CR_1883_Improvements_Phase_1_(Addendum_#8_Revision).pdf

PDF 427 KB Posted

Attached to
CR 1883 Improvements Phase 1 State and local contract opportunity
Solicitation number
ITB 25-16
Issued by
Walton County, Florida

About this file

This is an Invitation to Bid (ITB) from Walton County, Florida for the CR 1883 Improvements Phase 1 project (ITB 25-16), seeking a contractor to resurface approximately 4.92 miles of County Road 1883 from SR 83 to CR 183B. The project involves milling and resurfacing the existing roadway, upgrading signage and pavement markings, and implementing minor drainage improvements. The bid was released on May 29, 2025, with responses due by July 7, 2025 at 3:00 pm. A non-mandatory pre-bid meeting is scheduled for June 5, 2025 at 9:00 am, with both in-person and teleconference options. The contract duration is 160 days for substantial completion, with an additional 30 days for punch list items. Contractors must be FDOT prequalified in specific work classes including drainage, flexible paving, grading, and signage.

The project is funded through a Florida Department of Transportation (FDOT) Grant Agreement, with a total project scope detailed in an extensive unit price bid schedule covering 61 line items. The bid includes provisions for various roadway improvements such as milling, asphalt paving, pavement markings, drainage structures, and landscaping. A bid alternative is also provided for optional geosynthetic interlayer reinforcement and specific asphalt materials. Bidders must submit comprehensive documentation including proof of FDOT prequalification, bid bonds, insurance certificates, and various compliance forms. The county reserves the right to reject any bid and will award the contract to the lowest, most responsible and responsive bidder meeting the specified qualifications.

View the file

Other files for this state and local contract opportunity

Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/waltoncountyfl

Walton County

INVITATION TO BID

ITB 25-16

CR 1883 IMPROVEMENTS PHASE 1

RELEASE DATE: May 29, 2025

RESPONSE DEADLINE: July 7, 2025, 3:00 pm

Please refer to the project timeline in this document for all important deadlines.

Invitation To Bid #ITB 25-16 Title: CR 1883 Improvements Phase 1

Table of Contents

1. Invitation to Bid

2. Instruction to Bidders

3. Scope of Work

4. Bid Schedule

5. Vendor Submissions

6. Attachments

Attachments:

A - Contract No. 25-16

B - Public_Construction_Bond (25)

C - 44861515401-PLANS-01-ROADWAY

D - 44861515401-SPECS

E - 44861515401-TSP342-GIRS

F - EXHIBIT A_FDOT Grant Agreement

G - CR 1883 Form 251-B

H - CR 1883 Geotechnical Report (HF235116)

1. Invitation to Bid

BOARD OF COUNTY COMMISSIONERS,

WALTON COUNTY, FLORIDA

CR 1883 Improvements Phase 1

ITB 25-16

Sealed bids for the CR 1883 Improvements Phase 1 Project will be received by the Walton County Board of

County Commissioners, hereinafter referred to as "County" until 3:00 pm LOCAL TIME on Monday, July 7, 2025, for furnishing labor and materials and performing all work set forth in the Bidding Documents prepared by Walton County. IMMEDIATELY FOLLOWING the scheduled closing time for the reception of bids, all bids which have been submitted in accordance with the conditions of the Bidding Documents issued in relation to this Project will be publicly opened and read aloud.

Bidder is responsible for the submission of its bid.

Bids received after the specified day and time will not be opened.

The proposed project, hereinafter referred to as the “Project” consists of the resurfacing the existing roadway of CR 1883 for approximately 4.92 miles from the intersection of SR 83 to the intersection of CR 183B in

Walton County, Florida. Improvements include milling and resurfacing of the roadway, signing and pavement marking upgrades, and minor drainage improvements.

Contract Time: The contract duration is One Hundred Sixty (160) days to substantial completion with an additional Thirty (30) days for punch list completion.

This Project is funded with federal financial assistance awarded to the State of Florida and is subject to the terms and conditions of the State of Florida, Department of Transportation (FDOT) Grant Award Agreement No. G2M73 included in the attachments section of this ITB.

The contractor(s) performing the work on this Project (whether the prime contractor or a subcontractor) must be FDOT prequalified in the following work classes if performing work in that specific work class:

WORK CLASS # WORK CLASS NAME

7 Drainage

10 Flexible Paving

11 Grading

12 Grassing, Seeding, and Sodding

28 Pavement Marking

38 Roadway Signing

Proof of FDOT prequalification in the above work classes must be submitted with the bid.

Advertisement Date: May 29, 2025

Pre-Bid Meeting (Non-Mandatory): June 5, 2025, 9:00am

Office of Central Purchasing 176 Montgomery Circle DeFuniak Springs, Florida 32435

OR

Bidders may also attend the pre-bid meeting via teleconference by dialing 850-

635-0655 EXT 261217

Question Submission Deadline: June 23, 2025, 12:00am

Bid Closing Deadline: July 7, 2025, 3:00pm

In-Person Bid Opening:

Office of Central Purchasing 176 Montgomery Circle DeFuniak Springs, Florida 32435

OR

via teleconference by dialing 850-635-0655

EXT 261217

All responses must be submitted electronically via the County e-Procurement Portal:

https://procurement.opengov.com/portal/waltoncountyfl/projects/166878.

