Draft PWS CRAC 13 Jan 25.docx

DOCX document 186 KB Posted

Attached to
HVAC/CRAC Federal contract opportunity
Solicitation number
FA251725Q0034
Issued by
Department of the Air Force Space Command

About this file

This is a Performance Work Statement (PWS) for Computer Room Air Conditioning (CRAC) services at Peterson Space Force Base (PSFB) in Colorado Springs, CO, dated January 13, 2025. The contractor shall provide non-personal services, supervision, tools, materials, and equipment to maintain, upgrade, repair and operate all CRAC units located across multiple buildings at PSFB, with individual task orders issued for each building as needed for routine and emergency repairs.

The PWS requires contractors to provide preventative maintenance, routine diagnosis/repair, and emergency service (24/7/365) for 246 active CRAC units across the base. Key response times include: 24 hours for routine service calls during normal duty hours (0730-1700 Monday-Friday), 2 hours for emergency calls during duty hours, and 4 hours during non-duty hours. The contractor must maintain room temperatures at 74 degrees Fahrenheit or below, complete repairs within 48 hours of receiving parts, and provide temporary cooling if unable to immediately repair units. Personnel must hold current Universal EPA Section 608 Technician Certification, and several buildings require Secret clearance access. Monthly services include filter replacements, belt checks, humidifier operation checks, and coil leak inspections. The contractor must maintain detailed work order tracking systems and provide monthly reports on all maintenance activities.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC/CRAC, newest first.
File Type Posted
Draft6_Revised PWS-HVAC-CRAC.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

COMPUTER ROOM AIR CONDITIONING (CRAC) SERVICES

Peterson Space Force Base (PSFB) Colorado Springs, CO

13 January 2025

PWS - CRAC Services Peterson AFB, CO

Table of Contents

PWS - CRAC Services Peterson SFB, CO

Section 1: Description of Services6
Scope of Work6
Overview of Requirement6
Specific Tasks and Requirements6
PSFB CRAC Units Specific Tasks6
Personnel6
1.2.2.2Communications7
Mission Essential Services8
Hours of Operation8
Licenses, Certifications, and Permits9
Recordkeeping and Reporting9
Parts11
Relevant Documents12
Government wide Commercial Purchase Card (GPC)12
Base Regulations and Security12
Base Regulations12
Contract Security Requirements14
Hazmat, Environmental, and Utilities16
Hazmat Handling16
Water Quality17
General Environmental Compliance18
Code Requirements20
Utilities20
Section 2: Service Summary22
Overview22
PSFB CRAC22
2.2.1Performance Objectives, PWS Paragraphs and Thresholds22
Section 3: Government-Furnished Property and Services24
Government-Furnished Property and Services at Other Buildings24
Government-Furnished Property24
Government-Furnished Services24
Government Furnished Storage Space24
Section 4: Contractor-Furnished Property and Services25
Contractor-Furnished Property and Services at Other Buildings25
Contractor-Furnished Property25
Contractor-Furnished Services25
Appendices26
Appendix B: PSFB CRAC Unit Requirements26
Scope of Work26
Overview26
Areas of Responsibility26
Preventative Maintenance26
Routine (Non-Emergency) Diagnosis, Repair, and Service27
Emergency Service and Repair27
Replacement28
Other Requirements29
Security29
Building Access and Security29
Appendix C: Acronyms and Abbreviations30
Acronyms and Abbreviations30
Appendix D: Definitions31
Definitions31
Appendix E: Applicable Forms, Publications, and Websites32
Applicable Forms32
Applicable Publications32
Applicable Websites33
Appendix F: Workload Estimates34
F.1Workload Estimates34
F.1.1PSFB CRAC Units34
Appendix G: Training Required / Provided35
G.1Training Required / Provided35
Appendix H: Environmentally Preferred Products36
H.1Environmentally Preferred Products36
Appendix I: List of Attachments37
I.1List of Attachments37

SECTION 1: Description of Services

1.1. SCOPE OF WORK

1.1.1. OVERVIEW OF REQUIREMENT

1.1.1.1. Overview. The Contractor shall provide non-personal services, supervision, tools, materials, and equipment, unless otherwise specified as government-furnished to maintain, upgrade, repair and operate all CRAC units located at multiple buildings at PSFB. Individual task orders will be issued for each building as needed and for certain routine and emergency repairs. See Attachments 2-3 for a list of equipment located in each potential building (Attachments 2-3 are for informational purposes only and there to show the magnitude of potential work and may vary by individual task order)

1.2. SPECIFIC TASKS AND REQUIREMENTS

1.2.1. PSFB CRAC UNITS SPECIFIC TASKS

1.2.1.1. PSFB CRAC UNITS Tasks. See Appendix B for unique tasks and requirements for servicing PSFB CRAC units. This list is subject to change. Units can be added or removed. List shall be reviewed quarterly and adjusted as needed.

1.2.2. PERSONNEL

1.2.2.1. Contract Manager and Alternate Availability. The Contractor shall identify a contract manager and alternate who will be responsible for contract performance in accordance with (IAW) the Performance Work Statement (PWS). The contract manager or alternate will have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The name of this person and an alternate or alternates, who will act for the Contractor when the primary point of contact is absent, will be designated in writing to the Contracting Officer (CO) at the pre-performance conference and as changes are made thereafter within 24 hours of the change.

