CSS SP330020Q5016 Safety Shoes.pdf
PDF 513 KB Posted
- Attached to
- Safety Shoes Federal contract opportunity
- Solicitation number
- SP330020Q5016
- Issued by
- Defense Logistics Agency Distribution
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2020 Safety Shoe STATEMENT OF WORK.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP330020Q5016
Safety Shoes
NOTICE TO OFFERORS
1. Issuing Office:
DLA Distribution Acquisition Operations (J7) 430 Mifflin Avenue, Suite 3102A New Cumberland, PA 17070-5008
2. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in the Federal Acquisition Regulations (FAR) Subpart 12.6 – Streamlined Procedures for Evaluation and Solicitation for Commercial Items in conjunction with FAR Subpart 13.5 Simplified Procedures for Certain Commercial Items. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.
3. This notice incorporates provisions and clauses in effect through:
REGULATION IDENTIFICATION EFFECTIVE DATE
Federal Acquisition Circular (FAC) 2020-05 27 February 2020 Defense Federal Acquisition Regulation Supplement (DFARS) DFARS Publication Notice
(DPN)
20200114 14 January 2020
Defense Logistics Acquisition Directive (DLAD) Current to Revision 5 through PROCLTR 20-04 23 March 2020
The complete text of any of the clauses and provisions are available at the following websites:
FAR - https://www.acquisition.gov/browsefar DFARS - https://www.acq.osd.mil/dpap/dars/dfarspgi/current DLAD - http://www.dla.mil/HQ/Acquisition/Offers/DLAD.aspx
4. This Request for Quotation (RFQ) is being issued to establish the purchase of Safety Shoes to support DLA Distribution San Joaquin. The Government intends to award one (1) contract as a result of this RFQ and will be issued on a Standard Form (SF) 1449. The resulting contract will be a Firm Fixed Price Contract.
5. This RFQ is being solicited as a 100% set-aside for small business concerns. The North American Industry Classification System (NAICS) code for this acquisition is 316210 and the size standard is 1000 employees.
The Product or Service Code (PSC) for this acquisition is 8430.
6. PERIOD OF PERFORMANCE: The ordering period for this contract will be the date of contract award through one (1) year with two (2) one (1) year option periods. The Government reserves the rights to exercise the option year(s) in accordance with FAR 52.217-9 – Option to Extend the Term of the Contract.
7. ESTIMATED QUANTITIES: The quantities shown in the Schedule of Supplies are estimated only. They represent the Government’s best-known estimate for each line item. Payment will only be for the actual quantities provided to the Government at the price specified. If the Government requirements do not result in the quantities estimated; such event shall not constitute the basis for an equitable price adjustment under the contract.
8. DELIVERY INFORMATION: Government requires the supplies to be delivered at a maximum of 30 days after receipt of order (ARO). Early delivery is authorized and encouraged.
The Contractor shall deliver Safety Shoes to the following address:
SB3200
DLA DISTRIBUTION CENTER SAN JOAQUIN
25600 S CHRISMAN RD, BASE SUPPLY, WHSE 29-5
TRACY, CA 95376
https://www.acquisition.gov/browsefar https://www.acq.osd.mil/dpap/dars/dfarspgi/current http://www.dla.mil/HQ/Acquisition/Offers/DLAD.aspx
9. PROOF OF DELIVERY: Acceptable Proof of Delivery documents include: Shipping Documentation;
Materials Inspection and Receiving Report (DD250), Bill of Lading, Packing List, Tracking/Delivery Confirmation or Invoice. To ensure prompt payment to your company, the Proof of Deliveries must include the following:
• CONTRACT NUMBER or ORIGINAL DOCUMENT NUMBER
• PURCHASE ORDER NUMBER (as applicable)
• CLIN /MATERIAL NUMBER
• SPECIFIC QUANTITY SHIPPED IN REFERENCE TO QUANTITY ORDERED
• PRINTED NAME AND WRITTEN SIGNATURE OF A GOVERNMENT EMPLOYEE
10. PACKING AND MARKING REQUIREMENTS: All products shall be packaged best commercial practice in accordance with American Society for Testing and Materials (ASTM) 3951, marked in accordance with Military-Standard (MIL-STD)-129P. All Shipments must contain proper shipping documentation. Contractor shall attach, in a water resistant envelope, to the exterior shipping container a commercial packing list. All documents must include at a minimum, contract number and document number for the item, stock number, quantity, and unit of issue. Omission of any data on the shipping documentation could cause a delay in receipt of goods and significantly delay payment.
