DRAFT- JBSA VTE PWS - 15 Dec 2021.docx

DOCX document 103 KB Posted

Attached to
JBSA Vertical Transportation Equipment Services Federal contract opportunity
Solicitation number
FA301622R0008
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to JBSA Vertical Transportation Equipment Services, newest first.
File Type Posted
Synopsis - JBSA VTE Maint and Repair Services.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR VERTICAL TRANSPORTATION EQUIPMENT

MAINTENANCE, REPAIR, & INSPECTION SERVICES

1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair and inspect all real property Vertical Transportation Equipment (VTE) at Joint Base San Antonio (JBSA) Fort Sam Houston to include Camp Bullis, Lackland to include Chapman Training Annex and Kelly Field Annex, and Randolph in a manner that will ensure continuous use, safe operation and compliance with industry standards (full maintenance, repair and inspection with the exception of the exclusions listed in paragraph 2 below). All the VTE and their locations are listed in Appendix A.

NOTE: The term “VTE” in this Performance Work Statement (PWS) includes all equipment listed in Appendix A: freight and passenger elevators, escalators, and may include wheelchair/stair lifts, dock levelers and dumbwaiters. The government may add, change or delete VTE equipment for this requirement at any time through contract modification.

1.1. This full maintenance service agreement signifies the contractor takes total service responsibility for the equipment identified in the contract. Except those items covered in paragraph 2 below, the monthly fixed price includes all maintenance, repairs, inspections, replacements, routine and emergency service calls. The contractor shall assume all responsibility and determines the amount of service visits and types of service required to keep all VTE operating safely and within the performance objectives of paragraph 6.

1.2. Work conducted on VTE will be in accordance with the American Society of Mechanical Engineers (ASME) A17.1-2019 (or applicable code for year of VTE placed in service) Safety Code for Elevators and Escalators (ASME A17.1); ANSI/ASME A17.2-2020, Guide for Inspection of Elevators, Escalators and Moving Walks (applicable to equipment); A17.3-2020, Safety Code for Existing Elevators and Escalators (applicable to equipment); National Fire Protection Association Standards (NFPA); Unified Facilities Criteria (UFC) 3-600-01; Fire Protection Engineering for Facilities, Occupational Safety and Health Administration (OSHA) Standards and the recommendations of the Original Equipment Manufacturer (OEM).

2. OVER AND ABOVE (Excluded Services). Over and above services will be accomplished through the issuance of a work order from the Contracting Officer’s Representative (COR). The contractor shall perform and complete the work in accordance with the manufacturer’s guidelines and applicable paragraphs within the PWS. The following are not covered in the full maintenance service arrangement and are considered over and above services:

2.1. Alterations (a.k.a., modernizations). See paragraph 3.2.

2.2. Acts by parties other than the contractor of vandalism, abuse, negligence, damage resulting from rescue and recovery operations, acts of God (including damage resulting from emergency power generator power spikes and low quality).

2.3. Additional items excluded are cosmetic, construction, ancillary components of the VTE system including the finishing, repairing or replacement of the cab enclosure, ceiling frames, hoistway door panels, door frames, sills, car flooring, floor covering, main line power switches, main power breaker(s), hydraulic elevator jack outer housing, buried piping, smoke and fire sensors, fire service reports, main communication feeders to controller, security systems, batteries for emergency lighting and lowering that are not solely dedicated to the VTE, air conditioners and heaters.

2.4. Routine cleaning and refinishing of the interior of cars and the exterior of the hoistway doors and frames.

2.5. Payment, Cost Tracking and Approvals. Expenditures for over and above services shall be funded through Contract Line Item Number (CLIN) 0X02 (Labor) and 0X03 (Material), and shall be tracked in a manner that gives a clear and concise report (MS Excel is acceptable). The contractor shall submit a report detailing the expenditures against CLIN 0X02 and 0X03 on a monthly basis. The contractor shall sustain copies of these reports, which shall be made available to the government when requested by the CO. Any “over and above” requirement estimated to exceed $5,000 shall be submitted to the Contracting Officer for approval. The quote shall include the reason for repair and itemized costs of labor and materials. The contractor shall not start any repair work until receiving approval and authorization from the CO/COR. Under NO circumstance shall charges against the labor and material CLINs exceed the current balance of the Not to Exceed (NTE) amount.

3. DEFINITIONS.

3.1. Maintenance, Repair and Replacement. Maintenance, repair and replacement are on existing VTE and included in the contract scope of services. All maintenance, repair and replacement of damaged, broken, or worn parts are to be handled in a manner that ensures that the equipment may be operated safely. Maintenance, repair and replacement are actions to restore equipment to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations. See ASME A17.1 for requirements.

3.2. Alteration. An alteration is also on existing VTE but is not included under the full maintenance service arrangement. Alteration/modernization will be covered on an over and above CLIN or it may result in a modification to the contract. The typical alteration results in a betterment to the safe operation of the equipment. In the case of elevators, when an alteration is made, all affected safety requirements must be complied with. All work as part of an alteration is required to comply with specific requirements and can be found in the current ASME A17.1 Code edition. See ASME A17.1 for requirements.

NOTE: Any obsolete part, component or assembly unavailable from the manufacturer remains the contractor’s responsibility to obtain an engineered equivalent product from a commercial source.

