Drawings_Fire Pump Removal.pdf

PDF 688 KB Posted

Attached to
Remove Fire Pump Federal contract opportunity
Solicitation number
12505B20S990625
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

View the file

Other files for this federal contract opportunity

Other files attached to Remove Fire Pump, newest first.
File Type Posted
ARS-371.pdf PDF
ARS-372 use.pdf PDF
Past_Performance.pdf PDF
Specifications_Fire Pump Removal.pdf PDF
Combined Synopsis Solicitation.docx DOCX document
DBA Wage Rates.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING TITLE

DWG

NO.

INDEX OF DRAWINGS

100%

CONSTRUCTION

DOCUMENTS

FIRE PROTECTION SYMBOL LIST

SYMBOL: DESCRIPTION:

FIRE PROTECTIONFP

SERVICE WATER - POTABLEW

ANGLE VALVE

BUTTERFLY VALVE WITH MONITOR SWITCH

OS&Y GATE VALVE

OS&Y GATE VALVE WITH MONITOR SWITCH

PRESSURE SWITCH

P

NO HATCH LIGHT HAZARD

ORDINARY GROUP 1

SPRINKLER - WALL MOUNTED

SPRINKLER

SPRINKLER - CONCEALED

INSPECTOR TEST AND DRAIN VALVE

MONITOR SWITCH

PIPE CAP

PIPE DOWN

NEW CONNECTION

PIPE UP OR UP/DOWN

SHUTOFF VALVE NORMALLY OPEN

DRAINDFP

NOT ALL SYMBOLS MAY APPLY.

AUTOMATIC DRAIN VALVE

UNION/FLANGE

DIRECTION OF FLOW IN PIPE

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

CHECK VALVE

FLOW SWITCH

F

ROUTE TO DRAIN

AREA BOUNDARY

FIRE PROTECTION ABBREVIATION KEY

AD ACCESS DOOR

BFP BACKFLOW PREVENTER

N.C. NORMALLY CLOSED

ABOVE FINISHED FLOORAFF

NC NEW CONNECTION

NOT IN CONTRACTNIC

NORMALLY OPENN.O.

ABBR: DESCRIPTION:

TYPICALTYP

CK CHECK VALVE

GA OS&Y GATE VALVE

JP JOCKEY PUMP

FP FIRE PUMP

GATE VALVE - EXISTINGGA-E

CHECK VALVE - EXISTINGCK-E

JOCKEY PUMP - EXISTINGJP-E

FIRE PUMP - EXISTINGFP-E

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIM

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N O R

HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

NEW WORK BY THIS CONTRACTOR

(DARK SOLID LINE)

NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR

(DARK LONG DASHED LINE)

NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN

(LIGHT SOLID LINE)

EXISTING TO BE REMOVED BY THIS CONTRACTOR

(DARK SHORT DASHED LINE)

LINE TYPE KEY:

BUILDING CODE: IBC 2015 EDITION

FIRE CODE: IFC 2015 EDITION

ELECTRICAL CODE: NFPA 70 (NEC) 2017 EDITION

LOCAL BUILDING CODE: CURRENT EDITION

USDA DESIGN STANDARD: ARS 242.1 FACILITIES DESIGN STANDARDS

APPLICABLE CODES

CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.

CONTACT PERSONS:

PROJECT MANAGER

FIRE PROTECTION

ELECTRICAL

BLAKE O'BRIEN

BLAKE O'BRIEN

SHANE THOMPSON

DESCRIPTION: PERSON:

FIRE PROTECTION CONTRACTORF.P.C.