11. SYSTEM FOR AWARD MANAGEMENT (SAM): A prospective awardee shall be registered in the System for Award management (SAM) database by the quotation submission date, during performance and through final payment of any contract resulting from this solicitation. Offerors may obtain information on registration and annual confirmation requirements via the SAM website at http://www.sam.gov.
Contractor shall type company name, address, and CAGE code exactly as it appears in the DoD System for Award Management (SAM) Database.
Company Name:
Company Address:
Telephone:
CAGE code:
Point of Contact:
Email:
Manufacturer:
12. INVOICING AND PAYMENT: Invoicing and Payment will be made via Wide Area Work Flow. See DFARS
Clause 252.232-7006.
13. MARK CONTRACT NUMBER ON ALL CORRESPONDENCE: Contractor must mark the contract or purchase order number on all paperwork and shipments. The order number must appear on the exterior of the shipment. Failure to follow these instructions will hold up payment to you and could result in the return of merchandise at your expense.
14. Questions regarding this solicitation shall be submitted by electronic mail to the Acquisition Specialist, Sharon Stine, via email at sharon.stine@dla.mil, Subject: SP330020Q5016 RFQ Question. Question(s) must be received by 10:00 AM EST on 02 APRIL 2020. Answers to questions will be posted to the beta.SAM.gov website via an amendment to the solicitation.
15. The Government is not soliciting for the “same old way” of doing business. The Government encourages proposals that will achieve savings through innovative processes. Furthermore, DLA Distribution personnel are working to eliminate unnecessary requirements and negotiating for a reduction in supplies/material prices.
Therefore, your assistance is requested in reducing prices and improving our buying process.
http://www.sam.gov/ mailto:sharon.stine@dla.mil
ATTACHMENT
Attachment 01: Schedule of Supplies
Schedule of Supplies/Services – Safety Shoes
The period of performance for the Base Year will be April 15, 2020 thru April 14, 2021 The period of performance for Option Year 1 will be April 15, 2021 thru April 14, 2022 The period of performance for Option Year 2 will be April 15, 2022 thru April 14, 2031
(1) Keen- 1006978 - 1 each Unit price $ ___________________ Extended Total Price $____________________
Salient Characteristics - Left and right asymmetrical steel toe, ASTM F2412-11 and F2413-11 I/75 C/75 EH standards, Mesh liner provides breathability to help keep your feet cool in warm weather environments, Reflective webbing for additional safety, Torsional Stability Shank (TSS), Water resistant nubuck leather upper, Oil and slip resistant non-marking rubber outsole Dual density compression molded EVA midsole, Hydrophobic mesh lining.
Removable metatomical dual density EVA footbed or equal.
(2) Avenger – A7124 - 1 each Unit price $ ___________________ Extended Total Price $____________________
Salient Characteristics - Full -grain leather upper, steel toe, removable rebound foam insole for extra comfort, direct attach density PU slip and oil- resistant outsole, waterproof membrane, ASTM F2413-11 I/C, puncture resistant and EH or equal.
(3) Hytest – K11100 - 1 each Unit price $ ___________________ Extended Total Price $____________________
Salient Characteristics -Electrical Hazard, Slip resistant, Steel Toe, Action leather upper. Mesh lining. EVA footbed.
