guanella A003.pdf
PDF 1 MB Posted
- Attached to
- CO PFH 80-2(3), Guanella Pass Road Federal contract opportunity
- Solicitation number
- DTFH68-08-B-00012
About this file
Amendment A003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| guanella A002.pdf | ||
| amendmentA001.pdf | ||
| APPENDICES.pdf | ||
| InvitationforBid.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
B- 1
Bid Schedule
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
15101-0000 Mobilization ALL Lump Sum $___________________
15206-0000 Slope, reference, and clearing and grubbing stake 5.615 km $_______________ $___________________ 15214-2000 Survey and staking, retaining wall
ALL Lump Sum $___________________ 15214-3000 Survey and staking, parking area
ALL Lump Sum $___________________ 15215-1000 Survey and staking, approach road
Each $_______________ $___________________
15215-3000 Survey and staking, drainage structure Each $_______________ $___________________
15216-2000 Survey and staking, grade finishing stakes 11.231 km $_______________ $___________________ 15401-0000 Contractor testing
ALL Lump Sum $___________________ 15501-0000 Construction schedule
ALL Lump Sum $___________________ 15703-2000 Soil erosion control, temporary turf establishment
5.0 ha $_______________ $___________________
15705-0100 Soil erosion control, silt fence 5,700 m $_______________ $___________________ 15705-1400 Soil erosion control, sediment log m $_______________ $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text mcgehee Typewritten Text
AMENDMENT A003
04/21/08
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
B- 2
15706-0200 Soil erosion control, check dam Each $_______________ $___________________
15706-0400 Soil erosion control, sediment trap Each $_______________ $___________________
15706-1000 Soil erosion control, inlet protection Each $_______________ $___________________
15801-0000 Watering for dust control 3,000 m3 $_______________ $___________________ 20101-0000 Clearing and grubbing
6.2 ha $_______________ $___________________
20201-0000 Selective clearing 0.30 ha $_______________ $___________________ 20220-1000 Removal, individual tree
Each $_______________ $___________________
20301-1200 Removal of headwall Each $_______________ $___________________
20301-1500 Removal of light pole Each $_______________ $___________________
20301-1900 Removal of pipe culvert Each $_______________ $___________________
20301-2400 Removal of signs Each $_______________ $___________________
20301-3100 Removal of utility pole Each $_______________ $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 3
20302-0900 Removal of fence, chain link 1,120 m $_______________ $___________________ 20302-1200 Removal of guardrail m $_______________ $___________________
20302-2200 Removal of sewerline m $_______________ $___________________
20304-1000 Removal of structures and obstructions ALL Lump Sum $___________________
20401-0000 Roadway excavation 10,000 m3 $_______________ $___________________ 20402-0000 Subexcavation m3 $_______________ $___________________
20403-0000 Unclassified borrow 5,700 m3 $_______________ $___________________ 20420-0000 Embankment construction (Mine Waste Material)
1,500 m3 $_______________ $___________________
20501-0000 Controlled blast hole m $_______________ $___________________ 20802-0000 Foundation fill m3 $_______________ $___________________
20811-0000 Shoring and bracing m2 $_______________ $___________________ 21101-1000 Roadway obliteration, method 1 m2 $_______________ $___________________
25101-2000 Placed riprap, class 2 m3 $_______________ $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 4
25101-3000 Placed riprap, class 3 m3 $_______________ $___________________
25101-5000 Placed riprap, class 5 m3 $_______________ $___________________
25110-3000 Grouted riprap, class 3 m3 $_______________ $___________________
25125-0000 Boulder Each $_______________ $___________________
25126-0000 Remove and reset boulder Each $_______________ $___________________
25205-0000 Rock buttress m3 $_______________ $___________________
25210-0000 Rockery m2 $_______________ $___________________ 25501-1000 Mechanically stabilized earth wall, welded wire face
3,350 m2 $_______________ $___________________
25701-0000 Alternate retaining wall (Wall 03C) ALL Lump Sum $___________________
25701-0000 Alternate retaining wall (Wall 04C) ALL Lump Sum $___________________
25701-0000 Alternate retaining wall (Wall 10C)
25701-0000 Alternate retaining wall (Wall 11C)
25701-0000 Alternate retaining wall (Wall 12C-1) Lump Sum $___________________
25701-0000 Alternate retaining wall (Wall 12C-2) Lump Sum $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text mcgehee Typewritten Text mcgehee Typewritten Text mcgehee Typewritten Text mcgehee Typewritten Text mcgehee Typewritten Text Lump Sum mcgehee Typewritten Text Lump Sum mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 5
25701-0000 Alternate retaining wall (Wall 13C) 0 Lump Sum $___________________
25701-0000 Alternate retaining wall (Wall 14C) 0 Lump Sum $___________________
25701-0000 Alternate retaining wall (Wall 16C) 0 Lump Sum $___________________
25701-0000 Alternate retaining wall (Wall 17C) 0 Lump Sum $___________________
25901-0000 Soil nail m $_______________ $___________________ 25902-0000 Soil nail retaining wall m2 $_______________ $___________________
25903-0000 Verification test nail Each $_______________ $___________________