CONTRACTING OFFICERS REPRESENTATIVECOR

GENERAL CONTRACTORG.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO FIRE PROTECTION AND ELECTRICAL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT AND PIPING ARE DIAGRAMMATIC AND MAY

NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS. DRAWINGS SHOW THE

GENERAL ARRANGEMENT OF PIPING AND EQUIPMENT AND MAY NOT INCLUDE ALL OFFSETS

AND FITTINGS REQUIRED FOR COMPLETE INSTALLATION. THE DRAWINGS SHALL BE

FOLLOWED AS CLOSELY AS ACTUAL BUILDING CONSTRUCTION AND THE WORK OF OTHERS

WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES PHYSICALLY AT

SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ENGINEER BEFORE PROCEEDING WITH

FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS. THE

CONTRACTOR WHOSE WORK CAUSES DAMAGE IS RESPONSIBLE FOR PATCHING TO MATCH

ORIGINAL CONSTRUCTION, FIRE RATING, AND FINISH.

8. SEAL ALL WALL PENETRATIONS AIRTIGHT WHERE PIPING PENETRATES.

9. CAULK ALL PIPE PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL AND PARTITIONS.

THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE ROOM TO ANOTHER AND

TO PROVIDE THE DESIRED NC LEVELS WITHIN ROOMS.

10. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

11. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

12. ANCHORS EMBEDDED IN CONCRETE SHALL BE CRACKED CONCRETE APPROVED IN

ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING PIPING IS SHOWN. VERIFY EXISTING CONDITIONS BEFORE STARTING

WORK. NOTIFY COR OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR PIPING BEFORE FABRICATION. RISES AND

DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK

AND SHALL NOTIFY THE COR PRIOR TO BIDDING IF OTHER UTILITIES ARE REQUIRED TO BE

REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF WORK.

5. EACH CONTRACTOR SHALL CUT AND PATCH WALLS AND FLOORS ASSOCIATED WITH HIS

WORK.

6. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT OR PIPING TO BE INSTALLED. EACH CONTRACTOR SHALL EITHER

ARRANGE NEW EQUIPMENT OR PIPING IN SUCH A FASHION THAT IT DOES NOT CONFLICT

WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL SYSTEMS TO ALLOW FOR

INSTALLATION OF NEW EQUIPMENT OR PIPING.

7. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

8. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

9. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

10. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO

THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN

THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER IS THE BASIS OF

DESIGN.

3. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT

NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.

FIRE PROTECTION GENERAL NOTES:

NATIONAL LABORATORY FOR AGRICULTURE & THE ENVIRONMENT (NLAE)

FIRE PUMP REMOVAL

AMES, IOWA

#AG-32-SC-D-16-0004

USDA

REAL PROPERTY

USDA

SAFETY & HEALTH

AREA ENGINEER

DRAWN BY

CHECKED BY

DESIGNER

PROJECT MANAGER

EPM

A-E FIRM

USDA PROJECT NO.

DATE

NO. DATE BY

SHEET

DESCRIPTION

Service Research Agricultural

REVISIONS

FACILITIES ENGINEERING SECTION

SOUTH ATLANTIC AREA

950 COLLEGE STATION RD.

P.O. BOX 5677

ATHENS, GEORGIA 30605

100%

CONSTRUCTION

DOCUMENTS U

S D A

C A D

D H

D S G

P M

OF

ALAN TOLAND --

TRISHA VIGIL

DEAN MAGEE

PHOEBE BORDELON

F000

FIRE PROTECTION COVERSHEET

BTO

RML

DJL

17033

08-13-2018 02 07

A B C D E F G H J K L M N P Q R S T U V W X

DN

UP

DN

STORAGE

B18

RADIO ST.

B17

LOCKER

B16

LOCKER

B15

G. CHAMBER

B14

DRYING

B12

PREP

B10

REFRIG.

B11

STORAGE

B07

SOIL GRIND

B05

MECH.

B08

P & R

GRIND

B04

OFFICE

B02

P & R

PREP

B01

TARGET

B26A

INSTRU.

B26B

MECH.

B25D

RHIZOTRON

B22

J.C.

B27

SW. GEAR

B29

OFFICE

B28

EM. GEN.

B30

B25A

SHEET METAL

B25B

WELDING

B25C

MACHINING

B25

MECH. ROOM

B19

4"

BFP-E

FD100

REFER TO 2/F101

FOR CONT.