Trekker lightweight slip and oil resistant rubber outsole with EVA cushion midsole. Strobel/cement construction.
Safety Toe Rated ASTM I/75 C/75 EH. Athletic last or equal.
(4) Hytest – K12150 - 1 each Unit price $ ___________________ Extended Total Price $____________________
Salient Characteristics – Electrical Hazard, Steel toe, Action leather upper. Mesh lining. EVA footbed. Trekker lightweight slip and oil resistant rubber outsole with EVA cushioned midsole. Strobel/cement construction. Safety Toe Rated ASTM I/75 C/75 EH. Athletic last or equal.
(5) Hytest -K13180- 1 each Unit price $ ___________________ Extended Total Price $____________________
Salient Characteristics – Electrical Hazard, Steel toe, Full-grain leather upper. Fully lined. Removable cushioned insole. Oil and slip resistant rubber outsole with EVA cushion mid. Strobel construction. Steel toe rated ASTM I/75 C/75 MT/75 EH. 470 Wide toe last or equal.
(6) New Balance – MID627G - 1 each Unit price $ _____________ Extended Total Price $_________________
Salient Characteristics - Internal shank, Leather/mesh upper, Meets ASTM F2412-11 and ASTM F2413-11 Electrostatic Dissipative performance requirements that displace charges of electricity through a walking surface thus reducing static electricity hazards, Non-marking outsole, Slip resistant outsole , Steel Toe (meets ASTM F 2412-11 & ASTM F 2413-11 I/75 and C/75 impact and compression safety standards) or equal.
(7) Reebok – RB1940 - 1 each Unit price $ ___________________ Extended Total Price $____________________
Salient characteristics - ASTM F2413, XTR® Brand Extra Wide Composite Toe Cap, Electrical Hazard, Slip Resisting, Security Friendly, Waxy Nubuck leather, Moisture Wicking Nylon Mesh, EVA Cushion Midsole with Rubber SR Outsole, 100% Non-Metallic, Extra Wide Toe, Extreme Flexibility, Strobel Construction or equal.
(8) Caterpillar- P90192 - 1 each Unit price $ ___________________ Extended Total Price
Salient Characteristics - ASTM F2413-11 I/75 C/75 Steel Toe protects against impact or compression • ASTM F2413-05 1/75 EH Electrical Hazard Protection rated to protect against open circuits up to 600 volts in dry conditions • Strobel Construction provides superior flexibility and lightweight durability • Suede Upper provides long-term wear and durability • Nylex™ Sock Liner wicks away moisture from the foot to keep it dry and comfortable • Dual Density EVA Footbed offers extra shock absorption • Nylon Shank provides support and stability • T1080 Outsole performs against oil and water, and is heat and abrasion resistant • Slip-resistant Rubber Outsole reduces the risk of slips and falls on low tractions surfaces or equal.
SCHEDULE OF SUPPLIES
See Attachment 01: Schedule of Supplies.
Offerors shall quote Fixed Unit Prices for all line items shown on CLIN 0001 through CLIN 0002; 1001 through 1002; 2001 through 2002. All unit prices shall be quoted as FOB DESTINATION pricing.