26001-0000 Rock bolt m $_______________ $___________________ 26101-0000 Rock dowel m $_______________ $___________________
27001-0000 Grout m3 $_______________ $___________________
30101-0000 Aggregate base 18,800 t $_______________ $___________________ 30602-0000 Dust palliative application m2 $_______________ $___________________
30802-1000 Roadway aggregate, method 1 t $_______________ $___________________ 40101-0600 Superpave pavement, 12.5mm nominal maximum size aggregate, 0.3 to <3 million
ESAL
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 6
12,500 t $_______________ $___________________
40105-3000 Antistrip additive, type 3 t $_______________ $___________________ 40301-0300 Hot asphalt concrete pavement, grading C t $_______________ $___________________
41101-0000 Prime coat t $_______________ $___________________ 41105-0000 Blotter t $_______________ $___________________
41201-0000 Tack coat t $_______________ $___________________ 41301-1200 Asphalt pavement milling, 125mm depth m2 $_______________ $___________________
41701-0000 Minor cold asphalt mix t $_______________ $___________________ 55201-0200 Structural concrete, class A (AE) m3 $_______________ $___________________
55401-1000 Reinforcing steel 1,000 kg $_______________ $___________________ 56305-0000 Rock stain
2,000 m2 $_______________ $___________________
56602-0000 Shotcrete m3 $_______________ $___________________
60201-0600 450mm pipe culvert m $_______________ $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 7
60201-0800 600mm pipe culvert m $_______________ $___________________ 60201-0900 750mm pipe culvert m $_______________ $___________________
60201-1000 900mm pipe culvert m $_______________ $___________________ 60202-0200 450mm equivalent diameter arch or elliptical pipe culvert m $_______________ $___________________
60210-0600 End section for 450mm pipe culvert Each $_______________ $___________________
60210-0800 End section for 600mm pipe culvert Each $_______________ $___________________
60210-0900 End section for 750mm pipe culvert Each $_______________ $___________________
60210-1000 End section for 900mm pipe culvert Each $_______________ $___________________
60211-0600 End section for 450mm equivalent diameter arch or elliptical pipe culvert Each $_______________ $___________________
60212-0800 Elbow, 600mm Each $_______________ $___________________
60212-0900 Elbow, 750mm Each $_______________ $___________________
60212-1000 Elbow, 900mm Each $_______________ $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 8
60401-0000 Manhole Each $_______________ $___________________
60402-0000 Manhole m $_______________ $___________________
60403-0000 Inlet (Type 16 - single) Each $_______________ $___________________
60403-0000 Inlet (Type 16 - double) Each $_______________ $___________________
60403-0000 Inlet (Type 16 - triple) Each $_______________ $___________________
60404-1000 Catch basin, type 1 Each $_______________ $___________________
60405-0000 Manhole adjustment Each $_______________ $___________________
60409-0000 Inlet top, metal grate (security screen) Each $_______________ $___________________
60409-0100 Inlet top, metal frame and grate type A Each $_______________ $___________________
60409-0200 Inlet top, metal frame and grate type B Each $_______________ $___________________
60501-0000 Standard underdrain system m $_______________ $___________________ 60802-0600 Paved waterway, type 6 m $_______________ $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 9
60901-1200 Curb, concrete, 350mm depth 3,360 m $_______________ $___________________ 60901-8000 Curb, timber m $_______________ $___________________
60902-1000 Curb and gutter, concrete, 300mm depth m $_______________ $___________________
60906-1000 Gutter, concrete m2 $_______________ $___________________
60908-1000 Paved ditch, asphalt 2,500 m2 $_______________ $___________________ 61001-0000 Horizontal drain pipe m $_______________ $___________________
61102-3750 300mm waterline, ductile iron m $_______________ $___________________ 61202-0100 100mm sewer line, plastic m $_______________ $___________________
61202-0700 200mm sewer line, plastic m $_______________ $___________________
61301-0000 Simulated stone masonry surface treatment m2 $_______________ $___________________ 61302-0000 Simulated stone masonry test wall
Each $_______________ $___________________
61501-0200 Sidewalk, colored concrete m2 $_______________ $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 10
61502-1000 Drive pad, concrete m2 $_______________ $___________________
61504-1000 Accessibility ramp, concrete m2 $_______________ $___________________
61701-1850 Guardrail system G4, type 4, class A wood posts 1,100 m $_______________ $___________________ 61701-4000 Guardrail system SBTB m $_______________ $___________________
61701-4020 Guardrail system SBTC m $_______________ $___________________ 61702-0500 Terminal section, type FAT-9
61702-0600 Terminal section, type flared Each $_______________ $___________________
61901-0000 Fence (stone column with wood rails m $_______________ $___________________ 61901-1300 Fence, chain link (2100mm height, 3-strand bw)
1,100 m $_______________ $___________________
61901-1300 Fence, chain link (2100mm height, 3-strand bw, temporary) m $_______________ $___________________ 61902-0000 Gate (timber posts with chain)
Each $_______________ $___________________
61920-2000 Remove and reset gate Each $_______________ $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 11
