Drawings - Project 553-21-106.pdf
PDF 32 MB Posted
- Attached to
- Z1DA--Insulate Exterior Walls, Replace Windows 553-21-106 Federal contract opportunity
- Solicitation number
- 36C25023B0024
About this file
This document provides details on a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The solicitation number is 36C25023B0024 and seeks to insulate exterior walls and replace windows at Project 553-21-106, as evidenced by the 32MB file of drawings attached. The opportunity type is listed as a solicitation. No further information is provided on response dates, award amounts, pricing terms, or set-asides. The summary focuses on the federal agency and high-level work requirements based on available information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25023B0024 0002.pdf | ||
| 553-21-106 Pre-Bid Site Visit Agenda_.pdf | ||
| 553-21-106 Pre-bid Site Visit Attendance Log.pdf | ||
| 36C25023B0024 0001.pdf | ||
| 36C25023B0024 0001.docx | DOCX document | |
| _36C25023B0024_.pdf | ||
| Drawings Addendum 1 Notes.pdf | ||
| Specifications - Project 553-21-106 - Volume II.pdf | ||
| Specifications - Project 553-21-106 - Volume I.pdf | ||
| S02 - RFI Form 553-21-106.pdf | ||
| S02 - Contractor EMR Certification Form - 553-21-106.pdf | ||
| WD GDN MI20230101 Mod 2 -02-24-2023 - Building - Wayne County.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT OFFICER REPRESENTATIVE DATE
CHIEF OF ENGINEERING DATE
CONTRACT SPECIALIST DATE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN SUBMISSION
65% DESIGN DEVELOPMENT SUBMISSION
95% CONSTRUCTION DOCUMENTS SUBMISSION
11/01/2021
04/12/2022
07/06/2022
BID DOCUMENTS SUBMISSION 09/19/2022
C A u to d e s k \R e v it B a c k u p \1
.1
.1
A v g v e e rk a m p .r v t
/1
/2
:0 :4
P
M
GI000
COVER SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
INSULATE EXTERIOR WALLS &
REPLACE WINDOWS
4646 JOHN R ST., DETROIT, MI
553-21-106
09/19/2022 JG GV
553-21-106
INSULATE EXTERIOR WALLS & REPLACE WINDOWS
JOHN D. DINGELL VA MEDICAL CENTER
4646 JOHN R ST., DETROIT, MI
BID DOCUMENTS
BID DOCUMENTS
FULLY SPRINKLERED
937.224.0861
SHEET INDEX
SHEET NUMBER SHEET NAME
ARCHITECTURAL
AE001 ABBREVIATIONS & MISCELLANEOUS INFORMATION
AE101 FIRST FLOOR PLAN
AE102 SECOND FLOOR PLAN
AE103 THIRD FLOOR PLAN
AE104 FOURTH FLOOR PLAN
AE105 FIFTH FLOOR PLAN
AE106 SIXTH FLOOR PLAN
AE107 SEVENTH FLOOR PLAN
AE200 EXTERIOR BUILDING ELEVATIONS - EAST & WEST
AE201 EXTERIOR BUILDING ELEVATIONS - NORTH & SOUTH
AE600 WINDOW/CURTAIN WALL DETAILS
AREA MAP
VICINITY MAP
PROJECT LOCATION
PROJECT LOCATION
N
N
Contact:Contact: Contact:
HEAPY
William Samson
Senior Mechanical Designer
4000 W. DORTHY LANE
DAYTON, OH 45409
p: 937.224.0861 wjsamson@heapy.com
MECHANICAL
ENGINEER
John D. Dingell VA Medical Center
Kristopher Steis
COR
4646 John R St, Detroit, MI 48201 p: (xxx) xxx xxxx e: kristopher.steis@va.gov
OWNER
GUIDON DESIGN INC.
James Gooden
Sr. Project Manager
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 ext 145 e: jgooden@guidondesign.com
ARCHITECT
Revisions: Date:
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATIONOBJECT
REFERENCED
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
EXTENT OF REVISION
REVISION SET
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
A/E ARCHITECT/ENGINEER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
BLDG BUILDING
BOT BOTTOM
BSMT BASEMENT
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CLR CLEAR
CONSTR CONSTRUCTION
COORD COORDINATE
CORR CORRIDOR
D DEPTH
DBL DOUBLE
DET DETAIL
DIM DIMENSION
DOC DOCUMENT
DWG DRAWING
EA EACH
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EST ESTIMATE
EXIST EXISTING
EXP EXPANSION OR EXPOSED
FF FINISH FACE
FIN FINISH
FLR FLOOR
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FRMG FRAMING
FURG FURRING
GC GENERAL CONTRACTOR
GSB GYPSUM SHEATHING BOARD
GYP GYPSUM
HDR HEADER
HORIZ HORIZONTAL
INFO INFORMATION
INSUL INSULATION
JT JOINT
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
LIN LINEAR
MFG MANUFACTURING
MULL MULLION
NIC NOT IN CONTRACT
OPNG OPENING
ORIG ORIGINAL
PCC PRECAST CONCRETE
PRCST PRECAST
QTY QUANTITY
REC RECESSED
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RO ROUGH OPENING
SBSTR SUBSTRATE
SCHED SCHEDULE
SCHEM SCHEMATIC
SEP SEPARATE
SGL SINGLE
SHTHG SHEATHING
SIM SIMILAR
SPEC SPECIFICATION
STOR STORAGE
STRUCT STRUCTURAL
SYM SYMBOL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
TO TOP OF ___
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
VAR VARIES
VEST VESTIBULE
VIC VICINITY
VIF VERIFY IN FIELD
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WR WEATHER RESISTANT
WS WEATHERSTRIP
XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH
OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED
WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,
ACCESS CONTROL, ETC.