1.2.2.2. Communication. The on-duty Contractor maintenance personnel shall be available at all times by means of a landline telephone or cell phone system so that the Contracting Officer's Representative (COR) or Facility Manager (FM) can make contact in person or by phone at all times. Contractor shall provide a phone contact list to each COR/FM and send updated list to CORs/FMs as changes occur.

1.2.2.3. Contractor Employees. The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States Government, if the employment of that person creates a conflict of interest. The Contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel will not be an excuse for the Contractor’s inability to perform daily functions.

1.2.2.4. Attire/Presentation. Maintenance personnel shall be dressed in professional attire appropriate for their duties. Contractor personnel shall present a neat, clean, professional appearance, conduct themselves professionally at all times, and be easily recognized as a Contractor employee. All maintenance personnel will wear a standardized clean and maintained uniform or shirt/blouse with collar and full or half sleeves. Wearing of shorts and/or any military uniforms, or parts thereof, is prohibited. If required for building access, a government-issued identification badge will be worn visibly at all times, in all applicable areas as designated by the COR/FM. The Contractor will identify himself as a Contractor in meetings, telephone conversations, and e-mails and in any correspondence with the Government.

1.2.2.5. Conduct. Contractor personnel shall observe all facility safety and traffic regulations that apply to all facility employees. Parking and traffic rules will be observed at all times. Trucks or other construction equipment will not be permitted on the lawns or off the surfaced roadways without permission of the COR/FM. Alcoholic beverages on the job are not permitted. There will be no loud, profane or abusive language used on the job. Respect for and the welfare of the visitors/occupants is mandatory at all times.

1.2.2.6. Safety and Health Requirements. The Contractor will comply with federal, state and local laws with regard to safety and health standards.

1.2.2.7. Performance Meeting. Performance meetings with the Contractor will be conducted on an as requested basis. The purpose of these meetings is to discuss Contractor performance and any events on PSFB that will affect services being provided. The contract manager, as identified in paragraph (para) 1.2.2.1, should attend these meetings. The specific frequency, time and location of meetings, will be determined by the CO, CORs, and Contractor.

1.2.3. MISSION ESSENTIAL SERVICES

1.2.3.1. Performance of Services during Crises Declared by the National Command Authority. IAW Department of Defense Instruction (DoDI) 1100.22, the Government has determined that all services performed under this contract are essential for performance during crisis, unless otherwise directed by the CO. The Contractor is required to immediately respond IAW the timeframes specified in Appendices A and B.

1.2.4. HOURS OF OPERATION

1.2.4.1. General Hours of Operation. Normal duty hours are 0730 – 1700 Monday through Friday excluding Holidays, unless otherwise stated for each building. These are considered “Business Hours” and/or “Business Days”.

1.2.4.2. Recognized Federal Holidays. Unless otherwise stated, the Contractor is not required to maintain normal duty hours on Federal Holidays but must be available for emergencies during Federal Holidays. The following is a list of Federal Holidays observed by PSFB:

New Year’s DayLabor Day Martin Luther King DayColumbus Day President’s DayVeteran’s Day
Memorial DayThanksgiving Day
JuneteenthChristmas Day Independence Day

1.2.4.3. Unscheduled Interruptions. The work on this contract occurs on a military installation. Delays or additional response due to exercises and contingencies are part of the environment and cannot be considered cause for an adjustment in price. Maintenance operations are subject to unscheduled interruptions and maintenance personnel may be required to immediately leave the designated work area or be denied access due to security operations, exercises, etc. Mission requirements may necessitate suspension or cancellation of maintenance operations for that period. All uncompleted work requirements will be rescheduled for accomplishment at a later date

1.2.5. LICENSES, CERTIFICATIONS, AND PERMITS

1.2.5.1. Minimum Licensing, Certifications, and Permits. Unless otherwise stated, all items that require work on PSFB shall be diagnosed and repaired by properly trained and qualified person(s) as identified below:

1.2.5.1.1. HVAC/CRAC Mechanics. HVAC and/or CRAC Mechanic(s) must hold a current/valid Universal Environmental Protection Agency (EPA) Section 608 Technician Certification as a minimum. Non-Universal EPA HVAC/CRAC Section 608 Technician(s) may be on duty anytime under direct supervision of a Universal EPA certified HVAC/CRAC Mechanic.

1.2.5.2. HAZMAT Licenses. Licenses for employees in the use of hazardous materials will be the responsibility of the Contractor and at the Contractor’s expense.

1.2.5.3. Provide Copies. The Contractor shall provide a copy of all necessary licenses and certifications to the Government (CORs) IAW para 1.2.5.1.1.

1.2.6. RECORDKEEPING AND REPORTING

1.2.6.1. Overview. All records, documents, and associated papers provided by the Government or generated during the period of the contract will remain the property of the Government upon contract termination or expiration. During the contract period, these records, documents and associated papers will be made available to the Government upon request.

1.2.6.2. Work-Order Tracking System. The Contractor shall maintain a work-order tracking system to log all submitted routine work orders, emergency work orders, preventative maintenance work orders, and all completed service calls. The work-order tracking system shall include details of repairs completed including date of repair, name of technician(s), serial number of equipment repaired, parts used, part costs, labor hours, time and length of outages, and corrective actions taken. The Contractor shall submit an electronic monthly work-order report to the PSFB CRAC Unit COR. The report shall identify the equipment worked on and the purpose of the work order.