4. MAINTENANCE AND INSPECTION SERVICES.

4.1. The contractor with the COR shall determine the working order and condition of all VTE listed in Appendix A within sixty (60) calendar days of contract award. The government will either replace missing items or repair all items not in working order or serviceable condition, or the CO will direct the contractor to replace the missing items, accomplish the repair, and reimburse the contractor in accordance with the contract. The CO will give instructions for situations where a unit requires a level of repair potentially constituting alteration as described by paragraph 3.2. The contractor and the CO shall certify their agreement as to the working order of the equipment. After completion of the VTE assessment and approval by the CO, all VTE will become the full responsibility of the contractor for all maintenance, repair, inspection and replacement services in accordance with this PWS as prescribed in paragraphs 1. and 1.1. The availability of VTE across JBSA must not exceed more than four (4) down (inoperable) per month. All work shall be in accordance with standard commercial practices using only new parts of equal quality specified by the VTE manufacturer in effecting repairs (substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency).

4.2. The contractor shall develop and submit to the government a Maintenance Control Program (MCP) for each VTE within thirty (30) calendar days after contract award, and annually thereafter to cover the basic contract and all order periods. The MCP shall, at a minimum, include required inspections, timelines for inspections and maintenance to be performed. The contractor shall perform inspections and maintenance of all VTE in accordance with the MCP and shall ensure compliance with all minimum code requirements.

4.3. VTE maintenance shall be performed in accordance with the MCP to ensure reliable and continuous safe operation. The maintenance work shall be in accordance with commercial practices or manufacturer’s specifications, if available, and shall be intended to maintain the VTE in safe and reliable operating condition. The MCP is required to specify appropriate intervals for specific maintenance items.

4.4. Cleaning of equipment spaces and daily cleanup of job sites in conjunction with maintenance, repair, inspections and tests is required.

4.4.1. Cleaning of elevator pit in Building 1287, Dining Facility at JBSA-Fort Sam Houston shall be performed on a quarterly basis. The COR shall be notified after cleaning has been accomplished. After completion of cleaning the elevator pit, it shall be free of all food, liquids and other debris.

4.5. The contractor shall perform necessary inspections and tests as required under ASME A17.1 Appendix N, using a Qualified Elevator Inspector (QEI). The first annual test shall include the five-(5)-year test for all traction and roped hydraulic elevators regardless of due date. The three-(3)-year test shall be scheduled in conjunction with the annual test two years later from the first annual test.

4.6. The government may perform inspections of the VTE at no cost to the contractor for purposes of capital asset management and quality assurance. If discrepancies are discovered during these inspections, the contractor will be notified in writing of any determination and may be responsible for the corrective actions.

4.7. The contractor shall prepare and submit a written report within three (3) business days of maintenance and inspection services. The report shall identify each VTE, the location, maintenance work performed, repairs needed, date of inspection, name of inspector and overall condition of the VTE.

4.8. The contractor shall maintain a copy of all current VTE inspection documentation, along with an index indicating the location, date inspected, and date of the next required inspection having provided the original to the COR. The index and copies of certificates shall be delivered to the COR upon request and no later than one (1) business day of a request to review. Certificate of Inspection shall be displayed in each elevator so it is visible. The certificate shall be placed in frame so that it will not fall, tear or otherwise deteriorate. Framed certificate shall be clearly posted and visible.

5. REPAIR SERVICE CALLS. Contractor shall provide service calls (routine and emergency) under the full maintenance service agreement, and to repair and replace components of the VTE at no additional cost to the government. The contractor shall complete the service in a timely manner and return the VTE back to 100% operational condition. All maintenance and repairs shall be performed in accordance with the manufacturer’s instructions, standard commercial practices, and using parts specified by the manufacturer. When a component in a labeled product is replaced, it must be replaced with an identical component manufactured under the original labeling service (certifying agency). Substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency and COR. The parts used for replacement are required to comply with all the requirements that the old parts originally complied with. The Unified Facilities Guide Specifications (UFGS) and the Unified Facilities Criteria (UFC) will be used to benchmark acceptable replacement components. See UFGS 14 21 00. 00 20 (Electric Traction Elevators), UFGS 14 21 13 (Electric Traction Freight Elevators), UFGS 14 21 23 (Electric Traction Passenger Elevators) and UFGS 14 24 00 (Hydraulic Elevators) for guidance.

5.1. Point of Contact. The government shall be provided Point of Contacts (POC), a primary and alternate(s) to receive notifications from the government to perform the requirements in paragraph 5 of this PWS. At a minimum, the COR shall be provided the POC’s name, phone number and email. The same information shall be provided for the primary and alternate.

5.2. Routine Calls. Service calls will be classified as routine when the work or adjustments do not qualify as an emergency call. Routine calls will be coordinated by the respective COR office requiring service and based on the following geographic location of the elevator or lift.

1. Fort Sam Houston/Camp Bullis: 502 CES/CEOESF (All equipment listed in Appendix A, TE1)

1. Lackland; Chapman Training Annex and Kelly Field Annex: 502 CES/CEOESL (All equipment listed in Appendix A, TE2)

1. Randolph: 502 CES/CEOESR (All equipment listed in Appendix A, TE3)

5.2.1. An in-person response is required and work shall begin on routine service calls at no additional cost to the government. The contractor shall report within two (2) hours after receipt of the call on regular business hours 0700 to 1600, Monday through Friday, except federal holidays, and must first report to the COR office to sign in the logbook and pick-up an elevator/mechanical room key before heading to the job site. After completion of the work, the contractor shall return the key, sign off the logbook and provide a signed work order acknowledgement copy and for signature by the COR for services performed.

