21._Attachment_B_Project_Drawings.pdf
PDF 9 MB Posted
- Attached to
- Stegal Substation Equipment Upgrades Federal contract opportunity
- Solicitation number
- DE-SOL-0008503
About this file
DE-SOL-0008506 - Attachment B Project Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 21._DE-SOL-0008503_000003.pdf | ||
| 21._DE-SOL-0008503_000002.pdf | ||
| 21._DE-SOL-0008503_000001.pdf | ||
| 21._Attachment_D_Foreign_National_Data_Card.pdf | ||
| 21._Attachment_C_Wage_Determinations.pdf | ||
| 21._Attachment_E_CRD_DPO.pdf | ||
| 21._IFB_Letter-signed.pdf | ||
| 21._Attachment_F_Bid _Performance _Payment_Bonds.pdf | ||
| 21._Attachment_A_Specifications.pdf | ||
| 21._DE-SOL-0008503.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B
Stegall Substation Equipment Upgrades – Project Drawings 7/21/2015
DE-SOL-0008503
PROJECT DRAWINGS
STEGALL SUBSTATION
EQUIPMENT UPGRADES
NEBRASKA
SECTION C
DESCRIPTION/SPECIFICATIONS
Spec. No. 835
EQUIPMENT UPGRADES
PROJECT DRAWINGS
A. GENERAL:
CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at http://www.wapa.gov/business/buys.htm. Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.
INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes.
These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.
B. LIST OF DRAWINGS:
LOCATION MAP:
1. SG 0017 Rev. C – Location and Vicinity Map
ELECTRICAL:
2. SG 0001 Rev. R EI – Switching Diagram (Existing Installation)
3. SG 0001-1 – Switching Diagram (Sheet 1 of 2)
4. SG 0001-2 – Switching Diagram Tables (Sheet 2 of 2)
5. SG 0010 Rev. E EI – General Plot Plan (Existing Installation)
6. SG 0010 Rev. F – General Plot Plan
7. SG 1010 Rev. F EI – 230kV and HVDC Intertie Plan (Existing Installation)
8. SG 1010 Rev. G – 230kV and HVDC Intertie Plan
9. SG 1011 Rev. H EI – 230kV Bays V1, V3 Thru V8, V10 and V14 Plan (Existing Installation)
10. SG 1011 Rev. I - 230kV Bays V1, V3 Thru V8, V10 and V14 Plan
11. SG 1012 Rev. G EI – 115kV Bays Y1 Thru Y8 Plan (Existing Installation)
12. SG 1012 Rev. H – 115kV Bays Y1 Thru Y8 Plan
13. SG 1013 Rev. F EI – Transformers KV1A, KV2A, and 13.2kV Reactors Plan (Existing Installation)
14. SG 1013 Rev. G - Transformers KV1A, KV2A, and 13.2kV Reactors Plan
15. SG 1015 Rev. D EI – 13.2kV Area Sections B-B, B1-B1, and L-L (Existing Installation)
16. SG 1015 Rev. E – 13.2kV Area Sections B-B, B1-B1, and L-L
17. SG 1102 Rev. C – Equipment and Material Index
18. SG 1110 Rev. E EI – 230kV Bay V1 (Existing Installation)
19. SG 1110 Rev. F - 230kV Bay V1
20. SG 1115 Rev. F EI – 115kV Bay Y1 Section E-E (Existing Installation)
21. SG 1115 Rev. G – 115kV Bay Y1 Section E-E
22. SG 1118 Rev. D EI – Transformers KV1A, KV2A and 13.2kV Reactors Sections (Existing Installation)
23. SG 1118 Rev. E – Transformers KV1A, KV2A and 13.2kV Reactors Sections
24. SG 1164 – 13.2kV Area Reactor Dampening Structure
25. SG 1512 Rev. G EI – Transformers KV1A, 13.8kV Bus Structure and Control Building Grounding and Buried Cable Plan (Existing Installation)
26. SG 1512 Rev. H – Transformers KV1A, 13.8kV Bus Structure and Control Building Grounding and Buried Cable Plan
