Drawing and Photo.pdf
PDF 4 MB Posted
- Attached to
- Building 154 South Steam Header Bypass Valve Replacement Federal contract opportunity
- Solicitation number
- 12505B23R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF-1442.pdf | ||
| ARS-372.pdf | ||
| Statement of Work.pdf | ||
| Wage Determination.pdf | ||
| ARS-371.pdf | ||
| Past Performance Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Demo piping and bypass assembly noted above.
0-200
14" PIPE
0-200
2" PIPE
4" PIPE
Approximately 18"
Legend
Description Quantity
2" 90 Degree Flanged Elbow 1
2" Flanged Gate Valve 4
2" Flanged Tee Joint 2
2" to 1/2" Bushing 2
4" 90 Degree Welded Elbow 3
4" Flanged Gate Valve 2
4" to 2" Bushing 2
4" Welded Tee Joint 2
14" Gate Valve 1
Pigtail 2
Steam Pressure Gauge 2
A pp ro xi m at el y
1. All piping will be schedule 80, all piping components and valves will be heavy duty.
2. All piping and fittings will be welded.
3. All valves will be flanged.
4. All valves will be accessible from the catwalk.
5. Normal steam pressure is 125 psi.
| Bldg. 154 South Steam Bypass Demo C2 |