Through the e-Procurement Portal, responses will be securely locked and digitally encrypted until the submission deadline passes.

Should you encounter any technical difficulties or require assistance with the e-Procurement Portal, please reach out to our technical support team via the blue chat bubble on the bottom right or via email at procurement-support@opengov.com

All subcontractors and suppliers shall be declared on the prescribed Subcontractors and Suppliers Declaration form.

Each Bidder’s submittal shall include all the items listed in the Vendor Submissions section.

The Successful Bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the Contract, as prescribed in the Contract Documents.

https://procurement.opengov.com/portal/waltoncountyfl/projects/166878 mailto:procurement-support@opengov.com

All bid bonds, payment and performance bond(s), insurance contracts, and certificates of insurance shall be executed by a licensed agent of the surety or insurance company authorized to do business in the State of

Florida and meet the requirements set forth in the Bid Security section.

The bid may be withdrawn without penalty prior to the date and time of bid opening. Bids shall remain open and subject to acceptance for a period of thirty (30) calendar days after the date of bid opening, but the

County at its sole discretion may release any bid and bid security. No Bidder may withdraw its bid for a period of thirty (30) calendar days after the date of bid opening.

In order to perform work on public contracts, the successful Bidder shall have all licenses and permits required by federal, state, and local statutes, regulations, and ordinances.

The County will award the bid to the lowest, most Responsible and Responsive Bidder that is most qualified to perform the job according to the specifications and qualifications listed in the Invitation to Bid. Bidders shall provide documentation that they can perform the required services and provide documentation of past and present projects of this same nature, along with references. Failure to provide said documentation will result in a bid being found non-responsive.

Before a contract will be awarded for the Project contemplated herein, the County will conduct such investigations as is necessary to determine the performance record and ability of the apparent low Bidder to perform the size and type of project specified under the Contract. The County reserves the right to reject bids from Bidders whose Dun & Bradstreet Comprehensive Report, or past work performance with the County and other governmental agencies, including timeliness of completion of projects and history of payment to subcontractors or materialmen are deemed by the County to be unsatisfactory. The Bidder shall submit with its bid detailed written evidence of experience and current commitments necessary to allow the County to evaluate the bidder's qualifications. Failure to do so will result in bid being found non-responsive.

In the event the apparent low bid submitted by a Responsible and Responsive Bidder exceeds the County's budget for the Project, the County reserves the right to value engineer the published scope of work in order to effect deductive cost changes. In light of the modified scope of work, the County shall review the three lowest bids submitted by Responsible and Responsive Bidders in order to select one Bidder to whom to award the

Contract.

The County reserves the right to reject any or all bid(s), and may postpone the award of the Contract for a period of time which shall not extend beyond thirty (30) calendar days from the bid opening date.

A person or an affiliate who has been placed on the convicted vendor list following a conviction for public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, Florida

Statutes, for CATEGORY TWO for a period of thirty-six (36) months from the date of being placed on the convicted vendors list.

Walton County, as a political subdivision of the State of Florida, shall comply with Executive Order Number 11-

02, dated January 4, 2011, and shall require that contractors utilize the U.S. Department of Homeland

Security’s E-Verify system to verify the employment eligibility of: (a) all persons employed during the contract term by the contractor to perform employment duties within Florida; and (b) all persons (including subcontractors) assigned by the contractor to perform work pursuant to the Contract with the County.

Pursuant to §287.05701, Florida Statutes, the County may not request documentation of or consider a contractor's social, political, or ideological interests when determining if the contractor is a responsible contractor. Further, the County may not give preference to a contractor based on the vendor's social, political, or ideological interests.

2. Instruction to Bidders

2.1 DEFINED TERMS

The term "Bidder" shall mean one who submits a bid directly to the County, as distinct from a sub-bidder, who submits a bid to a Bidder. The term "Responsible and Responsive Bidder" means a person or entity who has submitted a bid which conforms in all material respects to the requirements set forth in the Bidding

Documents and has the capability, in all respects, to perform fully the contract requirements, and the tenacity, perseverance, experience, integrity, reliability, capacity, facilities, equipment, and credit which will assure good faith performance. The term “Successful Bidder” means the most Responsible and Responsive Bidder with the lowest bid who has been selected for award of the Contract. The term “Contract” shall mean the agreement between the Successful Bidder and the County resulting from this ITB. The term “Contract

Documents” includes the Construction Contract, Construction Plans prepared by Chipola, dated April 20, 2025, consisting of information provided in Scope of Work and Attachments sections. The term "Bidding

Documents" includes the Invitation to Bid, Instruction to Bidders, Contract Documents and the Bid Form

(including all addenda issued prior to receipt of bids). The term “Notice of Award” shall mean the form issued by the Purchasing Department awarding the Contract to the Successful Bidder. The term “Notice to Proceed” shall mean the letter issued by the Purchasing Department notifying Successful Bidder to commence work on the Project.