1.2.6.3. Monthly Work Order Reports. The Contractor shall electronically prepare a monthly detailed report for each building, including the items above in paragraph 1.2.6.2. The Contractor shall provide the report for all applicable buildings to the PSFB CRAC COR on a monthly basis by the fifth business day of each month and upon request within two (2) business days. Acceptable formats are Portable Document Format (PDF), Microsoft Word, or Microsoft Excel.

1.2.6.4. Equipment Inventory List. The Contractor shall maintain and update an inventory list of equipment for each building to include manufacturer, serial number, and model number as routine maintenance is completed, or as needed. The Contractor shall provide the list for all applicable buildings to the CRAC COR annually on the task order anniversary date and upon request within two (2) business days. Acceptable report formats are PDF, Microsoft Word, or Microsoft Excel

1.2.6.5. Specification and Data Sheets. The Contractor shall maintain a copy of all specification and data sheets, manufacturer’s certification of prototype testing on a complete and functional unit, and factory-certified record of the production testing on any new or replaced equipment items. The Contractor shall make these documents available to the Government annually on the task order anniversary date and upon request.

1.2.6.6. Safety Data Sheets. The Contractor shall obtain and make available upon request Manufacturers’ Materials Safety Data Sheets or Safety Data Sheet (SDS) on all hazardous materials used in the performance of this contract.

1.2.6.7. Licenses and Certifications. The Contractor shall provide a copy of all necessary licenses and certifications to the Government (CORs) within 10 calendar days of contract award and within 10 calendar days of craftsman hire date. The Contractor shall maintain sufficient records of all necessary licenses and certifications and make these records available to the Government upon request within two (2) business days. See Section 1.2.5 for required licenses.

1.2.6.8. Quality Control Program. The Contractor shall develop, implement, and maintain a Quality Control Program to ensure contracted services are performed IAW this PWS and accepted commercial practices. Contractor will develop and implement a plan and procedures which encompass all functions and requirements of the contract to identify, correct, and ensure non-recurrence of defective services. The Contractor shall provide the quality plan to the Government (CORs) for review and comment within 14 calendar days of contract award.

1.2.6.9. Equipment Maintenance Plan. The Contractor shall develop an Equipment Maintenance Plan, including sample equipment maintenance and inspection sheets, and submit the plan for review and comment by the CORs within 14 calendar days of task order award. The plan shall specify when the Contractor will accomplish preventive maintenance for each building, how maintenance and repairs will be documented, and how the Contractor will control, protect, preserve, and maintain all Government property. After review and agreement between the CORS and contractor, the plan shall be implemented and maintained and shall be made available to the Government (CORs) within two (2) business days of request.

1.2.6.10. Refrigerant Management Plan and Tracking. The Contractor shall provide complete and precise refrigerant recordkeeping IAW 40 Code of Federal Regulations (CFR) 82, Colorado Regulation 15 (5 CCR 1001-19), and AFMAN 32-7002 tracking refrigerant loss and recovered refrigerant added to system, cause of leak and actions taken to repair leak. All required maintenance and leak rate documentation will be maintained in the Air Pollutant Information Management System (APIMS). Each record shall match up with the serial number of equipment worked. Contractor shall submit this information in APIMS within two (2) business days of completing work. The Contractor shall submit a Refrigerant Management Plan to CORs within 30 calendar days of task order award for review and comment. The Contractor shall and provide a copy of the plan and documents validating compliance to the Government (CORS) upon request within (2) busuness days.

1.2.6.11. Contingency Plan (Mission-Essential Contractor Services Plan). The Contractor shall develop, implement and maintain a Contingency Plan that ensures continued performance in the event of catastrophic and non-catastrophic events, work stoppages, and utilities outages. The Contingency Plan will provide for immediate response to catastrophic events to ensure minimal impact on the mission. The plan shall also include procedures for promptly repairing utility breaks/interruptions made or caused by the Contractor. The Contractor shall make the Contingency Plan available to the Government (CORs) for review and comment within 2 business days after contract award.

1.2.7. PARTS

Parts. Costs for parts for preventative maintenance services shall be included in the fixed-price for monthly services. Costs for parts for routine service calls, and emergency service calls sufficient to complete/eliminate the emergency situation shall be included in the fixed-price for monthly services. Pricing for monthly services shall include consumables and parts, supplies and materials needed for routine and preventive maintenance and in performance of day-to-day contract requirements. If parts are required for additional repair, replacements or upgrades outside of the monthly services, or if parts for repair under a single routine service call or single emergency service call exceed $1,500, the contractor shall obtain approval from the COR prior to purchase and installation. The contractor shall not consolidate requirements or parts lists from multiple service calls in an effort to exceed the threshold. Request for approval shall include the manufacture, part number, and purpose or required part(s), and only the contractor’s Shipping and Handling Fee shall be applied to the cost of the parts. The contractor shall not proceed with ordering or installing parts without approval from the Contracting Officer. If approval is granted, the Contracting Officer will provide authorization and a task order or modification with funding for the additional parts. The contractor shall provide the COR with a monthly itemized parts list of parts purchased for installation. This report shall state where the part was used, for what purpose, manufacture & part number. Lastly, the report shall cite the appropriate Contract Number, Task Order, and CLIN Number.

1.2.7.1. Contractor Owns Replacement Parts Until Installation. The Contractor shall furnish and own all replacement parts until they are installed on Government-owned equipment.

1.2.7.2. Sufficient Number of Parts. The Contractor shall maintain a sufficient number of parts and materials (bench stock) required for normal maintenance and repairs IAW the PWS.