7 7

EXISTING BASEMENT

LEVEL ZONE CONTROL

VALVE ASSEMBLY.

FP

B-2

FP

B-1

GA-E

GA-E

CK-E

GA-E

GA-E

CK-E

JP-E

FP-E

GA-E (IN VERTICAL)

FIRE PUMP CONTROLLER

JOCKEY PUMP CONTROLLER

6"

NATIONAL LABORATORY FOR AGRICULTURE & THE ENVIRONMENT (NLAE)

FIRE PUMP REMOVAL

AMES, IOWA

#AG-32-SC-D-16-0004

USDA

REAL PROPERTY

USDA

SAFETY & HEALTH

AREA ENGINEER

DRAWN BY

CHECKED BY

DESIGNER

PROJECT MANAGER

EPM

A-E FIRM

USDA PROJECT NO.

DATE

NO. DATE BY

SHEET

DESCRIPTION

Service Research Agricultural

REVISIONS

FACILITIES ENGINEERING SECTION

SOUTH ATLANTIC AREA

950 COLLEGE STATION RD.

P.O. BOX 5677

ATHENS, GEORGIA 30605

100%

CONSTRUCTION

DOCUMENTS U

S D A

C A D

D H

D S G

P M

OF

ALAN TOLAND --

TRISHA VIGIL

DEAN MAGEE

PHOEBE BORDELON

FD100

BASEMENT - FIRE PROTECTION DEMOLITION

BTO

RML

DJL

17033

08-13-2018 03 07

N

O R HT

1/8" = 1'-0"1

BASEMENT - FIRE PROTECTION DEMOLITION

GENERAL FIRE PROTECTION NOTES :

1. REFER TO SHEET F000 - FIRE PROTECTION

COVERSHEET FOR FIRE PROTECTION

GENERAL NOTES AND SYMBOLS LIST.

2. FIRE PROTECTION SYSTEM SHALL BE PLACED

BACK IN SERVICE AT THE END OF EACH

WORKDAY.

3. REMOVAL OF FIRE PUMP REQUIRED IN THIS

SCOPE WILL REQUIRE FUTURE PROJECT TO

REVISE FIRE PROTECTION PIPING IN ADJACENT

BUILDING FOR BUILDING TO REMAIN

PROPERLY PROTECTED. REFER TO IMEG

REPORT DATED 12/15/2017.

N

O R HT

1/4" = 1'-0"2

BASEMENT - FIRE PROTECTION DEMOLITION - ENLARGED PLAN

KEYNOTES :

1. DEMOLISH EXISTING GATE VALVE AND ALL

ASSOCIATED ACCESSORIES.

2. DEMOLISH EXISTING CHECK VALVE AND ALL

ASSOCIATED ACCESSORIES.

3. DEMOLISH EXISTING JOCKEY PUMP, VALVES,

AND ASSOCIATED PIPING.

4. DEMOLISH EXISTING FIRE PUMP AND ALL

ASSOCIATED COMPONENTS.

5. DEMOLISH EXISTING FIRE PUMP CONTROLLER,

PRESSURE SENSING PIPE, AND ALL OTHER

ASSOCIATED COMPONENTS.

6. DEMOLISH EXISTING JOCKEY PUMP

CONTROLLER, PRESSURE SENSING PIPE, AND

ALL OTHER ASSOCIATED COMPONENTS.

7. DEMOLISH EXISTING PIPING BACK TO THIS

POINT. PREPARE EXISTING PIPE FOR NEW

CONNECTION.

REFER TO 1/F101

FOR CONT.

EXISTING BASEMENT LEVEL

ZONE CONTROL VALVE

ASSEMBLY LOCATED IN

MECHANICAL ROOM.

A B C D E F G H J K L M N P Q R S T U V W X

DN

UP

DN

STORAGE

B18

RADIO ST.

B17

LOCKER

B16

LOCKER

B15

G. CHAMBER

B14

DRYING

B12

PREP

B10

REFRIG.