CONTRACTORS SHALL IDENTIFY THE SMALL BUSINESS MANUFACTURER(S) FOR THE
PRODUCTS PROPOSED ON ALL CLINS:
CONTRACT CLAUSES
ADDENDA TO 52.212-4 Contract Terms and Conditions-Commercial Items (OCT 2018)
THE FOLLOWING CLAUSES ARE INCORPORATED BY REFERENCE:
FAR 52.204-13 System for Award Management Maintenance FAR 52.204-18 Commercial and Government Entity Code Maintenance FAR 52.204-19 Incorporation by Reference of Representations and Certifications FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems FAR 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations FAR 52.225-13 Restrictions on Certain Foreign Purchases FAR 52.232-39 Unenforceability of Unauthorized Obligations FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors FAR 52.247-34 F.o.b. Destination DFARS 252.203-7000 Requirements Relating to Compensation of Former DoD Officials DFARS 252.203-7002 Requirement to Inform Employees of Whistleblower Rights DFARS 252.203-7005 Representation Relating to Compensation of Former DoD Officials DFARS 252.204-7003 Control of Government Personnel Work Product
DFARS 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls
DFARS 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
DFARS 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
DFARS 252.225-7002 Qualifying Country Sources as Subcontractors DFARS 252.225-7036 Buy American—Free Trade Agreements--Balance of Payments Program--Basic DFARS 252.225-7048 Export-Controlled Items DFARS 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports DFARS 252.232-7010 Levies on Contract Payments DFARS 252.243-7001 Pricing of Contract Modifications DFARS 252.244-7000 Subcontracts for Commercial Items DFARS 252.247-7023 Transportation of Supplies by Sea—Basic
THE FOLLOWING CLAUSES ARE INCORPORATED BY FULL TEXT:
52.212-5 Contract Terms and Conditions Required to Implement Statutes Executive Orders –Commercial Items (JAN 2020)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232)
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C.
3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
(1) 52.203-6 Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate
I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402)
(2) 52.203-13 Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509)
(3) 52.203-15 Whistleblower Protections under the American Recovery and Reinvestment Act of
2009 (Jun 2010) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009).
X (4) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note).
(5) Reserved
(6) 52.204-14 Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
(7) 52.204-15 Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
X (8) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment (Oct 2015) (31 U.S.C. 6101 note).
(9) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
(10) Reserved
(11) (i) 52.219-3 Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a)
(ii) Alternate 1 (Nov 2011) of 52.219-3
(12) (i) 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).
(ii) Alternate I (Jan 2011) of 52.219-4
(13) Reserved
X (14) (i) 52.219-6 Notice Of Total Small Business Set-Aside (January 2019)(Deviation 2019-O0003) (15 U.S.C. 644).
(ii) Alternate I (Nov 2011).
(iii) Alternate II (Nov 2011).
(15) (i) 52.219-7 Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
(ii) Alternate I (Oct 1995) of 52.219-7.
(iii) Alternate II (Mar 2004) of 52.219-7.
(16) 52.219-8 Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).
(17) (i) 52.219-9 Small Business Plan (Aug 2018) (15 U.S.C. 637 (d)(4)).
(ii) Alternate I (Nov 2016) of 52.219-9
(iii) Alternate II (Nov 2016) of 52.219-9
(iv) Alternate III (Nov 2016) of 52.219-9
(v) Alternate IV (Aug 2018) of 52.219-9.
(18) 52.219-13 Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
(19) 52.219-14 Limitations on Subcontracting (Jan 2017) (15 U.S.C. 637(a)(14))
(20) 52.219-16 Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
(21) 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011)
(15 U.S.C. 657f).
X (22) 52.219-28 Post Award Small Business Program Representation (Jul 2013) (15 U.S.C.
632(a)(2)).
(23) 52.219-29 Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged
Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
(24) 52.219-30 Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business
Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
X (25) 52.222-3 Convict Labor (June 2003) (E.O. 11755).
X (26) 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Jan 2020) (E.O.
13126).
X (27) 52.222-21 Prohibition of Segregated Facilities (Apr 2015).
X (28) (i) 52.222-26 Equal Opportunity (Sep 2016) (E.O. 11246).
(ii) Alternate I (Feb 1999) of 52.222-26.
X (29) (i) 52.222-35 Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(ii) Alternate I (July 2014) of 52.222-35.
X (30) (i) 52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(ii) Alternate I (July 2014) of 52.222-36.
(31) 52.222-37 Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
(32) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec
2010) (E.O. 13496).
X (33) (i) 52.222-50 Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O.
13627).