1.2.7.3. Parts Quality. The Contractor shall purchase parts for repair and maintenance which are of equal or greater quality to the parts replaced. All components replaced (i.e. contactors, wiring, piping and valves) must be either new or refurbished to manufacturer’s tolerances.

1.2.7.4. Parts Under Warranty. The Contractor shall arrange for the repair or replacement of equipment and parts covered by a warranty. The Contractor shall replace or repair equipment and parts not under warranty.

1.2.7.5. Access Panels. All access panels (doors) and cover plates shall be reinstalled after inspection or work is completed.

1.2.8. RELEVENT DOCUMENTS

1.2.8.1. All Relevant Documents. After completion of work, the Contractor is required to submit all relevant documentation to the COR. Relevant documentation includes but is not limited to service manuals, wiring diagrams, start-up procedures, warranty information, etc.

1.2.9. GOVERNMENT WIDE COMMERCIAL PURCHASE CARD (GPC)

1.2.9.1. Accepting GPC for Payment. The Contractor is required to accept GPC as the method of payment for orders or calls valued at or below the micro-purchase threshold identified in Federal Acquisition Regulation (FAR) Part 2.

1.2.9.2. Waiver of Surcharges. For payments made utilizing the GPC against this contract, the Contractor shall waive any and all surcharges and taxes associated with processing the GPC through the Government Purchase Card Banking System, at the date/time of purchase.

1.2.9.3. GPC Purchase Receipt. All GPC purchases under the agreements shall be accompanied by delivery tickets or sales slips that shall contain the following minimum information: (i) Name of Contractor. (ii) Contract number and building number. (iii) Date of service. (iv) Purchase number. (v) Itemized list of supplies/services furnished. (vi) Quantity, unit price and extended price of each item, less applicable discounts (unit prices and extended prices need not be shown when incompatible with the use of automated systems, provided that the invoice is itemized to show this information). (vii) Date of delivery or shipment. (viii) Name and telephone number of the credit card holder, and the term “Credit Card”.

1.3. BASE REGULATIONS AND SECURITY

1.3.1. BASE REGULATIONS

1.3.1.1. Installation Entry. The Contractor shall comply with established security procedures for entering the installation and its facilities to include any special security procedures that may be established for entry to Restricted Areas or mission essential or vulnerable areas.

1.3.1.2. Entry Denial. The government reserves the right to terminate entry of any Contractor employee upon disclosure of information that indicates the individual’s continued entry to the installation is not in the best interest of the national security. Additionally, violation of or deviation from established security procedures by Contractor employees may result in confiscation of identification media and denial of future entry to the installation.

1.3.1.3. Installation Commander Requirements. The Contractor and all employees shall comply with all PSFB security requirements imposed by the Installation Commander at all times while on the premises to include not using cell phones while operating a vehicle on Base.

1.3.1.4. Commander’s Right to Deny Entry. The Commander of PSFB reserves the right to deny entry to a restricted or controlled area to any Contractor employee who’s NACI/LC is unfavorable and the right to terminate the entry of any employee upon disclosure of information which indicates the individual’s continued entry to any area is not in the best interest of national security. Additionally, violation of or deviation from established security procedures by Contractor employees may result in confiscation of identification media and denial of future entry to the installation.

1.3.1.5. Vehicle Requirements. Proper state vehicle registration, proof of insurance, and a valid driver’s license are required to drive on PSFB. All commercial vehicles must enter through the East Gate (Marksheffel Road), the primary search area for all commercial delivery vehicles.

1.3.1.6. Vehicles. All Contractor company vehicles used in the performance of this contract shall have the company name prominently displayed on each side of the vehicle. The Contractor shall maintain vehicles to present a neat, clean, and professional appearance. All vehicles will be in operable condition and meet the local, state, and federal safety requirements. The Government may inspect the Contractor's vehicles at any time and direct the removal of any objectionable vehicle from the installation. Vehicles found to be unsafe or unable to function as designed will be removed from the installation and replaced at Contractor’s expense. Vehicle repairs will not be performed on base.

1.3.1.7. Security Delays. The work on this contract occurs on a military installation. Delays or additional response due to exercises are part of the environment and cannot be considered cause for an adjustment in price. Maintenance operations are subject to unscheduled interruptions and maintenance personnel may be required to immediately leave the designated work area or be denied access due to security operations, exercises, etc. There are typically between two (2) and four (4) planned exercises per year with an average length of ten (10) calendar days each. Mission requirements may necessitate suspension or cancellation of maintenance operations for that period. All uncompleted work requirements shall be rescheduled for a later date.

1.3.2. CONTRACT SECURITY REQUIREMENTS

1.3.2.1. Security Officer. Within five (5) business days of contract award, the Contractor shall designate in writing to the CO a Security Officer who shall be the point of contact for all security matters. The Security Officer shall contact the individual Security Managers in various facilities regarding procedures to initiate personnel security requirements within five (5) business days after contract award.

1.3.2.2. Security Briefing. Contractor personnel shall be briefed by the Security Officer on established security requirements and procedures prior to any employee working on PSFB.

1.3.2.3. Background Checks. IAW Department of Defense Instruction (DODI) O-2000.16, Air Force Space Command Supplement (AFSPCSUP) 1, Para 2.17.3.1, Air Force Antiterrorism Standards, all Contractor personnel shall submit to a Colorado Crime Information Center (CCIC) and National Crime Information Center (NCIC) check prior to being granted access to the installation. Refusal to submit to the CCIC/NCIC check or a report of adverse information will result in denial of access to the Contractor’s employee(s).