5.2.2. For any necessary over and above services that have been identified, the contractor shall submit a detailed/itemized proposal cost estimate to the COR within 2 (two) business days for approval for the work. The required repair(s) shall have a breakdown of material(s) and labor costs, and any other relevant information. The contractor shall not perform or start any over and above repair work until approval and authorization is given by the COR. Payment for over and above service will be in accordance with paragraph 2.5.

5.3. Emergency Calls. Emergency calls are defined as calls made for services when a VTE system fails and constitutes a danger to personnel; threatens to damage properties; threatens to disrupt activity, operations, training missions and/or acts of God (including damage resulting from emergency power generator power spikes and low quality). Emergency calls will be coordinated by the respective COR office requiring service and based on the following geographic location of the elevator or lift.

a. JBSA Fort Sam/Camp Bullis: 502 CES/CEOESF (All equipment listed in Appendix A, TE1)

b. JBSA Lackland, Chapman Training Annex and Kelly Field Annex: 502 CES/CEOESL (All equipment listed in Appendix A, TE2)

c. JBSA Randolph: 502 CES/CEOESR (All equipment listed in Appendix A, TE3)

5.3.1. An in-person response is required and work shall begin on emergency service calls at no additional cost to the government. The contractor shall report within one (1) hour after receipt of the emergency call. Contractor must first report to the COR office to sign in the logbook and pick-up an elevator/mechanical room key before heading to the job site. During outside regular business hours, the contractor shall proceed to the respective CE/Energy Monitoring and Control System (EMCS) office to sign in the logbook and pick up the key. After completion of the work, the contractor shall return the key, sign off the logbook and provide a signed work order acknowledgement copy and for signature by the government (COR or EMCS) for services performed. Emergency services shall apply twenty-four (24) hours a day, seven (7) days a week to include federal holidays.

5.3.2. For any necessary over and above services that have been identified, the contractor shall submit a detailed/itemized proposal cost estimate to the COR within 2 (two) business days for approval for the work. The required repair(s) shall have a breakdown of material(s) and labor costs, and any other relevant information. The contractor shall not perform or start any over and above repair work until approval and authorization is given by the COR. Payment for over and above service will be in accordance with paragraph 2.5.

6. SERVICE SUMMARY (SS). The government will evaluate the contractor performance in accordance with the following criteria. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SS provides information on contract requirements, the expected level of contractor performance, the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success.

Table 1 - Service Summary

Performance Objective
PWS Para.
Performance Threshold
Method of Assessment

1. VTE Service Availability The availability of VTE across JBSA must not exceed more than four (down) (inoperable) per month.

4.1.
No more than 1 discrepancy per month.
Periodic Surveillance /Customer Complaint

2. Written Maintenance Control Program (MCP) for each VTE equipment Submit a completed MCP within thirty (30) calendar days of contract award and annually thereafter.

4.2.
Zero (0) discrepancies.

CO or COR Review

3. MCP Adherence VTE inspection and maintenance adhere with MCP.

4.2. and 4.3.
Zero (0) discrepancies.
Periodic Surveillance /Customer Complaint

4. Repair Service Calls VTE 100% repair, timely turnaround and using proper parts.

5.
Only one (1) call back of the same problem (same instance) each month at each JBSA serviced location.
Periodic Surveillance/ Customer Complaint

5. Routine Repair Service Call - Response Time Respond to routine calls within the time specified in paragraph 5.2.1.

5.2.1.
No more than 3 discrepancies per month per JBSA serviced location.
Periodic Surveillance/ Customer Complaint

6. Emergency Repair Service Call - Response Time Respond to emergency calls within the time specified in paragraph 5.3.1.

5.3.1
Zero (0) discrepancies per month at each JBSA serviced location.
Periodic Surveillance/ Customer Complaint

7. Reporting Timely report submission. Submit reports within three (3) business days after each incident.

4.7. and 9.
Zero (0) discrepancies.
Periodic Surveillance/ Customer Complaint

7. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The government will not provide any government furnished property and services.

8. GENERAL INFORMATION.

8.1. Quality Control. The contractor shall establish and maintain a Quality Control Plan (QCP) to ensure the contract services conform to the requirements of this PWS. Contractor shall create and implement procedures to recognize, prevent and eliminate non-performance and repeat of once identified defective service. As a minimum, the contractor shall develop quality control procedures that address the areas identified in Paragraph 6, Service Summary. The QCP shall demonstrate how the contractor ensures quality performance during the contract Period of Performance (POP), strategy to provide quality workmanship and continual process improvement. The contractor shall maintain the QCP throughout the POP of the contract. The CO will be provided updates to the QCP as they occur during the POP. Any changes to the QCP need to be accepted by the CO prior to implementation. The QCP will identify the procedures in writing for inspections, defect correction and non-recurrence, individual responsible for quality control, and the location of all inspection records and key control logs, which will always be available to the government upon request. The QCP will have the inspection forms and records, which will be used for the service. The contractor will identify a responsible quality control inspector to notify in case of customer complaints. A written QCP will be submitted to the CO for review, feedback and acceptance as part of the proposal package.