(ii) Alternate I (Mar 2015) of 52.222-50, (22 U.S.C. chapter 78 and E.O. 13627
(34) 52.222-54 Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
(35) (i) 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
(ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
(36) 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O.13693).
(37) 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).
(38) (i) 52.223-13 Acquisition of EPEAT® -Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514
(ii) Alternate I (Oct 2015) of 52.223-13.
(39) 52.223-14 Acquisition of EPEAT® -Registered Television (Jun 2014) (E.O.s 13423 and
13514).
(ii) Alternate I (Jun 2014) of 52.223-14.
(40) 52.223-15 Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
(41) (i) 52.223-16 Acquisition of EPEAT® -Registered Personal Computer Products (Oct 2015)
(E.O.s 13423 and 13514).
(ii) Alternate I (Jun 2014) of 52.223-16.
X (42) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging while Driving (Aug 2011) (E.O. 13513).
(43) 52.223-20 Aerosols (Jun 2016) (E.O. 13693).
(44) 52.223-21 Foams (Jun 2016) (E.O. 13696).
(45) (i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552a).
(ii) Alternate I (Jan 2017) of 52.224-3.
(46) 52.225-1 Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
(47) (i) 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C.
chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).
(ii) Alternate I (May 2014) of 52.225-3.
(iii) Alternate II (May 2014) of 52.225-3.
(iv) Alternate III (May 2014) of 52.225-3.
(48) 52.225-5 Trade Agreements (Oct 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X (49) 52.225-13 Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(50) 52.225-26 Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(51) 52.226-4 Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
(52) 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007)
(42 U.S.C. 5150).
(53) 52.232-29 Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C.
4505), 10 U.S.C. 2307(f)).
(54) 52.232-30 Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C.
2307(f)).
X (55) 52.232-33 Payment by Electronic Funds Transfer--System for Award Management (Oct 2018)
(31 U.S.C. 3332).
(56) 52.232-34 Payment by Electronic Funds Transfer—Other Than System for Award
Management (Jul 2013) (31 U.S.C. 3332).
(57) 52.232-36 Payment by Third Party (May 2014) (31 U.S.C. 3332).
(58) 52.239-1 Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
(59) 52.242-5 Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(12)).
(60) (i) 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46
U.S.C. Appx 1241(b) and 10 U.S.C. 2631).
(ii) Alternate I (Apr 2003) of 52.247-64.
(iii) Alternate II (Feb 2006) of 52.247-64.
FAR 52.217-9 Option To Extend The Term Of The Contract (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within thirty (30) days;
provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least sixty
(60) days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed three
(3) years.
(End of Clause)
FAR 52.252-2 Clauses Incorporated By Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR - https://www.acquisition.gov/browsefar DFARS - https://www.acq.osd.mil/dpap/dars/dfarspgi/current DLAD - http://www.dla.mil/HQ/Acquisition/Offers/DLAD.aspx
(End of Clause)
DFARS 252.232-7006 Wide Area Workflow Payment Instructions (DEC 2018)
(a) Definitions. As used in this clause—
• “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
• “Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
• “Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
• “Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall— https://www.acquisition.gov/browsefar https://www.acq.osd.mil/dpap/dars/dfarspgi/current http://www.dla.mil/HQ/Acquisition/Offers/DLAD.aspx http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm#252.232-7003 http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm#252.232-7003
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer._ 2 in 1 Invoice _(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer._____N/A______(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract. [Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC SL4701 Issue By DoDAAC SP3300 Admin DoDAAC** SP3300 Inspect By DoDAAC TBD Ship To Code SB3200 Ship From Code TBD Mark For Code TBD Service Approver (DoDAAC) SB3200 Service Acceptor (DoDAAC) N/A Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
https://www.sam.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact. Sharon.Stine@dla.mil (Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of Clause)
SOLICITATION PROVISIONS
THE FOLLOWING PROVISIONS ARE INCORPORATED BY REFERENCE:
FAR 52.204-7 System for Award Management FAR 52.204-8 Annual Representations and Certifications FAR 52.204-16 Commercial and Government Entity Code Reporting FAR 52.204-17 Ownership or Control of Offeror FAR 52.204-20 Predecessor of Offeror FAR 52.204-22 Alternative Line Item Proposal FAR 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services
Or Equipment FAR 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations—Representation FAR 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony
Conviction under any Federal Law FAR 52.217-5 Evaluation of Options FAR 52.222-22 Previous Contracts and Compliance Reports FAR 52.222-25 Affirmative Action Compliance DFARS 252.203-7005 Representation Relating to Compensation of Former DoD Officials DFARS 252.204-7007 Alternate A, Annual Representations and Certifications DFARS 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls DFARS 252.213-7000 Notice to Prospective Suppliers on Use of Supplier Performance Risk System in Past
Performance Evaluations
THE FOLLOWING PROVISIONS ARE INCORPORATED BY FULL TEXT:
FAR 52.216-1 Type of Contract (APR 1984) The Government contemplates award of a single Firm Fixed Price Purchase Order resulting from this solicitation.
