21._Attachment_B_Project_Drawings.pdf

PDF 9 MB Posted

Attached to
Stegal Substation Equipment Upgrades Federal contract opportunity
Solicitation number
DE-SOL-0008503
Issued by
Department of Energy Western Area Power Administration

About this file

DE-SOL-0008506 - Attachment B Project Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Stegal Substation Equipment Upgrades, newest first.
File Type Posted
21._DE-SOL-0008503_000003.pdf PDF
21._DE-SOL-0008503_000002.pdf PDF
21._DE-SOL-0008503_000001.pdf PDF
21._Attachment_D_Foreign_National_Data_Card.pdf PDF
21._Attachment_C_Wage_Determinations.pdf PDF
21._Attachment_E_CRD_DPO.pdf PDF
21._IFB_Letter-signed.pdf PDF
21._Attachment_F_Bid _Performance _Payment_Bonds.pdf PDF
21._Attachment_A_Specifications.pdf PDF
21._DE-SOL-0008503.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B

Stegall Substation Equipment Upgrades – Project Drawings 7/21/2015

DE-SOL-0008503

PROJECT DRAWINGS

STEGALL SUBSTATION

EQUIPMENT UPGRADES

NEBRASKA

SECTION C

DESCRIPTION/SPECIFICATIONS

Spec. No. 835

EQUIPMENT UPGRADES

PROJECT DRAWINGS

A. GENERAL:

CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at http://www.wapa.gov/business/buys.htm. Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.

INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes.

These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.

B. LIST OF DRAWINGS:

LOCATION MAP:

1. SG 0017 Rev. C – Location and Vicinity Map

ELECTRICAL:

2. SG 0001 Rev. R EI – Switching Diagram (Existing Installation)

3. SG 0001-1 – Switching Diagram (Sheet 1 of 2)

4. SG 0001-2 – Switching Diagram Tables (Sheet 2 of 2)

5. SG 0010 Rev. E EI – General Plot Plan (Existing Installation)

6. SG 0010 Rev. F – General Plot Plan

7. SG 1010 Rev. F EI – 230kV and HVDC Intertie Plan (Existing Installation)

8. SG 1010 Rev. G – 230kV and HVDC Intertie Plan

9. SG 1011 Rev. H EI – 230kV Bays V1, V3 Thru V8, V10 and V14 Plan (Existing Installation)

10. SG 1011 Rev. I - 230kV Bays V1, V3 Thru V8, V10 and V14 Plan

11. SG 1012 Rev. G EI – 115kV Bays Y1 Thru Y8 Plan (Existing Installation)

12. SG 1012 Rev. H – 115kV Bays Y1 Thru Y8 Plan

13. SG 1013 Rev. F EI – Transformers KV1A, KV2A, and 13.2kV Reactors Plan (Existing Installation)

14. SG 1013 Rev. G - Transformers KV1A, KV2A, and 13.2kV Reactors Plan

15. SG 1015 Rev. D EI – 13.2kV Area Sections B-B, B1-B1, and L-L (Existing Installation)

16. SG 1015 Rev. E – 13.2kV Area Sections B-B, B1-B1, and L-L

17. SG 1102 Rev. C – Equipment and Material Index

18. SG 1110 Rev. E EI – 230kV Bay V1 (Existing Installation)

19. SG 1110 Rev. F - 230kV Bay V1

20. SG 1115 Rev. F EI – 115kV Bay Y1 Section E-E (Existing Installation)

21. SG 1115 Rev. G – 115kV Bay Y1 Section E-E

22. SG 1118 Rev. D EI – Transformers KV1A, KV2A and 13.2kV Reactors Sections (Existing Installation)

23. SG 1118 Rev. E – Transformers KV1A, KV2A and 13.2kV Reactors Sections

24. SG 1164 – 13.2kV Area Reactor Dampening Structure

25. SG 1512 Rev. G EI – Transformers KV1A, 13.8kV Bus Structure and Control Building Grounding and Buried Cable Plan (Existing Installation)

26. SG 1512 Rev. H – Transformers KV1A, 13.8kV Bus Structure and Control Building Grounding and Buried Cable Plan

27. SG 1600 Rev. A EI – Station Service Wiring Diagram (Existing Installation)

28. SG 1600 Rev. B – Station Service Wiring Diagram

29. SG 1613 EI – 3-Phase Panelboard LW3B Wiring Diagram (Existing Installation)

30. SG 1613 Rev. A – 3-Phase Panelboard LW3B Wiring Diagram

31. SG T116 – Outline Drawing Dry Type Air Core Shunt Reactor

32. SG T600 – Control Cable List

CIVIL & STRUCTURAL:

33. SG 2004 Rev. G EI – Foundation General Plan (Existing Installation)

34. SG 2004 Rev. H – Foundation General Plan

35. SG 2009 Rev. F EI – Foundation Plan Transformer-Reactor Area (Existing Installation)

EQUIPMENT UPGRADES

PROJECT DRAWINGS

36. SG 2009-2 EI – Foundation Plan Transformer-Reactor Area – Demolition Plan (Sheet 2 of 3) (Existing Installation)

37. SG 2009-2 Rev. A – Foundation Plan Transformer-Reactor Area (Sheet 2 of 3)

38. SG 2011 Rev. D – Foundations Outline and Reinforcement

39. SG 2012 Rev. E – Foundations Outline and Reinforcement

40. SG 2013 Rev. C – Foundations Outline and Reinforcement

41. SG 2032 Rev. B – Steel Structures 230-115kV Transformer Structure General Plan and Elevations

42. SG 2033 Rev. B – Steel Structures 230-115kV Transformer Structure Assemblies and Connections

43. SG 2042 Rev. C – Steel Structures 13.2kV Switch and Bus Supports

44. SG 2048 Rev. C EI – Stringing Requirements (Existing Installation)

45. SG 2048 Rev. D – Stringing Requirements

46. SG 2050 Rev. B EI – Foundations Outline and Reinforcement (Existing Installation)

47. SG 2050 Rev. C – Foundations Outline and Reinforcement

48. SG 2051 Rev. C – Foundations Designations and Unit Quantities 230 and 115kV

49. SG 2052 Rev. F – Foundations Designations and Unit Quantities Below 115kV

50. SG 2070 Rev. A EI – Foundations Outline and Reinforcement (Existing Installation)

51. SG 2070 Rev. B – Foundations Outline and Reinforcement

52. SG 2072 Rev. B – 13.8kV Equipment and Bus Support - Type I

53. SG 2300 Rev. A – Foundations Outline and Reinforcement

54. SG 2301 – Foundations Outline and Reinforcement

55. SG 2302 Rev. B – Foundations Outline and Reinforcement

56. SG 2303 Rev. B – Foundations Outline and Reinforcement

57. SG 2550 – Anchor Bolts

58. SG 2600 – Reactor Breaker Frame - Type I Elevation

59. SG 2601 – Reactor Breaker Frame - Type I Sections and Details

60. SG 2602 – 13.8kV Switch & Bus Support Type III

61. SG 2603 – 13.8kV Bus Supports

62. SG 2604 – 230kV Transformer Structure Type I Elevation

63. SG 2605 – 230kV Transformer Structure Type I Assemblies and Connections

GEOLOGY:

64. SG 8000 Rev. A – Location of Exploration

65. SG 8001 Rev. A – Logs of Exploration

66. SG 8002 Rev. A – Logs of Exploration

67. SG 8003 – Geologic Log of Drill Hole

FOR INFORMATION ONLY DRAWINGS:

68. SG 2000 Rev. D FIO – Grading and Plot Plan (For Information Only)

STANDARD DRAWINGS:

Following is a partial list of standard drawings that will be needed for this specification. The standard drawings are available at http://www.wapa.gov/business/buys.htm

