D.1 Quality Assurance Surveillance Plan.pdf

PDF 117 KB Posted

Attached to
Q523--Perfusionist Service Federal contract opportunity
Solicitation number
36C25025Q0020
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

The document provided is a Quality Assurance Surveillance Plan (QASP) for a federal contract opportunity with Solicitation Number 36C25025Q0020 for Perfusionist Services. The QASP outlines the government's plan to monitor and evaluate the contractor's performance on this contract.

The key details include:

  • The contract is for Perfusionist Services and is being awarded by the Department of Veterans Affairs, Veterans Integrated Service Network 10.
  • The QASP defines the performance standards, methods of surveillance, and documentation requirements. It identifies the Contracting Officer and Contracting Officer's Representative responsible for overseeing the contract.
  • The QASP includes specific performance requirements such as qualifications of key personnel, patient access, patient safety, maintaining licensing and certification, and completing mandatory training. It defines the Acceptable Quality Levels and surveillance methods for evaluating each requirement.
  • The QASP also outlines the procedures for documenting performance, issuing Contractor Discrepancy Reports, and determining the appropriate CPARS rating based on the contractor's performance.

View the file

Other files for this federal contract opportunity

Other files attached to Q523--Perfusionist Service, newest first.
File Type Posted
36C25025Q0020 0001.docx DOCX document
D.2 Organizational Conflicts of Interest.pdf PDF
D.3 Contractor Certification for Immigration Nationality Act.pdf PDF
D.4 Contractor Rules of Behavior.pdf PDF
D.5 Past Performance Questionnaire.pdf PDF
36C25025Q0020.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

RFQ 36C25025Q0020

Perfusionist Services

Revision 03/09/2023 Page 1 of 10

The contractor will be evaluated in accordance with the following:

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored?

• How will monitoring take place?

• Who will conduct the monitoring?

• How will monitoring efforts and results be documented?

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United

States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Karen Williams

Organization or Agency: Department of Veterans Affairs, Network Contracting Office (NCO) 10

b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The

COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Matthew Fleming – Supervisory Management and Program Analyst – OR Manager

Organization or Agency: Cleveland VAMC

3. CONTRACTOR REPRESENTATIVES

The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.

Primary Program Manager:

Alternate Program Manager:

Perfusionist Services

Revision 03/09/2023 Page 2 of 10

4. PERFORMANCE STANDARDS

The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.

The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.

5. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION. 100% surveillance – Performed by Cardiac Surgeon once per quarter or on an as needed basis.

b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. Contractors Employees Training and Certification records will be reviewed per inspection period. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.

c. VALIDATED USER/CUSTOMER COMPLAINTS. N/A

d. RANDOM SAMPLING.

e. Verification and/or documentation provided by Contractor. Contractor will be required to provide the

COR with evidence of documentation compliance with provision of the PWS.

6. QASP PERFORMANCE REPORT DATE: __________________

Perfusionist Services

Revision 03/09/2023 Page 3 of 10

Measures PWS

Referen ce

(Fill-in)

Performance Requirement Standard Acceptable

Quality Level

Surveillance

Method

Met AQL/DID

NOT MEET

AQL-

CPARS

RATING/ADD

COMMENTS

Qualifications of Key

Personnel

4.6.4.1 All contract Perfusionists shall

have current certification in accordance with American

Board of Cardiovascular

Perfusion and maintain license, registration and/or certification

All Perfusionists shall be certified and compliant with all certifications

100% Random

Sampling of qualification documents

Patient Access (A) 4.6.4.2 Patient must receive treatment in a timely manner

Perfusionists shall be onsite and available during all scheduled OR hours.

Additionally, the on-call

Perfusionist shall be within 30 minutes of the facility to provide support for unscheduled or emergency cases

95% Periodic

Inspection and

Direct

Observation

Perfusionist Services

Revision 03/09/2023 Page 4 of 10

Patient Access (B) 4.6.4.3 Perfusionists shall be available and be in location as needed to properly perform tasks as specified

Perfusionists shall be onsite and available during all scheduled OR hours.