(End of Provision) FAR 52.233-2 Service of Protest (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from DLA Distribution J7 Acquisition Operations, Attn. Erik Smith, Contracting Officer, 430 Mifflin Ave, Suite 3102A, New Cumberland, PA 17070-5008.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
FAR - https://www.acquisition.gov/browsefar DFARS - https://www.acq.osd.mil/dpap/dars/dfarspgi/current DLAD - http://www.dla.mil/HQ/Acquisition/Offers/DLAD.aspx
FAR 52.212-1 Instructions to Offerors -- Commercial Items. (OCT 2018) ADDENDA TO FAR 52.212-1 Instructions to Offerors – Commercial Items (OCT 2018)
Reference paragraph (c) under referenced provision FAR 52.212-1. This paragraph is tailored to read as follows:
(c) Period of acceptance of offers. The offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers.
The following two (2) paragraphs under referenced provision 52.212-1 are hereby deleted:
(e) Multiple offers
(h) Multiple awards
QUOTE SUBMISSION INSTRUCTIONS
Time of Submission: Quotes are DUE NOT LATER THAN 10:00A.M. EST, 09 APRIL 2020. Late quotes will not be considered unless it is in the best interest of the government.
Method of Delivery: Quote submissions shall be via email to Sharon.stine@dla.mil on or before the quote due date.
Electronic copies ONLY. Facsimile and hard copy submissions of quotes will not be accepted.
Quote must have this statement in the footer or header of each page: SOURCE SELECTION INFORMATION
SEE FAR 2.101 AND 3.104.
Quotations may be submitted in contractor format and shall include:
(1) Signed and dated quote/cover letter with the following information: Solicitation Number, Company name, address, Contractor point of contact, telephone number, e-mail address, Contractor DUNS Number, and Commercial and Government Entity (CAGE) Code.
(2) Fully executed Solicitation with clauses and provisions completed, as necessary
(3) Fully executed Attachment 1 – Schedule of Supplies in EXCEL format
(4) Descriptive literature for submission of products to demonstrate the item(s) meet the minimum salient characteristics found in the Schedule of Supplies
(5) Signed acknowledgements of amendments (applicable only if any amendments are issued against this solicitation)
Notes to Offerors:
(1) Contractors are required to include a copy of the FAR provisions 52.212-3 and FAR 52.219-1 with its proposal OR may indicate completion of the representations and certifications on the internet at www.sam.gov.
Failure to include the certifications along with the quotation or to complete the certifications on the internet may https://www.acquisition.gov/browsefar https://www.acq.osd.mil/dpap/dars/dfarspgi/current http://www.dla.mil/HQ/Acquisition/Offers/DLAD.aspx result in elimination from consideration for award.