B11

STORAGE

B07

SOIL GRIND

B05

MECH.

B08

P & R

GRIND

B04

OFFICE

B02

P & R

PREP

B01

TARGET

B26A

INSTRU.

B26B

MECH.

B25D

RHIZOTRON

B22

J.C.

B27

SW. GEAR

B29

OFFICE

B28

EM. GEN.

B30

B25A

SHEET METAL

B25B

WELDING

B25C

MACHINING

B25

MECH. ROOM

B19

NC

NC

NC

NC NC

BFP-E

1" 1"

/4

1 1/4"1"1"

1"1"1 1/4"1 1/4"1 1/4"

1"1 1/4"

1"

1 1/4" 1 1/4"

1" 1" 1 1/4" 1 1/4"

1"

8"

1" 1 1/4" 1 1/4"

1 1/4"

1 1/4" 1 1/4"

1 1/4" 1"

1" 1 1/4" 1 1/4"

1 1/4"

1 1/4" 1 1/4" 1 1/4"

1" 1"

1"1 1/4"

/4

1 1/4"1 1/4"1 1/4"1 1/4"1 1/4" 1 1/4"1"

1 1/4" 1"

1 1/4"1 1/4"1 1/4"1"1"

1 1/4"

1 1/4"

1 1/4"1"

1 1/4"

1 1/4"

1 1/4" 1" 1"

1"1"1 1/4"

1 1/4"1 1/4"1 1/4" 1 1/4"

1 1/4"

1 1/4"

/4

1 1/4"1 1/4"1 1/4"

1 1/4"

4"

6"

4" 4"

1 1/4"

1 1/4"1 1/4"1" 1"

1"

/4

1"

1"

6"

1 1/4"

1 1/4"

/4

1"

1" 1 1/4" 1 1/4" 1 1/4"

1 1/4"

1 1/4"

1"1"1"

1"

1" 1 1/4"

/4

1" 1"

1"

1 1/4"

1"

1 1/4" 1 1/4"

1"

1 1/4" 1" 1"

1" 1"

1"1"1 1/4"

1 1/4"

1 1/4"1 1/4"

1 1/4"1 1/4"

1 1/4"1"1"

1 1/4"

1 1/4" 1 1/4" 1 1/4"1 1/4"1 1/4"

1" 1 1/4"

1 1/4"1" 1"

/4

1 1/4"

1 1/4" 1"

1 1/4"

1 1/4"

1" 1 1/4"

1 1/4"1 1/4" 1 1/4"1 1/4"

1 1/4"

1 1/4"1 1/4"

1 1/4"

1"1"

1" 1" 1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4" 1" 1"

1"1"

1 1/4"

/4

1 1/4"

"F

P

4"FP

"F

P

4"FP

NC

NC

NC

NC NC

BFP-E

EXISTING BASEMENT LEVEL ZONE

CONTROL VALVE ASSEMBLY

LOCATED IN MECHANICAL ROOM.

EXISTING BASEMENT LEVEL ZONE

CONTROL VALVE ASSEMBLY.

FP

B-2

FP

B-1

NATIONAL LABORATORY FOR AGRICULTURE & THE ENVIRONMENT (NLAE)

FIRE PUMP REMOVAL

AMES, IOWA

#AG-32-SC-D-16-0004

USDA

REAL PROPERTY

USDA

SAFETY & HEALTH

AREA ENGINEER

DRAWN BY

CHECKED BY

DESIGNER

PROJECT MANAGER

EPM

A-E FIRM

USDA PROJECT NO.

