District Safety Requirements for Treatment Plant Pumping Stations.pdf
PDF 1 MB Posted
- Attached to
- RFP 25-26-02 SECURITY GUARD SERVICES State and local contract opportunity
- Solicitation number
- 25-26-02
- Issued by
- California
About this file
The document is a District Safety Requirements manual for Treatment Plant and Pumping Station Projects issued by the Central Contra Costa Sanitary District (Central San). The comprehensive safety guide outlines detailed safety protocols, procedures, and requirements for contractors working on district facilities, covering areas such as potential hazards, general safety rules, specialized procedures for unique work environments, and specific safety protocols for activities like confined space entries, system shutdowns, lockout/tagout procedures, and hot work permits. The document includes multiple exhibits providing checklists, forms, and site maps to support safe work practices.
The safety manual emphasizes contractor responsibilities for ensuring workplace safety, including compliance with federal, state, and local safety regulations, informing employees about job site hazards, preventing injuries, and following specific safety procedures for working in complex treatment plant environments. Key safety focus areas include managing risks related to chemicals, electrical systems, vehicle and pedestrian traffic, confined spaces, fire prevention, and specialized work like welding or operating near gas and steam systems. The document requires contractors to complete safety orientations, use appropriate personal protective equipment, obtain necessary permits, and follow strict protocols for system shutdowns and emergency responses.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Sample Contract.docx | DOCX document | |
| Attachment_A_-_Insurance.docx | DOCX document | |
| RFP 25-26-02 Security Guard Services.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENTRAL CONTRA COSTA SANITARY DISTRICT
DISTRICT SAFETY REQUIREMENTS
FOR
TREATMENT PLANT AND PUMPING STATION PROJECTS
SRM 12/1/11
SRM 12/1/11
CONTENTS
Page
I. CONTRACTOR DUTIES 1
II. GENERAL SAFETY REQUIREMENTS
A. Potential Hazards 1 B. Basic Rules 2 C. Power Tools 3 D. Traffic Control 3 E. Isolation of Work Areas 3 F. High Voltage Systems 4 G. Trenching, Excavation, and Shoring 4 H. Medical Treatment 4 I. Fire 4 J. Chemicals 4
III. SPECIAL PROCEDURES AND UNIQUE HAZARDS
A. Confined Space Entries 5 B. System Shutdown Procedure 5 C. Lockout Tagout 6 D. Contractor Hot Work Permits 6 E. Natural Gas and Landfill Gas 7 F. Steam Lines and Steam-Operated Equipment 7
EXHIBITS
A. Contractor Safety Orientation Agenda 8 B. Treatment Plant Hazards 9 C. Contractor Shutdown Request 10 D. Lockout Tagout Flowchart 12 E. Hot Work Permit 13 F. Evacuation and Assembly Areas 14 G. Treatment Plant Site Map 15
I. CONTRACTOR DUTIES
The Contractor expressly assumes any and all duties to assure safety on the job site and all areas affected by the work-related activities.
The Contractor and its subcontractors shall comply with all applicable federal, state and local safety rules, regulations, requirements, and orders in the performance of the contract work. In addition, Contractor and its subcontractors shall comply with all requirements and procedures in this Appendix. Contractor shall take any additional precautions necessary to prevent injury to all persons, property or processes.
The Contractor has the duty to inform all employees, subcontractors, suppliers, and invitees of the District and of Contractor of the job site safety requirements and to enforce these requirements.
The Contractor shall not allow employees or subcontractors to begin work on District projects without a safety orientation specific to the potential hazards of the project. A copy of the District’s Contractor Safety Orientation meeting agenda is included as Exhibit A.
II. GENERAL SAFETY REQUIREMENTS
A. POTENTIAL HAZARDS
1. Treatment Plant
a. Chemicals: Hazardous chemicals including dry and hydrated lime, sodium hydroxide, calcium thiosulfate, hydrogen peroxide, sodium hypochlorite, acids, caustics, propane, gasoline, methane, diesel fuel are used in various prime movers and processes and are stored on or piped around the premises.
b. Ultraviolet Radiation: Ultraviolet radiation is used as part of the disinfection process.
c. Underground and exposed piping and duct systems: Piping and ducts may contain high and low pressure natural gas, methane, high voltage and low voltage energized electrical conductors, sewer gases (hydrogen sulfide and methane) and other hazardous substances.
d. Hazardous Materials: Within the treatment plant site there are buried petroliferous substances generally classified as hazardous materials. There is an on-site management plan for this material.
e. Vehicle Traffic: Large tank trucks deliver various chemicals within the treatment plant daily. Other vehicles and electric carts are operated around the treatment plant site.
1 SRM 12/1/11
f. Pedestrian Traffic: District employees and other authorized persons walk throughout the treatment plant.
g. Additional Hazards: Some additional hazards are listed on Exhibit B. Other hazards may be identified in the course of the work.