31 2044 Rev. E – Equipment Cabinet Platforms Steel Design and Details

31 2050 Rev. A – Transformer Platforms Steel Design and Details ɸ

05 StegallEquipUpgrades2014_project_dwgs_6-18-15.pdf
Cover Page
Drawing Index
sg_0017c
sg_0001r_ei
sg_0001_1
sg_0001_2
sg_0010e_ei
sg_0010f
sg_1010f_ei
sg_1010g
sg_1011h_ei
sg_1011i
sg_1012g_ei
sg_1012h
sg_1013f_ei
sg_1013g
sg_1015d_ei
sg_1015e
sg_1102c
sg_1110e_ei
sg_1110f
sg_1115f_ei
sg_1115g
sg_1118d_ei
sg_1118e
sg_1164
sg_1512g_ei
sg_1512h
sg_1600a_ei
sg_1600b
sg_1613_ei
sg_1613a
sg_t116
sg_t600
sg_2004g_ei
sg_2004h
sg_2009f_ei
sg_2009_2_ei
sg_2009_2a
sg_2011d
sg_2012e
sg_2013c
sg_2032b
sg_2033b
sg_2042c
sg_2048c_ei
sg_2048d
sg_2050b_ei
sg_2050c
sg_2051c
sg_2052f
sg_2070a_ei
sg_2070b
sg_2072b
sg_2300a
sg_2301
sg_2302b
sg_2303b
sg_2550
sg_2600
sg_2601
sg_2602
sg_2603
sg_2604
sg_2605
sg_8000a
sg_8001a
sg_8002a
sg_8003
sg_2000d_fio
05. StegallEquipUpgrades2014_project_dwgs_7-21-15.pdf
Cover Page
Drawing Index
sg_0017c
sg_0001r_ei
sg_0001_1
sg_0001_2
sg_0010e_ei
sg_0010f
sg_1010f_ei
sg_1010g
sg_1011h_ei
sg_1011i
sg_1012g_ei
sg_1012h
sg_1013f_ei
sg_1013g
sg_1015d_ei
sg_1015e
sg_1102c
sg_1110e_ei
sg_1110f
sg_1115f_ei
sg_1115g
sg_1118d_ei
sg_1118e
sg_1164
sg_1512g_ei
sg_1512h
sg_1600a_ei
sg_1600b
sg_1613_ei
sg_1613a
sg_t116
sg_t600
sg_2004g_ei
sg_2004h
sg_2009f_ei
sg_2009_2_ei
sg_2009_2a
sg_2011d
sg_2012e
sg_2013c
sg_2032b
sg_2033b
sg_2042c
sg_2048c_ei
sg_2048d
sg_2050b_ei
sg_2050c
sg_2051c
sg_2052f
sg_2070a_ei
sg_2070b
sg_2072b
sg_2300a
sg_2301
sg_2302b
sg_2303b
sg_2550
sg_2600
sg_2601
sg_2602
sg_2603
sg_2604
sg_2605
sg_8000a
sg_8001a
sg_8002a
sg_8003
sg_2000d_fio
05. StegallEquipUpgrades2014_project_dwgs_7-21-15.pdf
Cover Page
Drawing Index
sg_0017c
sg_0001r_ei
sg_0001_1
sg_0001_2
sg_0010e_ei
sg_0010f
sg_1010f_ei
sg_1010g
sg_1011h_ei
sg_1011i
sg_1012g_ei
sg_1012h
sg_1013f_ei
sg_1013g
sg_1015d_ei
sg_1015e
sg_1102c
sg_1110e_ei
sg_1110f
sg_1115f_ei
sg_1115g
sg_1118d_ei
sg_1118e
sg_1164
sg_1512g_ei
sg_1512h
sg_1600a_ei
sg_1600b
sg_1613_ei
sg_1613a
sg_t116
sg_t600
sg_2004g_ei
sg_2004h
sg_2009f_ei
sg_2009_2_ei
sg_2009_2a
sg_2011d
sg_2012e
sg_2013c
sg_2032b
sg_2033b
sg_2042c
sg_2048c_ei
sg_2048d
sg_2050b_ei
sg_2050c
sg_2051c
sg_2052f
sg_2070a_ei
sg_2070b
sg_2072b
sg_2300a
sg_2301
sg_2302b
sg_2303b
sg_2550
sg_2600
sg_2601
sg_2602
sg_2603
sg_2604
sg_2605
sg_8000a
sg_8001a
sg_8002a
sg_8003
sg_2000d_fio

File details come from the government source that posted it. Updated .