5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH
THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS
AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION
REQUIREMENTS.
7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE
FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK
THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF
WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY
CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING
AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED
METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
10. MECHANICAL AND PLUMBING DRAWINGS SHOW INFORMATION IN A DIAGRAMMATIC
FASHION WITHOUT DIMENSIONING. THE GENERAL CONTRACTOR IS TO COORDINATE
THE LOCATIONS OF ALL MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT WITH
RESPECT TO THE ARCHITECTURAL AND STRUCTURAL DETAILING OF SHAFTS,
CHASES, CEILING CONSTRUCTION, ETC.
11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR
MISSING DIMENSIONS.
12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
13. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
14. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
15. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
16. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND
EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DELIVERY AND ROUGH-IN.
17. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY
CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
18. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE
OWNER.
20. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
21. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT
CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE
CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE
CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO
COST TO THE OWNER.
22. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK, AS DETERMINED BY THE COR, SHALL BE PROVIDED.
X
SHEET LOCATION
VIEW NUMBER
XXXX
ELEVATION REFERENCES
ROOM
ROOM TAG
REVISION TO PLAN CALLOUT
PT-1
A
T
FINISH INDICATION
FRAME / WINDOW
GLAZING1
1 PLAN NOTE
1 DEMOLITION NOTE
ALTERNATE/BID DEDUCT ITEM
KEY NOTE SYMBOLS
CONSTRUCTION GENERAL NOTESARCHITECTURAL SYMBOLSARCHITECTURAL ABBREVIATIONS
V.I.F.
V .I.
F
LEVEL #
TYPES 1 & 2
V.I.F.
V .I.
F
V .I.
F
LEVEL 1
TYPES 3 & 4
GLAZING
SPANDREL
SPANDREL
GLAZING
V.I.F.
V .I.
F
LEVEL #
TYPE 5
GLAZING
SPANDREL
V.I.F.
V .I.
F
LEVEL 1
TYPE 9
GLAZING
SPANDREL
V .I.
F
V .I.
F
SPANDREL
V.I.F.
V .I.
F
LEVEL 1
TYPE 10
GLAZING
SPANDREL
V .I.
F
LEVEL #
TYPES 6 & 7
V.I.F.
GLAZING
SPANDREL
V .I.
F
LEVEL #
V .I.
F
V .I.
F
TYPE 8
V.I.F.
GLAZING
DOOR
DOOR - ONLY OCCURS
AT
SPECIFIC LOCATIONS.
PLANS FOR LOCATIONS.
OBLIQUEOBLIQUE
OBLIQUEOBLIQUE
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
GLAZING
AE600
Sim
AE600
Sim
GLAZING
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
AE600
Sim
CONSTRUCTION ACTIVITY - INFECTION RISK: C
PATIENT RISK GROUP: HIGHEST
CLASS OF PRECAUTION MATRIX: III & IV
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
C. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
D. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
E. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
F. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
G. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
H. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
I. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
J. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
K. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
L. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
B. EXTERIOR WORK SHALL BE COMPLETELD DURING DAYLIGHT HOURS.
COORDINATE WITH COR.
C. INTERIOR WORK HOURS AND NUMBER OF PHASES SHALL BE DICTATED BY
CONTRACTOR AND COORDINATED WITH COR.
PHASING GENERAL NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PROJECT INFORMATION
IC-V TEMPORARY INFECTION CONTROL VISQUEEN BARRIER
6-MIL FIRE RETARDENT POLY
INTERIOR SIDE
EXISTING CEILING
CONTINUOUSLY ADHERE 6-MIL. FIRE
RETARDANT POLY TO CEILING WITH TAPE
CONTINUOUSLY ADHERE FIRE
RETARDENT POLY TO FLOOR WITH TAPE
EXISTING DECK
CONSTRUCTION
SIDE
OCCUPIED
SIDE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN SUBMISSION
65% DESIGN DEVELOPMENT SUBMISSION
95% CONSTRUCTION DOCUMENTS SUBMISSION
11/01/2021
04/12/2022
07/06/2022
BID DOCUMENTS SUBMISSION 09/19/2022
C A u to d e s k \R e v it B a c k u p \1
.1
.1
A v g v e e rk a m p .r v t
/1
/2
:0 :1
P
M
AE001
ABBREVIATIONS &
MISCELLANEOUS INFORMATIONGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
INSULATE EXTERIOR WALLS &
REPLACE WINDOWS
4646 JOHN R ST., DETROIT, MI
553-21-106
09/19/2022 GV JG
BID DOCUMENTS
FULLY SPRINKLERED
937.224.0861
NO SCALEAE001
A WINDOW LEGEND
SCALE: 1 1/2" = 1'-0"AE001
1 TEMPORARY PLASTIC PARTITION
AE200
AE201
AE201
AE200
4 4 4 4 4 4 4 4
3 3 3 3
4 4 4 4 4 4 4
4 4 4 4 4 4 4 4
3 3
4 4 4 4 4 4 4 4
EXAM
B1326
EXAM
B1324
EXAM
B1324A
EXAM
B1324B
EXAM
B1324C
EXAM
B1324D
EXAM
B1324E
SCHEDULERS
B1322
WORK ROOM
B1320
KITCHEN
B1292
MULTI-PURPOSE
ROOM
B1290
CORRIDOR
B1215
FITNESS CENTER
B1214
OFFICE
B1247
OFFICE
B1245
OFFICE
B1243
OFFICE
B1241
OFFICE
B1240
OFFICE
A1111
PHARMACY
A1109
PHARMACY
A1105
CANTEEN STORAGE
A1039
DINING
A1038
CANTEEN
A1032
OFFICE
A1016
CORRIDOR
CA116
OFFICE
A1017
LOUNGE
A1018
CT PATIENT
TANSPORT
C1401
EXAM
C1408
EXAM
C1410
EXAM
C1412
EXAM
C1414
EXAM
C1416
OFFICE
C1418
VACANT
C1430
CORRIDOR
CC126
RECEPTION
C1435
RECEPTION
C1441
OFFICE
C1442
OFFICE
C1444
RED BLUE
YELLOWENERGY CENTER
KEY PLAN
N
SEE SHEET AE001 FOR PROJECT
GENERAL NOTES AND
ARCHITECTURAL SYMBOL LEGEND
SEE SHEET AE001 FOR
WINDOW LEGEND
AREA IN SCOPE
BEYOND PROJECT BOUNDARY
IC / PHASING LEGEND
- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF
WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.
- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &
STOREFRONTS LOCATED ON THE FIRST FLOOR.
INFECTION CONTROL & SHEET NOTES
*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*
1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.
FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH
SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO
MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED
(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER
LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH
EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.
BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.
2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT / CURTAIN WALL.
INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE
CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE
FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND
PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON
INTERIOR OF WINDOW.
3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.
HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.
4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE
REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW
JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE
PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED
FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING
DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE
REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE
A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT
FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR
STOREFRONT LOCATIONS.
EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF
WINDOW.
PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN SUBMISSION
65% DESIGN DEVELOPMENT SUBMISSION
95% CONSTRUCTION DOCUMENTS SUBMISSION
11/01/2021
04/12/2022
07/06/2022
BID DOCUMENTS SUBMISSION 09/19/2022
C A u to d e s k \R e v it B a c k u p \1
.1
.1
A v g v e e rk a m p .r v t
/1
/2
:0 :3
P
M
AE101
FIRST FLOOR PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
INSULATE EXTERIOR WALLS &
REPLACE WINDOWS
4646 JOHN R ST., DETROIT, MI
553-21-106
09/19/2022 JG GV
BID DOCUMENTS
FULLY SPRINKLERED
937.224.0861
SCALE: 3/64" = 1'-0"AE101
1 FIRST FLOOR N
AE201
AE201
AE200
2 2 2 2 2 2 2 2
1 1 1 1
2 2 2 2 2 2 22
2 2 2 2 2 2 2 2
1 1 1 1
2 2 2 2 2 2 2 2
111111111111111111
5555555 5 5 55 5 5 55 5
B E
D R
O O
M
B
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
C O
N F
E R
E N
C E
R O
O M
B
DAY ROOM
B2326
DAY ROOM
B2293
OFFICE
B2283
OFFICE
B2281
OFFICE
B2277
OFFICE
B2275
OFFICE
B2269
OFFICE
B2271
OFFICE
B2265
OFFICE
B2263
OFFICE
B2261
ICU BEDROOM
A2133
ICU BEDROOM
A2131
ICU BEDROOM
A2129
ICU BEDROOM
A2127
ICU BEDROOM
A2125
ICU BEDROOM
A2123
ICU BEDROOM
A2121
ICU BEDROOM
A2119
B E
D R
O
E D
A
IC
U
P H
Y S
IC
IA
N C
A L
L
R O
O M
A
DAY ROOM
A2059
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O O
M
IS
O
L A
T
IO
N
A
B E
D R
O O
M
IS
O
L A
T
IO
N
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
C L
A S
S R
O O
M
A
CORRIDOR
CA202
WAITING
A2001
LAB
C2909
OFFICE
C2907
OFFICE
C2908
OFFICE
C2924
OFFICE
C2925
COORDINATOR
C2923
DIALYSIS CUBICLE
C2942
DIALYSIS CUBICLE
C2943
DIALYSIS CUBICLE
C2944
DIALYSIS CUBICLE
C2946
DIALYSIS CUBICLE
C2947
DIALYSIS CUBICLE
C2948
DIALYSIS CUBICLE
C2949
CORRIDOR
CC287
EXAM
C2955
EXAM
C2957
OFFICE
C2828
OFFICE
C2826
OFFICE
C2824
OFFICE
C2822
OFFICE
C2820
PT ROOM
C2539
C O
R R
ID
O
R
C C
EXAM
C2455
EXAM
C2453
EXAM
C2451
EXAM
C2449
EXAM
C2447
EXAM
C2445
EXAM
C2443
EXAM
C2441
EXAM
C2439
EXAM
C2437
EXAM
C2404
EXAM
C2403
EXAM
C2402
OFFICE
C2401
CORRIDOR
CB203
C O
R R
ID
O
R
B
CORRIDOR
CB205
WAITING
B2301
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
B E
D R
O
E D
B
OFFICE
C2630
CORRIDOR
CC258
OFFICE
C2629
OTHER SPACE
C2634
CORRIDOR
CC254OFFICE
C2545
CORRIDOR
CA202
CORRIDOR
CA203
CORRIDOR
CA205
1 1 1 1 1
RED BLUE
YELLOWENERGY CENTER
KEY PLAN
N
SEE SHEET AE001 FOR PROJECT
GENERAL NOTES AND
ARCHITECTURAL SYMBOL LEGEND
SEE SHEET AE001 FOR
WINDOW LEGEND
AREA IN SCOPE
BEYOND PROJECT BOUNDARY
IC / PHASING LEGEND
- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF
WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.
- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &
STOREFRONTS LOCATED ON THE FIRST FLOOR.
INFECTION CONTROL & SHEET NOTES
*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*
1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.
FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH
SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO
MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED
(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER
LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH
EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.
BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.
2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT / CURTAIN WALL.
INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE
CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE
FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND
PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON
INTERIOR OF WINDOW.
3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.
HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.
4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE
REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW
JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE
PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED
FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING
DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE
REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE
A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT
FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR
STOREFRONT LOCATIONS.
EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF
WINDOW.
PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN SUBMISSION
65% DESIGN DEVELOPMENT SUBMISSION
95% CONSTRUCTION DOCUMENTS SUBMISSION
11/01/2021
04/12/2022
07/06/2022
BID DOCUMENTS SUBMISSION 09/19/2022
C A u to d e s k \R e v it B a c k u p \1
.1
.1
A v g v e e rk a m p .r v t
/1
/2
:0 :4
P
M
AE102
SECOND FLOOR PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
INSULATE EXTERIOR WALLS &
REPLACE WINDOWS
4646 JOHN R ST., DETROIT, MI
553-21-106
09/19/2022 JG GV
BID DOCUMENTS
FULLY SPRINKLERED
937.224.0861
SCALE: 3/64" = 1'-0"AE102
1 SECOND FLOOR N
No fin tube here.
AE201
AE201
AE200
2 2 2 2 2 2 2 2
1 1 1 1
2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2
1 1 1 1
2 2 2 2 2 2 2 2
11111111111111111111
5 5
5555555 5 5 55 5 5 55 5
EXAM
B3329
EXAM
B3331
EXAM
B3333
EXAM
B3335
EXAM
B3337
EXAM
B3339
EXAM
B3341
EXAM
B3343
WAITING
B3326
CLASSROOM
B3325
BREAK ROOM
B3286
OFFICE
B3284
OFFICE
B3283
OFFICE
B3281
OFFICE
B3280
OFFICE
B3279
OFFICE
B3277
OFFICE
B3276
OFFICE
B3275
OFFICE
B3273
OFFICE
B3271
BEDROOM
ISOLATION
A3133
BEDROOM
ISOLATION
A3131 B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
WAITING
A3057
WAITING
A3070
CONFERENCE ROOM
A3024
WAITING A
A3025
WAITING B
A3026
WAITING C
A3027
TOILET
A3018
OFFICE
A3017
OFFICE
A3016
OFFICE
A3015
OFFICE
A3014
OFFICE
A3013
LOUNGE
A3012
C O
R R
ID
O
R
C A
2 WAITING
A3001
WAITING
C3901
C O
R R
ID
O
R
C C
EXAM
C3910
LIBRARY
C3938
Room
C3941
Room
C3943
OFFICE
C3945
OFFICE
C3826
OFFICE
C3825
OFFICE
C3824
OFFICE
C3756
CONFERENCE ROOM
C3754
CORRIDOR
CC359
CORRIDOR
CC347
CORRIDOR
CC347
C O
R R
ID
O
R
C C
OFFICE
C3540
OFFICE
C3542
OFFICE
C3545
CORRIDOR
C3413
OFFICE
CC320
EXAM
C3412
OFFICE
C3410
C O
R R
ID
O
R
C B
2WAITING
B3301
EXAM
B3363
EXAM
B3365
EXAM
B3367
EXAM
B3369
EXAM
B3371
EXAM
B3373
EXAM
B3375
EXAM
B3377
EXAM
B3379
EXAM
B3381
OFFICE
B3247
OFFICE
B3246
CORRIDOR
CA303
CORRIDOR
CA305
CORRIDOR
CB303
CORRIDOR
CB305
BEDROOM
C3434
BEDROOM
C3432
BEDROOM
C3430
BEDROOM
C3428
BEDROOM
C3426
BEDROOM
C3424
BEDROOM
C3422
BEDROOM
C3420
EXAM
C3418
EXAM
C3416
EXAM
C3414
CORRIDOR
CC379
CORRIDOR
CC378
1 1 1 1 1
RED BLUE
YELLOWENERGY CENTER
KEY PLAN
N
SEE SHEET AE001 FOR PROJECT
GENERAL NOTES AND
ARCHITECTURAL SYMBOL LEGEND
SEE SHEET AE001 FOR
WINDOW LEGEND
AREA IN SCOPE
BEYOND PROJECT BOUNDARY
IC / PHASING LEGEND
- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF
WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.
- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &
STOREFRONTS LOCATED ON THE FIRST FLOOR.
INFECTION CONTROL & SHEET NOTES
*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*
1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.
FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH
SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO
MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED
(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER
LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH
EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.
BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.
2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT / CURTAIN WALL.
INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE
CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE
FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND
PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON
INTERIOR OF WINDOW.
3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.
HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.
4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE
REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW
JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE
PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED
FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING
DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE
REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE
A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT
FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR
STOREFRONT LOCATIONS.
EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF
WINDOW.
PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN SUBMISSION
65% DESIGN DEVELOPMENT SUBMISSION
95% CONSTRUCTION DOCUMENTS SUBMISSION
11/01/2021
04/12/2022
07/06/2022
BID DOCUMENTS SUBMISSION 09/19/2022
C A u to d e s k \R e v it B a c k u p \1
.1
.1
A v g v e e rk a m p .r v t
/1
/2
:0 :5
P
M
AE103
THIRD FLOOR PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
INSULATE EXTERIOR WALLS &
REPLACE WINDOWS
4646 JOHN R ST., DETROIT, MI
553-21-106
09/19/2022 JG GV
BID DOCUMENTS
FULLY SPRINKLERED
937.224.0861
SCALE: 3/64" = 1'-0"AE103
1 THIRD FLOOR N
AE201
AE201
AE200
2 2 2 2 2 2 2 2
1 1 1 1
2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2
1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
OFFICE
B4334
OFFICE
B4333
LAB
B4327
LAB
B4325
LAB
B4323
LAB
B4321
OFFICE
B4266
OFFICE
B4265
OFFICE
B4264
OFFICE
B4263
OFFICE
B4262
LAB
B4247
LAB
B4245
LAB
B4243
LAB
B4241
OFFICE
B4238
C O
R R
ID
O
R
C B
OFFICE
B4237
BEDROOM
ISOLATION
A4133
BEDROOM
ISOLATION
A4131 B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
PHYSICAL THERAPY
CLINIC
A4057
MAIN WAITING
A4064
INTAKE
A4063
INTAKE
A4062
WAITING A
A4035
WAITING B
A4034
WAITING C
A4033
C O
R R
ID
O
R
C A
VAS LAB
A4032
STAFF BREAKROOM
A4019
PODIATRY
A4017
NURSING STAFF
WORKSTATIONS
A4018
PODIATRY
PROVIDERS
A4016
ORTHO PROVIDERS
A4015ORTHO PROVIDERS
A4014
ORTHO NURSE
PRACTITIONERS
A4013
MURSE MANAGER
A4012
C O
R R
ID
O
R
C A
2 WAITING
A4001
CORRIDOR
CC481A
2 BED
C4904
2 BED
C4906
1 BED
C4908
2 BED
C4910
2 BED
C4911
ISOLATION
BEDROOM
C4917
SICU BEDROOM
C4918
SICU BEDROOM
C4920
SICU BEDROOM
C4922
SICU BEDROOM
C4924
SICU BEDROOM
C4930
CORRIDOR
CC474
CORRIDOR
CC467
CORRIDOR
CC459
CORRIDOR
CC448
LAB
C4503
LAB
C4501
LAB
C4500
OFFICE
C4466
OFFICE
C4465
OFFICE
C4463
OFFICE
C4461
OFFICE
C4459
OFFICE
C4457
OFFICE
C4455
OFFICE
C4453
OFFICE
C4451
CONFERENCE ROOM
C4450
LAB
C4445
STORAGE
C4443
OFFICE
C4439
OFFICE
C4438
WAITING
B4301
C O
R R
ID
O
R
C B
LAB
B4369
LAB
B4367
LAB
B4365
LAB
B4363
LAB
B4361
UTILIZATION
MANAGEMENT
ROOM
CA403
CORRIDOR
CA405
CORRIDOR
CB402
CORRIDOR
CB402
CORRIDOR
CB405
ANTE
C4930A
1 1 1 1 1
FLAG ROOM
B4224
RED BLUE
YELLOWENERGY CENTER
KEY PLAN
N
SEE SHEET AE001 FOR PROJECT
GENERAL NOTES AND
ARCHITECTURAL SYMBOL LEGEND
SEE SHEET AE001 FOR
WINDOW LEGEND
AREA IN SCOPE
BEYOND PROJECT BOUNDARY
IC / PHASING LEGEND
- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF
WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.
- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &
STOREFRONTS LOCATED ON THE FIRST FLOOR.
INFECTION CONTROL & SHEET NOTES
*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*
1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.
FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH
SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO
MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED
(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER
LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH
EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.
BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.
2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT / CURTAIN WALL.
INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE
CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE
FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND
PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON
INTERIOR OF WINDOW.
3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.
HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.
4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE
REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW
JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE
PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED
FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING
DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE
REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE
A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT
FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR
STOREFRONT LOCATIONS.
EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF
WINDOW.
PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN SUBMISSION
65% DESIGN DEVELOPMENT SUBMISSION
95% CONSTRUCTION DOCUMENTS SUBMISSION
11/01/2021
04/12/2022
07/06/2022
BID DOCUMENTS SUBMISSION 09/19/2022
C A u to d e s k \R e v it B a c k u p \1
.1
.1
A v g v e e rk a m p .r v t
/1
/2
:0 :1
P
M
AE104
FOURTH FLOOR PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
INSULATE EXTERIOR WALLS &
REPLACE WINDOWS
4646 JOHN R ST., DETROIT, MI
553-21-106
09/19/2022 JG GV
BID DOCUMENTS
FULLY SPRINKLERED
937.224.0861
SCALE: 3/64" = 1'-0"AE104
1 FOURTH FLOOR N
AE201
AE201
AE200
1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2
OFFICE
B5381
OFFICE
B5388
OFFICE
B5387
OFFICE
B5386
OFFICE
B5385
OFFICE
B5368
OFFICE
B5367
OFFICE
B5366
OFFICE
B5365
OFFICE
B5364
D
IR
E C
T O
R 'S
O F
F
IC
E
B
OFFICE
B5331
OFFICE
B5330
OFFICE
B5329
OFFICE
B5328
CONFERENCE
B5327
OFFICE
B5287
OFFICE
B5286
OFFICE
B5285
OFFICE
B5262
OFFICE
B5261
OFFICE
B5260
OFFICE
B5258
OFFICE
B5259 C O
R R
ID
O
R
C B
BEDROOM
ISOLATION
A5133
BEDROOM
ISOLATION
A5131
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
DAY ROOM
A5057
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
BEDROOM
ISOLATION
A5039
BEDROOM
ISOLATION
A5037
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
3LOUNGE
A5008
CORRIDOR
CA502
WAITING
A5001
BEDROOM -
RESIDENT
A5099
BEDROOM -
RESIDENT
A5098
CLASS ROOM
A5102
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
OFFICE
B5233
C O
R R
ID
O
R
C B
CONFERENCE
B5227C
CONFERENCE
B5227B
CONFERENCE
B5227A
OFFICE
B5219
CORRIDOR
CB504
OFFICE
B5398
OFFICE
B5397
OFFICE
B5396
OFFICE
B5395
Room
B5301
CORRIDOR
CB502
OFFICE
B5305
OFFICE
B5346
OFFICE
B5347
OFFICE
B5348
OFFICE
B5341
OFFICE
B5349OFFICE
B5371
OFFICE
B5374
C O
R R
ID
O
R
C B
MENS TOILET
B5375
10 10 10 10 10 10 10 10
CORRIDOR
CA504
CORRIDOR
CA504
CORRIDOR
CA505
3 3
1 1
RED BLUE
YELLOWENERGY CENTER
KEY PLAN
N
SEE SHEET AE001 FOR PROJECT
GENERAL NOTES AND
ARCHITECTURAL SYMBOL LEGEND
SEE SHEET AE001 FOR
WINDOW LEGEND
AREA IN SCOPE
BEYOND PROJECT BOUNDARY
IC / PHASING LEGEND
- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF
WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.
- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &
STOREFRONTS LOCATED ON THE FIRST FLOOR.
INFECTION CONTROL & SHEET NOTES
*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*
1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.
FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH
SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO
MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED
(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER
LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH
EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.
BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.
2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT / CURTAIN WALL.
INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE
CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE
FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND
PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON
INTERIOR OF WINDOW.
3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.
HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.
4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE
REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW
JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE
PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED
FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING
DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE
REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE
A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT
FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR
STOREFRONT LOCATIONS.
EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF
WINDOW.
PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN SUBMISSION
65% DESIGN DEVELOPMENT SUBMISSION
95% CONSTRUCTION DOCUMENTS SUBMISSION
11/01/2021
04/12/2022
07/06/2022
BID DOCUMENTS SUBMISSION 09/19/2022
C A u to d e s k \R e v it B a c k u p \1
.1
.1
A v g v e e rk a m p .r v t
/1
/2
:0 :1
P
M
AE105
FIFTH FLOOR PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
INSULATE EXTERIOR WALLS &
REPLACE WINDOWS
4646 JOHN R ST., DETROIT, MI
553-21-106
09/19/2022 JG GV
BID DOCUMENTS
FULLY SPRINKLERED
937.224.0861
SCALE: 3/64" = 1'-0"AE105
1 FIFTH FLOOR N
AE201
AE201
2 2 2 2 2 2 2 2
1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1111111111
BEDROOM
ISOLATION
A6133
BEDROOM
ISOLATION
A6131 B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
DAY ROOM
A6057
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
BEDROOM
ISOLATION
A6039
BEDROOM
ISOLATION
A6037
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
CLASS ROOM
A6011
CORRIDOR
CA602
WAITING
A6001
BEDROOM -
RESIDENT
A6098
BEDROOM -
RESIDENT
A6097
BEDROOM -
RESIDENT
A6096
CORRIDOR
CA604
BARBER SHOP
A6100
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
B E
D R
O
E D
A
AE200
CORRIDOR
CA605
RED BLUE
YELLOWENERGY CENTER
KEY PLAN
N
SEE SHEET AE001 FOR PROJECT
GENERAL NOTES AND
ARCHITECTURAL SYMBOL LEGEND
SEE SHEET AE001 FOR
WINDOW LEGEND
AREA IN SCOPE
BEYOND PROJECT BOUNDARY
IC / PHASING LEGEND
- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF
WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.
- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &
STOREFRONTS LOCATED ON THE FIRST FLOOR.
INFECTION CONTROL & SHEET NOTES
*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*
1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.
FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH
SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO
MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED
(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER
LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH
EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.
BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.
2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT / CURTAIN WALL.
INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE
CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE
FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND
PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON
INTERIOR OF WINDOW.
3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.
HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.
4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE
REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW
JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE
PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED
FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING
DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE
REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE
A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT
FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR
STOREFRONT LOCATIONS.
EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF
WINDOW.
PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN SUBMISSION
65% DESIGN DEVELOPMENT SUBMISSION
95% CONSTRUCTION DOCUMENTS SUBMISSION
11/01/2021
04/12/2022
07/06/2022
BID DOCUMENTS SUBMISSION 09/19/2022
C A u to d e s k \R e v it B a c k u p \1
.1
.1
A v g v e e rk a m p .r v t
/1
/2
:0 :2
P
M
AE106
SIXTH FLOOR PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
INSULATE EXTERIOR WALLS &
REPLACE WINDOWS
4646 JOHN R ST., DETROIT, MI
553-21-106
09/19/2022 JG GV
BID DOCUMENTS
FULLY SPRINKLERED
937.224.0861
SCALE: 3/64" = 1'-0"AE106
1 SIXTH FLOOR N
AE201
AE201
AE200
2 2 2 2 2 2 2 2
1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
OFFICE
A7131
OFFICE
A7129
OFFICE
A7127
OFFICE
A7125
OFFICE
A7123
OFFICE
A7121
OFFICE
A7119
OFFICE
A7117
GROUP
A7115
WAITING
A7055
CONFERENCE
A7053
OFFICE
A7051
OFFICE
A7049
OFFICE
A7047
OFFICE
A7045
OFFICE
A7043
OFFICE
A7041
OFFICE
A7039
OFFICE
A7037
OFFICE
A7029
OFFICE
A7027
OFFICE
A7025
OFFICE
A7023
OFFICE
A7021
OFFICE
A7019
OFFICE
A7017
OFFICE
A7015
OFFICE
A7013
OFFICE
A7011
CORRIDOR
CA702
LOUNGE
A7001
TOILET
A7097
STAFF LOUNGE
A7095
CORRIDOR
CA704
OFFICE
A7164
OFFICE
A7162
OFFICE
A7160
OFFICE
A7158
OFFICE
A7156
OFFICE
A7154
OFFICE
A7152
OFFICE
A7150
OFFICE
A7148
OFFICE
A7146
AE200
AE201
AE200
AE201
RED BLUE
YELLOWENERGY CENTER
KEY PLAN
N
SEE SHEET AE001 FOR PROJECT
GENERAL NOTES AND
ARCHITECTURAL SYMBOL LEGEND
SEE SHEET AE001 FOR
WINDOW LEGEND
AREA IN SCOPE
BEYOND PROJECT BOUNDARY
IC / PHASING LEGEND
- PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION AT ALL STOREFRONT / CURTAIN WALL LOCATIONS FOR DURATION OF
WORK. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION. REFER TO 1/AE001.
- BLAST RESISTANT FILM TO BE INSTALLED ON THE INTERIOR OF ALL WINDOWS &
STOREFRONTS LOCATED ON THE FIRST FLOOR.
INFECTION CONTROL & SHEET NOTES
*SEE SHEET AE001 FOR ADDITIONAL INFECTION CONTROL NOTES*
1. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: EXISTING FIN TUBE COVER TO BE REMOVED AND DISPOSED OF.
FIN TUBE TO BE CLEANED/COMBED. WINDOW JAMBS TO BE FILLED WITH
SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND PAINTED TO
MATCH EXISTING. NEW FIN TUBE COVER TO BE INSTALLED
(SEE SPEC 23 82 00 CHECKLIST). RESILENT BASE AT FIN TUBE COVER
LOCATION TO BE REMOVED AND REPLACED. RESILIENT BASE TO MATCH
EXISTING. SEE A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT.
BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF WINDOW.
2. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT / CURTAIN WALL.
INTERIOR: EXISTING GRILLE VENT TO BE REMOVED. FIN TUBE TO BE
CLEANED/COMBED. GRILLE TO BE REINSTALLED. WINDOW JAMBS TO BE
FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE PATCHED AND
PAINTED TO MATCH EXISTING. BLAST RESISTANT FILM TO BE INSTALLED ON
INTERIOR OF WINDOW.
3. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
INTERIOR: WINDOW JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION.
HOLES IN JAMB TO BE PATCHED AND PAINTED TO MATCH EXISTING.
4. EXTERIOR: EXISTING BACKER ROD AND SEALANT TO BE REMOVED. NEW
BACKER ROD AND SEALANT TO BE INSTALLED ALONG PERIMETER OF
STOREFRONT.
5. INTERIOR: EXISTING CURVED/SEGMENTED FIN TUBE COVER TO BE
REMOVED AND DISPOSED OF. FIN TUBE TO BE CLEANED/COMBED. WINDOW
JAMBS TO BE FILLED WITH SPRAY FOAM INSULATION. HOLES IN JAMB TO BE
PATCHED AND PAINTED TO MATCH EXISTING. NEW CURVED/SEGMENTED
FIN TUBE COVER TO BE CONSTRUCTED AND INSTALLED TO MATCH EXISTING
DIMENSIONS. RESILENT BASE AT FIN TUBE COVER LOCATION TO BE
REMOVED AND REPLACED. RESILIENT BASE TO MATCH EXISTING. SEE
A/AE600 FOR EXTENT OF RESILIENT BASE REPLACEMENT. BLAST RESISTANT
FILM TO BE INSTALLED ON INTERIOR OF WINDOW AT FIRST FLOOR
STOREFRONT LOCATIONS.
EXTERIOR: BLAST RESISTANT FILM TO BE INSTALLED ON INTERIOR OF
WINDOW.
PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN SUBMISSION
65% DESIGN DEVELOPMENT SUBMISSION
95% CONSTRUCTION DOCUMENTS SUBMISSION
11/01/2021
04/12/2022
07/06/2022
BID DOCUMENTS SUBMISSION 09/19/2022
C A u to d e s k \R e v it B a c k u p \1
.1
.1
A v g v e e rk a m p .r v t
/1
/2
:0 :2
P
M
AE107
SEVENTH FLOOR PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
INSULATE EXTERIOR WALLS &
REPLACE WINDOWS
4646 JOHN R ST., DETROIT, MI
553-21-106
09/19/2022 JG GV
BID DOCUMENTS
FULLY SPRINKLERED
937.224.0861
SCALE: 3/64" = 1'-0"AE107
1 SEVENTH FLOOR N
FIRST FLOOR
758' - 0"
SECOND FLOOR
781' - 4"
THIRD FLOOR
802' - 8"
FOURTH FLOOR
824' - 0"
FIFTH FLOOR
845' - 4"
SIXTH FLOOR
866' - 8"
SEVENTH FLOOR
888' - 0"
FIRST FLOOR
758' - 0"
SECOND FLOOR
781' - 4"
THIRD FLOOR
802' - 8"
FOURTH FLOOR
824' - 0"
FIFTH FLOOR
845' - 4"
SIXTH FLOOR
866' - 8"
SEVENTH FLOOR
888' - 0"
WINDOWS IN SCOPE
CURTAIN WALLS IN SCOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN SUBMISSION
65% DESIGN DEVELOPMENT SUBMISSION
95% CONSTRUCTION DOCUMENTS SUBMISSION
11/01/2021
04/12/2022
07/06/2022
BID DOCUMENTS SUBMISSION 09/19/2022
C A u to d e s k \R e v it B a c k u p \1
.1
.1
A v g v e e rk a m p .r v t
/1
/2
:0 :5
P
M
AE200
EXTERIOR BUILDING ELEVATIONS
- EAST & WESTGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
INSULATE EXTERIOR WALLS &
REPLACE WINDOWS
4646 JOHN R ST., DETROIT, MI
553-21-106
09/19/2022 JG GV
BID DOCUMENTS
FULLY SPRINKLERED
937.224.0861
SCALE: 3/64" = 1'-0"AE200
1 EXTERIOR ELEVATION - WEST FACADE
SCALE: 3/64" = 1'-0"AE200
2 EXTERIOR ELEVATION - EAST FACADE
FIRST FLOOR
758' - 0"
SECOND FLOOR
781' - 4"
THIRD FLOOR
802' - 8"
FOURTH FLOOR
824' - 0"
FIFTH FLOOR
845' - 4"
SIXTH FLOOR
866' - 8"
SEVENTH FLOOR
888' - 0"
FIRST FLOOR
758' - 0"
SECOND FLOOR
781' - 4"
THIRD FLOOR
802' - 8"
FOURTH FLOOR
824' - 0"
FIFTH FLOOR
845' - 4"
SIXTH FLOOR
866' - 8"
SEVENTH FLOOR
888' - 0"
WINDOWS IN SCOPE
CURTAIN WALLS IN SCOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN SUBMISSION
65% DESIGN DEVELOPMENT SUBMISSION
95% CONSTRUCTION DOCUMENTS SUBMISSION
11/01/2021
04/12/2022
07/06/2022
BID DOCUMENTS SUBMISSION 09/19/2022
C A u to d e s k \R e v it B a c k u p \1
.1
.1
A v g v e e rk a m p .r v t
/1
/2
:0 :0
P
M
AE201
EXTERIOR BUILDING ELEVATIONS
- NORTH & SOUTHGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
INSULATE EXTERIOR WALLS &
REPLACE WINDOWS
4646 JOHN R ST., DETROIT, MI
553-21-106
09/19/2022 JG GV
BID DOCUMENTS
FULLY SPRINKLERED
937.224.0861
SCALE: 3/64" = 1'-0"AE201
1 EXTERIOR ELEVATION - NORTH FACADE
SCALE: 3/64" = 1'-0"AE201
2 EXTERIOR ELEVATION - SOUTH FACADE
BROKEN GLASS TO BE
REPLACED AS NECESSARY
EXISTING CAULK JOINT AND
BACKER ROD TO BE REMOVED
AND REPLACED
(TYP)
PILOT HOLES TO DRILLED INTO
WINDOW JAMBS. JAMBS TO BE
FILLED WITH SPRAY FOAM
INSULATION. HOLE TO BE
PATCHED AND PAINTED TO
MATCH EXISTING.
EXISTING WALL
BROKEN GLASS TO BE
REPLACED AS NECESSARY
EXISTING CAULK JOINT AND
BACKER ROD TO BE REMOVED
AND REPLACED
(TYP)
EXISTING FLOOR SLAB
BROKEN SPANDREL TO BE
REPLACED AS NECESSARY
EXISTING CAULK JOINT AND
BACKER ROD TO BE REMOVED
AND REPLACED.
FIN TUBE COVER. SEE PLANS FOR
LOCATION OF NEW FIN TUBE
COVERS. REFER TO B/AE600 FOR
ADDITIONAL INFORMATION
EXISTING FIN TUBE
EXISTING INSULATION TO
REMAIN. IF INSULATION IS NOT
PRESENT, POLYISOCYANURATE
TO BE INSTALLED. V.I.F.
BROKEN GLASS TO BE
REPLACED AS NECESSARY
EXISTING CAULK JOINT AND
BACKER ROD TO BE REMOVED
AND REPLACED
(TYP)
BROKEN SPANDREL TO BE
REPLACED AS NECESSARY
EXISTING CAULK JOINT AND
BACKER ROD TO BE REMOVED
AND REPLACED
(TYP)
AE600
Sim
BROKEN GLASS TO BE
REPLACED AS NECESSARY
EXISTING CAULK JOINT AND
BACKER ROD TO BE REMOVED AND
REPLACED (TYP)
EXISTING WALL CONSTRUCTION
FIN TUBE COVER. SEE PLANS FOR
LOCATION OF NEW FIN TUBE
COVERS. REFER TO B/AE600 FOR
ADDITIONAL INFORMATION
EXISTING FIN TUBE
EXISTING INSULATION TO
REMAIN. IF INSULATION IS NOT
PRESENT, POLYISOCYANURATE
TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .