This amendment revises the F.4 DELIVERABLES on page 21 and 22.
Other files for this federal contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The file's text, extracted by GovTribe without its formatting.
Tasks
| Deliverables |
| Due Dates (weeks after start) |
| Due Dates (weeks after start) |
| 1 |
| Project Management |
| 1.1 Draft Project Plan |
| 4 |
| 4 |
| 1.1 Final Project Plan |
| 6 |
| 6 |
| 1.1 Kickoff Meeting Notes |
| 6 |
| 6 |
| 1.3 Quarterly Progress Reports |
| Quarterly |
| Quarterly |
| 2 |
| Review and Revise Use Cases for Selected Scenarios |
| · Final use case scenarios for each service showing Clarus data traceability |
| 12 |
| 12 |
| · Participating agencies’ review(s) |
| 12 |
| 12 |
| 3 |
| High Level System Requirements |
| · Draft High level system requirements document and for each service |
| 18 |
| 18 |
| · Web conference on Draft High Level System Requirements |
| 18 |
| 18 |
| · Web conference Minutes |
| 19 |
| 19 |
| · Final High Level Systems Requirements and comment disposition matrix for each service |
| 22 |
| 22 |
| · Web conference to discuss final High Level System Requirements |
| 22 |
| 22 |
| 4 |
| Detailed System Requirements |
| · Draft Detailed system requirements document with Clarus data flow |
| 30 |
| 30 |
| · Web conference to discuss draft requirements |
| 30 |
| 30 |
| · Web conference Minutes |
| 31 |
| 31 |
| · Final Detailed System Requirements document and comment dispostion matrix |
| 34 |
| 34 |
| · Web conference (using PowerPoint) to discuss the final Detailed Systems Requirements |
| 34 |
| 34 |
| 5 |
| System Design, Development and Testing |
| · Draft System design document |
| 40 |
| 40 |
| · Web conference to discuss the draft system design document |
| 40 |
| 40 |
| · Web conference Minutes |
| 41 |
| 41 |
| · Final system design document for each service with comment disposition matrix |
| 46 |
| 44 |
| · Web conference demonstrating the developed system |
| 46 |
| 56 |
| 6 |
| Installation, Training and Operational Testing |
| · Draft installation, training and operational testing test plan |
| 52 |
| 59 |
| · Web conference discussing the draft plan |
| 52 |
| 59 |
| · Web conference Minutes |
| 53 |
| 60 |
| · Final Installation, Training and Operational Test Plan and comment disposition matrix |
| 56 |
| 63 |
| · Web conference discussing the Final Plan |
| 58 |
| 63 |
| · Installation and operation of the service(s) at the public agency site(s) |
| 62 |
| 65 |
| 7 |
| Service Promotion Plan |
| · Promotion plan for each service |
| 64 |
| 67 |
| · Presentations for two (2) Clarus ICC meetings (508 Compliant) |
| Coordinated with COTR |
| Coordinated with COTR |
| 8 |
| Service Evaluations by Independent Contractor |
| · Attend independent evaluation kickoff meeting |
| Coordinated with COTR |
| Coordinated with COTR |
| · Providing data and commentary to the independent contractor. |
| Coordinated with COTR |
| Coordinated with COTR |
| 9 |
| Clarus System Evaluation |
| · Draft Clarus system evaluation report |
| 90 |
| 90 |
| · Comment disposition matrix |
| 90 |
| 90 |
| · Final Clarus system evaluation report (508 Compliant) |
| 101 |
| 101 |
| 10 |
| Demonstrate Implemented Service(s) |
| · Demonstration of completed services at USDOT HQ in Washington |
| 104 |
| 104 |