DATE

NO. DATE BY

SHEET

DESCRIPTION

Service Research Agricultural

REVISIONS

FACILITIES ENGINEERING SECTION

SOUTH ATLANTIC AREA

950 COLLEGE STATION RD.

P.O. BOX 5677

ATHENS, GEORGIA 30605

100%

CONSTRUCTION

DOCUMENTS U

S D A

C A D

D H

D S G

P M

OF

ALAN TOLAND --

TRISHA VIGIL

DEAN MAGEE

PHOEBE BORDELON

F100

BASEMENT - FIRE PROTECTION

BTO

RML

DJL

17033

08-13-2018 04 07

N O R

HT

1/8" = 1'-0"1

BASEMENT - FIRE PROTECTION NEW WORK

GENERAL FIRE PROTECTION NOTES :

1. REFER TO SHEET F000 - FIRE PROTECTION

COVERSHEET FOR FIRE PROTECTION

GENERAL NOTES AND SYMBOLS LIST.

2. REMOVAL OF FIRE PUMP REQUIRED IN THIS

SCOPE WILL REQUIRE FUTURE PROJECT TO

REVISE FIRE PROTECTION PIPING IN ADJACENT

BUILDING FOR BUILDING TO REMAIN

PROPERLY PROTECTED. REFER TO IMEG

REPORT DATED 12/15/2017.

3. FIRE PROTECTION SYSTEM SHALL BE PLACED

BACK IN SERVICE AT THE END OF EACH

WORKDAY.

4. CONTRACTOR SHALL PROVIDE ALL REQUIRED

PROVISIONS TO ISOLATE AND

HYDROSTATICALLY TEST NEW PIPING. EXTENT

OF NEW PIPING IS INDICATED ON THIS SHEET.

NEW PIPING SHALL BE TESTED AT 200 PSI FOR

2 HRS ACCORDING TO NFPA 13.

ELECTRICAL ABBREVIATION KEY

AFF ABOVE FINISHED FLOOR

N.C. NORMALLY CLOSED

N.O. NORMALLY OPEN

ABBR: DESCRIPTION:

TYP TYPICAL

C CONDUIT

1. ##-### INDICATES ELECTRICAL EQUIPMENT DEFINED IN ELECTRICAL SCHEDULES OR

SPECIFICATION. REFER TO DRAWINGS CONTAINING ELECTRICAL SCHEDULES. PERMANENT

NAMEPLATE SHALL MATCH FINAL EQUIPMENT NOMENCLATURE, NOT ELECTRICAL

EQUIPMENT TAG NAME, REFER TO SPECIFICATIONS.

ELECTRICAL GENERAL NOTES:

REFER TO SHEET F000 FOR REQUIRED CODES, LIST OF PROJECT CONTACTS AND PROJECT

VIEW KEY.

1. CIRCUIT NUMBERS ARE SHOWN FOR CIRCUIT IDENTIFICATION. CIRCUITING SHALL AGREE

WITH NUMBERING ON THE PANEL PROVIDED. COMMON NEUTRALS MAY NOT BE USED FOR

BRANCH CIRCUITS. BALANCE THE LOAD ON PANEL AS EVENLY AS POSSIBLE BETWEEN

EACH PHASE.

2. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS SHALL

BE TESTED AND CERTIFIED AS A SYSTEM PER ASTM E814 STANDARDS FOR FIRE TESTS OF

THROUGH-PENETRATION FIRESTOPS. REFER TO 26 05 03 FOR ADDITIONAL INFORMATION

AND REQUIREMENTS SPECIFIC TO FIRESTOPPING.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL

OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE

EXPENSE OF THIS CONTRACTOR. ALL CONDUITS THROUGH WALLS SHALL BE GROUTED OR

SEALED INTO OPENINGS.

