Drawings - Replace Boilers B304 Rev 00.pdf
PDF 660 KB Posted
- Attached to
- Replace Boiler System in Bldg. 304 Selfridge ANGB Federal contract opportunity
- Solicitation number
- W50S8522R0011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Proposal Conference Minutes - Replace Boilers Bldg. 304.docx | DOCX document | |
| Pre-Proposal Site Visit Sign-In Sheet - B304.pdf | ||
| Analyze Historic Brick Report Section.pdf | ||
| SOW Replace Boilers B304 - VGLZ 222004.pdf | ||
| 127 SFS Vetted Form 2021.xlsx | XLSX spreadsheet | |
| Attachment 5a Division 01 Specifications _ All.pdf | ||
| W50S8522R0011 solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5
A
B
C
D
A
B
C
D
SHEET OF
Engineer/Consultants
Sheet Title
REPLACE
BOILERS
B304
MECHANICAL
DEMO PLAN
1 5
REVISIONS:
Project Number:
File:
Drawn By:
Designed By:
Checked By: T. Resh
T. Resh
H. Bauzon/C. Craig
VGLZ 22204
Mark Date Description
PROJECT
Scale: NOT TO SCALE
Date: 01 OCT 2021
NOTES:
DEMO EXISTING AIR INTAKE & EXHAUST
REMOVE EXISTING TEMP BOILERS &
TURN OVER TO 127th HVAC SHOP
RE-USE EXISTING
NG LINES FOR NEW
BOILERS
SELECTIVE DEMO OF EXISTING
HHW PIPE FOR INSTALLATION
OF NEW BOILERS
RE-USE EXISTING MAIN CIRCULATION
PUMPS. HOLD FOR CONNECTION TO
NEW BOILER SYSTEM
DEMO SHOT FEEDER,
SELECTIVE DEMO PIPE FOR
NEW SHOT FEEDER LOCATION.
RE-USE EXISTING EXPANSION TANK,
HOLD FOR CONNECTION TO
NEW BOILER SYSTEM
DEMO EXISTING BOILERS
& REMOVE FROM SITE
DEMO EXISTING
NATURAL GAS LINES
BACK & CAP
DEMO EXISTING
AIR SEPARATOR
SELECTIVE DEMO OF
EXISTING HHW PIPE FOR
INSTALLATION OF NEW BOILERS
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR #3
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text G
AutoCAD SHX Text
CD
AutoCAD SHX Text
CD
AutoCAD SHX Text
CD
AutoCAD SHX Text
HWS
AutoCAD SHX Text S
AutoCAD SHX Text 127th WING/CIVIL ENGINEER
AutoCAD SHX Text
SELFRIDGE AIR
AutoCAD SHX Text
NATIONAL GUARD
AutoCAD SHX Text
BASE, MICHIGAN
AutoCAD SHX Text
1. THE PLAN AND UNDERGROUND THE PLAN AND UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE GOVERNMENT MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE GOVERNMENT FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM AVAILABLE INFORMATION.
AutoCAD SHX Text NOTE: FOR INFORMATION PURPOSES ONLY. NOT FOR DESIGN OR CONSTRUCTION. FIELD VERIFY DIMENSIONS PRIOR TO DESIGN AND PRIOR TO CONSTRUCTION.
A
B
C
D
A
B
C
D
SHEET OF
Engineer/Consultants
Sheet Title
REPLACE
BOILERS
B304
MECHANICAL
PLAN
2 5
REVISIONS:
Project Number:
File:
Drawn By:
Designed By:
Checked By: T. Resh
T. Resh
H. Bauzon/C. Craig
VGLZ 22204
Mark Date Description
PROJECT
Scale: NOT TO SCALE
Date: 01 OCT 2021
NOTES:
INSTALL NEW BOILERS ON
NEW PADS WITH PRIMARY LOOP
CIRCULATION PUMPS.
NEW 2" CONCRETE PADS.