2.2 COPIES OF BIDDING DOCUMENTS

A. Complete sets of Bidding Documents must be used in preparing bids; neither the County nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of

Bidding Documents.

B. The County and Engineer in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining bids on the Project and do not confer a license or grant for any other use.

2.3 QUALIFICATIONS OF BIDDERS

To demonstrate qualifications to perform the Project, each Bidder shall submit with their bid detailed written evidence of experience completing projects of the nature and scope similar to the project described in this

Invitation to Bid, documentation of current commitments, a copy of all applicable occupational and state contractor licenses, and such information as is required in the Vendor Submissions section. Each Bidder must also be prepared to submit within five (5) business days of the County's request, written evidence, such as licenses, financial data, previous experience, present commitments, and other such data as may be requested by the County. Each bid must contain evidence of Bidder's qualification to do business in the State of Florida.

Specifically, the Bidder shall have all licenses and permits required by federal, state, and local statutes, regulations, and ordinances.

2.4 EXAMINATION OF CONTRACT DOCUMENTS AND SITE

https://procurement.opengov.com/portal/waltoncountyfl/projects/166878/document?section=1530025 https://procurement.opengov.com/portal/waltoncountyfl/projects/166878/document?section=1530022 https://procurement.opengov.com/portal/waltoncountyfl/projects/166878/document?section=1530021

A. It is the responsibility of each Bidder before submitting a bid, to (a) examine the Contract Documents thoroughly, (b) visit the Project site to become familiar with local conditions that may affect cost, progress, performance, or completion of the Project, including the time and cost in obtaining any necessary fee or permit, (c) consider federal, state, and local laws and regulations that may affect cost, progress, performance, or completion of the Project, (d) study and carefully correlate Bidder's observations with the Contract Documents, (e) notify the County of any conflicts, errors, or discrepancies in the Contract Documents, and (f) attend any mandatory pre-bid meeting. The County does not assume responsibility for the accuracy or completeness of the Contract Documents or for any additional reports, drawings, and specifications that may be made available for viewing by the County to any Bidder on request.

B. Before submitting a bid, each Bidder will, at the Bidder's own expense, make or obtain any additional information and data which pertain to the physical conditions (surface, subsurface, underground facilities) at or contiguous to the site which may affect cost, progress, performance, or completion of the Project and which Bidder deems necessary to determine its bid for performing and completing the

Project in accordance with the time, price, and other terms and conditions of the Contract Documents.

C. Upon request, in advance, the County will provide each Bidder access to the Project site to conduct such explorations and tests as each Bidder deems necessary for submission of a bid. Bidder shall fill all holes, clean up, and restore the site to its former condition upon completion of such explorations.

D. Temporary construction facilities and storage of materials and equipment will be provided by Bidder.

E. The submission of a bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of these Instructions to Bidders including visiting the Project site to become familiar with local conditions that may affect the cost, progress, performance, or completion of the Project; that without exception the bid is premised upon performing and furnishing of the labor, services, equipment, and materials required by the Contract Documents in accordance with such means, methods, techniques, sequences, or procedures of construction as may be indicated in or required by the Contract Documents; and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and completion of the Project.

2.5 NON-MANDATORY PRE-BID CONFERENCE

A non-mandatory pre-bid conference will be held at 9:00 am on Thursday, June 5, 2025 at Office of Central

Purchasing 176 Montgomery Circle DeFuniak Springs, Florida 32435 OR Bidders may also attend the pre-bid meeting via teleconference by dialing 850-635-0655 EXT 261217.

Bidders attending via teleconference are strongly encouraged to join the teleconference at least 10 minutes before the designated start time. If unable to join the teleconference at the number above, please call 850-

892-8176 and ask to be included in the CR 1883 Improvements Phase 1 pre-bid teleconference.

2.6 INTERPRETATIONS AND ADDENDA

A. All questions about the meaning or intent of the Contract Documents are to be posted on the County's e-Procurement portal accessible via the following link;

https://procurement.opengov.com/portal/waltoncountyfl.