2. Pumping Stations Hazards include the storage and handling of substances including caustic soda, hydrogen peroxide, sodium hypochlorite, diesel fuel, motor oil, anti-freeze and various biological enzymes.
B. BASIC RULES
1. Work shall not begin until all Contractor personnel have been informed of potential hazards and the applicable safety procedures required at each job site.
2. The Contractor shall not operate any District equipment, compressed air, switches, valves or other controls. Contractor shall contact the Engineer or District representative if operation of District equipment becomes necessary.
3. Water:
a. Drinking water shall be supplied by the Contractor.
b. Do not drink water from hose connections located throughout the treatment plant. Most of these connections supply treated wastewater and are posted with signs reading “Do Not Drink”.
c. Water from hose connections should not be used to wash hands or equipment.
d. Water lines throughout the treatment plant are labeled as follows:
1W – city water from the Contra Costa Water District 2W – wastewater (filter plant effluent) 3W – wastewater (plant effluent)
e. To prevent contamination of the city water supply, consult the Engineer before making any cross-connection to any water line.
4. Only tools designed for the task shall be used. Makeshift tools or tools in poor condition shall not be used.
5. Horseplay is not allowed.
2 SRM 12/1/11
6. Smoking is strictly prohibited inside and outside of all District buildings, facilities and open spaces except where “Smoking Area” signs are posted.
7. Use of alcoholic beverages and/or illegal drugs is strictly prohibited. Workers who use prescription and non-prescription drugs that may interfere with the ability to work safely shall not be allowed on the job site.
C. POWER TOOLS
1. Electric powered hand tools shall be protected by approved ground fault circuit interrupters or shall be double insulated.
2. Fixed electric power tools shall be properly wired and grounded.
3. Pneumatically driver power tools shall be disconnected from air lines when not in use. Air lines shall be properly clipped together.
4. Powder-actuated tools shall be used only by certified personnel with a valid license in their possession.
D. TRAFFIC CONTROL
1. All Contractors shall:
a. Install and maintain required traffic control devices,
b. Provide appropriately equipped and trained flaggers when required,
c. Schedule and expedite the work to cause the least inconvenience to District operations and activities,
d. Provide adequate safeguards for workers and District personnel, and
e. Wear appropriately colored warning garments outfitted with reflective material for nighttime work.
2. All work on streets, roadways or similar thoroughfares shall comply with the State of California, Department of Transportation’s Manual of Traffic Controls for Construction and Maintenance Work Zones and any local ordinances.
3. No work may be performed in any public right of way without permission from the authorizing agency.
E. ISOLATION OF WORK AREAS
A Contractor may ask the Engineer to restrict access to active construction areas to only those persons engaged in the work and to
3 SRM 12/1/11
District personnel who are required to have access to controls or equipment in the work area.
F. HIGH VOLTAGE SYSTEMS
All work on high voltage electrical systems shall be done in accordance with the CalOSHA High Voltage Electrical Safety Orders and the National Electric Code (NEC).
Work on high voltage electrical systems shall be coordinated with District electricians and plant operations personnel.
G. TRENCHING, EXCAVATION, AND SHORING
Contractor shall comply with CalOSHA Article 6, Excavations Construction Safety Orders. Contractors shall maintain a competent person on site during excavations.
H. MEDICAL TREATMENT
1. The Contractor shall comply with the first aid requirements of the CalOSHA Construction Safety Orders.
2. The Contractor shall make prior arrangements for emergency medical care and for transportation of injured Contractor or subcontractor personnel.
3. For medical emergencies at the Treatment Plant, call 911 (or 9- 911 from a District phone) and then notify the Plant Operations Control Room (x 214 or 229-7214) of the emergency.
4. For medical emergencies at a Pumping Station, call 911 and then notify any available District personnel on site.
I. FIRE
1. The Contractor shall have fire extinguishers at the job site. For work that generates sparks or open flames, appropriate fire extinguishers shall be readily available at the specific work site.
2 For fire-related emergencies at the Treatment Plant, call 911 (or 9-911 from a District phone) and then notify the Plant Operations Control Room (x 214 or 229-7214) of the emergency.
3. For fire-related emergencies at a Pumping Station, call 911 and then notify any available District personnel on site.
J. CHEMICALS
Contractors and all subcontractors bringing their own chemicals on site shall inform those working in the area and shall post MSD sheets at the job site as long as the chemicals remain there.