ELECTRICAL INSTALLATION NOTES:

FA-100 28 31 00 FIRE ALARM CONTROL PANEL

FA-160 28 31 00 FIRE ALARM ADDRESSABLE MONITOR MODULEMM

FA-260 28 31 00 FIRE ALARM FLOW SWITCH TO MONITOR FIRE

PROTECTION SYSTEM

FS

FA-261 28 31 00 FIRE ALARM MONITOR SWITCH TO

MONITOR FIRE PROTECTION SYSTEM

MS

NA NA CIRCUIT BREAKER - SURFACE MOUNTED

NA NA DISCONNECT

ELECTRICAL SYMBOL LIST

SYMBOL: TAG:

SPEC

SECTION:

DESCRIPTION:

ELECTRICAL SYMBOL LIST

SYMBOL: TAG:

SPEC

SECTION:

DESCRIPTION:

JB 26 05 33 JUNCTION BOX

J

J

ECONN 26 05 33 ELECTRICAL CONNECTION

E

E

PANEL '###' NA EXISTING PANELBOARD - SURFACE MOUNT

NA NA EXISTING MANUAL SWITCH / STARTER /

COMBINATION STARTER

ELECTRICAL SYMBOL LIST

SYMBOL: TAG:

SPEC

SECTION:

DESCRIPTION:

NA NA EXISTING TRANSFORMER

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING EQUIPMENT, LUMINARIES, AND CONDUIT ARE SHOWN. VERIFY EXISTING

CONDITIONS AND REPORT ANY CONFLICTS WITH NEW WORK BEFORE STARTING WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR CABLE TRAY, BUSWAY AND CONDUITS

BEFORE FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING

FIELD CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK

AND SHALL NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE PRIOR TO BIDDING IF

OTHER UTILITIES ARE REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO

HIS/HER AREA OF WORK.

5. EACH CONTRACTOR SHALL CUT AND PATCH ROOFS, WALLS, AND FLOORS ASSOCIATED

WITH HIS/HER WORK.

6. WHERE EXISTING ELECTRICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH NEW

EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL EITHER

ARRANGE NEW EQUIPMENT, CONDUIT, OR DUCTWORK IN SUCH A FASHION THAT IT DOES

NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING ELECTRICAL SYSTEMS TO

ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

ELECTRICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL ELECTRICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, LIGHTING, POWER, AND SYSTEMS.

ELECTRICAL PHASING NOTES:

THESE NOTES APPLY TO ALL ELECTRICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, LIGHTING, POWER, AND SYSTEMS.

1. THE FIRE PROTECTION AND ELECTRICAL DRAWINGS DO NOT DEPICT THE MEANS AND

METHODS TO MEET THE REQUIREMENTS OF THE PHASING CRITERIA.

2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.

WITH AFFECTED ADJACENT AREAS.

3. PROVIDE TEMPORARY LIGHTING, POWER, SYSTEMS, ETC. AS NEEDED TO MAINTAIN

SERVICE TO ALL AREAS DURING ALL PHASES OF PROJECT.

4. INSTALL TEMPORARY LIGHTING, CIRCUITS, ETC. AS NECESSARY TO KEEP ALL OCCUPIED

SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT

5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.

NATIONAL LABORATORY FOR AGRICULTURE & THE ENVIRONMENT (NLAE)

FIRE PUMP REMOVAL

AMES, IOWA

#AG-32-SC-D-16-0004

USDA

REAL PROPERTY

USDA

SAFETY & HEALTH

AREA ENGINEER

DRAWN BY

CHECKED BY

DESIGNER

PROJECT MANAGER

EPM

A-E FIRM

USDA PROJECT NO.

DATE

NO. DATE BY

SHEET

DESCRIPTION

Service Research Agricultural

REVISIONS

FACILITIES ENGINEERING SECTION

SOUTH ATLANTIC AREA

950 COLLEGE STATION RD.

P.O. BOX 5677

ATHENS, GEORGIA 30605

100%

CONSTRUCTION

DOCUMENTS U

S D A

C A D

D H

D S G

P M

OF

ALAN TOLAND --

TRISHA VIGIL

DEAN MAGEE

PHOEBE BORDELON

E000

ELECTRICAL COVERSHEET

SET

IPS

SET

17033

08-13-2018 05 07

A B C D E F G H J K L M N P Q R S T U V W X

DN

UP

DN

STORAGE

B18

RADIO ST.

B17

LOCKER

B16

LOCKER

B15

G. CHAMBER

B14

DRYING

B12

PREP

B10

REFRIG.

