The F.4 DELIVERABLES section posted 22 July 08 has been revised to indicate that column 3 was the original due dates and column 4 is the new revised due dates.

View the file

Other files for this federal contract opportunity

Other files attached to DEVELOPMENT AND DEPLOYMENT OF CLARUS-ENABLED SERVICES, newest first.
File Type Posted
CLARUSmodifiedSCHEDULE.doc DOC document
pastperfattachment.doc DOC document
Attachments_1-5.doc DOC document
PDFCLARUS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tasks

Deliverables
Due Dates (weeks after start)-Original
Due Dates (weeks after start)-Amended
1
Project Management
1.1 Draft Project Plan
4
4
1.1 Final Project Plan
6
6
1.1 Kickoff Meeting Notes
6
6
1.3 Quarterly Progress Reports
Quarterly
Quarterly
2
Review and Revise Use Cases for Selected Scenarios
· Final use case scenarios for each service showing Clarus data traceability
12
12
· Participating agencies’ review(s)
12
12
3
High Level System Requirements
· Draft High level system requirements document and for each service
18
18
· Web conference on Draft High Level System Requirements
18
18
· Web conference Minutes
19
19
· Final High Level Systems Requirements and comment disposition matrix for each service
22
22
· Web conference to discuss final High Level System Requirements
22
22
4
Detailed System Requirements
· Draft Detailed system requirements document with Clarus data flow
30
30
· Web conference to discuss draft requirements
30
30
· Web conference Minutes
31
31
· Final Detailed System Requirements document and comment dispostion matrix
34
34
· Web conference (using PowerPoint) to discuss the final Detailed Systems Requirements
34
34
5
System Design, Development and Testing
· Draft System design document
40
40
· Web conference to discuss the draft system design document
40
40
· Web conference Minutes
41
41
· Final system design document for each service with comment disposition matrix
46
44
· Web conference demonstrating the developed system
46
56
6
Installation, Training and Operational Testing
· Draft installation, training and operational testing test plan
52
59
· Web conference discussing the draft plan
52
59
· Web conference Minutes
53
60
· Final Installation, Training and Operational Test Plan and comment disposition matrix
56
63
· Web conference discussing the Final Plan
58
63
· Installation and operation of the service(s) at the public agency site(s)
62
65
7
Service Promotion Plan
· Promotion plan for each service
64
67
· Presentations for two (2) Clarus ICC meetings (508 Compliant)
Coordinated with COTR
Coordinated with COTR
8
Service Evaluations by Independent Contractor
· Attend independent evaluation kickoff meeting
Coordinated with COTR
Coordinated with COTR
· Providing data and commentary to the independent contractor.
Coordinated with COTR
Coordinated with COTR
9
Clarus System Evaluation
· Draft Clarus system evaluation report
90
90
· Comment disposition matrix
90
90
· Final Clarus system evaluation report (508 Compliant)
101
101
10
Demonstrate Implemented Service(s)
· Demonstration of completed services at USDOT HQ in Washington
104
104