Drawings - Project 553-21-106.pdf

PDF 32 MB Posted

Attached to
Z1DA--Insulate Exterior Walls, Replace Windows 553-21-106 Federal contract opportunity
Solicitation number
36C25023B0024
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document provides details on a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The solicitation number is 36C25023B0024 and seeks to insulate exterior walls and replace windows at Project 553-21-106, as evidenced by the 32MB file of drawings attached. The opportunity type is listed as a solicitation. No further information is provided on response dates, award amounts, pricing terms, or set-asides. The summary focuses on the federal agency and high-level work requirements based on available information.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Insulate Exterior Walls, Replace Windows 553-21-106, newest first.
File Type Posted
36C25023B0024 0002.pdf PDF
553-21-106 Pre-Bid Site Visit Agenda_.pdf PDF
553-21-106 Pre-bid Site Visit Attendance Log.pdf PDF
36C25023B0024 0001.pdf PDF
36C25023B0024 0001.docx DOCX document
_36C25023B0024_.pdf PDF
Drawings Addendum 1 Notes.pdf PDF
Specifications - Project 553-21-106 - Volume II.pdf PDF
Specifications - Project 553-21-106 - Volume I.pdf PDF
S02 - RFI Form 553-21-106.pdf PDF
S02 - Contractor EMR Certification Form - 553-21-106.pdf PDF
WD GDN MI20230101 Mod 2 -02-24-2023 - Building - Wayne County.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT OFFICER REPRESENTATIVE DATE

CHIEF OF ENGINEERING DATE

CONTRACT SPECIALIST DATE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN SUBMISSION

65% DESIGN DEVELOPMENT SUBMISSION

95% CONSTRUCTION DOCUMENTS SUBMISSION

11/01/2021

04/12/2022

07/06/2022

BID DOCUMENTS SUBMISSION 09/19/2022

C A u to d e s k \R e v it B a c k u p \1

.1

.1

A v g v e e rk a m p .r v t

/1

/2

:0 :4

P

M

GI000

COVER SHEET

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

INSULATE EXTERIOR WALLS &

REPLACE WINDOWS

4646 JOHN R ST., DETROIT, MI

553-21-106

09/19/2022 JG GV

553-21-106

INSULATE EXTERIOR WALLS & REPLACE WINDOWS

JOHN D. DINGELL VA MEDICAL CENTER

4646 JOHN R ST., DETROIT, MI

BID DOCUMENTS

BID DOCUMENTS

FULLY SPRINKLERED

937.224.0861

SHEET INDEX

SHEET NUMBER SHEET NAME

ARCHITECTURAL

AE001 ABBREVIATIONS & MISCELLANEOUS INFORMATION

AE101 FIRST FLOOR PLAN

AE102 SECOND FLOOR PLAN

AE103 THIRD FLOOR PLAN

AE104 FOURTH FLOOR PLAN

AE105 FIFTH FLOOR PLAN

AE106 SIXTH FLOOR PLAN

AE107 SEVENTH FLOOR PLAN

AE200 EXTERIOR BUILDING ELEVATIONS - EAST & WEST

AE201 EXTERIOR BUILDING ELEVATIONS - NORTH & SOUTH

AE600 WINDOW/CURTAIN WALL DETAILS

AREA MAP

VICINITY MAP

PROJECT LOCATION

PROJECT LOCATION

N

N

Contact:Contact: Contact:

HEAPY

William Samson

Senior Mechanical Designer

4000 W. DORTHY LANE

DAYTON, OH 45409

p: 937.224.0861 wjsamson@heapy.com

MECHANICAL

ENGINEER

John D. Dingell VA Medical Center

Kristopher Steis

COR

4646 John R St, Detroit, MI 48201 p: (xxx) xxx xxxx e: kristopher.steis@va.gov

OWNER

GUIDON DESIGN INC.

James Gooden

Sr. Project Manager

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 ext 145 e: jgooden@guidondesign.com

ARCHITECT

Revisions: Date:

SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATIONOBJECT

REFERENCED

X

XXXX

SCALE: ??

VIEW TITLE

N

NORTH ARROW

EXTENT OF REVISION

REVISION SET

PROJECT BOUNDARY

BEYOND PROJECT BOUNDARY, NIC

DETAIL/DRAWING SCALE

TITLE OF DETAIL/DRAWING

DETAIL/DRAWING NUMBER

SHEET NUMBER

A/E ARCHITECT/ENGINEER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

BLDG BUILDING

BOT BOTTOM

BSMT BASEMENT

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CLR CLEAR

CONSTR CONSTRUCTION

COORD COORDINATE

CORR CORRIDOR

D DEPTH

DBL DOUBLE

DET DETAIL

DIM DIMENSION

DOC DOCUMENT

DWG DRAWING

EA EACH

EPS EXPANDED POLYSTYRENE BOARD (INSULATION)

EQ EQUAL

EST ESTIMATE

EXIST EXISTING

EXP EXPANSION OR EXPOSED

FF FINISH FACE

FIN FINISH

FLR FLOOR

FOC FACE OF CONCRETE OR FACE OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FRMG FRAMING