B11

STORAGE

B07

SOIL GRIND

B05

MECH.

B08

P & R

GRIND

B04

OFFICE

B02

P & R

PREP

B01

TARGET

B26A

INSTRU.

B26B

MECH.

B25D

RHIZOTRON

B22

J.C.

B27

SW. GEAR

B29

OFFICE

B28

EM. GEN.

B30

B25A

SHEET METAL

B25B

WELDING

B25C

MACHINING

B25

MECH. ROOM

B19

MS

MS

MS

E

E

MS

MS

MS

BFP-E

PANEL EBA

PANEL NBA

TR-225

TR-30

FIRE PUMP FEEDER

PULL BOX

TR-225

PANEL NB1

PANEL NDPB1PANEL NDPBA

INCOMING UNIT

SUBSTATION SWGEAR B29

EXISTING FIRE ALARM

CONTROL PANEL

HV SWITCH

TRANSFORMER

SWITCHBOARD

NATIONAL LABORATORY FOR AGRICULTURE & THE ENVIRONMENT (NLAE)

FIRE PUMP REMOVAL

AMES, IOWA

#AG-32-SC-D-16-0004

USDA

REAL PROPERTY

USDA

SAFETY & HEALTH

AREA ENGINEER

DRAWN BY

CHECKED BY

DESIGNER

PROJECT MANAGER

EPM

A-E FIRM

USDA PROJECT NO.

DATE

NO. DATE BY

SHEET

DESCRIPTION

Service Research Agricultural

REVISIONS

FACILITIES ENGINEERING SECTION

SOUTH ATLANTIC AREA

950 COLLEGE STATION RD.

P.O. BOX 5677

ATHENS, GEORGIA 30605

100%

CONSTRUCTION

DOCUMENTS U

S D A

C A D

D H

D S G

P M

OF

ALAN TOLAND --

TRISHA VIGIL

DEAN MAGEE

PHOEBE BORDELON

E100

BASEMENT - ELECTRICAL

SET

Checker

SET

17033

08-13-2018 06 07

NATIONAL LABORATORY FOR AGRICULTURE & THE ENVIRONMENT (NLAE)

FIRE PUMP REMOVAL

AMES, IOWA

#AG-32-SC-D-16-0004

USDA

REAL PROPERTY

USDA

SAFETY & HEALTH

AREA ENGINEER

DRAWN BY

CHECKED BY

DESIGNER

PROJECT MANAGER

EPM

A-E FIRM

USDA PROJECT NO.

DATE

NO. DATE BY

SHEET

DESCRIPTION

Service Research Agricultural

REVISIONS

FACILITIES ENGINEERING SECTION

SOUTH ATLANTIC AREA

950 COLLEGE STATION RD.

P.O. BOX 5677

ATHENS, GEORGIA 30605

100%

CONSTRUCTION

DOCUMENTS U

S D A

C A D

D H

D S G

P M

OF

ALAN TOLAND --

TRISHA VIGIL

DEAN MAGEE

PHOEBE BORDELON

E100

BASEMENT - ELECTRICAL

SET

Checker

SET

17033

08-13-2018 06 07

KEY NOTES :

1. FIRE PUMP TAP FROM MAIN SWITCHGEAR.

REMOVE CONDUIT AND WIRE BACK TO

SOURCE. E.C. SHALL PROVIDE A NEW METAL

TOP COVER TO CLOSE UP CONDUIT ENTRY

POINTS. COVER SHALL MATCH EXISTING

MATERIAL AND COLOR OF SWITCHGEAR. E.C.

SHALL COORDINATE SHUTDOWN OF MAIN

ELECTRICAL SERVICE WITH CONTRACTING

OFFICER REPRESENTATIVE.

2. DISCONNECT FIRE ALARM SYSTEM MONITOR

SWITCH. E.C. SHALL COORDINATE WITH

CONTRACTING OFFICER REPRESENTATIVE TO

HAVE FIRE ALARM CONTROL PANEL

REPROGRAMMED TO REFLECT CHANGES TO

SYSTEM. TYPICAL OF 6. REMOVE ALL CONDUIT

AND WIRE BACK TO SOURCE.

3. DISCONNECT EXISTING FIRE PUMP AND

ASSOCIATED CONTROLLER FOR REMOVAL BY

OTHERS.

4. DISCONNECT EXISTING JOCKEY PUMP AND

ASSOCIATED CONTROLLER FOR REMOVAL BY

OTHERS.

N O R

HT

1/8" = 1'-0"1

BASEMENT - ELECTRICAL

3-300E

2000KVA

5 KV, 3-PHASE, 4W

INCOMING 5KV FEEDER

480/277V, 3-PHASE, 4W

N E

U T R

A L

SWGEAR B29

DPM

C.T.'S

(3)

3200AF

2000AT

[LSIG]

GROUND

A

M P

B U

S

(3 )

###A/3P

SPACE

LA

600A/3P

DPM

C.T.'S

4160V

480/277V

800AF

400AT

200A/3P

EMERGENCY GENERATOR

250KW

480/277V

3-PHASE, 4WG

NEUTRALGROUND

400A/3P

TS-1

200A

FIRE PUMP CONTROLLER

800AF

200AT

M

800AF

800AT

M

TO NDPB1

800AF

800AT

M

800AF

800AT

M

800AF

200AT

M

800AF

200AT

M

800AF

350AT

M

800AF

350AT

M

800AF

##AT

M

TO NDPB2

TO MCC#1

TO MCC#2

TO MCC#3

TO NDPBB

TO NDPBA

SPARE

E

FIRE PUMP

60HP

BREAKER FOR FIRE PUMP

TO EDPB1

TO EDPB1-3

3#10 & 1#10 GND

IN 3/4" C.

JOCKEY PUMP

2HP

3#500 KCM & 1#3 GND

IN 3 1/2" C.

4#4/0 & 1#6 GND

IN 2 1/2" C.

3#500 KCM & 1#3 GND

IN 3 1/2" C.

3#500 KCM & 1#3 GND

IN 3 1/2" C.

4#4/0 & 1#6 GND

IN 2 1/2" C.

FIRE PUMP

PULL BOX

E

NATIONAL LABORATORY FOR AGRICULTURE & THE ENVIRONMENT (NLAE)

FIRE PUMP REMOVAL

AMES, IOWA

#AG-32-SC-D-16-0004

USDA

REAL PROPERTY

USDA

SAFETY & HEALTH

AREA ENGINEER

DRAWN BY

CHECKED BY

DESIGNER

PROJECT MANAGER

EPM

A-E FIRM

USDA PROJECT NO.

DATE

NO. DATE BY

SHEET

DESCRIPTION

Service Research Agricultural

REVISIONS

FACILITIES ENGINEERING SECTION

SOUTH ATLANTIC AREA

950 COLLEGE STATION RD.

P.O. BOX 5677

ATHENS, GEORGIA 30605

100%

CONSTRUCTION

DOCUMENTS U

S D A

C A D

D H

D S G

P M

OF

ALAN TOLAND --

TRISHA VIGIL

DEAN MAGEE

PHOEBE BORDELON

ED400

ELECTRICAL-ONE LINE DEMO

SET

Checker

SET

17033

08-13-2018 07 07

NO SCALE1

ELECTRICAL ONE LINE DIAGRAM - DEMOLITION

G001.pdf
Fire Protection Set.pdf
Sheets
F000 - FIRE PROTECTION COVERSHEET
FD100 - BASEMENT - FIRE PROTECTION DEMOLITION
F100 - BASEMENT - FIRE PROTECTION
Electrical Set.pdf
Sheets
E000 - ELECTRICAL COVERSHEET
E100 - BASEMENT - ELECTRICAL
ED400 - ELECTRICAL-ONE LINE DEMO

File details come from the government source that posted it. Updated .