(2) The name of the small business manufacturer is required to be considered for award.
(3) The proposed delivery time is required to be considered for award.
(4) Completed Attachment 1 - Schedule of Supplies for base year and two (2) option years in EXCEL file
Workbook format is required. One soft copy of the Schedule of Supplies for Base Year and Two Option Years in EXCEL file Workbook format is provided with this RFQ. The EXCEL Workbook contains one (1) worksheet.
EXCEL spreadsheets contain formulas for calculating the total price per CLIN for CLINs X001 and X002. Offeror is to complete the Unit Price cell for each CLIN and each contract year. Prices must be rounded to two decimal points.
(End of Provision)
ADDENDA TO FAR 52.212-2 Evaluation – Commercial Items (OCT 2014)
(a) The Government will award one contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The Government intends to award one contract to the responsive, responsible offer using the Lowest Technically Acceptable Price process, with the lowest overall price for all CLINs. Award will be made on all or none basis. In order to be considered for award, an offer must be provided for all CLINS. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the acceptable offeror with the overall lowest evaluated price, inclusive of options, which is deemed responsible in accordance with the Federal Acquisition Regulations (FAR). The requirements include all stated terms, conditions, completion of representations and certifications, and all other requirements of this solicitation.
Request for Quote shall be evaluated for acceptability or unacceptability only and shall not be rated. Award will be based on the overall lowest evaluated price of the quotes meeting or exceeding the acceptability standards for the non-price factors. Any offeror who has submitted a technically acceptable quote and who has been found to have an acceptable past performance will then have the quote evaluated for lowest price.
This competition is not being conducted using FAR Part 15 procedures. The award decision process is being conducted under FAR Part 12 and FAR Part 13. IAW FAR 13.106-2(b)(3), the Government does not intend to conduct discussions but reserves the right to hold discussions if deemed necessary by the Contracting Officer. The Government reserves the right to seek clarifications, i.e., "limited exchanges" between the Government and interested bidders that may allow bidders to clarify certain aspects of their quotes or to resolve minor or clerical errors.
The Government reserves the right to evaluate quotes and may seek to make an award without asking for revised quotes. Accordingly, contractors are encouraged to provide their most realistic and competitive terms with their initial quotes.
If the Contracting Officer does determine it is in the Government’s best interest to conduct communications with offerors, and a contractor is given an opportunity to correct any deficiencies in a quote, and after correction the quote is still determined to be unacceptable, such determinations will be cause for rejection of the quote. No offeror will be given an unlimited amount of opportunities for correction of a quote. The Government reserves the right to make a final determination whether a quote is acceptable or unacceptable solely on the basis of the information submitted and proceed without requesting additional information.
The following non-price factors shall be used to determine acceptability of a quote:
Factor 1: Technical
Factor 1 shall be evaluated on an Acceptable/Unacceptable basis. To be considered acceptable and eligible for award, an offeror must address the factor set forth in accordance with the instructions of this solicitation. A major item and/or gross omission which precludes meeting solicitation objectives that cannot be corrected prior to or during communications without major revision or complete resubmission of the quote will cause a quote to be found technically unacceptable.
FACTOR 1: TECHNICAL
The following criteria shall be used to establish technical acceptability:
(1) To be considered for award, offers must have provided the items requested in this RFQ.
(2) To be considered for award, offerors must have an acceptable Past Performance record.
Past Performance shall be evaluated on an Acceptable/Unacceptable basis. In the case of an offeror without a past performance record or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable”.
The offeror will be evaluated on the past performance records provided as part of the quote and any other past performance information obtained from other sources, which may include: Supplier Performance Risk System (SPRS), Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases;
interviews with Program Managers, Contracting Officers, and Fee Determining Officials; information provided by the offeror and the Defense Contract Management Agency.
Technical information shall be evaluated for acceptability (only) on a pass/fail basis and will not be rated. Any offeror who has been determined acceptable (pass) on their technical information will then have their quote evaluated for price.
