The F.4 DELIVERABLES section posted 22 July 08 has been revised to indicate that column 3 was the original due dates and column 4 is the new revised due dates.
Other files for this federal contract opportunity
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
Text version
The file's text, extracted by GovTribe without its formatting.
Tasks
Deliverables
Due Dates (weeks after start)-Original
Due Dates (weeks after start)-Amended
1
Project Management
1.1 Draft Project Plan
4
4
1.1 Final Project Plan
6
6
1.1 Kickoff Meeting Notes
6
6
1.3 Quarterly Progress Reports
Quarterly
Quarterly
2
Review and Revise Use Cases for Selected Scenarios
· Final use case scenarios for each service showing Clarus data traceability
12
12
· Participating agencies’ review(s)
12
12
3
High Level System Requirements
· Draft High level system requirements document and for each service
18
18
· Web conference on Draft High Level System Requirements
18
18
· Web conference Minutes
19
19
· Final High Level Systems Requirements and comment disposition matrix for each service
22
22
· Web conference to discuss final High Level System Requirements
22
22
4
Detailed System Requirements
· Draft Detailed system requirements document with Clarus data flow
30
30
· Web conference to discuss draft requirements
30
30
· Web conference Minutes
31
31
· Final Detailed System Requirements document and comment dispostion matrix
34
34
· Web conference (using PowerPoint) to discuss the final Detailed Systems Requirements
34
34
5
System Design, Development and Testing
· Draft System design document
40
40
· Web conference to discuss the draft system design document
40
40
· Web conference Minutes
41
41
· Final system design document for each service with comment disposition matrix
46
44
· Web conference demonstrating the developed system
46
56
6
Installation, Training and Operational Testing
· Draft installation, training and operational testing test plan
52
59
· Web conference discussing the draft plan
52
59
· Web conference Minutes
53
60
· Final Installation, Training and Operational Test Plan and comment disposition matrix
56
63
· Web conference discussing the Final Plan
58
63
· Installation and operation of the service(s) at the public agency site(s)
62
65
7
Service Promotion Plan
· Promotion plan for each service
64
67
· Presentations for two (2) Clarus ICC meetings (508 Compliant)
Coordinated with COTR
Coordinated with COTR
8
Service Evaluations by Independent Contractor
· Attend independent evaluation kickoff meeting
Coordinated with COTR
Coordinated with COTR
· Providing data and commentary to the independent contractor.
Coordinated with COTR
Coordinated with COTR
9
Clarus System Evaluation
· Draft Clarus system evaluation report
90
90
· Comment disposition matrix
90
90
· Final Clarus system evaluation report (508 Compliant)
101
101
10
Demonstrate Implemented Service(s)
· Demonstration of completed services at USDOT HQ in Washington
104
104