27. SG 1600 Rev. A EI – Station Service Wiring Diagram (Existing Installation)
28. SG 1600 Rev. B – Station Service Wiring Diagram
29. SG 1613 EI – 3-Phase Panelboard LW3B Wiring Diagram (Existing Installation)
30. SG 1613 Rev. A – 3-Phase Panelboard LW3B Wiring Diagram
31. SG T116 – Outline Drawing Dry Type Air Core Shunt Reactor
32. SG T600 – Control Cable List
CIVIL & STRUCTURAL:
33. SG 2004 Rev. G EI – Foundation General Plan (Existing Installation)
34. SG 2004 Rev. H – Foundation General Plan
35. SG 2009 Rev. F EI – Foundation Plan Transformer-Reactor Area (Existing Installation)
EQUIPMENT UPGRADES
PROJECT DRAWINGS
36. SG 2009-2 EI – Foundation Plan Transformer-Reactor Area – Demolition Plan (Sheet 2 of 3) (Existing Installation)
37. SG 2009-2 Rev. A – Foundation Plan Transformer-Reactor Area (Sheet 2 of 3)
38. SG 2011 Rev. D – Foundations Outline and Reinforcement
39. SG 2012 Rev. E – Foundations Outline and Reinforcement
40. SG 2013 Rev. C – Foundations Outline and Reinforcement
41. SG 2032 Rev. B – Steel Structures 230-115kV Transformer Structure General Plan and Elevations
42. SG 2033 Rev. B – Steel Structures 230-115kV Transformer Structure Assemblies and Connections
43. SG 2042 Rev. C – Steel Structures 13.2kV Switch and Bus Supports
44. SG 2048 Rev. C EI – Stringing Requirements (Existing Installation)
45. SG 2048 Rev. D – Stringing Requirements
46. SG 2050 Rev. B EI – Foundations Outline and Reinforcement (Existing Installation)
47. SG 2050 Rev. C – Foundations Outline and Reinforcement
48. SG 2051 Rev. C – Foundations Designations and Unit Quantities 230 and 115kV
49. SG 2052 Rev. F – Foundations Designations and Unit Quantities Below 115kV
50. SG 2070 Rev. A EI – Foundations Outline and Reinforcement (Existing Installation)
51. SG 2070 Rev. B – Foundations Outline and Reinforcement
52. SG 2072 Rev. B – 13.8kV Equipment and Bus Support - Type I
53. SG 2300 Rev. A – Foundations Outline and Reinforcement
54. SG 2301 – Foundations Outline and Reinforcement
55. SG 2302 Rev. B – Foundations Outline and Reinforcement
56. SG 2303 Rev. B – Foundations Outline and Reinforcement
57. SG 2550 – Anchor Bolts
58. SG 2600 – Reactor Breaker Frame - Type I Elevation
59. SG 2601 – Reactor Breaker Frame - Type I Sections and Details
60. SG 2602 – 13.8kV Switch & Bus Support Type III
61. SG 2603 – 13.8kV Bus Supports
62. SG 2604 – 230kV Transformer Structure Type I Elevation
63. SG 2605 – 230kV Transformer Structure Type I Assemblies and Connections
GEOLOGY:
64. SG 8000 Rev. A – Location of Exploration
65. SG 8001 Rev. A – Logs of Exploration
66. SG 8002 Rev. A – Logs of Exploration
67. SG 8003 – Geologic Log of Drill Hole
FOR INFORMATION ONLY DRAWINGS:
68. SG 2000 Rev. D FIO – Grading and Plot Plan (For Information Only)
STANDARD DRAWINGS:
Following is a partial list of standard drawings that will be needed for this specification. The standard drawings are available at http://www.wapa.gov/business/buys.htm
31 2044 Rev. E – Equipment Cabinet Platforms Steel Design and Details
31 2050 Rev. A – Transformer Platforms Steel Design and Details ɸ
| 05 StegallEquipUpgrades2014_project_dwgs_6-18-15.pdf |