FURG FURRING

GC GENERAL CONTRACTOR

GSB GYPSUM SHEATHING BOARD

GYP GYPSUM

HDR HEADER

HORIZ HORIZONTAL

INFO INFORMATION

INSUL INSULATION

JT JOINT

KD KILN DRIED OR KNOCKED DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

LIN LINEAR

MFG MANUFACTURING

MULL MULLION

NIC NOT IN CONTRACT

OPNG OPENING

ORIG ORIGINAL

PCC PRECAST CONCRETE

PRCST PRECAST

QTY QUANTITY

REC RECESSED

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RO ROUGH OPENING

SBSTR SUBSTRATE

SCHED SCHEDULE

SCHEM SCHEMATIC

SEP SEPARATE

SGL SINGLE

SHTHG SHEATHING

SIM SIMILAR

SPEC SPECIFICATION

STOR STORAGE

STRUCT STRUCTURAL

SYM SYMBOL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

TO TOP OF ___

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOW TOP OF WALL

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

VAR VARIES

VEST VESTIBULE

VIC VICINITY

VIF VERIFY IN FIELD

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WR WEATHER RESISTANT

WS WEATHERSTRIP

XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)

1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®

SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION

MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL

DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,

SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES

MANAGEMENT.

2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE

CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE

NATIONAL CAD STANDARD AS GUIDES.

3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT

TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.

CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER

QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY

THE BID DUE DATE.

4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH

OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED

WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,

ACCESS CONTROL, ETC.

5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN

FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT

LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK

AND ACCESS TO EXISTING UTILITIES FOR TIE IN.

6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING

BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC

MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR

VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH

THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS

AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,

ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION

REQUIREMENTS.

7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF

WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE

FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK

THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF

WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY

CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.

8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR

UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,

GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.

9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING

AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING

CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING

PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED

METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.

10. MECHANICAL AND PLUMBING DRAWINGS SHOW INFORMATION IN A DIAGRAMMATIC

FASHION WITHOUT DIMENSIONING. THE GENERAL CONTRACTOR IS TO COORDINATE

THE LOCATIONS OF ALL MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT WITH

RESPECT TO THE ARCHITECTURAL AND STRUCTURAL DETAILING OF SHAFTS,

CHASES, CEILING CONSTRUCTION, ETC.

11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT

IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW

CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION

BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED

CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY

ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR

MISSING DIMENSIONS.

12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL

ORIENTATION AND CONTEXT ONLY.

13. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS

“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE

DETAIL, AREA, OR ITEM REFERENCED.

14. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.

CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,

INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.

15. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS

AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL

DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.

16. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND

EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF

DELIVERY AND ROUGH-IN.

17. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY

CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.

18. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE

FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND

HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.

19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL

UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO

UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE

OWNER.

20. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING

REQUIRED DURING CONSTRUCTION.

21. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT

CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE

CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE

CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO

COST TO THE OWNER.

22. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT

DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER

QUALITY OF WORK, AS DETERMINED BY THE COR, SHALL BE PROVIDED.

X

SHEET LOCATION

VIEW NUMBER

XXXX

ELEVATION REFERENCES

ROOM

ROOM TAG

REVISION TO PLAN CALLOUT

PT-1

A

T

FINISH INDICATION

FRAME / WINDOW

GLAZING1

1 PLAN NOTE

1 DEMOLITION NOTE

ALTERNATE/BID DEDUCT ITEM

KEY NOTE SYMBOLS

CONSTRUCTION GENERAL NOTESARCHITECTURAL SYMBOLSARCHITECTURAL ABBREVIATIONS

V.I.F.

V .I.

F

LEVEL #

TYPES 1 & 2

V.I.F.

V .I.

F

V .I.

F

LEVEL 1

TYPES 3 & 4

GLAZING

SPANDREL

SPANDREL

GLAZING

V.I.F.

V .I.

F

LEVEL #

TYPE 5

GLAZING

SPANDREL

V.I.F.

V .I.

F

LEVEL 1

TYPE 9

GLAZING

SPANDREL

V .I.

F

V .I.

F

SPANDREL

V.I.F.

V .I.

F

LEVEL 1

TYPE 10

GLAZING

SPANDREL

V .I.

F

LEVEL #

TYPES 6 & 7

V.I.F.

GLAZING

SPANDREL

V .I.

F

LEVEL #

V .I.

F

V .I.

F

TYPE 8

V.I.F.

GLAZING

DOOR

DOOR - ONLY OCCURS

AT

SPECIFIC LOCATIONS.

PLANS FOR LOCATIONS.

OBLIQUEOBLIQUE

OBLIQUEOBLIQUE

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

GLAZING

AE600

Sim

AE600

Sim

GLAZING

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

AE600

Sim

CONSTRUCTION ACTIVITY - INFECTION RISK: C

PATIENT RISK GROUP: HIGHEST

CLASS OF PRECAUTION MATRIX: III & IV

A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

B. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

C. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

D. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW

THE FLOOR PLATE OF THE PROJECT BOUNDARY.

E. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED

IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED

AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

F. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

G. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

H. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

I. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED

WITH 4 MIL. POLY SHEET.

J. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

K. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

L. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

B. EXTERIOR WORK SHALL BE COMPLETELD DURING DAYLIGHT HOURS.

COORDINATE WITH COR.

C. INTERIOR WORK HOURS AND NUMBER OF PHASES SHALL BE DICTATED BY

CONTRACTOR AND COORDINATED WITH COR.

PHASING GENERAL NOTES

INFECTION CONTROL GENERAL NOTES

INFECTION CONTROL PROJECT INFORMATION

IC-V TEMPORARY INFECTION CONTROL VISQUEEN BARRIER

6-MIL FIRE RETARDENT POLY

INTERIOR SIDE

EXISTING CEILING

CONTINUOUSLY ADHERE 6-MIL. FIRE

RETARDANT POLY TO CEILING WITH TAPE

CONTINUOUSLY ADHERE FIRE

RETARDENT POLY TO FLOOR WITH TAPE

EXISTING DECK

CONSTRUCTION

SIDE

OCCUPIED

SIDE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN SUBMISSION

65% DESIGN DEVELOPMENT SUBMISSION

95% CONSTRUCTION DOCUMENTS SUBMISSION

11/01/2021

04/12/2022

07/06/2022

BID DOCUMENTS SUBMISSION 09/19/2022

C A u to d e s k \R e v it B a c k u p \1

.1

.1

A v g v e e rk a m p .r v t

/1

/2

:0 :1

P

M

AE001

ABBREVIATIONS &

MISCELLANEOUS INFORMATIONGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

INSULATE EXTERIOR WALLS &

REPLACE WINDOWS

4646 JOHN R ST., DETROIT, MI

553-21-106

09/19/2022 GV JG

BID DOCUMENTS

FULLY SPRINKLERED

937.224.0861

NO SCALEAE001

A WINDOW LEGEND

SCALE: 1 1/2" = 1'-0"AE001

1 TEMPORARY PLASTIC PARTITION

AE200

AE201

AE201

AE200

4 4 4 4 4 4 4 4

3 3 3 3

4 4 4 4 4 4 4

4 4 4 4 4 4 4 4

3 3

4 4 4 4 4 4 4 4

EXAM

B1326

EXAM

B1324

EXAM

B1324A

EXAM

B1324B

EXAM

B1324C

EXAM

B1324D

EXAM

B1324E

SCHEDULERS

B1322

WORK ROOM

B1320

KITCHEN

B1292

MULTI-PURPOSE

ROOM

B1290

CORRIDOR

B1215

FITNESS CENTER

B1214

OFFICE

B1247

OFFICE

B1245

OFFICE

B1243

OFFICE

B1241

OFFICE

B1240

OFFICE

A1111

PHARMACY

A1109

PHARMACY

A1105

CANTEEN STORAGE

A1039

DINING

A1038

CANTEEN

A1032

OFFICE

A1016

CORRIDOR

CA116

OFFICE

A1017

LOUNGE

A1018

CT PATIENT

TANSPORT

C1401

EXAM

C1408

EXAM

C1410

EXAM

C1412

EXAM

C1414

EXAM

C1416

OFFICE

C1418

VACANT

C1430

CORRIDOR

CC126

RECEPTION

C1435

RECEPTION

C1441

OFFICE

C1442

OFFICE

C1444

RED BLUE

YELLOWENERGY CENTER

KEY PLAN

N

SEE SHEET AE001 FOR PROJECT

GENERAL NOTES AND

ARCHITECTURAL SYMBOL LEGEND

SEE SHEET AE001 FOR

WINDOW LEGEND

AREA IN SCOPE

BEYOND PROJECT BOUNDARY

IC / PHASING LEGEND

- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF

WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.

- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &

STOREFRONTS LOCATED ON THE FIRST FLOOR.

INFECTION CONTROL & SHEET NOTES

*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*

1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.

FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH

SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO

MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED

(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER

LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH

EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.

BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.

2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT / CURTAIN WALL.

INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE

CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE

FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND

PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON

INTERIOR OF WINDOW.

3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.

HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.

4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE

REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW

JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE

PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED

FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING

DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE

REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE

A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT

FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR

STOREFRONT LOCATIONS.

EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF

WINDOW.

PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN SUBMISSION

65% DESIGN DEVELOPMENT SUBMISSION

95% CONSTRUCTION DOCUMENTS SUBMISSION

11/01/2021

04/12/2022

07/06/2022

BID DOCUMENTS SUBMISSION 09/19/2022

C A u to d e s k \R e v it B a c k u p \1

.1

.1

A v g v e e rk a m p .r v t

/1

/2

:0 :3

P

M

AE101

FIRST FLOOR PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

INSULATE EXTERIOR WALLS &

REPLACE WINDOWS

4646 JOHN R ST., DETROIT, MI

553-21-106

09/19/2022 JG GV

BID DOCUMENTS

FULLY SPRINKLERED

937.224.0861

SCALE: 3/64" = 1'-0"AE101

1 FIRST FLOOR N

AE201

AE201

AE200

2 2 2 2 2 2 2 2

1 1 1 1

2 2 2 2 2 2 22

2 2 2 2 2 2 2 2

1 1 1 1

2 2 2 2 2 2 2 2

111111111111111111

5555555 5 5 55 5 5 55 5

B E

D R

O O

M

B

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

C O

N F

E R

E N

C E

R O

O M

B

DAY ROOM

B2326

DAY ROOM

B2293

OFFICE

B2283

OFFICE

B2281

OFFICE

B2277

OFFICE

B2275

OFFICE

B2269

OFFICE

B2271

OFFICE

B2265

OFFICE

B2263

OFFICE

B2261

ICU BEDROOM

A2133

ICU BEDROOM

A2131

ICU BEDROOM

A2129

ICU BEDROOM

A2127

ICU BEDROOM

A2125

ICU BEDROOM

A2123

ICU BEDROOM

A2121

ICU BEDROOM

A2119

B E

D R

O

E D

A

IC

U

P H

Y S

IC

IA

N C

A L

L

R O

O M

A

DAY ROOM

A2059

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O O

M

IS

O

L A

T

IO

N

A

B E

D R

O O

M

IS

O

L A

T

IO

N

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

C L

A S

S R

O O

M

A

CORRIDOR

CA202

WAITING

A2001

LAB

C2909

OFFICE

C2907

OFFICE

C2908

OFFICE

C2924

OFFICE

C2925

COORDINATOR

C2923

DIALYSIS CUBICLE

C2942

DIALYSIS CUBICLE

C2943

DIALYSIS CUBICLE

C2944

DIALYSIS CUBICLE

C2946

DIALYSIS CUBICLE

C2947

DIALYSIS CUBICLE

C2948

DIALYSIS CUBICLE

C2949

CORRIDOR

CC287

EXAM

C2955

EXAM

C2957

OFFICE

C2828

OFFICE

C2826

OFFICE

C2824

OFFICE

C2822

OFFICE

C2820

PT ROOM

C2539

C O

R R

ID

O

R

C C

EXAM

C2455

EXAM

C2453

EXAM

C2451

EXAM

C2449

EXAM

C2447

EXAM

C2445

EXAM

C2443

EXAM

C2441

EXAM

C2439

EXAM

C2437

EXAM

C2404

EXAM

C2403

EXAM

C2402

OFFICE

C2401

CORRIDOR

CB203

C O

R R

ID

O

R

B

CORRIDOR

CB205

WAITING

B2301

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

B E

D R

O

E D

B

OFFICE

C2630

CORRIDOR

CC258

OFFICE

C2629

OTHER SPACE

C2634

CORRIDOR

CC254OFFICE

C2545

CORRIDOR

CA202

CORRIDOR

CA203

CORRIDOR

CA205

1 1 1 1 1

RED BLUE

YELLOWENERGY CENTER

KEY PLAN

N

SEE SHEET AE001 FOR PROJECT

GENERAL NOTES AND

ARCHITECTURAL SYMBOL LEGEND

SEE SHEET AE001 FOR

WINDOW LEGEND

AREA IN SCOPE

BEYOND PROJECT BOUNDARY

IC / PHASING LEGEND

- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF

WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.

- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &

STOREFRONTS LOCATED ON THE FIRST FLOOR.

INFECTION CONTROL & SHEET NOTES

*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*

1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.

FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH

SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO

MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED

(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER

LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH

EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.

BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.

2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT / CURTAIN WALL.

INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE

CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE

FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND

PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON

INTERIOR OF WINDOW.

3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.

HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.

4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE

REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW

JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE

PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED

FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING

DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE

REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE

A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT

FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR

STOREFRONT LOCATIONS.

EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF

WINDOW.

PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN SUBMISSION

65% DESIGN DEVELOPMENT SUBMISSION

95% CONSTRUCTION DOCUMENTS SUBMISSION

11/01/2021

04/12/2022

07/06/2022

BID DOCUMENTS SUBMISSION 09/19/2022

C A u to d e s k \R e v it B a c k u p \1

.1

.1

A v g v e e rk a m p .r v t

/1

/2

:0 :4

P

M

AE102

SECOND FLOOR PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

INSULATE EXTERIOR WALLS &

REPLACE WINDOWS

4646 JOHN R ST., DETROIT, MI

553-21-106

09/19/2022 JG GV

BID DOCUMENTS

FULLY SPRINKLERED

937.224.0861

SCALE: 3/64" = 1'-0"AE102

1 SECOND FLOOR N

No fin tube here.

