DID Warranty Performance Report.pdf
PDF 411 KB Posted
- Attached to
- R/V Chinook Engine Repair Federal contract opportunity
- Solicitation number
- N0016722Q0103
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DID Repair Status Report.pdf | ||
| DID Parts List.pdf | ||
| CDRL A002 Condition Found Report_SIGNED.pdf | ||
| CDRL A005 Quality Assessment Report_SIGNED.pdf | ||
| CDRL A006 Warranty_SIGNED.pdf | ||
| N0016722Q0103 CSS.docx | DOCX document | |
| DID Quality Assessment Report.pdf | ||
| CDRL A001 Project Schedule_SIGNED.pdf | ||
| DID Project Schedule.pdf | ||
| DID Condition Found Report.pdf | ||
| CDRL A004 Engine Repair Report_SIGNED.pdf | ||
| CDRL A003 Parts List_SIGNED.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: WARRANTY PERFORMANCE REPORT
Number: DI-SESS-81639A Approved Date: 20160614
AMSC Number: F9671 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: 11 (OO-ALC/CSA) Project Number: SESS-2015-078
Applicable Forms: DD Form 250
Use/Relationship: The Warranty Performance Reports provide information on items under warranty; contractor repair, replacement, and reimbursement; and equipment failure data associated with Reliability Improvement Warranties (RIWs).
a. Data is used to track and assess the effectiveness and implementation of the contract warranty provisions; to apprise the government of the type, severity, and frequency of failures;
to verify warranty coverage for each item delivered; and to document warranty periods and delivery schedules.
b. This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.
c. The warranty status portion of this DID is geared to warranty provisions where individual warranted item identification is needed, and remedies include repair/replacement and reimbursement. The warranty data portion is geared to warranty provisions where a Reliability Improvement Warranty (RIW) is delineated in the contract or data on reliability/performance achievement is necessary.
d. It is not intended that all the requirements contained herein should be applied to every contract. Portions of this DID may be tailored out according to the needs of the procuring agency.
e. This DID supersedes DI-SESS-81639.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. The Warranty Performance Report shall be in contractor format and shall delineate data for each contract line item (CLIN) covered by the warranty.
3. Content. The report shall contain the following:
3.1 Warranty status information.
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.
DI-SESS-81639A
3.1.1 Header information. The header shall include the following:
a. Contract number.
b. Calendar reporting period covered by the report c.
d. Repair facility address (including city, state, and zip code).
e. and Government Entity (CAGE) Code.
f. Department of Defense Activity Address Code (DoDAAC).
3.1.2 Warranted item information. The report shall include the following information for each CLIN covered by a warranty delivered to the Government during the reporting period.
a. CLIN.
b. National Stock Number (NSN).
c. Nomenclature (noun).
d. Serial Number (SN).
e. Part Number.
f. Delivery date (date of government acceptance by execution of DD Form 250, Material Inspection and Receiving Report, or scheduled date for future deliveries).
(Copies of this Form are available online at http://www.dtic.mil/whs/directives/forms/index.htm.)
g. Shipping date.
h. Destination.
i. In-service date (date when the warranted items are turned over to field users).
j. Contract date.
k. Warranty date.
l. Warranty length.
m. Warranty end date.
n. Applicable weapon system(s).
o. Cumulative data of 3.1.2 for CLIN items delivered under the contract to the Government from contract award to the end of the reporting period.
p. Cumulative data of 3.1.2 for CLIN items delivered under the contract to the Government for which the warranty has expired from contract award to the end date of the reporting period.
3.1.3 re include:
a. NSN and nomenclature of the returned CLIN.
b. Date received at plant.
c. SN.
d. Action taken (repaired/replaced/awaiting action/shipped)
e. NSN, part number, and quantity of repair parts used.
f. Cost of repair/replacement (parts and labor).
g. Cost of failure.
3.1.4 On-site contractor warranty repair/replacement. For CLINs repaired/replaced on-site (local contractor facilities, dealerships, representatives) by the contractor designated representative during the reporting period, information shall include:
a. NSN and nomenclature of the CLIN item.
b. SN.
c. Action taken (repaired/replaced).
d. NSN, part number, and quantity of repair parts used.
e. Cost of repair/replacement (parts and labor).
f. Cost of failure.
3.1.5 Contractor reimbursements to government for warranty repair. For warranty claims submitted to the contractor for reimbursement of government costs for warranty repair during the reporting period, information shall include:
a. Government warranty claim number.
b. NSN and nomenclature.
c. Government claim amount.
d. Contractor reimbursement amount.
e. Reason for denial of reimbursement, if applicable.
f. Reason for lesser amount of reimbursement than government claim amount, if applicable.
g. Status of claim.
3.1.6 Cumulative data. For 3.1.3, 3.1.4, and 3.1.5 report cumulative data from contract award to the end date of the reporting period.
3.1.7 Remarks. Provide contractor comments and recommendations as required.
3.2 Warranty data.
3.2.1 Program summary. The program summary shall include the following:
a. Program detail. The program/RIW start date, reporting period start and cut-off date.
b. Utilization details. The average quantity of installed systems average operating time (AOT) and total operating hours (TOH).
c. Repair detail. The quantity of units returned subdivided by: exclusions (expressed both as a quantity as well as a percent of total units returned), non-verified failures (expressed both as a quantity as well as a percent of total units returned), and quantity of warranted failures;
warranty units repaired and total repair days expressed as a quantity.
d. Performance statistics. The achieved mean time between failures (MTBF) and average turn-around time (TAT).
e. Program status. The number of days and operating hours, contract warranty, warranty used and warranty remaining.
3.2.2 Unit summary. Summary of the activity for each type unit (line replaceable unit [LRU]/shop replaceable unit [SRU]) as follows:
a. Delivery/processing status. The number of total units delivered and units returned subdivided by: exclusions (expressed as both quantity as well as a percentage of total units returned), non-verified failures (expressed as both a quantity as well as a percentage of total units returned), and quantity of warranted failures; quantity in repair, quantity in secure storage, quantity shipped, quantity condemned/lost, quantity on consignment, repair man hours, and repair parts and material costs.
b. Utilization details. The average quantity of units installed and TOH.
c. Unit cycle time. The logistical pipeline in average days for the following segments:
shipment to contractor receipt, contractor receipt to storage, storage to shipment, shipment to installation, installation to removal, and removal to shipment.
d. Unit performance. MTBF guaranteed and achieved, TAT guaranteed and achieved.
e. Unit/detail. Historical activity of all delivered units as follows: unit SN, data to storage, date of material release order (MRO), date shipped, elapsed time indicator (ETI) read out, configuration code, shipping destination, date installed, aircraft/equipment type and tail/SN, date removed, date shipped to contractor, date received by contractor, originating activity, ETI reading in and RIW repair code (i.e., warranty exclusion, non-verified failure, warranty failure).
3.2.3 Modification status summary. Each type unit (LRU/SRU) shall contain all engineering change proposals (ECPs) submitted for reliability improvements as follows: ECP number, date submitted, date approved, status code (e.g., government approval, automatic approval, disapproved), configuration code, production effectivity (date), and quantity as well as total percent of units affected and completed.
3.2.4 Consignment spares inventory. A listing, indicating units (LRU/SRU) on consignment (load) to the Government, including the nomenclature, SN, and date of consignment.
3.2.5 Parts consumption. An alphanumerical listing of all parts contained in the equipment under warranty, indicating the total quantity of each part consumed during repair actions. Data shall include all repair actions from the warranty start date through the required report cut-off date.
End of DI-SESS-81639A.