Text version

Demo piping and bypass assembly noted above.

0-200

14" PIPE

0-200

2" PIPE

4" PIPE

Approximately 18"

Legend

Description Quantity

2" 90 Degree Flanged Elbow 1

2" Flanged Gate Valve 4

2" Flanged Tee Joint 2

2" to 1/2" Bushing 2

4" 90 Degree Welded Elbow 3

4" Flanged Gate Valve 2

4" to 2" Bushing 2

4" Welded Tee Joint 2

14" Gate Valve 1

Pigtail 2

Steam Pressure Gauge 2

A pp ro xi m at el y

1. All piping will be schedule 80, all piping components and valves will be heavy duty.

2. All piping and fittings will be welded.

3. All valves will be flanged.

4. All valves will be accessible from the catwalk.

5. Normal steam pressure is 125 psi.

Bldg. 154 South Steam Bypass Demo C2
Bldg. 154 South Steam Bypass B2