INSTALL NEW CONCENTRIC / FLUSH
MOUNTED INTAKE EXHAUST
PER MFG / MECH CODE
REQUIREMENTS.
NEW PIPE CONFIGURATION CONNECTED TO
NEW BOILERS PER MANUFACTURERS SPECS
AND LEAD / LAG CONFIGURATION
REQUIREMENTS.
RECONNECT EXISTING MAIN
CIRCULATION PUMPS
INSTALL NEW CHEMICAL SHOT
FEEDER SYSTEM
RECONNECT EXPANSION
TANK TO BOILER SYSTEM
INSTALL NEW
Y STRAINER
INSTALL NEW
Y STRAINER
NOTES:
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR #3
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text G
AutoCAD SHX Text
CD
AutoCAD SHX Text
CD
AutoCAD SHX Text
CD
AutoCAD SHX Text
HWS
AutoCAD SHX Text S
AutoCAD SHX Text 127th WING/CIVIL ENGINEER
AutoCAD SHX Text
SELFRIDGE AIR
AutoCAD SHX Text
NATIONAL GUARD
AutoCAD SHX Text
BASE, MICHIGAN
AutoCAD SHX Text
1. THE PLAN AND UNDERGROUND THE PLAN AND UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE GOVERNMENT MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE GOVERNMENT FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM AVAILABLE INFORMATION.
AutoCAD SHX Text NOTE: FOR INFORMATION PURPOSES ONLY. NOT FOR DESIGN OR CONSTRUCTION. FIELD VERIFY DIMENSIONS PRIOR TO DESIGN AND PRIOR TO CONSTRUCTION.
1. INSTALL NEW AIR SEPARATOR IN AN ACCESSIBLE LOCATION IN THE ATTIC. 2. NEW INSTALL OF BOILERS WILL REQUIRE CHANGES TO THE EXISTING PIPE CONFIGURATIONS IN THE BOILER AREA. 3. PROVIDE ISOLATION VALVES FOR BOILER REPLACEMENT OR REPAIRS.
A
B
C
D
A
B
C
D
SHEET OF
Engineer/Consultants
Sheet Title
REPLACE
BOILERS
B304
MECHANICAL
DETAILS &
SCHEDULE
3 5
REVISIONS:
Project Number:
File:
Drawn By:
Designed By:
Checked By: T. Resh
T. Resh
H. Bauzon/C. Craig
VGLZ 22204
Mark Date Description
PROJECT
Scale: NOT TO SCALE
Date: 01 OCT 2021
NOTES:
HOT WATER BOILER SCHEDULE
MARK LOCATION SERVICE
REMARKS
PHASE
VOLTAGE
NOTES:
1. PROVIDE ACID NEUTRALIZING KIT FOR CONDENSATE DRAIN.
2. FOR BOILER CIRCULATION PUMPS, SEE PUMP SCHEDULE FOR
DETAILS.
3. PROVIDE WITH VERTICAL 4" PVC AIR INLET AND 4" PVC FLUE VENT.
4. PROVIDE WITH SMART SYSTEM CONTROL AND BMS GATEWAY
(BACNET COMPATIBLE).
5. BOILER TO BE PROVIDED WITH FLOW SWITCH.
6. PROVIDE W/ EXPANSION TANK(FLEXCON INTAUO-ASME-14
GAL./11.5 GAL. ACCEPTANCE
7. PROVIDE WITH AIR SEPERATOR(HONEYWELL SPARCO - PV150 -1.5")
8. PROVIDE W/ CHEMICAL SHOT FEEDER SYSTEM
BASED ON
MAKE/MODELTYPE
INPUT MBH
MAX./MIN. AFUE %
110°F RWT
MAX OUTPUT
MBH @
IN. W.G.
GAS
PRESS.