FACTOR 2: PRICING
If a quote has been determined acceptable under the non-price factor listed above, the Government will then evaluate the quote for the lowest price. The proposed total price, the sum of the total amount for all CLINS, between offers that are determined to be technically acceptable will be the determining factor in the selection of a quote for award. All CLINs must be priced. Price analysis shall not be conducted on offerors determined to be unacceptable for award, since the offeror will not be in line for award as the lowest priced technically acceptable offeror.
The Government will perform a price analysis to determine the reasonableness of proposed price. The Government will utilize a comparison of proposed prices received in response to the solicitation.
Award will be based on the overall lowest priced quote that meets or exceeds the acceptability standards for the non-cost factors.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
FAR 52.212-3 Offeror Representations and Certifications-Commercial Items (Dec 2019) With Alternate I
(OCT 2014)
The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically in the System for Award Management (SAM) accessed through https://www.sam.gov. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (v)) of this provision.
(a) Definitions. As used in this provision— “Covered telecommunications equipment or services” has the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
“Economically disadvantaged women-owned small business (EDWOSB) concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.
“Forced or indentured child labor” means all work or service—
(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or
(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.
“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.
“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.
“Inverted domestic corporation”, means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).
“Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999, except—
(1) PSC 5510, Lumber and Related Basic Wood Materials;
(2) Product or Service Group (PSG) 87, Agricultural Supplies;
(3) PSG 88, Live Animals;
(4) PSG 89, Subsistence;
(5) PSC 9410, Crude Grades of Plant Materials;
(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;
(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;
(8) PSC 9610, Ores;
(9) PSC 9620, Minerals, Natural and Synthetic; and
(10) PSC 9630, Additive Metal Materials.
“Place of manufacture” means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.
“Predecessor” means an entity that is replaced by a successor and includes any predecessors of the predecessor.
“Restricted business operations” means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—
(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;
(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;
(3) Consist of providing goods or services to marginalized populations of Sudan;
(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;
https://www.sam.gov/ https://www.acquisition.gov/content/52204-25-prohibition-contracting-certain-telecommunications-and-video-surveillance-services-or-equipment#id1989I600I4C http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title6-section395&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title6-section395&num=0&edition=prelim
(5) Consist of providing goods or services that are used only to promote health or education; or
(6) Have been voluntarily suspended.“Sensitive technology”— “Sensitive technology”—
(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically— (i)To restrict the free flow of unbiased information in Iran; or (ii)To disrupt, monitor, or otherwise restrict speech of the people of Iran; and
(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3)of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).
“Service-disabled veteran-owned small business concern”—
(1) Means a small business concern—
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veteransor, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.
(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service connected, as defined in 38 U.S.C. 101(16).
“Small business concern” means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR Part 121 and size standards in this solicitation.
“Small disadvantaged business concern”, consistent with13 CFR 124.1002, means a small business concern under the size standard applicable to the acquisition, that— (1)Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by—
(i) One or more socially disadvantaged (as defined at13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104) individuals who are citizens of the United States; and
(ii) Each individual claiming economic disadvantage has a net worth not exceeding $750,000 after taking into account the applicable exclusions set forth at 13 CFR124.104(c)(2); and
(2) The management and daily business operations of which are controlled (as defined at 13.CFR 124.106) by individuals, who meet the criteria in paragraphs (1)(i) and (ii) of this definition.
“Subsidiary” means an entity in which more than 50 percent of the entity is owned—
(1) Directly by a parent corporation; or
(2) Through another subsidiary of a parent corporation “Successor” means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.
“Veteran-owned small business concern” means a small business concern—
(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and
(2) The management and daily business operations of which are controlled by one or more veterans.
“Women-owned small business (WOSB) concern eligible under the WOSB Program” (in accordance with 13 CFR part 127), means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .