prior to
Additionally, do not disturb existing flume structure.
Do not damage existing bridge components that are to remain in place.
for additional requirements regarding removal.
See Section 104 & 203 of FP-14 and Special Contract Requirements endwall members.
timber running planks, timber curb, steel pipe railing, and timber
Remove all existing deck elements, including transverse deck planks, N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g d e c k .d g n
RG3017-
CA BLM 5910(1)
CASE MOUNTAIN ROAD
TULARE COUNTY, CALIFORNIA
of 5
6 MILE FLUME BRIDGE
OPTION X
JANUARY 2015
GENERAL NOTES
NONE 2 BK. EIKERMANN D. GERMANI
S11
N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \R
G g n .d g n
CA BLM 5910(1)
CASE MOUNTAIN ROAD
TULARE COUNTY, CALIFORNIA
of 5
6 MILE FLUME BRIDGE
Grouted CMU wall
2'-0"
1'-0" bearing plate
" steel 4
Grouted CMU wall
2'-0"
1'-0" glulam deck panel
" timber 8 1New 5 steel girder
Existing W12x72 bearing plate
" steel 4
(to be removed)
2x timber endwall profile grade
Approx. existing
(to be removed) timber running planks 2 13x11
W12x72 steel girder
EXISTING ABUTMENT SECTION
Begin or End Bridge
(to be removed) timber decking2 13x11 timber endwall
New 3x18 rough sawn
Taper ends.
2x12 Timber running planks.
K. EIKERMANN D. GERMANI 3 C
BRIDGE ABUTMENTS
" = 1'-0"2
NEW ABUTMENT SECTION (SECTION A-A)
Note: See RG3017-A for location of Section A-A.
1'-6"
Grouted CMU wall
(Normal to Abut.) (Normal to Abut.)
(Normal to Abut.)
S12 installation. Countersink head.
"Ø pilot hole prior to 64 15max. spa. Drill
" Ø x 6" lag screw w/ washer @ 2'-0" 8 at girder end.
Begin or End Bridge
Grouted CMU wall
2'-0" glulam deck panel
" timber 8 1New 5 steel girder
Existing W12x72
Taper ends.
2x12 Timber running planks.
(Normal to Abut.)
at girder end.
Begin or End Bridge
Girder end
STRUCTURAL EXCAVATION DETAIL
STRUCTURE BACKFILL DETAIL
timber endwall
New 3x18 rough sawn
1'-6"
Excavation.
Pay limits for Structure profile grade
Approx. existing subsection 208.09 of FP-14.
material and compact per
Backfill with excavated steel girder.
Existing W12x72 grade
New profile deck panel.
top of glulam
Grade to meet
N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \R
G a b u t.
d g n
CA BLM 5910(1)
CASE MOUNTAIN ROAD
TULARE COUNTY, CALIFORNIA
of 5
6 MILE FLUME BRIDGE
12'-2"
13'-7"
6"
"2
C BridgeL
3" (typ.)
C BridgeL
12'-0"
3'-0"1'-6"1'-6"3'-0"
(typ.)
timber running planks
2"x12" rough sawn glulam deck panel
" timber 8
EXISTING TYPICAL SECTION
TYPICAL SECTION
"2 111 "2
13'-11"
0%
(to be removed, typ.)
Lag bolt deck connection
2" Ø steel pipe railing
(to be removed, typ.)
(to be removed, typ.)
6 x 6 timber curb planks (to be removed, typ.)
timber running 2 13 x 11
(to be removed, typ.)
timber decking2 13 x 11 head bolt (typ.)
No Scale clip (typ.)
Steel deck
OPTION X
D
(typ.)
stay in place steel girder to
W12x72 rolled
Timber Railing see RG3017-E for details.
Countersink hole @ bolt head.
2'-0" max. along girders.
Note: Space deck connections @
" = 1'-0"2 1 4
TYPICAL SECTION
DECK CONNECTION DETAIL
D. GERMANI
"±2 11'-82'-2"±2'-11"±2'-11"±2'-2"±"±2
11'-8
"±2 11'-102'-2"±2'-11"±2'-11"±2'-2"±"±2
11'-10
K. EIKERMANN
S13
N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \r g ty p ic a l.
d g n
CA BLM 5910(1)
CASE MOUNTAIN ROAD
TULARE COUNTY, CALIFORNIA
of 5
6 MILE FLUME BRIDGE
TYPICAL RAIL SECTION
B
C PostL
C PostL
6" 8"
A
A
B
VIEW A-A VIEW B-B
1'-0"
3"
" Ø dome head bolt (typ.)8
3'-6"
(typ.)
L
PLAN
ELEVATION
timber curb
C 6 x 12
6" 3"
5 E
4" Ø dome head bolt thru
C timber curb L "
" Ø hole8 3with 1
" plate washer 4 16" x 6" x a ll s id e s
(min. 11 ga. thickness)
Galvanized metal cap recommendations.
manufacturers
Attach to post per
POST CAP DETAIL
(typ. @ all posts) bolt thru C curb
" Ø dome head 4
L
" Ø dome head bolt (typ.)4
L timber curb
C 6 x 12
" Ø dome head bolt (typ.)4
K. EIKERMANND. GERMANI
" = 1'-0"4
" Ø dome head bolt (typ.)8
4" Ø split rings
" Ø dome head bolt (typ.)4
4" Ø split ring (typ.)
ty p
C PostL
(typ.@ ends) (typ.@ int.)
glulam rail
" 2 1" x 104 see detail.
Post cap post timber
8 x 8 curb timber
6 x 12 spacer block
" timber 2 1" x 74
" Ø dome head bolts thru 11 "
Ø holes
" Ø dome head bolt (typ.)4 scupper block
6 x 12 timber gutterline) along
(measured
Post spa.
6"8" 4"10"
6 x 12 timber scupper block
(typ. @ end post)
3'-0"
4" 8"6"
6 x 12 timber scupper block
(typ. @ int. post)
C C
Begin or End Bridge
"8 11'-92'-0" gutterline) along
(measured
Post spa.
bolt (typ.)
" Ø dome head 4 3 post (typ.)
8 x 8 timber
(typ.@ int.)
Gutterline
Begin or End Bridge
"8 11'-9 2'-0" gutterline) along
(measured
Post spa.
(typ.@ int.)
C post (typ.)
head bolt thru
" Ø dome 4
L curb timber
6 x 12
Begin or End Bridge
SECTION C-C
@ ACUTE END @ OBTUSE END
" Ø hole (typ.)8 3with 1
" plate washer 4 1" x 2
1" x 52 rings (typ.)
4" Ø split
OPTIONAL CURB SPLICE DETAILS
Glulam rail member shall not contain splice.
continuous over not less than 2 posts.
shall be located so that curb member is
Curb splice is not required but if provided
BRIDGE RAILING
(typ.)
to match skew.
and scupper block
Miter ends of curb to match skew.
and scupper block
Miter ends of curb
S14 gutterline along measured
4'-0"2'-0"
RAILING NOTES:
No Scale
UNLESS NOTED
N
C A \5
(1
B r id g e \R
G \C
A e s \D
G N
F il e s \R
G r a il .d g n
CA BLM 5910(1)
CASE MOUNTAIN ROAD
TULARE COUNTY, CALIFORNIA
of 5
6 MILE FLUME BRIDGE
| S-Sheets.pdf |
| rg3000 deck |
| RG3000gn |
| rg3000 foundation |
| rg3000 ex pier |
| rg3000 ex pier |
| rg3000 typical |
| rg3000 abut |
| rg3000 abut |
| rg3000 rebar |
| rg3017pdf FINAL.pdf |
| rg3017 deck |
| RG3017gn |
| RG3017abut |
| rg3017 typical |
| RG3017rail |
File details come from the government source that posted it. Updated .