| Cover Page |
| Drawing Index |
| sg_0017c |
| sg_0001r_ei |
| sg_0001_1 |
| sg_0001_2 |
| sg_0010e_ei |
| sg_0010f |
| sg_1010f_ei |
| sg_1010g |
| sg_1011h_ei |
| sg_1011i |
| sg_1012g_ei |
| sg_1012h |
| sg_1013f_ei |
| sg_1013g |
| sg_1015d_ei |
| sg_1015e |
| sg_1102c |
| sg_1110e_ei |
| sg_1110f |
| sg_1115f_ei |
| sg_1115g |
| sg_1118d_ei |
| sg_1118e |
| sg_1164 |
| sg_1512g_ei |
| sg_1512h |
| sg_1600a_ei |
| sg_1600b |
| sg_1613_ei |
| sg_1613a |
| sg_t116 |
| sg_t600 |
| sg_2004g_ei |
| sg_2004h |
| sg_2009f_ei |
| sg_2009_2_ei |
| sg_2009_2a |
| sg_2011d |
| sg_2012e |
| sg_2013c |
| sg_2032b |
| sg_2033b |
| sg_2042c |
| sg_2048c_ei |
| sg_2048d |
| sg_2050b_ei |
| sg_2050c |
| sg_2051c |
| sg_2052f |
| sg_2070a_ei |
| sg_2070b |
| sg_2072b |
| sg_2300a |
| sg_2301 |
| sg_2302b |
| sg_2303b |
| sg_2550 |
| sg_2600 |
| sg_2601 |
| sg_2602 |
| sg_2603 |
| sg_2604 |
| sg_2605 |
| sg_8000a |
| sg_8001a |
| sg_8002a |
| sg_8003 |
| sg_2000d_fio |
| 05. StegallEquipUpgrades2014_project_dwgs_7-21-15.pdf |
| Cover Page |
| Drawing Index |
| sg_0017c |
| sg_0001r_ei |
| sg_0001_1 |
| sg_0001_2 |
| sg_0010e_ei |
| sg_0010f |
| sg_1010f_ei |
| sg_1010g |
| sg_1011h_ei |
| sg_1011i |
| sg_1012g_ei |
| sg_1012h |
| sg_1013f_ei |
| sg_1013g |
| sg_1015d_ei |
| sg_1015e |
| sg_1102c |
| sg_1110e_ei |
| sg_1110f |
| sg_1115f_ei |
| sg_1115g |
| sg_1118d_ei |
| sg_1118e |
| sg_1164 |
| sg_1512g_ei |
| sg_1512h |
| sg_1600a_ei |
| sg_1600b |
| sg_1613_ei |
| sg_1613a |
| sg_t116 |
| sg_t600 |
| sg_2004g_ei |
| sg_2004h |
| sg_2009f_ei |
| sg_2009_2_ei |
| sg_2009_2a |
| sg_2011d |
| sg_2012e |
| sg_2013c |
| sg_2032b |
| sg_2033b |
| sg_2042c |
| sg_2048c_ei |
| sg_2048d |
| sg_2050b_ei |
| sg_2050c |
| sg_2051c |
| sg_2052f |
| sg_2070a_ei |
| sg_2070b |
| sg_2072b |
| sg_2300a |
| sg_2301 |
| sg_2302b |
| sg_2303b |
| sg_2550 |
| sg_2600 |
| sg_2601 |
| sg_2602 |
| sg_2603 |
| sg_2604 |
| sg_2605 |
| sg_8000a |
| sg_8001a |
| sg_8002a |
| sg_8003 |
| sg_2000d_fio |
| 05. StegallEquipUpgrades2014_project_dwgs_7-21-15.pdf |
| Cover Page |
| Drawing Index |
| sg_0017c |
| sg_0001r_ei |
| sg_0001_1 |
| sg_0001_2 |
| sg_0010e_ei |
| sg_0010f |
| sg_1010f_ei |
| sg_1010g |
| sg_1011h_ei |
| sg_1011i |
| sg_1012g_ei |
| sg_1012h |
| sg_1013f_ei |
| sg_1013g |
| sg_1015d_ei |
| sg_1015e |
| sg_1102c |
| sg_1110e_ei |
| sg_1110f |
| sg_1115f_ei |
| sg_1115g |
| sg_1118d_ei |
| sg_1118e |
| sg_1164 |
| sg_1512g_ei |
| sg_1512h |
| sg_1600a_ei |
| sg_1600b |
| sg_1613_ei |
| sg_1613a |
| sg_t116 |
| sg_t600 |
| sg_2004g_ei |
| sg_2004h |
| sg_2009f_ei |
| sg_2009_2_ei |
| sg_2009_2a |
| sg_2011d |
| sg_2012e |
| sg_2013c |
| sg_2032b |
| sg_2033b |
| sg_2042c |
| sg_2048c_ei |
| sg_2048d |
| sg_2050b_ei |
| sg_2050c |
| sg_2051c |
| sg_2052f |
| sg_2070a_ei |
| sg_2070b |
| sg_2072b |
| sg_2300a |
| sg_2301 |
| sg_2302b |
| sg_2303b |
| sg_2550 |
| sg_2600 |
| sg_2601 |
| sg_2602 |
| sg_2603 |
| sg_2604 |
| sg_2605 |
| sg_8000a |
| sg_8001a |
| sg_8002a |
| sg_8003 |
| sg_2000d_fio |
File details come from the government source that posted it. Updated .