AE201

AE201

AE200

2 2 2 2 2 2 2 2

1 1 1 1

2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2

1 1 1 1

2 2 2 2 2 2 2 2

11111111111111111111

5 5

5555555 5 5 55 5 5 55 5

EXAM

B3329

EXAM

B3331

EXAM

B3333

EXAM

B3335

EXAM

B3337

EXAM

B3339

EXAM

B3341

EXAM

B3343

WAITING

B3326

CLASSROOM

B3325

BREAK ROOM

B3286

OFFICE

B3284

OFFICE

B3283

OFFICE

B3281

OFFICE

B3280

OFFICE

B3279

OFFICE

B3277

OFFICE

B3276

OFFICE

B3275

OFFICE

B3273

OFFICE

B3271

BEDROOM

ISOLATION

A3133

BEDROOM

ISOLATION

A3131 B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

WAITING

A3057

WAITING

A3070

CONFERENCE ROOM

A3024

WAITING A

A3025

WAITING B

A3026

WAITING C

A3027

TOILET

A3018

OFFICE

A3017

OFFICE

A3016

OFFICE

A3015

OFFICE

A3014

OFFICE

A3013

LOUNGE

A3012

C O

R R

ID

O

R

C A

2 WAITING

A3001

WAITING

C3901

C O

R R

ID

O

R

C C

EXAM

C3910

LIBRARY

C3938

Room

C3941

Room

C3943

OFFICE

C3945

OFFICE

C3826

OFFICE

C3825

OFFICE

C3824

OFFICE

C3756

CONFERENCE ROOM

C3754

CORRIDOR

CC359

CORRIDOR

CC347

CORRIDOR

CC347

C O

R R

ID

O

R

C C

OFFICE

C3540

OFFICE

C3542

OFFICE

C3545

CORRIDOR

C3413

OFFICE

CC320

EXAM

C3412

OFFICE

C3410

C O

R R

ID

O

R

C B

2WAITING

B3301

EXAM

B3363

EXAM

B3365

EXAM

B3367

EXAM

B3369

EXAM

B3371

EXAM

B3373

EXAM

B3375

EXAM

B3377

EXAM

B3379

EXAM

B3381

OFFICE

B3247

OFFICE

B3246

CORRIDOR

CA303

CORRIDOR

CA305

CORRIDOR

CB303

CORRIDOR

CB305

BEDROOM

C3434

BEDROOM

C3432

BEDROOM

C3430

BEDROOM

C3428

BEDROOM

C3426

BEDROOM

C3424

BEDROOM

C3422

BEDROOM

C3420

EXAM

C3418

EXAM

C3416

EXAM

C3414

CORRIDOR

CC379

CORRIDOR

CC378

1 1 1 1 1

RED BLUE

YELLOWENERGY CENTER

KEY PLAN

N

SEE SHEET AE001 FOR PROJECT

GENERAL NOTES AND

ARCHITECTURAL SYMBOL LEGEND

SEE SHEET AE001 FOR

WINDOW LEGEND

AREA IN SCOPE

BEYOND PROJECT BOUNDARY

IC / PHASING LEGEND

- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF

WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.

- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &

STOREFRONTS LOCATED ON THE FIRST FLOOR.

INFECTION CONTROL & SHEET NOTES

*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*

1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.

FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH

SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO

MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED

(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER

LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH

EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.

BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.

2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT / CURTAIN WALL.

INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE

CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE

FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND

PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON

INTERIOR OF WINDOW.

3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.

HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.

4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE

REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW

JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE

PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED

FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING

DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE

REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE

A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT

FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR

STOREFRONT LOCATIONS.

EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF

WINDOW.

PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN SUBMISSION

65% DESIGN DEVELOPMENT SUBMISSION

95% CONSTRUCTION DOCUMENTS SUBMISSION

11/01/2021

04/12/2022

07/06/2022

BID DOCUMENTS SUBMISSION 09/19/2022

C A u to d e s k \R e v it B a c k u p \1

.1

.1

A v g v e e rk a m p .r v t

/1

/2

:0 :5

P

M

AE103

THIRD FLOOR PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

INSULATE EXTERIOR WALLS &

REPLACE WINDOWS

4646 JOHN R ST., DETROIT, MI

553-21-106

09/19/2022 JG GV

BID DOCUMENTS

FULLY SPRINKLERED

937.224.0861

SCALE: 3/64" = 1'-0"AE103

1 THIRD FLOOR N

AE201

AE201

AE200

2 2 2 2 2 2 2 2

1 1 1 1

2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2

1 1 1 1

2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

OFFICE

B4334

OFFICE

B4333

LAB

B4327

LAB

B4325

LAB

B4323

LAB

B4321

OFFICE

B4266

OFFICE

B4265

OFFICE

B4264

OFFICE

B4263

OFFICE

B4262

LAB

B4247

LAB

B4245

LAB

B4243

LAB

B4241

OFFICE

B4238

C O

R R

ID

O

R

C B

OFFICE

B4237

BEDROOM

ISOLATION

A4133

BEDROOM

ISOLATION

A4131 B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

PHYSICAL THERAPY

CLINIC

A4057

MAIN WAITING

A4064

INTAKE

A4063

INTAKE

A4062

WAITING A

A4035

WAITING B

A4034

WAITING C

A4033

C O

R R

ID

O

R

C A

VAS LAB

A4032

STAFF BREAKROOM

A4019

PODIATRY

A4017

NURSING STAFF

WORKSTATIONS

A4018

PODIATRY

PROVIDERS

A4016

ORTHO PROVIDERS

A4015ORTHO PROVIDERS

A4014

ORTHO NURSE

PRACTITIONERS

A4013

MURSE MANAGER

A4012

C O

R R

ID

O

R

C A

2 WAITING

A4001

CORRIDOR

CC481A

2 BED

C4904

2 BED

C4906

1 BED

C4908

2 BED

C4910

2 BED

C4911

ISOLATION

BEDROOM

C4917

SICU BEDROOM

C4918

SICU BEDROOM

C4920

SICU BEDROOM

C4922

SICU BEDROOM

C4924

SICU BEDROOM

C4930

CORRIDOR

CC474

CORRIDOR

CC467

CORRIDOR

CC459

CORRIDOR

CC448

LAB

C4503

LAB

C4501

LAB

C4500

OFFICE

C4466

OFFICE

C4465

OFFICE

C4463

OFFICE

C4461

OFFICE

C4459

OFFICE

C4457

OFFICE

C4455

OFFICE

C4453

OFFICE

C4451

CONFERENCE ROOM

C4450

LAB

C4445

STORAGE

C4443

OFFICE

C4439

OFFICE

C4438

WAITING

B4301

C O

R R

ID

O

R

C B

LAB

B4369

LAB

B4367

LAB

B4365

LAB

B4363

LAB

B4361

UTILIZATION

MANAGEMENT

ROOM

CA403

CORRIDOR

CA405

CORRIDOR

CB402

CORRIDOR

CB402

CORRIDOR

CB405

ANTE

C4930A

1 1 1 1 1

FLAG ROOM

B4224

RED BLUE

YELLOWENERGY CENTER

KEY PLAN

N

SEE SHEET AE001 FOR PROJECT

GENERAL NOTES AND

ARCHITECTURAL SYMBOL LEGEND

SEE SHEET AE001 FOR

WINDOW LEGEND

AREA IN SCOPE

BEYOND PROJECT BOUNDARY

IC / PHASING LEGEND

- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF

WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.

- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &

STOREFRONTS LOCATED ON THE FIRST FLOOR.

INFECTION CONTROL & SHEET NOTES

*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*

1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.

FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH

SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO

MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED

(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER

LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH

EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.

BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.

2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT / CURTAIN WALL.

INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE

CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE

FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND

PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON

INTERIOR OF WINDOW.

3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.

HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.

4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE

REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW

JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE

PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED

FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING

DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE

REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE

A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT

FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR

STOREFRONT LOCATIONS.

EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF

WINDOW.

PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN SUBMISSION

65% DESIGN DEVELOPMENT SUBMISSION

95% CONSTRUCTION DOCUMENTS SUBMISSION

11/01/2021

04/12/2022

07/06/2022

BID DOCUMENTS SUBMISSION 09/19/2022

C A u to d e s k \R e v it B a c k u p \1

.1

.1

A v g v e e rk a m p .r v t

/1

/2

:0 :1

P

M

AE104

FOURTH FLOOR PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

INSULATE EXTERIOR WALLS &

REPLACE WINDOWS

4646 JOHN R ST., DETROIT, MI

553-21-106

09/19/2022 JG GV

BID DOCUMENTS

FULLY SPRINKLERED

937.224.0861

SCALE: 3/64" = 1'-0"AE104

1 FOURTH FLOOR N

AE201

AE201

AE200

1 1 1 1

2 2 2 2 2 2 2 2

1 1 1 1

2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 2

OFFICE

B5381

OFFICE

B5388

OFFICE

B5387

OFFICE

B5386

OFFICE

B5385

OFFICE

B5368

OFFICE

B5367

OFFICE

B5366

OFFICE

B5365

OFFICE

B5364

D

IR

E C

T O

R 'S

O F

F

IC

E

B

OFFICE

B5331

OFFICE

B5330

OFFICE

B5329

OFFICE

B5328

CONFERENCE

B5327

OFFICE

B5287

OFFICE

B5286

OFFICE

B5285

OFFICE

B5262

OFFICE

B5261

OFFICE

B5260

OFFICE

B5258

OFFICE

B5259 C O

R R

ID

O

R

C B

BEDROOM

ISOLATION

A5133

BEDROOM

ISOLATION

A5131

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

DAY ROOM

A5057

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

BEDROOM

ISOLATION

A5039

BEDROOM

ISOLATION

A5037

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

3LOUNGE

A5008

CORRIDOR

CA502

WAITING

A5001

BEDROOM -

RESIDENT

A5099

BEDROOM -

RESIDENT

A5098

CLASS ROOM

A5102

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

OFFICE

B5233

C O

R R

ID

O

R

C B

CONFERENCE

B5227C

CONFERENCE

B5227B

CONFERENCE

B5227A

OFFICE

B5219

CORRIDOR

CB504

OFFICE

B5398

OFFICE

B5397

OFFICE

B5396

OFFICE

B5395

Room

B5301

CORRIDOR

CB502

OFFICE

B5305

OFFICE

B5346

OFFICE

B5347

OFFICE

B5348

OFFICE

B5341

OFFICE

B5349OFFICE

B5371

OFFICE

B5374

C O

R R

ID

O

R

C B

MENS TOILET

B5375

10 10 10 10 10 10 10 10

CORRIDOR

CA504

CORRIDOR

CA504

CORRIDOR

CA505

3 3

1 1

RED BLUE

YELLOWENERGY CENTER

KEY PLAN

N

SEE SHEET AE001 FOR PROJECT

GENERAL NOTES AND

ARCHITECTURAL SYMBOL LEGEND

SEE SHEET AE001 FOR

WINDOW LEGEND

AREA IN SCOPE

BEYOND PROJECT BOUNDARY

IC / PHASING LEGEND

- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF

WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.

- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &

STOREFRONTS LOCATED ON THE FIRST FLOOR.

INFECTION CONTROL & SHEET NOTES

*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*

1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.

FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH

SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO

MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED

(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER

LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH

EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.

BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.

2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT / CURTAIN WALL.

INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE

CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE

FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND

PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON

INTERIOR OF WINDOW.

3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.

HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.

4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE

REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW

JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE

PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED

FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING

DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE

REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE

A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT

FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR

STOREFRONT LOCATIONS.

EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF

WINDOW.

PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN SUBMISSION

65% DESIGN DEVELOPMENT SUBMISSION

95% CONSTRUCTION DOCUMENTS SUBMISSION

11/01/2021

04/12/2022

07/06/2022

BID DOCUMENTS SUBMISSION 09/19/2022

C A u to d e s k \R e v it B a c k u p \1

.1

.1

A v g v e e rk a m p .r v t

/1

/2

:0 :1

P

M

AE105

FIFTH FLOOR PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

INSULATE EXTERIOR WALLS &

REPLACE WINDOWS

4646 JOHN R ST., DETROIT, MI

553-21-106

09/19/2022 JG GV

BID DOCUMENTS

FULLY SPRINKLERED

937.224.0861

SCALE: 3/64" = 1'-0"AE105

1 FIFTH FLOOR N

AE201

AE201

2 2 2 2 2 2 2 2

1 1 1 1

2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1111111111

BEDROOM

ISOLATION

A6133

BEDROOM

ISOLATION

A6131 B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

DAY ROOM

A6057

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

BEDROOM

ISOLATION

A6039

BEDROOM

ISOLATION

A6037

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

CLASS ROOM

A6011

CORRIDOR

CA602

WAITING

A6001

BEDROOM -

RESIDENT

A6098

BEDROOM -

RESIDENT

A6097

BEDROOM -

RESIDENT

A6096

CORRIDOR

CA604

BARBER SHOP

A6100

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

B E

D R

O

E D

A

AE200

CORRIDOR

CA605

RED BLUE

YELLOWENERGY CENTER

KEY PLAN

N

SEE SHEET AE001 FOR PROJECT

GENERAL NOTES AND

ARCHITECTURAL SYMBOL LEGEND

SEE SHEET AE001 FOR

WINDOW LEGEND

AREA IN SCOPE

BEYOND PROJECT BOUNDARY

IC / PHASING LEGEND

- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF

WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.

- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &

STOREFRONTS LOCATED ON THE FIRST FLOOR.

INFECTION CONTROL & SHEET NOTES

*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*

1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.

FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH

SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO

MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED

(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER

LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH

EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.

BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.

2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT / CURTAIN WALL.

INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE

CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE

FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND

PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON

INTERIOR OF WINDOW.

3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.

HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.

4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE

REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW

JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE

PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED

FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING

DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE

REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE

A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT

FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR

STOREFRONT LOCATIONS.

EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF

WINDOW.

PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN SUBMISSION

65% DESIGN DEVELOPMENT SUBMISSION

95% CONSTRUCTION DOCUMENTS SUBMISSION

11/01/2021

04/12/2022

07/06/2022

BID DOCUMENTS SUBMISSION 09/19/2022

C A u to d e s k \R e v it B a c k u p \1

.1

.1

A v g v e e rk a m p .r v t

/1

/2

:0 :2

P

M

AE106

SIXTH FLOOR PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

INSULATE EXTERIOR WALLS &

REPLACE WINDOWS

4646 JOHN R ST., DETROIT, MI

553-21-106

09/19/2022 JG GV

BID DOCUMENTS

FULLY SPRINKLERED

937.224.0861

SCALE: 3/64" = 1'-0"AE106

1 SIXTH FLOOR N

AE201

AE201

AE200

2 2 2 2 2 2 2 2

1 1 1 1

2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

OFFICE

A7131

OFFICE

A7129

OFFICE

A7127

OFFICE

A7125

OFFICE

A7123

OFFICE

A7121

OFFICE

A7119

OFFICE

A7117

GROUP

A7115

WAITING

A7055

CONFERENCE

A7053

OFFICE

A7051

OFFICE

A7049

OFFICE

A7047

OFFICE

A7045

OFFICE

A7043

OFFICE

A7041

OFFICE

A7039

OFFICE

A7037

OFFICE

A7029

OFFICE

A7027

OFFICE

A7025

OFFICE

A7023

OFFICE

A7021

OFFICE

A7019

OFFICE

A7017

OFFICE

A7015

OFFICE

A7013

OFFICE

A7011

CORRIDOR

CA702

LOUNGE

A7001

TOILET

A7097

STAFF LOUNGE

A7095

CORRIDOR

CA704

OFFICE

A7164

OFFICE

A7162

OFFICE

A7160

OFFICE

A7158

OFFICE

A7156

OFFICE

A7154

OFFICE

A7152

OFFICE

A7150

OFFICE

A7148

OFFICE

A7146

AE200

AE201

AE200

AE201

RED BLUE

YELLOWENERGY CENTER

KEY PLAN

N

SEE SHEET AE001 FOR PROJECT

GENERAL NOTES AND

ARCHITECTURAL SYMBOL LEGEND

SEE SHEET AE001 FOR

WINDOW LEGEND

AREA IN SCOPE

BEYOND PROJECT BOUNDARY

IC / PHASING LEGEND

- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF

WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.

- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &

STOREFRONTS LOCATED ON THE FIRST FLOOR.

INFECTION CONTROL & SHEET NOTES

*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*

1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.

FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH

SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO

MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED

(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER

LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH

EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.

BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.

2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT / CURTAIN WALL.

INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE

CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE

FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND

PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON

INTERIOR OF WINDOW.

3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.

HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.

4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW

BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF

STOREFRONT.

5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE

REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW

JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE

PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED

FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING

DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE

REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE

A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT

FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR

STOREFRONT LOCATIONS.

EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF

WINDOW.

PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN SUBMISSION

65% DESIGN DEVELOPMENT SUBMISSION

95% CONSTRUCTION DOCUMENTS SUBMISSION

11/01/2021

04/12/2022

07/06/2022

BID DOCUMENTS SUBMISSION 09/19/2022

C A u to d e s k \R e v it B a c k u p \1

.1

.1

A v g v e e rk a m p .r v t

/1

/2

:0 :2

P

M

AE107

SEVENTH FLOOR PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

INSULATE EXTERIOR WALLS &

REPLACE WINDOWS

4646 JOHN R ST., DETROIT, MI

553-21-106

09/19/2022 JG GV

BID DOCUMENTS

FULLY SPRINKLERED

937.224.0861

SCALE: 3/64" = 1'-0"AE107

1 SEVENTH FLOOR N

FIRST FLOOR

758' - 0"

SECOND FLOOR

781' - 4"

THIRD FLOOR

802' - 8"

FOURTH FLOOR

824' - 0"

FIFTH FLOOR

845' - 4"