8.2. Quality Assurance. The government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). The government shall inspect and evaluate the contractor’s performance to ensure services are received in accordance with the contract requirements. The COR will periodically inspect by watching actual task performance, physically checking an attribute of the completed task, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not the performance meets the standards contained in this PWS. Should the CO or COR determine the task has not been performed to the standards of the PWS, the contractor will be given one (1) calendar day to re-accomplish the unacceptable service or non-performance at no additional cost to the government. The COR will use a locally developed JBSA VTE surveillance checklist for inspection and to record surveillance results. When any performance threshold exceeds its limit in accordance with paragraph 6, Service Summary, the contractor will be issued a Contract Discrepancy Report (CDR), DD Form 2772, from which the CO could initiate a Multi-Functional Team (MFT) progress meeting. The surveillance checklist and CDR then becomes an official government record of the contractor’s performance.

8.3. Hours of Operation. The contractor shall perform services during the following hours: 7:00 a.m. to 4:00 p.m., Monday thru Friday, except federal holidays. Emergency repair service calls apply twenty-four (24) hours a day, seven (7) days a week to include federal holidays.

8.3.1. Base Closures. Work scheduled but not performed because of weather, exercises, or actual alerts, will be accomplished as soon as possible after the base reopens and contractors are allowed to enter.

8.3.2. Recognized Federal Holidays. If the following holidays fall on Saturday, the preceding Friday will be observed. If it falls on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the contractor shall be responsible for rescheduling services for the first day post the holiday observance. If the President grants Department of Defense (DoD) employees an additional holiday/administrative leave day, it will not apply to the contractor.

New Year’s Day1 January
Martin Luther King Jr. Day3rd Monday in January
President’s Day3rd Monday in February
Memorial DayLast Monday in May
Juneteenth Day19 June
Independence Day4 July
Labor Day1st Monday in September
Columbus Day2nd Monday in October
Veteran’s Day11 November
Thanksgiving Day4th Thursday in November
Christmas Day25 December

8.4. Security Requirements (Contractor/Employee Base Pass and Identification, Special Clearances and Vehicle Passes). The contractor shall comply with all requirements and procedures in accordance with Air Force Federal Acquisition Regulation Supplement (AFFARS) 5352.242-9000, Contractor Access to Air Force Installations. All documentation shall be submitted at the pre-performance conference and as changes occur.

8.4.1. Obtaining and Retrieving Identification Media. As prescribed in AFFARS 5352.242-9000, the contractor shall comply with the following requirements:

a. The contractor shall obtain base identification and vehicle passes for all contractor personnel who make frequent visits to or perform work on the Joint Base installation(s) cited in the contract.

b. No later than three (3) days prior to start of work, the contractor shall submit a written request on company letterhead (or e-mail correspondence) to the government listing the following: service contract title, contract number, location of work site, contract start and stop dates, work schedule, and names of contractor employees needing access to the base, including full legal name, date of birth, Social Security Number (SSN), state issued I.D. Card/Driver’s License #, and name of sub-contractor if not employed directly by contractor (government will provide a template to be used in submitting visitor pass request). The authorized Government Official will endorse the request and forward it to the issuing base pass and registration office or security forces for processing. Contractors will present government (state or federal) issued ID, and INS Form 9 (I9), before being issued a pass to enter the installation. A Wants and Warrants check is conducted for every person before a pass is issued. Personnel employed by the contractor must get a pass for their privately owned vehicles with proof of following:

(1) Liability Insurance

(2) Current License Plates
(3) Current State Inspection Sticker (if required)
(4) Valid State Driver License
(5) A phone number for sponsor on base

c. Vehicles owned by the contractor with the company name permanently printed on them are not required to obtain a pass as long as a current work order is presented at the time of entry. However, current liability insurance, state inspection sticker and registration is required. The person driving the vehicle must have a valid operator license for the type of vehicle.

d. The contractor is responsible for ensuring employees present their Form I-9 (Employment Eligibility Verification).

e. Upon completion or termination of the contract or expiration of the identification passes, the contractor shall ensure all base identification passes issued to contractor employees are returned to the issuing authority office. The pass will need to be retrieved and returned to Security Forces if a contractor employee has been terminated, and reported if lost to end access to the installation.

f. Failure to comply with these requirements may result in withholding of final payment.

8.4.2. Physical Security. All contractor employees shall comply with the Base Operations Plans and instructions for Force Protection Condition (FPCON) levels procedures, Random Antiterrorism Measures (RAMS) and local search/identification requirements. All government property including controlled forms shall be safeguarded. At the close of each work period, facilities, support equipment, and other valuable materials shall be secured. During increased FPCONs, there may be limited access to the installation and entrance delays should be expected.

8.4.3. Entry Procedures to Controlled/Restricted Areas. Contractor personnel requiring unescorted entry to areas designated as controlled or restricted areas by the installation commander shall comply with installation’s access requirements and will possess, as a minimum, a favorable suitability determination. These requirements are contained in Joint Base Publication San Antonio Instruction 31-1131, Installation Access and AFI 31-501, Personnel Security Program Management, for suitability determinations. The contractor shall comply and implement local base procedures for entry to Air Force controlled areas. Waiting time up to thirty (30) minutes should be expected in controlled/restricted areas for availability of escort personnel.

8.4.4. Key Control. The contractor shall obtain elevator/lift/mechanical room keys (Sign-In/Sign-Off Log) from the respective COR and EMCS offices to perform maintenance or repair services and returned in the same manner as given. Government keys shall not be duplicated and lost keys shall be reported immediately to the COR. The government replaces lost keys or performs re-keying. The total cost of lost keys, re-keying or lock replacement shall be deducted from the monthly payment due. Keys shall not be used by other than current authorized contractor employees, and shall not use keys to open work areas for personnel other than employees engaged in performance of their duties

8.4.5. Traffic Laws. The contractor employees shall comply with all base traffic rules and regulations at each installation.