Additionally, the on-call

Perfusionist shall be within 30 minutes of the facility to provide support for unscheduled or emergency cases

95% Random

Sampling of

Time and

Attendance

Sheets

Patient Safety 4.6.4.4 Patient safety incidents shall be reported using Patient

Safety Reporting System

All incidents shall be reported immediately (within 24 hours)

All of patient safety incidents are reported using Patient

Safety Reporting

System within 24 hours of incident

100% Direct

Observation and periodic inspection

Maintains licensing, registration, and certification.

4.6.4.5 Updated Licensing, registration

and certification shall be provided as they are renewed.

Licensing and registration information shall be kept current

All licensing, registration(s) and certification(s) for contract personnel(s) shall be provided as they are renewed

100%

Periodic

Inspection and

Random

Sampling

Perfusionist Services

Revision 03/09/2023 Page 5 of 10

Mandatory Training, Privacy, Confidentiality and

HIPAA

4.6.4.6 Contractor personnel(s) shall

complete all required training on time per facility policy.

Contractor personnel(s) is aware of all laws, regulations, policies and procedures relating to Privacy, Confidentiality, and HIPAA and complies with all standards

Zero breaches of privacy or confidentiality.

All contractor personnel(s) shall comply with all laws, regulations, policies and procedures relating to

Privacy, Confidentiality, and HIPAA..

100% completions

Periodic

Inspection.

Contractor personnel(s) shall provide evidence of annual training required by the facility, reports violations per

VA Directive

6500.6.

Clinical Information Return 4.6.4.7 Perfusionists shall be responsible to check and compute all calculations of perfusion and cell saver treatments.

All cases 100% Direct observation and random sampling.

Documentation/Timesheet 4.6.4.8 Time Sheet Documentation to be completed biweekly and turned in to Section Chief and

COR for concurrence

Biweekly 95% Periodic inspection and random sampling

Perfusionist Services

Revision 03/09/2023 Page 6 of 10

7. CPARS RATINGS ASSIGNED TO QASP ITEMS:

Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:

EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

VERY GOOD: Performance meets contractual requirements and exceeds some to the Government’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.

SATISFACTORY: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.

MARGINAL: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency

(e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).

UNSATISFACTORY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An

Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).

8. DOCUMENTING PERFORMANCE

Perfusionist Services

Revision 03/09/2023 Page 7 of 10

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS).

b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the

CO determines formal written communication is required, the COR shall prepare a Contract

Discrepancy Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.

Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CDR below.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement. The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Reporting. The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.

10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

SIGNED:

COR NAME/TITLE DATE

SIGNED:

CONTRACTOR NAME/TITLE DATE

Perfusionist Services

Revision 03/09/2023 Page 8 of 10

Perfusionist Services

Revision 03/09/2023 Page 9 of 10

CONTRACT REPORT

1. CONTRACT NUMBER 2. REPORT NUMBER

3. TO: (Contracting Officer) 4. FROM: (Name of COR)

5. DATES

a. CR PREPARED

b. RETURNED BY

CONTRACTOR:

c. ACTION COMPLETE

6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)

7. SIGNATURE OF COR Date:

8. SIGNATURE OF CONTRACTING OFFICER Date:

9a. TO (Contracting Officer) 9a. FROM (Contractor)

10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT

RECURRENCE. (Cite applicable quality control program procedures or new procedures.

Attach continuation sheet(s) if necessary.)

11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:

Perfusionist Services

Revision 03/09/2023 Page 10 of 10

12. GOVERNMENT EVALUATION.

13. GOVERNMENT ACTIONS

14. CLOSE OUT

NAME TITLE SIGNATURE DATE

CONTRACTOR

NOTIFIED

COR

CONTRACTING

OFFICER

File details come from the government source that posted it. Updated .