61921-1000 Remove and reset fence m $_______________ $___________________
62201-0150 Dump truck, 7 cubic meter minimum capacity Hour $_______________ $___________________
62201-0550 Backhoe loader, 180 liter minimum rated capacity bucket, 600mm width Hour $_______________ $___________________
62201-0950 Wheel loader, 3 cubic meter minimum rated capacity Hour $_______________ $___________________
62201-1450 Bulldozer, 250kW minimum flywheel power Hour $_______________ $___________________
62201-2850 Motor grader, 3.6 meter minimum blade Hour $_______________ $___________________
62201-3000 Hydraulic excavator Hour $_______________ $___________________
62301-0000 General labor 1,100 Hour $_______________ $___________________
62302-0100 Special labor, slope scaling Hour $_______________ $___________________
62302-1000 Special labor, hired technical services Hour $_______________ $___________________
62302-1100 Special labor, hired survey services Hour $_______________ $___________________
62407-0000 Placing conserved topsoil 1,615 m3 $_______________ $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 12
62510-2000 Seeding, hydraulic method 15.0 ha $_______________ $___________________ 62515-2000 Mulching, hydraulic method
12.0 ha $_______________ $___________________
62515-3000 Mulching, hydraulic method, bonded fiber matrix 4.0 ha $_______________ $___________________ 62520-0000 Fertilizer
15.0 ha $_______________ $___________________
62616-2200 Populus tremuloides, quaking aspen, 450mm to 900mm height, container grown Each $_______________ $___________________
62616-2300 Prunus virginiana, chokecherry, 450mm to 900mm height, container grown Each $_______________ $___________________
62618-0800 Rosa woodsii, woods rose, 300mm to 450mm height, container grown Each $_______________ $___________________
62901-0600 Rolled erosion control product, type 2.B 1,600 m2 $_______________ $___________________ 63301-0000 Sign system (major site identification)
Each $_______________ $___________________
63304-0900 Signs, aluminum panels, type 3 sheeting m2 $_______________ $___________________
63304-1300 Signs, plastic panels, type 3 sheeting m2 $_______________ $___________________
63305-1700 Posts, wood, 100mm x 100mm m $_______________ $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 13
63305-1800 Posts, wood, 100mm x 150mm m $_______________ $___________________ 63306-0450 Post, steel, 75mm x 75mm (wall mount)
Each $_______________ $___________________
63308-2000 Object marker, type 2 Each $_______________ $___________________
63309-0100 Delineator, type 1 Each $_______________ $___________________
63309-0900 Delineator, type flexible Each $_______________ $___________________
63317-1000 Remove and reset sign m2 $_______________ $___________________
63401-0300 Pavement markings, type B, solid 43,000 m $_______________ $___________________ 63401-0400 Pavement markings, type B, broken
3,140 m $_______________ $___________________
63405-0850 Pavement markings, type B, accessibility symbol Each $_______________ $___________________
63501-1000 Temporary traffic control, traffic and safety supervisor ALL Lump Sum $___________________
63502-0600 Temporary traffic control, barricade type 3 Each $_______________ $___________________
63502-0900 Temporary traffic control, cone, type 700mm Each $_______________ $___________________
63502-1300 Temporary traffic control, drum Each $_______________ $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 14
63502-1400 Temporary traffic control, vertical panel Each $_______________ $___________________
63502-1500 Temporary traffic control, warning light type A Each $_______________ $___________________
63502-1600 Temporary traffic control, warning light type B Each $_______________ $___________________
63502-1700 Temporary traffic control, warning light type C Each $_______________ $___________________
63502-2000 Temporary traffic control, portable changeable message sign Each $_______________ $___________________
63502-3100 Temporary traffic control, traffic signal system Each $_______________ $___________________
63503-0400 Temporary traffic control, concrete barrier m $_______________ $___________________ 63503-1000 Temporary traffic control, plastic fence m $_______________ $___________________
63504-1000 Temporary traffic control, construction sign m2 $_______________ $___________________
63506-0500 Temporary traffic control, flagger 14,300
Hour $_______________ $___________________ 63506-0600 Temporary traffic control, pilot car
4,000 Hour $_______________ $___________________
63610-2800 Conduit, 100mm, PVC 5,500 m $_______________ $___________________
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
Estimated Quantity Unit Bid Price Amount Bid
B- 15
63610-3200 Conduit, 150mm, PVC 1,800 m $_______________ $___________________ 63610-3500 Conduit, 200mm, PVC m $_______________ $___________________
63622-0000 Utility trench m $_______________ $___________________ 63623-1000 Manhole, electrical
Each $_______________ $___________________
65101-1000 Draped rockfall protection, wire mesh 1,750 m2 $_______________ $___________________ 65101-2000 Draped rockfall protection, cable net
3,100 m2 $_______________ $___________________
65102-0000 Rockfall protection fence m $_______________ $___________________
$_____________________TOTAL
Submitted by:
Name of Bidder
Project: CO PFH 80-2(3)
GUANELLA PASS ROAD - PHASE 2 (SCHEDULE A)
Bid Schedule A mcgehee Typewritten Text
File details come from the government source that posted it. Updated .