8.5. Special Qualifications. The contractor shall possess a valid registration with the Texas Department of Licensing and Regulation to perform installation, alteration, testing, repair or maintenance of an elevator escalator, or related equipment. Documentation shall be provided as part of the proposal package.

8.6. Schedule Coordination. The contractor shall be responsible for coordinating all phases of operations with the appropriate base personnel through the COR. The facilities shall remain in operation while work is performed and coordinated around the normal activities of the facility.

Note: JBSA Randolph has three (3) historical elevators /lifts located in buildings (100, 661 & 675) that require coordination through the Cultural Resource Manager (CRM). This will help to maintain the “State Historical Preservation” of these lifts. The contractor will request this action from the COR who will then contact the CRM at (210) 221-5070 prior to any maintenance being performed.

8.7. Environmental Control. The contractor shall comply with all applicable federal, state, and local laws, regulations, ordinances, policies and standards related to environmental matters. Where applicable, use environmentally safe products throughout the contract. Maintain in company vehicle on site, Safety Data Sheets (SDS) for all chemicals and is subject to random checks by the government. Maintain and provide on demand an inventory of Hazardous Materials (HAZMAT) being brought on the government installation. Complete and provide on demand, monthly inventories of HAZMAT used, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances (ODS) and oils brought on the government installation. This monthly information shall be given to the HAZMAT office at one of the JBSA locations (See Appendix B for HAZMAT Point of Contact (POC) information). If the contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the contractor shall immediately notify the COR and appropriate emergency responders. Contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The contractor shall maintain a spill plan as required by federal, state, and local laws and regulations and shall be submitted to CO within 30 days of contract award.

8.8. Asbestos. VTE’s may be located in facilities that may contain Asbestos Containing Material (ACM) or Presumed Asbestos Containing Material (PACM). The contractor (not the government) shall determine if any exposure to ACM may result in performing work under the contract and shall comply with Section 29 CFR 1910.1001(j)(7)(iv).

8.9. Hazmart. The government Hazardous Material Control Program (HAZMART) personnel will inventory all chemicals that the contractor brings on JBSA Fort Sam Houston, Lackland, Chapman Training Annex, Kelly Field Annex, Randolph and Camp Bullis. Any products that meet the criteria of “hazardous waste” must be bar coded and tracked until permanently removed from government property. The inventory shall be performed prior to commencement of work. Criteria for identifying hazardous waste, is contained in Subpart C of 40 CFR, Part 261.

8.10. Hazardous Material/ Waste Management. The JBSA Randolph HAZMAT Manager will brief the contractor on JBSA Hazardous Material/Waste Management Plan at the pre-performance meeting.

8.11. Hazardous Material Handling. The contractor shall have approval from the base Bio-Environmental Engineer (BEE) and HAZMART prior to purchasing, handling, using, and storing any chemicals, solvents, lubricants, and other products that require SDS. Materials and products shall be identified on Air Force Form 3952 Chemical/Hazardous Material Authorization Request, Process Identification Form, and Shop Disposal Form. One copy of the SDS shall be provided for each item to the BEE and HAZMART for review prior to any chemicals being brought onto JBSA Fort Sam Houston, Lackland, Chapman Training Annex, Kelly Field Annex, Randolph and Camp Bullis. The contractor shall maintain one copy of the SDS for each hazardous material line item used within the work center. Products that are, or contain Toxic 17 chemicals, Extremely Hazardous Substances (EHS), ODS, Chlorofluorocarbon CFC) or Persistent Bioaccumulative and Toxic (PBT) chemicals shall not be used. Any HAZMAT containing one of these banned substances will not be allowed on the government installation.

9. SAFETY REQUIREMENTS AND REPORTS. The contractor shall perform work in a safe manner as required by the Occupational Safety and Health Administration (OSHA) requirements. Provide the CO or COR a verbal report as soon as possible of each occurrence of damage to government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident Investigation Reports to the government within three (3) business days of each occurrence.

NOTE: In case of an emergency, the JBSA Fire Departments are the first responders, or the 502 Civil Engineer Squadron EMCS/Randolph (alternate) can be contacted at (210) 652-3151.

a. Fort Sam Houston Fire Dept: (210) 221-2244 or 911

b. Lackland Fire Dept: (210) 671-2921 or 911

c. Randolph Fire Dept: (210) 652-6915 or 911

10. APPENDICES.

1. VTE Equipment Listing

1. HAZMAT POC Listing Information

1. Data Requirements

Appendix A

VTE EQUIPMENT LISTING

JBSA-Fort Sam Houston TE1

Item
Type of VTE
Location of VTE
Manufacturer
Capacity (LBS)
Yr Installed
1
Passenger Elevator
16
Dover
2100
1993
2
Passenger Elevator
44
Otis
2000
1952
3
Freight Elevator
44
Otis
2000
1952
4
Wheelchair Lift
122
Wheel-O-Vator
750
1996
5
Wheelchair Lift
126
Wheel-O-Vator
750
1996
6
Wheelchair Lift
129
Wheel-O-Vator
750
1996
7
Wheelchair Lift
131
Garaventa
750
2012
8
Passenger Elevator
134
Thyssen Krupp
2100
2016
9
Wheelchair Lift
142
Garaventa
750
1996
10
Wheelchair Lift
143
Genesis Vertical
750
2009
11
Wheelchair Lift
144
Porch Lift
750
Unknown
12
Passenger Elevator
145
Schindler
2100
2011
13
Passenger Elevator
146
Schindler
2500
2011
14
Passenger Elevator
147
Schindler
2500
2011
15
Passenger Elevator
149
Schindler
2500
2011
16
Passenger Elevator
247
Thyssen Krupp
2500
2011
17
Passenger Elevator
601
Schindler
2500
2010
18
Passenger Elevator
605
Thyssen Krupp
2100
2012
19
Passenger Elevator
608
Thyssen Krupp
2100
2012
20
Chair Lift
613
Wheel-O-Vator
750
2012
21
Wheelchair Lift
615
Garaventa
660
2012
22
Passenger Elevator
895
Thyssen Krupp
2500
2009
23
Passenger Elevator
895
Thyssen Krupp
5000
2009
24
Passenger Elevator
899
Thyssen Krupp
2500
2009
25
Passenger Elevator
899
Thyssen Krupp
5000
2009
26
Passenger Elevator
903
Thyssen Krupp
2500
2008
27
Passenger Elevator
1001
Schindler
3500
2010
28
Passenger Elevator
1002
MCE-Traction
2000
2003
29
Passenger Elevator
1002
MCE-Traction
2000
Unknown
30
Passenger Elevator
1029
Dover
4500
1995
31
Passenger Elevator
1287
Thyssen Krupp
4500
2009
32
Passenger Elevator
1287
Thyssen Krupp
4500
2009
33
Passenger Elevator
1291
Otis
3500
2013
34
Passenger Elevator
1356
Thyssen Krupp
2500
2010
35
Passenger Elevator
1356
Thyssen Krupp
5000
2010
36
Passenger Elevator
1364
Thyssen Krupp
2500
2010
37
Passenger Elevator
1364
Thyssen Krupp
5000
2010
38
Passenger Elevator
1369
Garaventa
1400
2011
39
Passenger Elevator
1393
Otis
5000
2010
40
Passenger Elevator
1394
Kone-LCE
5000
2006
41
Passenger Elevator
1397
Dover
2100
1995
42
Passenger Elevator
1467
Thyssen Krupp
2500
2013
43
Passenger Elevator
1469
Thyssen Krupp
3500
2009
44
Passenger Elevator
1469
Thyssen Krupp
4000
2009
45
Passenger Elevator
1475
Thyssen Krupp
3500
2010
46
Passenger Elevator
1475
Thyssen Krupp
4000
2010
47
Passenger Elevator
1477
Thyssen Krupp/Tac32
2500
2012
48
Passenger Elevator
1479
Thyssen Krupp
3500
2009
49
Passenger Elevator
1479
Thyssen Krupp
4000
2009
50
Passenger Elevator
1620
Schindler
2100
2003
51
Passenger Elevator
2001
Thyssen Krupp
2500
2008
52
Passenger Elevator
2003
Dover
3500
1998
53
Passenger Elevator
2007
Thyssen Krupp/Tac32
2100
2013
54
Wheelchair Lift
2200
Porch-Lift
750
Unknown
55
Passenger Elevator
2248
Schindler
2100
2009
56
Wheelchair Lift
2250
Porch-Lift
750
2010
57
Passenger Elevator
2261
Thyssen Krupp
3000
2010
58
Passenger Elevator
2261
Thyssen Krupp
3000
2010
59
Passenger Elevator
2261
Thyssen Krupp
3000
2010
60
Passenger Elevator
2261
Thyssen Krupp
4000
2010
61
Passenger Elevator
2263
Dover Oildraulics
2500
1988
62
Passenger Elevator
2264
Schindler
4500
2011
63
Passenger Elevator
2264
Schindler
3500
2011
64
Passenger Elevator
2264
Schindler
4500
2011
65
Wheelchair Lift
2264
Garaventa
750
2011
66
Passenger Elevator
2265
Schindler
3500
2011
67
Passenger Elevator
2265
Schindler
4500
2007
68
Passenger Elevator
2266
Schindler
3500
2007
69
Passenger Elevator
2266
Schindler
4500
2010
70
Passenger Elevator
2266
Schindler
3500
2010
71
Wheelchair Lift
2267
Wheel-O-Vator
750
2000
72
Passenger Elevator
2270
Thyssen Krupp
4500
2011
73
Wheelchair Lift
2272
Porch-Lift
750
Unknown
74
Wheelchair Lift
2273
Garaventa
750
Unknown
75
Passenger Elevator
2376
MCE
5000
2000
76
Passenger Elevator
2791
Thyssen Krupp
4500
2009
77
Passenger Elevator
2792
Unitec
4000
2013
78
Passenger Elevator
2792
Unitec
4000
2013
79
Wheelchair Lift
2797
Wheel-O-Vator
750
2003
80
Passenger Elevator
2840
Kone-XP
4000
1972
81
Passenger Elevator
2840
Kone-XP
4000
1972
82
Wheelchair Lift
2840 (Theater)
Ascension
750
2013
83
Freight Elevator
2841
Schindler
6000
2009
84
Passenger Elevator
2841
Schindler
3500
2009
85
Chair Lift
2841
Precision Lift, Industries
750
2021
86
Passenger Elevator
3312
Otis
3500
2011
87
Passenger Elevator
3312
Otis
3500
2011
88
Passenger Elevator
3314
Otis
3500
2011
89
Passenger Elevator
3314
Otis
3500
2011
90
Passenger Elevator
3526
Thyssen Krupp
2500
2012
91
Passenger Elevator #D
3631
Smart Rise
4500
2012
92
Passenger Elevator #EF
3631
Schindler
4500
2009
93
Passenger Elevator# AB
3635
Schindler
4500
2009
94
Passenger Elevator
3672 SAMMC
Kone
4000
2011
95
Passenger Elevator
3672 SAMMC
Kone
2500
2011
96
Passenger Elevator
3672 SAMMC
Kone
2500
2011
97
Passenger Elevator
3672 SAMMC
Kone
2500
2011
98
Passenger Elevator
3672 SAMMC
Kone
2500
2011
99
Passenger Elevator
3672 SAMMC
Kone
2500
2011
100
Passenger Elevator
3820
Thyssen Krupp
4000
2012
101
Passenger Elevator
3820
Thyssen Krupp
4000
2012
102
Passenger Elevator
3820
Thyssen Krupp
4000
2012
103
Passenger Elevator
3820
Thyssen Krupp
4000
2012
104
Passenger Elevator
3822
Thyssen Krupp
4000
2011
105
Freight Elevator
4011
Thyssen/Montgomery
6000
2003
106
Passenger Elevator
4011
Thyssen Krupp
2000
2010
107
Wheelchair Lift
4011
Garaventa
750
2011
108
Wheelchair Lift
4012
Garaventa
750
2015
109
Wheelchair Lift
4197
Vestil
5000
Unknown
110
Wheelchair Lift
4197
Symmetry Elevating Solutions
750
2021
111
Passenger Elevator
5004
Schindler
2100
2009
112
Passenger Elevator
5044
Schindler
2100
2009