1.3.2.4. Obtaining Access. IAW Installation Security Instruction 31-101, Para 6.2.8, the Contractor shall obtain all necessary cards, passes, decals or other items required for access on PSFB, including access for those employees who drive to work. Upon completion or termination of the contract, or termination of a Contractor employee, the Contractor shall surrender any identification badges and vehicle identification to the Security Police at the Visitor’s Control Center. Final contract payment will not be made until all badges have been accounted for.

1.3.2.5. Unescorted Entry (Controlled). The Government may issue Controlled Area Badges, which are valid only for the actual period of employment or the term of the contract, whichever terminates first. Contractor employees shall display their controlled area badges on their outer garments above waist level, and shall, upon request, surrender badges to any Department of Defense member for identification verification. Violations or deviations from established security procedures by Contractor employees may result in the confiscation of controlled area badges and the denial of future entry to these areas.

Contractor Badge Request. The Contractor shall provide a letter to the COR or FM on company letterhead including company address, telephone number, and contract number listing all employees who require access to PSFB. The letter shall include, for each employee, the employee’s full name, social security number, driver’s license number, date of birth, place of birth, citizenship, security level, and duty hours. The letter will be on file with the PSFB Security Forces Squadron (SFS) for 30 calendar days from the date on the letter, after which it will be discarded. Each Contractor employee must obtain the necessary badge within the 30-day period. When a badge is requested for a new employee, an updated employee list shall be provided to the COR or FM. The Government is not responsible for Contractor employees who cannot obtain or maintain the appropriate security clearance or badge.

1.3.2.6. Contractor Badge. Contractor employees shall apply for individual identification badges at the PSFB SFS Visitors’ Control Center, Bldg. 1334, upon employment after access letter is on file with the SFS. Badges are processed Monday through Friday from 7:00 AM to 4:00 PM. No appointment is necessary.

1.3.2.7. Removal from Area. Contractor personnel shall immediately leave any area upon notification by the CO, COR, FM, Security Personnel, SFS, or other appropriate authority when directed, as occasional operational requirements or emergencies dictate.

1.3.2.8. Restricted Areas on PSFB. Several facilities are restricted areas where special security procedures are utilized. Contract performance required within these areas shall require Contractor to comply with various levels of security and established personnel security entry control procedures. Contractor employees requiring access to these facilities shall obtain required badges/clearances. Required access to specific rooms often will include an additional security level requiring escort. Contractor employees shall enter through designated entry control points by the most direct route to and from the work site.

1.3.2.9. Disclosure of Sensitive Data. The Contractor shall recognize that, in the performance of the contract, it may receive or have access to certain sensitive information. The Contractor shall agree to use and examine this information exclusively in the performance of the contract and to take the necessary steps to prevent disclosure of such information to any party outside of the Government.

1.3.2.10. Physical Security. The Contractor shall protect Government information, property, equipment and resources that are generated, issued, or supplied under the terms of this contract IAW AFI 31-601 Para 1.3, and AFI 16-1404, Para

1.2. Further, the Contractor shall not remove any Government property from the installation unless authorized by the FM or COR in writing. The Contractor shall immediately report any damage to Government property to the COR, FM, and CO. The Contractor shall repair or replace all damage to real property, including grounds, to original condition at no additional expense to the Government. The Contractor shall repair all damage within five (5) business days with materials of like type, quality, and finish by skilled craftsmen of the trades involved.

1.3.2.11. Facility Security. The Contractor shall complete all additional security training to gain access to specific facilities, operating systems, and information via the Learning Management System. The Contractor shall safeguard all Government property provided for Contractor use. Upon work completion, Contractor employees shall secure all doors, turn off all lights, and protect any classified information.

1.3.2.12. Key/Lock Control. The Contractor shall ensure all keys and lock combinations issued to the Contractor by the Government are not lost, misplaced, or used by unauthorized persons. The Contractor shall not duplicate any keys issued by the Government. Contractor shall immediately report any occurrences of lost keys to the COR or FM. If the COR or FM cannot be reached, the Contractor shall notify SFS. In the event keys must be replaced, the Government will replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the Contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system and will deduct the cost of replacement from the monthly payment due the Contractor.

1.4. HAZMAT, ENVIRONMENTAL, AND UTILITIES

1.4.1. HAZMAT HANDLING

1.4.1.1. Chemical and Material Disposal. The Contractor shall dispose of all chemicals IAW Environmental Federal, State and Local Laws and Regulations IAW the Peterson/Cheyenne Mountain Hazardous Waste Management Plan.

Hazardous Material Handling. The Contractor shall handle hazardous materials according to federal, state, and local laws and emergency response requirements. Licenses for employees in the use of hazardous materials will be the responsibility of the Contractor and will be obtained at the Contractor’s expense. The Contractor shall report all instances of spills, leaks, and inadvertent release of hazardous materials to the COR and FM as soon as the event occurs. The Contractor shall take all hazardous materials off base with them at the close of the contract. No hazardous materials shall be left or stored on base after the contracting period.

1.4.1.2. Safety Data Sheets (SDS). The Contractor shall maintain Manufacturers’ Safety Data Sheets (SDS) on all hazardous materials used in the performance of this contract.

