DocumentSecurityStatement 47PC1120R0007.pdf

PDF 212 KB Posted

Attached to
Hanley 4th Floor Restroom & Lobby Construction Project Federal contract opportunity
Solicitation number
47PC1120R0007
Issued by
General Services Administration Public Buildings Service Region 2

About this file

This document provides details for a federal construction contract solicitation for restroom and lobby renovations. The solicitation is being issued as a competitive set-aside for Service Disabled Veteran Owned Small Businesses by the General Services Administration Public Buildings Service Region 2. Interested contractors must download the security notice document from Beta.SAM.gov and submit the completed form to receive plans and specifications. Proposals are due by April 6, 2020 for the fixed price contract to renovate approximately 1,139 square feet of the 4th floor restrooms and lobby at the James M. Hanley Federal Building in Syracuse, New York. The scope of work includes interior construction such as walls, doors, casework, flooring, plumbing, electrical and mechanical systems. A pre-bid site visit will be held on March 17, 2020. The solicitation package includes proposal forms, wage determinations, and instructions for technical proposals, past performance questionnaires, and contractor financial information to be submitted with bids.

View the file

Other files for this federal contract opportunity

Other files attached to Hanley 4th Floor Restroom & Lobby Construction Project, newest first.
File Type Posted
Amendment 004 47PC1120R0007 Hanley4thFlrRestroom.pdf PDF
Amendment 003 47PC1120R0007 Hanley4thFlrRestroom.pdf PDF
Amendment 002 47PC1120R0007 Hanley4thFlrRestroom.pdf PDF
Amendment 001 Hanley4thFlrRestroom.pdf PDF
SolicitationPackage47PC1120R0007.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

47PC1120R0007

Hanley 4th Floor Restroom & Lobby Drawings and Specifications

3. Term of Effectiveness. The efforts required above shall continue throughout the entire term of contract and for what specific time thereafter as may be necessary, as determined by the Government. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention.

4. Written agreement of disposal. For all contracts using SBU building information, the contractor shall provide a written statement that he and his subcontractors have properly disposed of the SBU building documents, with the exception of the contractor's record copy, at the time of Release of Claims to obtain final payment. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work). Destruction shall be done by burning or shredding hardcopy, and/or physically destroying CDs, deleting and removing files from the electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software.

The recipient acknowledges the requirement to use reasonable care, as outlined above, to safeguard the documents and, if not awarded, the contract (and at the completion of any protest/appeal process) will make every reasonable and prudent effort to destroy or render useless all SBU information received during the solicitation.

I agree that I will abide by this agreement and will only disseminate Sensitive But Unclassified (SBU) building information to other authorized users under the conditions set forth above.

Signature Date

Title Company name (Attach copy of business license to request.)

Telephone Street address

Federal ID Number (Tax ID) City, State, Zip

DUNS Number email address

GSAPBSR2 LOGIN NAME: _______________ _

(To be completed only ifa login ID was issued for a previous solicitation. Ifno login ID exists or has been forgotten, one will be assigned upon acceptance of all required documentation.)

EMAIL this completed document to the attention of the responsible Contract Specialist.

CONTRACTOR DOCUMENT DISPOSAL NOTICE

(To be com leted and submitted u on close of solicitation, at the time of Release of Claims, or when the need no longer exists for documents.)

I certify that all documents, hard copy and/or electronic, received by me and/or my subcontractors, with the exception of my record copy, have been properly disposed of using the methods as described in item 4 above. Any record copies of documents will be safeguarded against unauthorized use for the term of retention.

Signature Date

II GSA USE ONLY BELOW II

VERJFIED: YES NO

NOTES: _ _ _ _ _ _ _ _______________ _

CO Initials�- - - - --

File details come from the government source that posted it. Updated .