120V/1ØB1
B2
BOILER ROOM HEATING HW HIGH EFFICIENCY LOCHINVAR
KBN 550
OR EQUAL
550/60 98.0 499-550 4"-14" - 1, 2, 3, 4, 5, 6, 7, 8
NET
AHRI
MBH
TOTAL
AMPS
2.7
TO FLOOR
DRAIN
FLOOR MOUNTED BLADDER TYPE EXPANSION
TANK AND AIR SEPARATOR PIPING DIAGRAM
NTS (ALL NEW)
WATER MAKEUP
CHEMICAL
SHOT FEEDER
HS
HR
PRESSURE
GAUGE
AUTOMATIC
AIR VENT
REDUCED PRESSURE ZONE
BACKFLOW PREVENTER
GLOBE VALVE
AUTOMATIC AIR VENT WITH
NEW HIGH CAPACITY
FLOAT TYPE AUTOMATIC
AIR VENT EQUAL TO
METRAFLEX MV-15A
AutoCAD SHX Text 127th WING/CIVIL ENGINEER
AutoCAD SHX Text
SELFRIDGE AIR
AutoCAD SHX Text
NATIONAL GUARD
AutoCAD SHX Text
BASE, MICHIGAN
AutoCAD SHX Text
1. THE PLAN AND UNDERGROUND THE PLAN AND UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE GOVERNMENT MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE GOVERNMENT FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM AVAILABLE INFORMATION.
NOTE: FOR INFORMATION PURPOSES ONLY. NOT FOR DESIGN OR CONSTRUCTION. FIELD VERIFY DIMENSIONS PRIOR TO DESIGN AND PRIOR TO CONSTRUCTION.
A
B
C
D
A
B
D
SHEET OF
Engineer/Consultants
Sheet Title
NEW HEATING
HW BOILERS
PIPING &
CONTROLS
4 5
REVISIONS:
Project Number:
File:
Drawn By:
Designed By:
Checked By: T. Resh
T. Resh
H. Bauzon/ C. Craig
Mark Date Description
PROJECT
Scale: NOT TO SCALE
Date:
NOTES:
WELD NECK
FLANGE
CHECK
VALVE
LONG RADIUS
ELBOW
BUTTERFLY
VALVE
SIDE VIEW
FLANGE
WELD NECKWELD NECK
FLANGE
PLAN VIEW
PARALLEL PUMP INSTALLATION
NOT TO SCALE
HEATING PLANT PIPING DIAGRAM
NOT TO SCALE
BP-1
B-1CONDENSATE TRAP
REDUCER AS
REQUIRED (TYP.)
TEMPERATURE AND PRESSURE RELIEF VALVE. PIPE FULL SIZE
TO FLOOR DRAIN
PRESSURE GAUGE
3" CONCRETE
HOUSEKEEPING PAD 3/4" ACIDIC CONDENSATE
ROUTE TO ACID
NEUTRALIZATION TANK
CONDENSATE ACID WASTE
NEUTRALIZATION TANK (BY BOILER
MANUFACTURER)
EX. FLOOR DRAIN
NON-SLAM CHECK
VALVE
BOILER CIRC. PUMP
3/4" DRAIN COCK W/ THREADED HOSE CONN. AND
CAP (TYP.)
BLADDER
EXPANSION
TANK
PRESSURE
GAUGE
B&G #87 AIR
VENT OR
EQUAL
HWS TEMP. SENSOR BY
TEMPERATURE CONTROLS
CONTRACTOR. MOUNT IN
THERMOWELL.
TAP OFF
SIDE
CIRCUIT SETTER BALANCING
VALVE
DIRT LEG (TYP.)
TO FLOOR DRAIN
BOILER FLOW SWITCH. MOUNT IN
PIPE WELL
LOCAL VENT W/
GOOSENECK
UNION (TYP.) 1 1/4"G SITE
GLASS
CHECK
VALVE
VENT STACK
THERMOMETER (TYP.)
COMBUSTION AIR INTAKE
BUTTERFLY
ISOLATION VALVE
(TYP.)
PLUG VALVE
STRAINER
HWR TO
SYSTEM
B-2
EXTEND TO FLOOR DRAIN
FS FS
HW
SHW
R
HWR HWS
HWSHWS
T
HWR
BP-2
HWSTO VAVs
BOILER CIRC. PUMP
FLOOR MOUNTED BLADDER
EXPANSION TANK WITH SHOT
FEEDER AND AIR SEPARATOR
AND MAKEUP WATER
CONNECTION.
HWR
HWS
SEE SHEET 1
P
NEW DIFFRERENTIAL PRESSURE SENSOR
INSTALL 2ND FLOOR
ROOM 228
REPLACE
BOILERS
B304
VGLZ 22204
1 OCT 2021
P
NEW DIFFRERENTIAL PRESSURE SENSOR
INSTALL 2ND FLOOR
ROOM 207
EXISTING
AutoCAD SHX Text 127th WING/CIVIL ENGINEER
AutoCAD SHX Text
SELFRIDGE AIR
AutoCAD SHX Text
NATIONAL GUARD
AutoCAD SHX Text
BASE, MICHIGAN
AutoCAD SHX Text
1. THE PLAN AND UNDERGROUND THE PLAN AND UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE GOVERNMENT MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE GOVERNMENT FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM AVAILABLE INFORMATION.
AutoCAD SHX Text NOTE: FOR INFORMATION PURPOSES ONLY. NOT FOR DESIGN OR CONSTRUCTION. FIELD VERIFY DIMENSIONS PRIOR TO DESIGN AND PRIOR TO CONSTRUCTION.
AutoCAD SHX Text
REDUCER
AutoCAD SHX Text
NEEDLE VALVE
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
REDUCER
PUMP
A
B
C
D
A
B
D
SHEET OF
Engineer/Consultants
Sheet Title
NEW HEATING
HW BOILERS
PIPING &
CONTROLS
5 5
REVISIONS:
Project Number:
File:
Drawn By:
Designed By:
Checked By: T. Resh
T. Resh
H. Bauzon/ C. Craig
Mark Date Description
PROJECT
Scale: NOT TO SCALE
Date:
NOTES:
115VGRD
DDC CONTROLLER & PANEL WITH OPERATOR INTERFACE
CSR
FI
RI
NG
RA
TE
CO
MM
ON
AL
AR
M
ST
AT
US
FA
ILU
RE
BOILER CP
SY
ST
EM
EN
AB
LE
CO
MM
ON
AL
AR
M
ST
AT
US
FA
ILU
RE
SUN
SHIELD
OA TEMP.
REFERENCE
SENSOR
G
LO
BA
L O
A
TE
MP
RE
FE
RE
NC
E
SYSTEM DIAGRAM AND SEQUENCE BASED ON LOCHINVAR, KBN SERIES MFR TECHNOLOGY
B-2
LAG BP-2
HP-304-2
NORTH FACE OF
BUILDING EXTERIOR
LOOP TEMP. RANGE 120°F-180°F BASED
ON RESET - 60°F-0°F AMBIENT
TO BLDG. RADIATORS
SECONDARY LOOP
FROM BLDG. RADIATORS
SECONDARY LOOP
VFD
ST
AT
US
AL
AR
M
HS
T
EM
P
HR
T
EM
P
SEQUENCE OF OPERATIONS:
BP-1
BOILER AND BOILER FUEL SYSTEMS EMERGENCY STOP:
THE FOLLOWING SHALL BE PROVIDED BY AND COORDINATED BY THE TEMPERATURE
CONTROLS CONTRACTOR.
THE FOLLOWING SEQUENCE SHALL BE INITIATED UPON ACTIVATION OF MAIN BOILER PLANT
EMERGENCY STOP CONTROL SWITCHES TO BE LOCATED AT THE EGRESS DOORWAYS TO THE
MECH/BOILER ROOM PER CODE. THESE SWITCHES SHALL BE PUSH-PULL, MAINTAINED
CONTACT TYPE, WITH MUSHROOM HEADS, AS NORMALLY PROVIDED FOR THIS SERVICE.