4 SRM 12/1/11
III. SPECIAL PROCEDURES AND UNIQUE HAZARDS
A. CONFINED SPACE ENTRIES (from Section 3.3.1 of the District’s Confined Spaces Safety Directive)
1. Contractors performing Confined Space entries on District property must:
a. Comply with CalOSHA regulations as applied to employers engaged in construction work,
b. Complete a District safety orientation on the hazards specific to the Confined Space, the work being performed, and applicable communication protocols and emergency response procedures,
c. Advise District staff of any impacts their work could have on District employees working near the Confined Space entry area,
d. Post their Permit-Required Confined Space Permits at the entry site and/or make the Permit immediately accessible to District employees upon request, and
e. Provide copies of any Confined Space Entry Permits to the Control Room before any entries begin.
2. If employees from multiple contractors enter a Confined Space, the Controlling Contractor must coordinate each entry to ensure all safety requirements have been met; that Entrants, Attendants, and support personnel duties have been identified;
and that communication protocols and emergency response procedures are consistent.
3. If a separate entity is retained to provide rescue services, the Controlling Contractor and its employees will follow the emergency notification and response procedures established by that rescue services entity.
4. Upon completion of the contracted work, the Controlling Contractor and its employees shall participate in a debriefing with District staff (Project Manager and/or Safety Officer and/or designees) to discuss any hazards confronted or created in the Confined Space during the entry operations.
B. SYSTEM SHUTDOWN PROCEDURE
When the Contractor’s work involves tying in to an existing, live treatment plant or pumping station system, the system shall be shut down prior to the commencement of work. The Contractor shall complete and present the Contractor Shutdown Request form (Exhibit C) to the Engineer at least two weeks before the actual
5 SRM 12/1/11
system shutdown. The Engineer shall note any special safety precautions on the Contractor Shutdown Request.
An authorized Contractor representative shall sign the Shutdown Request form. By signing this form, Contractor acknowledges its receipt and its understanding of the form and agrees to start work at the approved date and time.
C. LOCKOUT TAGOUT (from Section 6 of the District’s Lockout Tagout Safety Directive)
1. Contractors must comply with the group kit requirement when contractor work coincides with plant maintenance and operations LOTO.
2. Contractors (authorized by the District) shall use a lock/tag system jointly agreed upon that meets the shared requirements of the LOTO programs.
3. Contractors are required to provide their own singularly keyed lockout lock(s).
4. It is the responsibility of Contractors to properly install lockout locks and tags. Contractors are to remove their lockout lock(s) and tag(s) when they have completed their assigned job tasks.
5. Additional lockout tagout procedures for Contractors are shown in Exhibit D.
D. CONTRACTOR HOT WORK PERMITS
1. Use of Hot Work Permits
Permits are required prior to welding, cutting, burning, soldering, use of an open flame, or when ignition sources are initiated anywhere within the treatment plant or pumping station fenced boundaries.
2. Procedure
a. A Hot Work Permit (Exhibit E) shall be issued to the
Contractor or its designated representative by the Inspector. Hot work on equipment or in areas controlled by the District shall not proceed without the permission of the Engineer. Contractor may request designation of special work areas and blanket Hot Work Permits for fabrication activities. Blanket permits apply only to special work areas and may not be issued for more than thirty (30) days.
A daily Hot Work Permit is required when the Contractor is working in an area that is hazardous by nature or in any area where District employees are working.
6 SRM 12/1/11
b. The Inspector issuing the Hot Work Permit shall indicate on the permit what personal protective equipment is required and any specific safety precautions the Contractor shall observe. Before issuing the permit, the Inspector shall inspect the area for combustibles and verify that no explosive atmosphere is present.
c. Two copies of the Hot Work Permit shall be transmitted to the Engineer, who will forward one copy to the Plant Operations Superintendant or his/her designated representative at least one hour before the work will begin.
d. Contractor personnel assigned to hot work activities shall meet all requirements noted on the permit before beginning work.
3. Fire Watch A fire watch shall be used when welding above combustible material or near operating equipment. The need for a fire watch will be specified on the Hot Work Permit written for the job.
The Contractor shall assign fire watch personnel and ensure that such personnel are adequately instructed in their duties and responsibilities. An adequate number and type of fire extinguishers shall be available for immediate use.
E. NATURAL GAS AND LANDFILL GAS
When Contractor personnel are working on natural gas or landfill gas (methane) systems, they shall be abide by District Lockout Tagout procedures.
The systems shall be purged with nitrogen. The Contractor shall conduct air monitoring for gases and shall not proceed with any work until the level of gas reaches a non-explosive level.
F. STEAM LINES AND STEAM-OPERATED EQUIPMENT
The Contractor shall notify the Engineer at least five (5) days before its personnel intend to work on any part of the steam system.
When Contractor personnel are working on steam lines and/or steam-operated equipment they shall abide by District Lockout Tagout procedures.