B. Addenda may be issued to modify the Bidding Documents as deemed appropriate by the County.

DIRECTING QUESTIONS TO ANY OTHER COUNTY COMMISSIONER, COUNTY EMPLOYEE, PROJECT ENGINEER, OR ANY OTHER PERSON IS PROHIBITED AND WILL RESULT IN A BID BEING DISQUALIFIED. QUESTIONS MUST

BE SUBMITTED ON THE COUNTY'S E-PROCUREMENT PORTAL AT

https://procurement.opengov.com/portal/waltoncountyfl NO LATER THAN 3:00 pm ON Monday, July 7, 2025. Interpretations or clarifications considered necessary by the County in response to such questions will be issued by Addenda on the County’s e-Procurement portal. Only questions answered by formal written

Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

2.7 BLACKOUT PERIOD

The period between the beginning of the advertisement for the Invitation to Bid, and the contract award, or any resulting bid protest is resolved, or the solicitation is otherwise canceled is referred to as the blackout period. During the blackout period any communication regarding the aforementioned solicitations is prohibited between the Bidder (or its agents or representatives) and any other entity with the potential for a financial interest in the award (or their respective agents or representatives) regarding such competitive solicitation, and any County Commissioner or County employee, selection committee member, or other persons authorized to act on behalf of the County including the County’s architect, engineer, or their sub consultants, or anyone designated to provide a recommendation to award a particular contract, other than

Purchasing Division staff. Each competitive solicitation shall provide notice of the blackout period.

Exceptions to the Blackout Period. The blackout period shall not apply to:

A. Communications at any public proceeding or meeting, including pre-bid conferences, selection committee presentations, or pre-award meetings.

B. Communications during contract negotiations between designated County employees and the contract awardee.

C. Communication with a vendor initiated by a Purchasing Division employee following the bid opening to clarify the vendor’s bid or intended scope of services.

https://procurement.opengov.com/portal/waltoncountyfl athttps://procurement.opengov.com/portal/waltoncountyfl athttps://procurement.opengov.com/portal/waltoncountyfl

D. Communication following the filing of a protest between the protesting party and the Purchasing

Division, County Administrator’s Office, and the County Attorney’s Office, during the dispute resolution process.

E. Purchases exempt from competitive selection, sole source procurements, single source procurements, and emergency procurements, as defined in Walton County Board of County Commissioners

Purchasing Policy and Procedure Manual.

F. Communications with existing vendors in the performance of existing contracts.

2.8 BID SECURITY

A. Each bid must be accompanied by bid security in an amount of five percent (5%) of the Bidder's base bid price made payable to Walton County Board of County Commissioners and in the form of a certified bank check or a bid bond on the form attached, issued by a surety duly authorized and qualified to conduct business in the State of Florida. Further, the surety or insurance company shall have at least an “A-“ policyholder’s rating and a financial rating of at least Class VII and shall be listed on the United States Treasury Department's T-list as acceptable to issue bonds for the applicable dollar amount. Applicable bond documents may be uploaded, but physical checks must be delivered to the

Office of Central Purchasing prior to the bid opening. It is the Bidder’s responsibility to ensure that its bid bond check is delivered at the proper time and place.

B. The bid security of the Successful Bidder will be retained until such Bidder has executed the Contract, and has furnished the required Performance and Payment Bond(s) and Certificates of Insurance. If the

Successful Bidder fails to execute and deliver the Contract, or furnish the required Certificates of

Insurance, within TEN (10) business days after the Notice of Award and the required certified copies of the recorded Performance and Payment bond(s) within THREE (3) business days of receipt of the executed contract, the County may annul the Notice of Award and the bid security of that Bidder will be forfeited. The bid security of other Bidders may be retained by the County until TEN (10) business days after the Notice of Award, whereupon bid security furnished by such Bidders will be returned.

C. Failure to submit an appropriate bid security shall result in the bid being declared unresponsive.

2.9 SUBSTITUTE OR "OR-EQUAL" ITEMS

The use of brand names is for the purpose of describing the standard of quality, performance, and characteristics desired and is not intended to limit or restrict competition. Equipment or materials determined by the County to be substantially equivalent to that equipment or materials specified by brand name will be considered for award.

2.10 CONTRACT TIME AND LIQUIDATED DAMAGES

Contractor shall substantially complete the Project within One Hundred Sixty (160) calendar days of issuance of the Notice to Proceed. Final completion of the project shall be accomplished within Thirty (30) calendar days from the date a punch list of the remaining items to be completed is issued by the County. Failure to achieve substantial completion within the designated time may result in the County imposing liquidated damages in the amount of TWO THOUSAND, SIX HUNDRED SIXTY-SEVEN AND 00/100THS ($2,667.00) per calendar day. Failure to achieve final completion within the designated time may result in the imposition of liquidated damages of TWO THOUSAND, SIX HUNDRED SIXTY-SEVEN AND 00/100THS ($2,667.00) per calendar day and shall accrue until an application for final payment has been approved by the County. These liquidated damages represent a reasonable estimate of the County’s extra expenses and losses for denied use of the facility, financing costs, additional extended overhead, and any lost revenues and do not constitute a penalty or forfeiture.

2.11 BID FORM

A. The Bidder shall use the Bid Form included with the Bidding Documents. Failure to use the Bid Form shall result in the bid being declared un-responsive. All blanks on the Bid Form must be completed in ink by hand or typewritten.