UPON ACTIVATION OF THE E-STOP SWITCH, THE BOILERS SHALL BE COMMANDED OFF AND THE
DDC SHALL CONTINUE TO RUN THE ACTIVE PRIMARY AND SECONDARY HEATING PUMPS UNTIL
THE SECONDARY HEATING LOOP SUPPLY TEMPERATURE DROPS 20°F (ADJ) BELOW LOOP
TEMPERATURE SETPOINT IN ORDER TO DISSIPATE THE RESIDUAL HEAT IN THE FORMERLY
ACTIVE BOILERS AT WHICH POINT THE PUMPS WILL BE COMMANDED OFF.
POWERED OPEN/ NORMALLY CLOSED SAFETY SHUT-OFF SOLENOID VALVE LOCATED ON THE
MAIN NATURAL GAS BOILER FUEL SOURCE SHALL BE INTERLOCKED TO CLOSE WHEN THE
EMERGENCY STOP IS ACTIVATED.
PROVIDE AN INTERLOCK TO THE LOCAL FIRE ALARM SYSTEM PANEL IF PRESENT TO ACHIEVE THE
SAME SEQUENCE AS DESCRIBED ABOVE UPON FIRE ALARM STATUS. COORDINATE WITH THE
FIRE ALARM SYSTEM VENDOR/CONTRACTOR.
HIGH-EFFICIENCY HEATING HOT WATER
BOILERS CONTROL DIAGRAM
NOT TO SCALE
ST
AR
T/S
TO
P
HR HR
AI DI DI DI DIDO DO AI AI AI
M
B1
LEAD
BOILER CP
CSR
M
T
T
TT
HS
T
CSR
M
BOILERS & HEATING PUMPS:
BOILER SYSTEM RUN CONDITIONS:
THE BOILER SYSTEM SHALL BE ENABLED TO RUN WHENEVER:
· A DEFINABLE NUMBER OF HOT WATER COILS NEED HEATING.
· RUNS YEAR ROUND.
TO PREVENT SHORT CYCLING, THE BOILER SYSTEM SHALL RUN FOR AND BE OFF FOR MINIMUM ADJUSTABLE TIMES
(BOTH USER DEFINABLE), UNLESS SHUTDOWN ON SAFETIES OR OUTSIDE AIR CONDITIONS.
THE BOILER SHALL RUN SUBJECT TO ITS OWN INTERNAL SAFETIES AND CONTROLS.
THE BOILER SYSTEM SHALL ALSO RUN FOR FREEZE PROTECTION WHENEVER THE OUTSIDE AIR TEMPERATURE IS
LESS THAN 38°F (ADJ.).
ALARMS SHALL BE PROVIDED AS FOLLOWS:
· FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
· RUNNING IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
BOILER LEAD/LAG OPERATION:
THE BOILER OPERATING CONTROLLERS TO BE SET AT 190°F TO OPERATE AS A SECONDARY HIGH LIMIT.
THE TWO BOILERS SHALL OPERATE IN A LEAD/LAG FASHION ALONG WITH THEIR RESPECTIVE BOILER PUMPS.
· THE LEAD BOILER SHALL RUN FIRST.
· AS HOT WATER TEMPERATURE DROPS BELOW A LAG BOILER SETPOINT, THE LAG BOILER SHALL STAGE ON
AND RUN IN UNISON WITH THE LEAD BOILER TO MAINTAIN HOT WATER TEMPERATURE SETPOINT.
· AS HOT WATER TEMPERATURE DROPS BELOW A SECOND LAG BOILER SETPOINT (IF AVAILABLE), THE SECOND
LAG BOILER SHALL STAGE ON AND RUN IN UNISON WITH THE LEAD & LAG BOILER TO MAINTAIN HOT WATER
TEMPERATURE SETPOINT.