SIXTH FLOOR

866' - 8"

SEVENTH FLOOR

888' - 0"

FIRST FLOOR

758' - 0"

SECOND FLOOR

781' - 4"

THIRD FLOOR

802' - 8"

FOURTH FLOOR

824' - 0"

FIFTH FLOOR

845' - 4"

SIXTH FLOOR

866' - 8"

SEVENTH FLOOR

888' - 0"

WINDOWS IN SCOPE

CURTAIN WALLS IN SCOPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN SUBMISSION

65% DESIGN DEVELOPMENT SUBMISSION

95% CONSTRUCTION DOCUMENTS SUBMISSION

11/01/2021

04/12/2022

07/06/2022

BID DOCUMENTS SUBMISSION 09/19/2022

C A u to d e s k \R e v it B a c k u p \1

.1

.1

A v g v e e rk a m p .r v t

/1

/2

:0 :5

P

M

AE200

EXTERIOR BUILDING ELEVATIONS

- EAST & WESTGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

INSULATE EXTERIOR WALLS &

REPLACE WINDOWS

4646 JOHN R ST., DETROIT, MI

553-21-106

09/19/2022 JG GV

BID DOCUMENTS

FULLY SPRINKLERED

937.224.0861

SCALE: 3/64" = 1'-0"AE200

1 EXTERIOR ELEVATION - WEST FACADE

SCALE: 3/64" = 1'-0"AE200

2 EXTERIOR ELEVATION - EAST FACADE

FIRST FLOOR

758' - 0"

SECOND FLOOR

781' - 4"

THIRD FLOOR

802' - 8"

FOURTH FLOOR

824' - 0"

FIFTH FLOOR

845' - 4"

SIXTH FLOOR

866' - 8"

SEVENTH FLOOR

888' - 0"

FIRST FLOOR

758' - 0"

SECOND FLOOR

781' - 4"

THIRD FLOOR

802' - 8"

FOURTH FLOOR

824' - 0"

FIFTH FLOOR

845' - 4"

SIXTH FLOOR

866' - 8"

SEVENTH FLOOR

888' - 0"

WINDOWS IN SCOPE

CURTAIN WALLS IN SCOPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN SUBMISSION

65% DESIGN DEVELOPMENT SUBMISSION

95% CONSTRUCTION DOCUMENTS SUBMISSION

11/01/2021

04/12/2022

07/06/2022

BID DOCUMENTS SUBMISSION 09/19/2022

C A u to d e s k \R e v it B a c k u p \1

.1

.1

A v g v e e rk a m p .r v t

/1

/2

:0 :0

P

M

AE201

EXTERIOR BUILDING ELEVATIONS

- NORTH & SOUTHGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

INSULATE EXTERIOR WALLS &

REPLACE WINDOWS

4646 JOHN R ST., DETROIT, MI

553-21-106

09/19/2022 JG GV

BID DOCUMENTS

FULLY SPRINKLERED

937.224.0861

SCALE: 3/64" = 1'-0"AE201

1 EXTERIOR ELEVATION - NORTH FACADE

SCALE: 3/64" = 1'-0"AE201

2 EXTERIOR ELEVATION - SOUTH FACADE

BROKEN GLASS TO BE

REPLACED AS NECESSARY

EXISTING CAULK JOINT AND

BACKER ROD TO BE REMOVED

AND REPLACED

(TYP)

PILOT HOLES TO DRILLED INTO

WINDOW JAMBS. JAMBS TO BE

FILLED WITH SPRAY FOAM

INSULATION. HOLE TO BE

PATCHED AND PAINTED TO

MATCH EXISTING.

EXISTING WALL

BROKEN GLASS TO BE

REPLACED AS NECESSARY

EXISTING CAULK JOINT AND

BACKER ROD TO BE REMOVED

AND REPLACED

(TYP)

EXISTING FLOOR SLAB

BROKEN SPANDREL TO BE

REPLACED AS NECESSARY

EXISTING CAULK JOINT AND

BACKER ROD TO BE REMOVED

AND REPLACED.

FIN TUBE COVER. SEE PLANS FOR

LOCATION OF NEW FIN TUBE

COVERS. REFER TO B/AE600 FOR

ADDITIONAL INFORMATION

EXISTING FIN TUBE

EXISTING INSULATION TO

REMAIN. IF INSULATION IS NOT

PRESENT, POLYISOCYANURATE

TO BE INSTALLED. V.I.F.

BROKEN GLASS TO BE

REPLACED AS NECESSARY

EXISTING CAULK JOINT AND

BACKER ROD TO BE REMOVED

AND REPLACED

(TYP)

BROKEN SPANDREL TO BE

REPLACED AS NECESSARY

EXISTING CAULK JOINT AND

BACKER ROD TO BE REMOVED

AND REPLACED

(TYP)

AE600

Sim

BROKEN GLASS TO BE

REPLACED AS NECESSARY

EXISTING CAULK JOINT AND

BACKER ROD TO BE REMOVED AND

REPLACED (TYP)

EXISTING WALL CONSTRUCTION

FIN TUBE COVER. SEE PLANS FOR

LOCATION OF NEW FIN TUBE

COVERS. REFER TO B/AE600 FOR

ADDITIONAL INFORMATION

EXISTING FIN TUBE

EXISTING INSULATION TO

REMAIN. IF INSULATION IS NOT

PRESENT, POLYISOCYANURATE

TO…

This is the start of the file's text. The full file is on GovTribe.