B. Bids by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign), and the corporate seal must be affixed and attested. The corporate address and state of incorporation must be shown below the signature.

C. Bids by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature, and the official address of the partnership must be shown below the signature.

D. All bids shall be notarized and names must be typed or printed below the signature. The bid shall contain an acknowledgement of receipt of all addenda via County’s e-Procurement Portal. The contact person's name, address and telephone number, for communications regarding the bid must be provided.

E. Each Bidder’s submittal shall include all the items listed in the Vendor Submissions section.

2.12 SUBMISSION OF BIDS

All bids submitted on e-Procurement Portal will be securely locked and digitally encrypted until the submission deadline passes. Please note that all bids must be submitted prior to 3:00 pm on Monday, July 7, 2025.

Ensure that all required documents and information are complete and accurately provided before submission.

Upon successful submission through the e-Procurement Portal, you will receive a confirmation email acknowledging receipt of your bid.

Bids received after the specified deadline will not be considered.

Thank you for your attention to these submission instructions. Should you have any questions regarding the bidding process or requirements, feel free to contact the Purchasing Department at purchasing@co.walton.fl.us or call 850.892.8176.

2.13 MODIFICATION AND WITHDRAWAL OF BIDS

A. Bids may be modified or withdrawn by the Bidder by clicking on “Unsubmit Proposal” via County’s e-

Procurement Portal. Bids can be re-submitted at any time prior to the opening of bids.

B. Bids may not be withdrawn for a period of thirty (30) calendar days after the date of bid opening.

2.14 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE

All bids shall remain open and subject to acceptance for a period of thirty (30) calendar days after the date of bid opening, but the County at its sole discretion may release any bid and return the bid security prior to that date.

2.15 AWARD OF CONTRACT

A. The County reserves the right to reject any and all bids for any reason or for no reason as may be deemed necessary by the County to be in its best interest, including but not limited to bids from any contractor who has failed to successfully complete a previous project to the satisfaction of the County.

The County further reserves the right to waive any and all informalities, and reserves the right to reject all nonconforming, unresponsive, unbalanced, or conditional bids. PLEASE NOTE: ANY TERMS, CONDITIONS, OR EXCEPTIONS SUBMITTED WITH A BID SHALL BE DISREGARDED AND HAVE NO

EFFECT UPON THE CONTRACT RESULTING FROM THIS SOLICITATION. The County reserves the right to reject the bid of any Bidder if the County believes that it would not be in the best interest of the

Project to make an award to that Bidder, because the bid is not responsive or responsible, or the

Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the County. The County also reserves the right to enter into contract negotiations with a Responsible and Responsive Bidder who submits the lowest bid. If the County and the low Bidder cannot negotiate a successful contract the County may terminate such negotiations and begin negotiations with a Responsible and Responsive Bidder who submits the next lowest bid. No

Bidder shall have any rights against the County arising from such negotiations. Discrepancies in the multiplication of units of work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Where numeric data is given both in Arabic numerals and in written language, and where there exists a discrepancy between an Arabic numeral and written language, the written language shall be presumed to be correct and the Arabic numeral presumed incorrect.

B. In the event the apparent low bid submitted by a Responsible and Responsive Bidder exceeds the

County's budget for the Project, the County reserves the right to value engineer the published scope of mailto:purchasing@co.walton.fl.us work in order to effect deductive cost changes. In light of the modified scope of work, the County shall review the three lowest bids submitted by Responsible and Responsive Bidders in order to select one

Bidder to whom to award the contract.

C. The County reserves the right to delete any bid items and the total bid shall be determined as the sum of the bid items awarded. In evaluating bids, the County will consider the qualifications of the Bidders, whether or not the bids comply with the prescribed requirements, time of completion and other data, as may be requested in the Bid Form or prior to the Notice of Award. The County may conduct such investigations as the County deems necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications and financial ability of Bidders, proposed Subcontractors, Suppliers, and other persons and organizations to perform and complete the Project in accordance with the Contract

Documents to the County's satisfaction within the prescribed time. The County may consider the operating costs, maintenance requirements, performance data, and guarantees of major items of materials and equipment proposed for incorporation in the Project when such data is required to be submitted prior to Notice of Award.

If the contract is to be awarded, it will be awarded to the Responsible and Responsive Bidder submitting the lowest bid whose evaluation by the County indicates to the County that the award will be in the best interest of the Project. The County will give the Successful Bidder a Notice of Award within thirty (30) days after the day of the bid opening.

2.16 BID PROTEST

Any person or entity whose bid is rejected, in whole or in part, or who submits a bid but is not awarded the contract, may protest such decision. Written notice of intent to file a bid protest must be submitted with the

Purchasing Department or Chief Financial Officer within twenty-four (24) hours after the Board’s declaration of its intention with regard to an award. Written protest must be submitted to Purchasing Director or Chief

Financial Officer within ten (10) calendar days after filing written notice of intent.