· AS HOT WATER TEMPERATURE RISES BACK TO 20°F (ADJ.) ABOVE SETPOINT, THE LAG BOILER SHALL STAGE
OFF.
· AS HOT WATER TEMPERATURE RISES BACK TO 10°F (ADJ.) ABOVE SETPOINT, THE LAG BOILER SHALL STAGE
OFF.
THE DESIGNATED LEAD BOILER SHALL ROTATE UPON ONE OF THE FOLLOWING CONDITIONS: (USER SELECTABLE):
· MANUALLY THROUGH A SOFTWARE SWITCH
· IF BOILER RUNTIME (ADJ.) IS EXCEEDED
· DAILY
· WEEKLY
· MONTHLY
ALARMS SHALL BE PROVIDED AS FOLLOWS:
· LOW WATER TEMPERATURE
· BOILER FAILURE
HOT WATER SUPPLY TEMPERATURE SETPOINT RESET: ( BY TWO METHODS)
1) THE HOT WATER SUPPLY TEMPERATURE SETPOINT SHALL RESET USING A TRIM AND
RESPOND ALGORITHM BASED ON HEATING REQUIREMENTS. AS THE FACILITY'S DEMAND FOR
HEATING GOES BEYOND A USER DEFINABLE AMOUNT OF REQUESTS, THE SETPOINT SHALL
RESET TO A HIGHER VALUE (ADJ.). ONCE THE HEATING REQUESTS ARE SATISFIED THE
SETPOINT SHALL GRADUALLY LOWER OVER TIME TO REDUCE HEATING ENERGY USE.
2) OUTSIDE AIR RESET. (USER SELECTABLE)
PRIMARY HOT WATER TEMPERATURE MONITORING:
THE FOLLOWING TEMPERATURES SHALL BE MONITORED:
· PRIMARY HOT WATER SUPPLY.
· PRIMARY HOT WATER RETURN.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
· HIGH PRIMARY HOT WATER SUPPLY TEMP: IF GREATER THAN 200°F (ADJ.).
· LOW PRIMARY HOT WATER SUPPLY TEMP: IF LESS THAN 130°F (ADJ.).
HP-304-1
TO VAV BOXES
DI DO
CSR
M
ST
AT
US
AL
AR
M
ST
AR
T/S
TO
P
DO AO
SE
TP
OI
NT
ON
/O
FF
VFD
DI DO AO
SE
TP
OI
NT
ON
/O
FF
VFD
VFD
AO
SE
TP
OI
NT
AO
SE
TP
OI
NT
REPLACE
BOILERS
B304
VGLZ 22204
01 OCT 2021
FI
RI
NG
RA
TE
AI
P
P
DI
FF
ER
EN
TI
AL
PR
ES
SU
RE
AI
DI
FF
ER
EN
TI
AL
PR
ES
SU
RE
AI
NEW
NEW
AutoCAD SHX Text 127th WING/CIVIL ENGINEER
AutoCAD SHX Text
SELFRIDGE AIR
AutoCAD SHX Text
NATIONAL GUARD
AutoCAD SHX Text
BASE, MICHIGAN
AutoCAD SHX Text
1. THE PLAN AND UNDERGROUND THE PLAN AND UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE GOVERNMENT MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE GOVERNMENT FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM AVAILABLE INFORMATION.
NOTE: FOR INFORMATION PURPOSES ONLY. NOT FOR DESIGN OR CONSTRUCTION. FIELD VERIFY DIMENSIONS PRIOR TO DESIGN AND PRIOR TO CONSTRUCTION.
| Sheets and Views |
| Replace Boilers B304 03_2022-Model |
| Replace Boilers B304 03_2022-S1 of 5 |
| Replace Boilers B304 03_2022-S2 of 5 |
| Replace Boilers B304 03_2022-S3 of 5 |
| Replace Boilers B304 03_2022-S4 of 5 |
| Replace Boilers B304 03_2022-S5 of 5 |
File details come from the government source that posted it. Updated .