This document provides details for a federal contract opportunity issued by the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area. Solicitation number 12505B23R0014 seeks offers for concrete repairs. The 18MB Drawings.pdf file contains plans related to the required concrete repair work. Responses are due by the date specified in the full solicitation document. The award will be made to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the government, considering only price and past performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF-30.pdf | ||
| Site Visit Sign In Sheet - July 5.pdf | ||
| Site Visit Sign In Sheet - July 6.pdf | ||
| Statement of Work.pdf | ||
| Underground Electrical Drawings.pdf | ||
| Past Performance Questionnaire.pdf | ||
| ARS-371.pdf | ||
| SF-1442.pdf | ||
| Wage Determination.pdf | ||
| ARS-372.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Location Coordinator:Contracting Officer Rep.:Contracting Officer:Engineering Project Manager:
Task
Order #:
Drawing Title:PROJECT TITLE:
FEU Project #:
Drawing Number:
Agricultural Research Service U.S. Department of Agriculture
NCAH
1920 Dayton Avenue Ames, Iowa 50010
Revision:
Client:
Sheet: Of
Designer:
Date:
Date:
Field Barn 203 & 204
UNITED STATES DEPARTMENT OF AGRICULTURE
AGRICULTURE RESEARCH SERVICE
NATIONAL CENTERS FOR ANIMAL HEALTH
Building 21 Sidewalk
Bldg. 21
N
S
W E
Field Barn 215 & 216
Drawing Title:
Drawing Number:
Sheet: Of
Building 21 Main Entrance
Approximately 1,534 ft2
C O
N S
T R
U C
T
IO
N A
R E
A
130' approx.
N
S
Sheet: Of
Landscaping and bollards to remain.
Match to existing sidewalk/roadway.
Remove and replace ADA warning pads into existing location.
(2)
See page 7 for rock wall details 1, 2, 3.
(1)
(3)
N
Sheet: Of barricaded for construction lay down area and equipment
Make 4 temporary handicap parking stalls
Building 21 Entry Point
CONSTRUCTION
VEHICLE TRAFFIC
Suggested Employee Route for Parking
C O
N S
T R
U C
T
IO
N A
R E
A N
Sheet: Of
AREA 1 - Building 21 Main Entrance Sidewalk:
1.Replace approximately 1,534 square feet of cracked sidewalk from the roadway leading into the southern main entrance into building 21.
2.Contractor shall remove all concrete within area shown in drawings down to existing base and replace concrete with new.
Contractor may use USDA crushed concrete from the on-site USDA stockpile as new base if needed.
3.New concrete shall be, at a minimum, the same thickness of slab as existing concrete sidewalk. Contractor shall install new #5 steel rebar reinforcing 16” on center (2” from bottom of pour) in each direction in all areas receiving new concrete and dowel rebar into any existing adjacent concrete of area receiving new concrete a minimum of 8” into existing sidewalk and paving.
4.All new concrete in this area shall be sloped to match existing slope. Contractor shall remove debris and seal joints and cracks in existing and new concrete located within this area. Contractor to saw-cut concrete. Cuts to match existing sizes and patterns in sidewalk, except where detailed in drawing (page 6).
5.Coordinate all downtime with the USDA for this area of work. All existing storm intakes/manholes/utilities shall be maintained and protected during construction as they are.
6.See attached drawings for further reference/guidance to the above Area.
7.Contractor shall take any-and-all precautions necessary to not damage surrounding campus areas, construction, utilities, and finishes including areas not noted to be in the concrete and paving scope. Any areas including pavement, utilities, grass, gravel/rocks, bollards, and building structures that is disturbed by Contractor’s work shall be fixed to match existing construction and finish to pre-construction condition. Glass at the main entry foyer of the building where the sidewalk begins shall be rinsed clean, using clean tap water, of concrete dust, dirt, and debris at completion of the sidewalk repair.
Sheet: Of
Match/replicate existing cut square sizes. 2ft2
Section B squares to align with Sections A, C,and D. No offset angle.
Section-A 2ft squares
Section-B 5ft squares
Section-C 5ft squares
Section-D 5ft squares 10ft wide total
1. Square sizes in B, C, and D to be (5' squares).
2. Dotted line represents approximate section D centerline. North South cuts in all sections to follow this angle.
N
E W
Sheet: Of
(1)
REMOVE CAULKING, SAW CUT CONCRETE MINIMUM
6" FROM ROCK VENEER, REMOVE CUT CONCRETE
PIECES BY HAND SO TO NOT DAMAGE VENEER.
INSTALL BARRIER AND EXPANSION JOINT BELOW
VENEER AGAINST CONCRETE FOOTING AND POUR
NEW CONCRETE AGAINST. SEAL JOINT WITH
POLYURETHANE CONCRETE CAULKING.
(2) (3)
SAME INSTRUCTIONS AS
DETAIL (B) FOR REMOVAL AND
INSTALLATION.
DETAILS
REMOVE THIS CONCRETE FOOTING
FOR NEW SIDEWALK POUR.
BEGIN SIDEWALK REMOVAL
HERE.
(2)
Sheet: Of
ALL FIELD BARNS
1.Install approximately 538 square feet of concrete in feed bunk area field barns 203 & 204. Install approximately 782 square feet of concrete in feed bunk area field barns 215 & 216.
2.Contractor shall remove all dirt, gravel, and debris within area shown in drawings down to existing base and replace concrete with new concrete. Contractor may use USDA crushed concrete from the on-site USDA stockpile as new base if needed.
3.New concrete shall be, at a minimum, the same thickness of slab as existing concrete feed bunk slab. Contractor shall install new #5 steel rebar reinforcing 16” on center (2” from bottom of pour) in each direction in all areas receiving new concrete and dowel rebar into any existing adjacent concrete of area receiving new concrete a minimum of 8” into existing sidewalk and paving.
All new concrete in this area shall be sloped to match existing slope. Where the edge of concrete meets the existing wooden fence posts, there shall be a gap of 2” between concrete edge and posts.
4.USDA will move the concrete feed bunks off existing slab, clean debris from existing slab, and move feed bunks back into place upon project completion. Contractor shall remove debris and seal joints and cracks in existing and new concrete located within this area. Contractor to saw-cut concrete to match existing feed bunk concrete pad cuts.
5.Coordinate all downtime with the USDA for this area of work. All existing storm intakes/manholes/utilities shall be maintained and protected during construction as they are, if applicable.
6.See attached drawings for further reference/guidance to the above Area.
7.Contractor shall take any-and-all precautions necessary to not damage surrounding campus areas, construction, utilities, and finishes including areas not noted to be in the concrete and paving scope. Any areas including pavement, utilities, grass, gravel/rocks, bollards, and building structures that is disturbed by Contractor’s work shall be fixed to match existing construction and finish to pre-construction condition.
Sheet: Of
215 216203 204
New concrete.
(approx. 538 sf each)
Existing concrete pad.
New concrete.
(approx. 782 sf each)
Existing concrete pad.
Wood Fence
Feed Bunk.
To be moved by USDA
Feed Bunk.
To be moved by USDA
N
Sheet: Of fu tu re
Crushed Material
BASE BID AREA 1
ALT BID 1
AREA 2
ALT BID 2
AREA 3
ALT BID 3
AREA 4
ALT BID 4
AREA 5
E
W
N S
| 1 - Title Page |
| 2 - Work Location and Footage-21 |
| 3 - Work Location and Callouts-21 |
| 4 - Traffic Control-Pedestrian Control-21 |
| 5 - SoW-Bldg. 21 |
| 6 - Photo Detail-21 |
| 7 - Rock Wall Detail-21 |
| 8 - SoW-Field Barns |
| 9 - Work Location and Footage-FBs |
| 10 - Site Bid Areas |
| EPM Dropdown: [Tommy Walker] |
| CO Dropdown: [Josh Dobereiner] |
| COR Dropdown: [Tommy Walker] |
| LC: N/A |
| PROJECT TITLE: |
FY23 Concrete Repairs
| Task Order-Contract #: |
| Task Order-Contract Award Date=: |
| Drawing Title:: Title Page |
| Revision Date:: 5/10/2023 |
| File Name=: Tommy Walker |
| Drawing Number: 1 |
| FEU Project #: 23010 |
| Client=ARU, APHIS, CVB, etc: USDA |
| Sheet Of: 1 |
| Sheet # Total: 10 |
| Project Title: FY23 Concrete Repairs |
| PAGE: |
| 1: 1 |
| 2: 2 |
| 3: 3 |
| 4: 4 |
| 5: 5 |
| 6: 6 |
| 7: 7 |
| 8: 8 |
| 9: 9 |
| 10: 10 |
| 11: |
| 12: |
| 13: |
| 14: |
| 15: |
| 16: |
| 17: |
| DESCRIPTION: |
| 0: Title Page |
| 1: Work Location & Footage-21 |
| 2: Work Location & Callouts-21 |
| 3: Traffic-Pedestrian Control-21 |
| 4: Statement of Work-21 |
| 5: Photo Detail-21 |
| 6: Rock Wall Details-21 |
| 7: Statement of Work-FBs |
| 8: Work Location and Footage-FBs |
| 9: Site Bid Areas |
| 10: |
| 11: |
| 12: |
| 13: |
| 14: |
| 15: |
| 16: |
| Revision: [FOR BID] |
| Drawing Title:: Work Location & Footage-21 |
| Drawing Number: 2 |
| Sheet Of: 2 |
| Sheet # Total: 10 |
| Drawing Title:: Work Location & Callouts |
| Drawing Number: 3 |
| Sheet Of: 3 |
| Sheet # Total: 10 |
| Drawing Title:: Traffic-Pedestrian Control |
| Drawing Number: 4 |
| Sheet Of: 4 |
| Sheet # Total: 10 |
| Drawing Title:: Statement of Work-21 Sidewalk |
| Drawing Number: 5 |
| Sheet Of: 5 |
| Sheet # Total: 10 |
| Drawing Title:: Photo Detail |
| Drawing Number: 6 |
| Sheet Of: 6 |
| Sheet # Total: 10 |
| Drawing Title:: Rock Wall Detail |
| Drawing Number: 7 |
| Sheet Of: 7 |
| Sheet # Total: 10 |
| Drawing Title:: Statement of Work-21 Sidewalk |
| Drawing Number: 8 |
| Sheet Of: 8 |
| Sheet # Total: 10 |
| Drawing Title:: Work Location & Footage-FBs |
| Drawing Number: 9 |
| Sheet Of: 9 |
| Sheet # Total: 10 |
| Drawing Title:: Site Bid Areas |
| Drawing Number: 10 |
| Sheet Of: 10 |
| Sheet # Total: 10 |