Each written protest must be accompanied by a bid protest bond in the form of a certified check, cashier’s check, or money order made payable to the Walton County Board of County Commissioners, in an amount equal to 1% of the protestor’s bid received by the County, but in no case less than $500.00.

The condition of the protest bond shall be that, should the protest be determined to be without merit and non-valid, the bond shall be forfeited to the County in its entirety.

2.17 PUBLIC ENTITY CRIMES

A person or an affiliate who has been placed on the convicted vendor list following a conviction for public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, Florida

Statutes, for CATEGORY TWO for a period of thirty-six (36) months from the date of being placed on the convicted vendors list.

3. Scope of Work

3.1 SCOPE OF WORK FOR RESURFACING CR 1883

1. Summary

This Scope of Work (SOW) outlines the requirements for the resurfacing of the existing roadway on CR 1883, which extends approximately 4.92 miles from the intersection of SR 83 to the intersection of CR 183B in

Walton County, Florida. The project aims to enhance the roadway through milling and resurfacing, upgrading of signage and pavement markings, and implementing minor drainage improvements. FDOT standards and specifications shall apply, including appropriate Maintenance of Traffic (MOT) requirements.

Contractor will need to apply for a National Pollutant Discharge Elimination System (NPDES) permit through the Florida Department of Environmental Protection (FDEP). Please see Form 251B in the Attachments

Section of this ITB.

There is the possibility that gopher tortoises are present at or near the construction site. Additionally, they may establish new burrows within or immediately adjacent to the project work area during the construction of this project. If any existing or new gopher tortoise or burrows are identified during construction, all construction within 25 feet of the burrow must cease and the Contractor must coordinate with the Walton County Project Manager who will then coordinate with the Florida Fish and Wildlife Conservation Commission (FWC) accordingly.

Gopher tortoises and their burrows are protected by state law, and a gopher tortoise relocation permit must be obtained from Florida Fish and Wildlife Conservation Commission (FWC) before disturbing burrows and conducting construction activities (Chapter 68A - 27.003, FL Administrative Code). A disturbance includes any type of work within 25 feet of a gopher tortoise burrow. For information on gopher tortoise relocation permits, refer to the FWC Gopher

Tortoise Permitting Guidelines webpage. For additional guidance, refer to the Gopher Tortoise Enforcement Policy.

2. Detailed Specifications

All work performed on this project must conform to the standards outlined in the following sections.

A. Milling and Resurfacing:

o The existing asphalt surface will be milled to a depth as specified in the plans to adequately prepare the subgrade for resurfacing.

o The resurfacing material shall conform to FDOT Section 320 - Flexible Paving.

o All milling operations must occur in accordance with FDOT Standard Specifications for Road and

Bridge Construction.

B. Drainage Improvements:

https://myfwc.com/wildlifehabitats/profiles/reptiles/gopher-tortoise/ https://www.flrules.org/gateway/ChapterHome.asp?Chapter=68A-27 https://myfwc.com/license/wildlife/gopher-tortoise-permits/permitting-guidelines/ https://myfwc.com/license/wildlife/gopher-tortoise-permits/permitting-guidelines/ https://myfwc.com/license/wildlife/gopher-tortoise-permits/enforcement-policy/ o Minor drainage improvements shall include adjustments to existing structures as per FDOT

Standard Specifications, Section 450.

o All work must conform to drainage standards specified in the project plans and shall maintain proper flow and drainage throughout.

C. Pavement Marking:

o New pavement markings shall conform to FDOT Standard Specifications, Section 700 and the

Manual on Uniform Traffic Control Devices (MUTCD).

o Materials utilized for pavement marking must comply with FDOT specifications regarding durability and visibility.

D. Roadway Signing:

o Upgrade and installation of roadway signing must meet the criteria established within FDOT

Standard Specifications Section 102 and the MUTCD.

o Signs shall be reflective and installed at the locations specified in the provided plans to ensure maximum visibility.

3. Service Requirements

The Contractor is responsible for providing the necessary manpower, materials, equipment, and services to successfully complete the project. The following services are essential:

A. Pre-Construction Meeting:

o A pre-construction meeting shall be scheduled to discuss project details, timelines, safety, and any concerns.

B. Traffic Control Plan:

o The Contractor shall develop and implement a traffic control plan in compliance with FDOT

Standard Plans and Specifications.

o All maintenance of traffic during construction must ensure the safety of the workers and the public.

C. Quality Control:

o The Contractor shall establish a quality control process to regularly monitor construction operations and ensure compliance with project specifications.

o Any deficiencies must be immediately addressed to maintain quality standards.

D. Reporting:

o Weekly progress reports shall be submitted outlining the status of construction activities, any issues encountered, and proposed resolutions.

4. Delivery Requirements

All work performed under this SOW must conform to the following delivery requirements:

A. Completion Timeline:

o The project is to be completed within the timeframe specified in the solicitation, with adherence to the schedule being critical to the success of the project.

o Weather-related delays shall be communicated immediately to Walton County for readjustment of timelines.

B. Work Hours:

o All construction work must be scheduled between the hours of 7:00 AM and 7:00 PM, Monday through Friday, with other hours requiring prior approval from Walton County.

C. Materials Delivery:

o All materials required for the project must be delivered to the site in accordance with the construction schedule.

o Any materials should be checked for compliance with project specifications upon delivery before they are used in the project.

D. Final Inspection:

o A final inspection will take place upon completion of all project work. The Contractor must ensure that all aspects of the project meet or exceed FDOT and Walton County standards.

5. Conclusion

The successful completion of this project will greatly enhance the safety and functionality of CR 1883 in

Walton County, FL. The Contractor is expected to adhere to all outlined specifications, service requirements, and delivery timelines within this Scope of Work.

All questions related to this Scope of Work and the overall solicitation may be directed to the designated contact listed within the solicitation documents.

4. Bid Schedule

BIDS shall include sales tax and all other applicable taxes and fees.

This is a unit price bid. The following Bid Schedule is intended as a general recap of the work involved. It is

NOT an all-inclusive detail of everything required to do this job. It is the contractor’s responsibility to carefully review the Bidding Documents to determine what is needed to do the whole job, and to reflect this in the unit price bid. This basis of award will be the total base bid for the project. IF DURING THE BID PROCESS, THE

CONTRACTOR NOTICES A DISCREPANCY BETWEEN THE WORK REQUIRED AND THIS BID SCHEDULE HE MUST

BRING IT TO THE PURCHASING DIRECTOR'S ATTENTION BEFORE THE BID CLOSING DATE.

NOTE: The unit prices listed below will be used as the basis for computing the value of any change orders either additive or deductive. THE OWNER RESERVES THE RIGHT TO REJECT ANY OR ALL BIDS.

CR 1883 IMPROVEMENTS PHASE 1 PRICING TABLE

Line Item Item # Description Quantity Unit of

Measure Unit Cost Total

1 0101 1 Mobilization 1 LS

2 0102 1 Maintenance of Traffic 190 LS/DA

3 0102 60 Work Zone Signs 4,940 ED

4 0102 74 1 Channelizing Devices-

Types I, II, DI, VP, Drum or LCD

65,550 ED

5 0102 99 Portable Changeable

Message Sign

408 ED

6 0104 10 3 Sediment Barrier 1,899 LF

7 0107 1 Litter Removal and

Disposal

327.75 AC

8 0107 2 Mowing 327.75 AC

9 0110 1 1 Clearing & Grubbing 1.24 AC

10 0110 4 10 Removal of Existing

Concrete

73 SY

11 0160 4 Type B Stabilization 794 SY

Line Item Item # Description Quantity Unit of

Measure Unit Cost Total

12 0285706 Optional Base, Base

Group 06

794 SY

13 0286 1 Turnout

Construction/Driveway

Base - Optional

Materials

1,186 SY

14 0327 70 5 Milling Exist Asph Pavt, 2" Avg Depth

64,611 SY

15 0334 1 52 Superpave Asphaltic

Conc, Traffic B, PG 76-

5,468.7 TN

16 0337 7 80 Asphalt Concrete

Friction Course, Traffic

B, FC-9.5, PG 76-22

3,596.3 TN

17 0430 94 1 Desilting Pipe 0-24" 1,052 LF

18 0430 94 2 Desilting Pipe 25-36" 218 LF

19 0430174115 Pipe Culvert, Optional

Material, Round, 15"SD

50 LF

20 0430174118 Pipe Culvert, Optional

Material, Round, 18"SD

1,220 LF

21 0430174124 Pipe Culvert, Optional

Material, Round, 24"SD

3 LF

22 0430174215 Pipe Culvert, Optional

Material, Other Shape -

Ellip/Arch, 15"SD

57 LF

23 0430174218 Pipe Culvert, Optional

Material, Other Shape -

Ellip/Arch, 18"SD

25 LF

24 0430174224 Pipe Culvert, Optional

Material, Other Shape -

Ellip/Arch, 24"SD

49 LF

Unit Cost Total

25 0430175118 Pipe Culvert, Optional

Material, Round, 18"S/CD

66 LF

26 0430175124 Pipe Culvert, Optional

Material, Round, 24"S/CD

119 LF

27 0430175136 Pipe Culvert, Optional

Material, Round, 36"S/CD

12 LF

28 0430524100 Straight Concrete

Endwalls, 24", Single, 0

Degrees, Round

19 EA

29 0430536200 Straight Concrete

Endwalls, 36", Double, 0 Degrees, Round

1 EA

30 0430830 Filling And Plugging

Pipe- Place Out Of

Service

3 CY

31 0430982125 Mitered End Section, Optional Round, 18"