JBSA-Lackland TE2

Item
Type of VTE
Location of VTE
Manufacturer
Capacity (LBS)
Yr Installed
1
Passenger Elevator
126
Thyssen Krupp
3000
2005
2
Passenger Elevator
127
Thyssen Krupp
3000
2005
3
Passenger Elevator
315
Schindler
2100
2004
4
Passenger Elevator
830
Kone
3500
2006
5
Passenger Elevator
896
Kone
3500
2005
6
Passenger Elevator
907
Kone
2500
2005
7
Passenger Elevator
917
Schindler
3000
1998
8
Passenger Elevator
921
Otis
2500
2012
9
Passenger Elevator
935
US Elevator
2500
2006
10
Material Lift
968
Wildeck
3000
1996
11
Passenger Elevator
1160
MCE
1500
1996
12
Freight Elevator
2000
Montgomery
6000
2010
13
Passenger Elevator
2000
Dover
2100
1992
14
Passenger Elevator
2007
Dover
2500
1982
15
Passenger Elevator
2028
Dover
2500
2003
16
Equipment Lift
2049
Pflow
3000
2008
17
Cargo
2049
Pflow
3000
Unknown
18
Passenger Elevator
2058
Thyssen Krupp
8500
1989
19
Passenger Elevator
2061
Schindler
2500
2014
20
Passenger Elevator
2072
Schindler
2100
2000
21
Passenger Elevator
2167
Dover
3000
1997
22
Passenger Elevator
2439
Dover
4500
1994
23
Passenger Elevator
2449
Dover
4500
1994
24
Passenger Elevator
2484
Dover
2100
1996
25
Passenger Elevator
2490
Dover
3500
1996
26
Passenger Elevator
3742
Canton, Elevator, Inc.
2500
2017
27
Passenger Elevator
3850
Otis
2500
1998
28
Passenger Elevator
5008
General
2500
1986
29
Passenger Elevator
5160
Dover
2100
1990
30
Passenger Elevator
5616
Dover
5000
1973
31
Passenger Elevator
5725
Thyssen Krupp
2500
2007
32
Passenger Elevator
6578
Thyssen Krupp
5000
2012
33
Passenger Elevator
6582
Thyssen Krupp
5000
2012
34
Passenger Elevator
6586
Thyssen Krupp
5000
2013
35
Passenger Elevator
6588
Thyssen Krupp
5000
2014
36
Passenger Elevator
6592
Otis
5000
2014
37
Passenger Elevator
6596
Thyssen Krupp
5000
2015
38
Passenger Elevator
7065
Schindler
5000
2008
39
Passenger Elevator
7356
Dover
2500
1998
40
Passenger Elevator
7425
Dover
2500
1991
41
Passenger Elevator
7426
Dover
2500
1995
42
Passenger Elevator
7435
Dover
2500
1998
43
Passenger Elevator
7436
Dover
2500
1992
44
Passenger Elevator
7460
Dover
2500
1998
45
Passenger Elevator
7535
Esco
3000
1991
46
Passenger Elevator
7535
Esco
3000
1991
47
Passenger Elevator
7445
Thyssen Krupp
2100
2009
48
Passenger Elevator
9122
Dover
3500
1995
49
Freight Elevator
9225
Dover
10,000
1960
50
Passenger Elevator
10215
Dover
2500
1992
51
Passenger Elevator
10380
Dover
4500
1996
52
Passenger Elevator
10385
Dover
4500
1996
53
Passenger Elevator
10395
Dover
4500
1998
54
Passenger Elevator
10501
Montgomery
2000
1987
55
Passenger Elevator
10504
Kone
2500
2007
56
Passenger Elevator
10504
Kone
2500
2007
57
Passenger Elevator
10900
Dover
4000
1994

JBSA-Randolph TE3

Item
Type of VTE
Location of VTE
Manufacturer
Capacity (LBS)
Yr Installed
1
Chair Lift
6
Garaventa
495
2010
2
Passenger
8
Schindler
5000
2001
3
Passenger
28
Montgomery
2500
2004
4
Passenger
55
Kone
2500
2002
5
Chair Lift
74
Gillespie
1000
Unknown
6
Passenger
100
Otis Cable
1500
1936
7
Chair Lift
100
Porch
500
1990
8
Chair Lift
112
Wheel-O-Vator Co.
750
2000
9
Chair Lift
112
Savaria
750
2011
10
Passenger
393
Dover
2500
1994
11
Passenger
394
Dover
2500
1994
12
Passenger
399
Dover
250
1984
13
Passenger
491
ThyssenKrupp
3000
Unknown
14
Passenger
499 (Wing A)
Baxco
3500
2012
15
Passenger
492 (Wing C)
Baxco
2000
2004
16
Passenger
493 (Wing D)
MCE
2,000
2013
17
Freight
494 (Wing E)
Dover
10,000
1986
18
Chair Lift
575
Garaventa
450
1992
19
Chair Lift
575
Wheel-O-Vator Co.
550
1993
20
Passenger
581
Dover
2000
1984
21
Passenger
592
Dover
2500
1992
22
Passenger
661
Otis Cable
1500
1943
23
Passenger
663
Dover
2500
1984
24
Passenger
667
ThyssenKrupp
3000
2010
25
Passenger
675
Otis Cable
1800
1936
26
Freight
738
Esco
5000
1978
27
Passenger
860
Orion Concord
1400
2006
28
Passenger
863
ThyssenKrupp
2000
2007
29
Passenger
900
ThyssenKrupp
3,500
2013
30
Passenger
901
ThyssenKrupp
3500
2011
31
Passenger
902
Montgomery
3500
1992
32
Passenger
903
Dover
3500
1996
33
Wheel Chair Lift
903
Home Elevator of Texas
750
1997
34
Passenger
905
Schindler
2500
2004
35
Passenger
907
Dover
2000
1997
36
Wheel Chair Lift
907
Dover
750
1997
37
Passenger
977
Otis
3,500
2011
38
Wheel Chair Lift
999
Wheel-O-Vator Co.
750
2006

Chart Definitions:

Item: Assigned item number for VTE.

Type of VTE: Elevator, Escalator, Dumbwaiter, Chair Lift, etc.

Location of VTE: Facility Number Manufacturer: Kone, Otis, Thyssen Krupp, etc.

Capacity (lbs): VTE capacity in pounds.

Yr Installed: Indicate the year the equipment was initially installed.

Appendix B

HAZMAT POC Listing Information

502 CES/CEIE

Installation HAZMAT Mgmt Program (IHMP) Office Joint Base San Antonio-Lackland, TX 78236

(210) 671-0333, Fax: (210) 671-4074

502 CES/CEIE

Environmental Protection Specialist Installation HAZMAT Management Program (IHMP) Office Joint Base San Antonio-Lackland, TX 78236

(210) 671-0331, Fax: (210) 671-4074

Site Manager Hazardous Material Management Program Joint Base San Antonio-Fort Sam Houston (JBSA-FSH) Chenega Global Services, LLC 502 CES/CEIE Environmental Management 2250 Engineer Street Bldg. 4196

(210) 808-6280

JBSA-FSH Hazardous Material Management Chenega Global Services, LLC 502 CES/CEIE Environmental Management 2250 Engineer Street Bldg. 4196 Joint Base San Antonio-Fort Sam Houston (JBSA-FSH)

(210) 808-6333

Hazardous Waste Manager Chenega Global Services, LLC 502 CES/CEAN Bldg. 37 410 J Street Joint Base San Antonio-Randolph 78150

(210) 652-5666, DSN 487-5666

Appendix C

DATA REQUIREMENTS

Provide the data as indicated below to the COR. All reports, submittals, logs, and information provided to the government will be electronic and compatible with Microsoft Office (latest Version), such as Excel, Word and others. “Compatible” means the document can be opened using the appropriate Microsoft Office component without any discernible effect on the text (e.g., loss of data) or the formatting of the document:

Item No.
Description
Format
Frequency
1
Maintenance Control Plan (MCP)
Contractor Format
30 calendar days after award and updated as needed.
2
Work Performed
Contractor Format
Submit within three (3) business days of work.
3
Damage and Injury Reports
Accident Report
Submit within three (3) business days of each occurrence.
4
Contractors Monthly Invoices/Reports
WAWF
Monthly (by the 5th of each month).
5
Certification Requirements
As Required by Law
Provided as part of proposal package and updated as needed.
6
Contractors Quality Control Plan (QCP)
Contractor Format
Provided as part of proposal package and updated as needed.
7
Security Requirements
As Required by AFFARS 5352-242.9000

No later than three (3) days before start of work and renewal.

8
Spill Plan
Contractor Format
Provided within thirty (30) calendar days of contract award.
9
Hazardous Material Reporting Requirements
Contractor Format
Submit prior to transporting and using at installation.

File details come from the government source that posted it. Updated .