7 SRM 12/1/11
EXHIBIT A
8 SRM 12/1/11
EXHIBIT B
Treatment Plant Hazards
• Sodium Hypochlorite
• Slips, Falls into Primary Sedimentation Basins; Clarifiers
• Vehicle and Pedestrian Traffic
• Raw sewage, primary effluent, secondary effluent or final effluent
• Hydrogen peroxide
• Hydrogen sulfide
• UV – ultraviolet radiation
• Asbestos & Cam 17 Metals
• Confined Spaces
• Fire Suppression Systems
• Electrical Underground Conduit
• Electrical Substations o Filter Plant/Recycled Water o UV Disinfection o Pump & Blower Bldg o Standby Power Bldg o Headworks o Solids Conditioning Bldg o Secondary N & S Clarifiers A & N Tanks
Solids Conditioning Building
• Ash
• Hydrogen Sulfide
• Methane
• Phosphoric Acid
• Sodium Hydroxide
9 SRM 12/1/11
EXHIBIT C – CONTRACTOR SHUTDOWN REQUEST
10 SRM 12/1/11
11 SRM 12/1/11
EXHIBIT D – LOCKOUT TAGOUT FLOWCHART
12 SRM 12/1/11
EXHIBIT E
13 SRM 12/1/11
EXHIBIT F – Evacuation and Assembly Areas
14 SRM 12/1/11
PLANT GRID NORTH
CAL GRID NORTH
22^17’26"
FEET
G ra y so n C re e k
SubStation 33
SubStation 34
Holding Basin "A"
South
MCC 81 Sludge
Thickeners
SubStation 81
Filter Plant
Forebay
Filter
Plant
Clearwell
Holding Basin "A"
North
NAX
Plant
Filter Plant
Operations Bldg.
DAF Area
SubStation 73
Mechanical
Maintenance Bldg.
Holding Basin "B"
Holding Basin "C"
Alum
Sludge
Ponds
Walnut Creek
SubStation 32
Drain
Structure
Drain
Structure
Basin "B"
Sump Pump
Basin "C"
Sump Pump
Diffuser
Structure
MCC 42
N.E. Sump
Sludge Blending Tank
Emergency Sludge
Storage Tank
U.V. Bldg.
Substation 17
SubStation 40
Hypo Site 2 Diversion Structure
Influent Structure
Structure 1
Structure 1A
Hypo Site 1
Junction Structure "D"
Primary OCU
RAS Pump Pits
Trailer 1
Wet Weather
Structure
"A South"
Power Building
MCC 48
Backwash
Pumps
Industrial
Water Pumps
Auto/Eq.
Fuel Pumps
SubStation 82
Materials
Control Building
Pump Station
Emergency Lime Slaker
Solids Conditioning Bldg.
Plant Operations Administration Area
Headquarters Office Building
Chemical Feed Building
Backwash Tank
Primary
Sedimentation Tanks
Standby Power Building
Junction Structure "J"
Wet Weather
Structure
"A North" Drain Back
Sump Pump
Wet Weather
Structure "B"
100 PSI
Metering Yard
Sulfur Dioxide
Building
North South
UV Channel
Pump/Blower Bldg.
LEGEND:
Chainlink fence
Emergency Exit Gate
Single Gate
Double Gate
DAF Biofilter IMHOFF PLACEIMHOFF DRIVEMH 18
Buildings & Grounds
Condenser Cooling Pumps
Influent Diversion Bldg.
Wet Weather Structure
S.C.B. Odor Control Unit
Household
Hazardous Waste
Collection Facility
4737 Imhoff Place Warehouse
Fuel Oil Storage
$$$$date/time$$$$ $$$$$$$$$directory/filename$$$$$$$$$
Bioassay Trailer
Trailer 2
SubStation 16
Bypass Struct.
Odor Control
Gas Yard
Cogen. Gas Compressor
Applied Water Pumps (3)
Applied Water Pumps VFD Bldg.
Drain Back
Channel
200 PSI
Metering Yard
Dechlorination Bldg.
Metering MH
Maintenance & Reliability
Center (MRC)
Laboratory
Electrical Switch Building
Clearwell
Overflow
Structure
Aeration
Tanks
Dolan’s
Pond
Clarifiers
(Secondary Sed Tanks)
Clarifiers
(Final Sed Tanks)
Junction
Structure "JS1"
PLANT GRID NORTH
CAL GRID NORTH
22^17’26"
FEET
IMHOFF PLACEIMHOFF DRIVE
$$$$date/time$$$$ $$$$$$$$$directory/filename$$$$$$$$$
| 1. Contractors performing Confined Space entries on District property must: |
| 2. If employees from multiple contractors enter a Confined Space, the Controlling Contractor must coordinate each entry to ensure all safety requirements have been met; that Entrants, Attendants, and support personnel duties have been identified; and that communication protocols and emergency response procedures are consistent. |
File details come from the government source that posted it. Updated .