1.4.1.3. Hazardous Materials Approval. The Contractor shall obtain, prepare, and provide an AF Form 3952, Chemical/Hazardous Material Request Authorization and Manufacturer’s Safety Data Sheet (SDS), to the base HAZMAT Manager, Sandy Ingrassia/556-1478, for all chemicals/hazardous materials to be used on PSFB within two (2) weeks after contract start date and within two (2) weeks after any new materials or supplies are purchased for use under this contract. All hazardous materials or chemicals brought and used on the installation by the Contractor will be subject to pre- approval and authorization by the installation environmental office. The PSFB Hazardous Material Management Program Team will review Contractor hazardous material requests and will notify the Contractor of materials approved.

1.4.1.4. HAZMAT Tracking and Reporting. Document the types and quantities of hazardous materials used in performance of this contract. The Contractor’s documentation shall be provided to the Government on a monthly basis on the first business day of each month and submitted to the HAZMAT Manager at Bldg. 1324.

1.4.1.5. Handling as Required by Law. The Contractor shall manage all hazardous chemicals or toxic material used, removed or handled and wastes generated IAW federal, state and local laws.

1.4.1.6. Hazardous Waste Management. The Contractor shall immediately contact the PSFB 21 CES/CEIE HW Manager, upon generating any waste that is regulated as hazardous. The Contractor shall contact the HW Manager if assistance is needed in making a waste determination. Contractor shall ensure all copies of shipping documents, manifests and any weight tickets for waste shipped off base are supplied to 21 CES/CEIE Installation Management.

1.4.2. WATER QUALITY

Waste Water Discharge: All Sanitary discharges will be IAW the Colorado Springs Utilities Insignificant Industrial User requirements as required by the CSU Contract w/Peterson SFB. A copy of the CSU requirements may be obtained from the installation water quality manager, 21 CES/CEIE.

1.4.2.1 Storm Water Discharge: All Storm water discharges are IAW the EPA Municipal Storm Water General Permit (MSGP) and the Peterson Multi-Sector Storm Sewer (MS4) Permit. The Contractor shall receive annual training from installation water quality manager 21 CES/CEIE annually. A certified back flow prevention device must be installed on all faucets before connecting equipment/devices that mix or prepare soaps or other cleaning chemicals.

Remove all equipment/devices from faucets when finished with task.

1.4.3. GENERAL ENVIRONMENTAL COMPLIANCE

1.4.3.1. Sustainable Procurement. In order to comply with the green procurement requirements of Section 6002 of Resource Conservation and Recovery Act of 1976 the Government requires the use of recycled and recovered materials, bio-based products, energy and water savings products, and environmentally-preferable products. Recycled and recovered materials are identified by the Environmental Protection Agency’s Comprehensive Procurement Guidelines (information available at https://www.epa.gov/smm/comprehensive-proceurement-guideline-cpg-program Bio-Based products are identified by United States Department of Agriculture under Bio-Based products (information is available at http://www.biobased.oce.usda.gov). Environmentally preferable products are products that are less hazardous to the environment. Some products are certified by the Green Seal organization (information is available at http://www.greenseal.org/). See Appendix I for a list of environmentally preferred materials. These materials and products must meet the requirements of the PWS, must not delay the progress of the work, must be available from more than one source, and must not be cost prohibitive. Material and product submittals for all recycled-content items shall list the recycled and recovered materials used and the percentage content. The Contractor shall track the purchase, quantities and the percent of recyclable content for these materials throughout the life of the contract. Consolidate and provide information as required by Federal Acquisition Regulation (FAR) 52.223-9, titled Certification and Estimate of Percentage of Recovered Material Content for EPA Designated Items. The quarterly and annual reports will be sent to the COR and 21 CES/CEA.

1.4.3.2. Hazardous Material Handler Point of Contact. The Contractor shall ensure that the Government has an up-to-date Hazardous Material Point of Contact and provide the information to 21 CES/CEIE, within two (2) weeks of contract award and within two (2) weeks of changes thereafter.

1.4.3.3. Environmental Training Sessions. The PSFB Environmental Management Staff (21 CES/CEIE) will provide required environmental training courses for Contractor employees on the topics below. Required trainings will be coordinated through the 21 CES/CEIE. Trainings can be scheduled through 21 CES/CEIE at 21ces_ceie.distro@us.af.mil. Trainings will be supplied by the Government and must be completed within two (2) weeks of start of work, and when a new employee is hired. All environmental classes may be completed in one training session lasting approximately two and a half (2 ½) hours. Several of the trainings must additionally be completed by each Contractor employee as an annual requirement (see para 1.4.4.3.3 and 1.4.4.3.5) and must be completed within one (1) month of the course anniversary date. Should the Government suspect non-compliance, a refresher will be given to the Contractor on an as-needed basis. Specifically, these training sessions are:

1.4.3.3.1. Hazardous waste management training (annually).

1.4.3.3.2. Storm Water MS-4 and MSGP Training (annually).

1.4.3.3.3. Spill Prevention, Controls and Countermeasures Training, and Storm Water Pollution Prevention (annually).

1.4.3.3.4. Air Pollution Information Management System (APIMS) training on the Refrigerant management module (annually).

1.4.3.3.5. Cultural Resources training (annually).

1.4.3.4. Environmental Inspection Process (EIP). The Contractor shall participate in EIP as required by the PSFB Commander’s Inspection Program (CCIP). EIP is designed to combine Federal, State, Department of Defense (DoD), and Air Force environmental regulations, B.2 Contractor shall semi-annually perform self- assessment using the Gov’t provided checklist. 21 CES/CEIE will perform compliance inspections as required by federal rule.

1.4.3.5. Work Site Maintenance. The Contractor shall maintain all indoor and outdoor work sites to prevent the spread of contamination, provide for the safety of all individuals in the vicinity of the work site areas, prevent the attraction of insects, pests or rodents, and prevent the release of any contamination to the environment. All trash, debris and unusable parts generated during maintenance and repairs shall be removed from the base and properly disposed by the Contractor. The Contractor shall keep the work area free at all times from accumulation of waste and non-essential materials. The work site shall be maintained to present an orderly appearance and to maximize work efficiency.

1.4.3.6. Insect and Rodent Control. If the need arises for entomology services, the Contractor shall call the 21 CES Service Desk. The Government will provide insect/rodent control services at no expense to the Contractor.

1.4.3.7. Refuse/Recycle Collection. The Contractor may use any Government dumpster located on base for recycling cardboard or disposing of refuse. If Contractor personnel have any questions regarding items to put in the refuse bins, they shall contact the Recycling Manager, 21 CES/CEIE. The Contractor will close all container lids.

1.4.4. CODE REQUIREMENTS

1.4.4.1. Coordination. The Contractor shall coordinate with the base fire department 719-556-6574 or 719-556-7354 for hot work permits (for welding or open flame operations), as required. Welding or torching of any kind on PSFB requires a hot work permit. The Contractor shall obtain a hot work permit from the Base Fire Department, Building 218. A permit will be issued within three (3) business days with instructions for fire prevention.

1.4.5. UTILITIES

1.4.5.1. Government Provided Utilities. The Government will provide gas, electricity, sewage, and water. The Contractor shall practice utility conservation.

1.4.5.2. Request for Utilities Outage. The Contractor shall submit a request in writing of any utility outage necessitated by the project work at least 15 business days prior to the proposed outage unless otherwise approved in writing by the COR or FM. The Contractor shall not operate any valve, circuit breaker, or other utility shut-off device unless approved in writing by the COR/FM.

1.4.5.3. Utilities Outage Conflicts. The Contractor shall verify that there are no conflicts with the scheduled outage immediately before shutting off the utility and implement lockout/tag out procedures as needed. At a minimum, all scheduled outages require COR or FM written approval. Scheduled outages shall reference the specific work order (AF Form 332); stipulate the specific utility system and/or circuits to be affected; the location of the work; the time, date, and duration of the requested outage for each system; and describe the contingency plans for restoring the utility to service.

1.4.5.4. Wiring Alterations. The Contractor shall not disturb electrical and/or communications facilities and wiring not discussed in the PWS or drawings. Where such facilities require removal for accomplishment of the project work, the Contractor shall notify the COR and FM in writing at least seven (7) calendar days in advance of the requirement for accomplishment of such removal work by the Government. The Contractor shall allow the utility owner to remove the impacted systems. If the lines are damaged by the Contractor's wiring activities, the Contractor is required to restore service within 24-hours at no cost to the Government.

1.4.5.5. Excavations and Digging. The Contractor shall be responsible for initiating a Work Clearance Request on an AF Form 103 when excavation is required. The Contractor shall complete the form and attach drawings to the AF Form 103 showing exact location and description of the work to be accomplished. Should any of the coordination points indicate additional utility lines or structures to those already shown on the drawings, (by sketch on the Contractor's drawing or by field location marking), the Contractor shall protect each of the indicated items. The Contractor shall verify the exact location of all indicated utility lines and structures, and protect the same in the project work area. Should damage occur to any utility line or structure, the Contractor shall repair the damage and return the item(s) to its/their original working condition at no cost to the Government.

1.4.5.6. Surface Damage. The Contractor shall take special care and coordination in any high-visibility areas so as not to unnecessarily damage surfaces. The Contractor shall consult with the 21 CES/CEOSS representative before any markings are placed in these areas. In all high-visibility locations, the Contractor shall completely remove the paint used to locate utilities from sidewalks, pavements, and plazas at the end of the project. The Contractor shall repair any damage and return location to original condition.

SECTION 2: Service Summary

2.

2.1. OVERVIEW

2.1.1.1. Description. The Service Summary (SS) is a listing of significant performance objectives with associated performance thresholds (specific standards) derived from the PWS, and establishes the baseline for the Government’s surveillance program. The Government may unilaterally change items in the SS based on the Government’s oversight of Contractor’s performance. The Contractor must satisfactorily perform all PWS requirements, even if not listed in the SS. All thresholds must be met on a monthly (calendar month) basis unless stated otherwise.

2.2. PSFB CRAC

2.2.1. PERFORMANCE OBJECTIVES, PWS PARAGRAPHS AND THRESHOLDS

Performance Objective
PWS

Reference Performance Threshold

2.3.1.1. Preventative Maintenance. Initiate performance of scheduled monthly preventative maintenance. If there is a delay, maintenance is rescheduled to be performed within seven (7) calendar days of originally scheduled preventative maintenance.

Appendix B, Para B.1.3
95% completion of scheduled monthly preventative maintenance.

If rescheduled, 100% completed within seven (7) calendar days of originally scheduled preventative maintenance.

2.3.1.2. Preventative Maintenance Parts. If materials are ordered, complete work within seven (7) calendar days after receipt of materials.
Appendix B, Para B.1.3.1
If materials are ordered, 95% of work completed within seven (7) calendar days after receipt of materials. With no more than 5% of preventative maintenance services performed IAW the approved scheduled in more

2.3.1.3. Routine Service Calls. Identify and respond to routine service calls within 24 hours during normal duty days/hours.

Appendix B, Para B.1.4
100% of responses within 24 hours during normal duty days/hours.
2.3.1.4. Routine Service Call Parts. Contractor shall complete all routine non-emergency work orders within seven (7) calendar days of receiving parts.
Appendix B, Para B.1.4.2
If parts are ordered, 95% of recurring work completed within seven (7) calendar days after receipt of parts. With no more than 5% of routine services performed IAW the approved scheduled in more than seven (7) calendar days of the scheduled completion date.

2.3.1.5. Emergency Calls. Respond to emergency service calls within two

(2) hours during normal duty hours and within four (4) hours during non-duty hours and repair within 48 hours of receiving parts.

Appendix B, Para B.1.5
100% of responses within two (2) hours during normal duty hours and 100% within four (4) hours during non-duty hours.

2.3.1.6. Environmental Compliance. No validated, installation-level repeat trends of environmental compliance issues

Section 1.4 and all sub- paragraphs
Zero (0) valid defects for environmental Notice of Violation (NOV) (Federal and State)

SECTION 3: Government-Furnished Property and Services

3.

3.1. GOVERNMENT-FURNISHED PROPERTY AND SERVICES AT OTHER BUILDINGS

3.1.1. GOVERNMENT-FURNISHED PROPERTY

3.1.1.1. None. The Government will not provide any Government-Furnished Property as defined in FAR Subpart 45.101.

3.1.1.2. Equipment. None.

3.1.1.3. Supplies. None. All administrative supplies will be provided and stored by the Contractor.

3.1.2. GOVERNMENT-FURNISHED SERVICES

3.1.2.1. None. The Government will not provide any Government-Furnished Services.

3.1.3. GOVERNMENT FURNISHED STORAGE SPACE

3.1.3.1. Storage Space. None. The Government does not have a storage area for the Contractor’s equipment. Therefore, it is the Contractor’s responsibility to bring the necessary equipment for repairs and service.

SECTION 4: Contractor-Furnished Property and Services

4.

4.1. CONTRACTOR-FURNISHED PROPERTY AND SERVICES AT OTHER BUILDINGS

4.1.1. CONTRACTOR-FURNISHED PROPERTY

4.1.1.1. Equipment Required. Except for property specifically stated to be Government- Furnished Property (see PWS Section 3), the Contractor shall furnish all tools, materials, equipment and personnel required to perform all requirements IAW this PWS.

4.1.1.2. Visibly Marked. Contractor-owned equipment shall be visibly marked for easy identification.

4.1.2. CONTRACTOR-FURNISHED SERVICES

4.1.2.1. All Services. Except for services specifically stated to be Government-furnished (see PWS Section 3), the Contractor shall furnish all services required to perform IAW this PWS.

APPENDIX B: PSFB CRAC Unit Requirements

C.

B.1. SCOPE OF WORK

B.1.1. OVERVIEW

B.1.1.1 Overview. The Contractor shall provide non-personal services for CRAC units located at PSFB. Unless otherwise specified as Government-Furnished (see PWS Section 3), the Contractor shall provide all management, tools, supplies, equipment, personal protective equipment, and labor necessary to diagnose, repair and service computer room air conditioning (CRAC) equipment and associated appurtenances such as contactors, wiring, piping, and valves that could cause equipment malfunction or failure on PSFB. All services will be accomplished IAW manufacturer specifications. The Contractor shall ensure areas serving computer systems and equipment supported/affected by the repairs and/or maintenance will maintain sufficient temperature levels (74 degrees Fahrenheit room temperature or below). The Contractor shall comply with all federal, state, and local laws in the performance of these requirements. Any equipment that requires repair on PSFB shall be diagnosed and repaired by properly trained and qualified person(s) IAW Section 1.2.5.

B.1.1.2. Task Orders. Task orders will be issued for each building’s preventative maintenance, routine, and emergency service needs. Task orders are inclusive for each service to include parts. Further task orders may be issued at later dates to increase funding for any service that falls outside the normal scope of operation.

B.1.2. AREAS OF RESPONSIBILITY

B.1.2.1. Chilled Water Equipment. Contractor is responsible for electrical downstream from isolation switches on this equipment. Contractor is responsible for piping downstream of any water isolation valves on equipment as applicable.

B.1.2.2. Stand-Alone Split Systems (Refrigerant only). Contractor is responsible for electrical downstream from isolation switches on this equipment.

B.1.3. PREVENTATIVE MAINTENANCE

B.1.3.1. Response Time and Scheduling. Preventative maintenance will be scheduled with buildings FMs during normal duty hours. If there will be a delay, notify the FM and reschedule maintenance to be performed within seven (7) calendar days of originally scheduled preventative maintenance. If materials are ordered, complete recurring work within 7 calendar days after receipt of materials.

B.1.3.2. Performance. The Contractor shall provide preventative maintenance and service IAW the manufacturer specifications.

B.1.3.3. Equipment and Parts. The Contractor shall provide all management, tools, supplies, parts, electrical components, labor and equipment required to repair or maintain the CRAC units and any associated equipment. All replacement components (i.e. contactors, wiring, piping and valves) must be either new or refurbished to manufacturer’s tolerances.

B.1.4. ROUTINE (NON-EMERGENCY) DIAGNOSIS, REPAIR, AND SERVICE

B.1.4.1. Routine Service Calls. Routine service calls are requests for diagnosis, repair, or service that do not meet the requirements of Emergency Calls and are for service other than preventative maintenance.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .