E-PHI BAA attachment v5.pptx
PPTX presentation 590 KB Posted
- Attached to
- Electronic-Photonic Heterogeneous Integration (E-PHI) Federal contract opportunity
- Solicitation number
- DARPA-BAA-11-45
About this file
Slide Summary Template
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DARPA-BAA-11-45_E-PHI_Amendment 01_Final For Posting_24 May 11.pdf | ||
| DARPA-BAA-11-45_E-PHI_Final for Posting_14Apr11.pdf | ||
| Approved_Proposer_Checklist.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prime Contractor: Title of Proposal Technical Area(s) of Proposal Mark appropriately on each slide, not on master
Performer Team:
Team Lead: Name Affiliation (Summary of Role) Subcontractor 1: Name Affiliation (Summary of Role) Sub 2: Name Affiliation (Summary of Role) N. Sub N: Name Affiliation (Summary of Role) Include Logos For All Team Members Innovative Claims/Challenges:
Innovations represented by your proposed heterogeneous integration approach(es)
Primary challenges to be overcome Schedule and Budget:
Give total cost and duration (in months) of each segment of the program, separated by key intermediate milestones.
Program Goals:
List Demonstration Type (if proposing to Technical Area III)
Description of final goal of proposed work (consider including figure(s) if appropriate)
Quantitative proposer-defined end-of-program goals
4/4/2011
Overview and Innovations
Replace box with supporting graphic(s) (processing overviews, block diagrams, etc) Resize and/or divide area as needed Summarize key heterogeneous integration process technology that will be developed and/or utilized; list integrated materials and devices to be employed Include block diagram(s) of the process flow (Technical Area I), architectures to be evaluated (Technical Area II), and/or proposed demonstration microsystem (Technical Area III) Summarize design innovations that will enable achievement of the end of program goals.
Summarize limitations/tradeoffs (e.g. process compatibility, thermal management, etc.) of proposed process, architecture, and demo circuits in your approach.
Provide details on primary challenges to be overcome Mark appropriately on each slide, not on master
Goals, Milestones, Transition Mark appropriately on each slide, not on master
Program Timeline
Key Program Milestones (Add as many milestones with quantitative descriptions as needed). Milestone spacing should be roughly to scale. Delete this text.
Milestone 1 Milestone 2 Milestone n
Show Duration → [Number of Months between each milestone]
Replace box with metrics table(s) here Resize and/or divide area as needed Describe all program metrics, including intermediate and performer-defined – use table format (see BAA metrics tables for preferred table format) Show your proposed program structure and summarize key milestones that lead to achievement of program goals (can be indicated in timeline format below) Describe potential technology transition opportunities.
image1.png image5.png
File details come from the government source that posted it. Updated .