CD

2 EA

32 0430984123 Mitered End Section, Optional Round, 15" SD

6 EA

33 0430984125 Mitered End Section, Optional Round, 18" SD

82 EA

34 0430984129 Mitered End Section, Optional Round, 24" SD

4 EA

35 0430984623 Mitered End Section, Optional - Ellip/Arch, 15" SD

4 EA

36 0430984625 Mitered End Section, Optional - Ellip/Arch, 18" SD

2 EA

Unit Cost Total

37 0430984629 Mitered End Section, Optional - Ellip/Arch, 24" SD

2 EA

38 0524 1 2 Concrete Ditch

Pavement, Non

Reinforced, 4"

36 SY

39 0530 3 4 Riprap, Rubble, F&I, Ditch Lining

24 TN

40 0530 74 Bedding Stone 17.3 TN

41 0546 71 1 Raised Rumble Strip

Set- Permanent

4 EA

42 0570 1 2 Performance Turf, Sod 14,917 SY

43 0700 1 11 Single Post Sign F&I

Ground Mount, Less

Than 12 SF

55 AS

44 0700 1 500 Single Column Ground

Assembly, Relocate

1 EA

45 0700 1 600 Single Column Ground

Assembly, Remove

38 AS

46 0705 10 1 Object Marker, Type 1 14 EA

47 0705 10 2 Object Marker, Type 2 44 EA

48 0706 1 3 Retro-Reflective

Pavement Markers

2,434 EA

49 0710 90 Final Pavement

Markings

1 LS

50 0710 11101 Painted Pavement

Markings, Standard, White, Solid, 6"

9.997 GM

Unit Cost Total

51 0710 11125 Painted Pavement

Markings, White, Solid, Stop Lines/Crosswalk, 24"

155 LF

52 0710 11131 Painted Pavement

Markings, Standard, White, Skip, 10-30 or 3-

9 Skip, 6" Wide

0.012 GM

53 0710 11160 Painted Pavement

Markings, Standard, White, Message or

Symbol

1 EA

54 0710 11201 Painted Pavement

Markings, Standard, Yellow, Solid, 6"

8.051 GM

55 0710 11231 Painted Pavement

Markings, Standard, Yellow, Skip, 6"

1.089 GM

56 0711 11125 Thermoplastic, Standard, White, Solid, 24" for Stop Line and

Crosswalk

155 LF

57 0711 11160 Thermoplastic, Standard, White, Message or Symbol

1 EA

58 0711 16101 Thermoplastic, Standard, Other

Surfaces, White, Solid, 6"

9.997 GM

59 0711 16131 Thermoplastic, Standard, Other

Surfaces, White, Skip, 10-30 or 3-9 Skip, 6"

Wide

0.012 GM

Unit Cost Total

60 0711 16201 Thermoplastic, Standard, Other

Surfaces, Yellow, Solid, 6"

8.051 GM

61 0711 16231 Thermoplastic, Standard, Other

Surfaces, Yellow, Skip, 6"

1.089 GM

TOTAL

TABLE 2

Measure Unit Cost Total

Bid Alternative

1 0342 1 Geosynthetic Interlayer

Reinforcement System

64,611 SY

2 0334152 Superpave Asphaltic

Conc, Traffic B, PG 26-

5,468.7 TN

3 0337780 Asphalt Concrete

Friction Course, Traffic

B, FC-9.5, PG 76-22

3,596.3 TN

TOTAL

5. Vendor Submissions

All subsections in this section require a response.

Important: Bidders are responsible for reviewing all required forms and documentation listed in this solicitation. If any forms require notarization—such as the Public Entity Crimes Statement or the Unauthorized Alien Affidavit—they must be properly executed and uploaded with your submission. Failure to include completed and notarized documents, where applicable, may result in your bid being deemed non-responsive.

5.1 BIDDER'S DECLARATION AND UNDERSTANDING *

The undersigned, herein defined as the "Bidder," declares that the only persons or parties interested in this bid are those named herein, that this bid is, in all respects, fair and without fraud, that it is made without collusion with any employee or official of the County, and that the bid is made without any connection or collusion with any person submitting another bid on this Project.

The Bidder further declares that it has visited the Project site, inspected the plans and specifications, examined all the Contract Documents, and has satisfied itself to the quantities involved, including materials and equipment and the conditions of work involved, including the fact that the description of work and materials, as included herein, is brief and is intended only to indicate the general nature of the Project and to identify the said quantities with the detailed requirements of the Contract Documents, and this bid is made according to the provisions and under the terms of the Contract Documents which are made a part of this bid.

☐ Please confirm

*Response required

5.2 CONTRACT EXECUTION, CERTIFICATES OF INSURANCE AND BONDS*

The Successful Bidder agrees to acknowledge the terms and conditions of the Contract and return a signed

Contract with any Certificates of Insurance (COI) to the County, within TEN (10) calendar days after Notice of

Award. Upon receipt of the signed Contract and COI, the County will execute the Contract and send the executed contract to the Successful Bidder to acquire the Performance and Payment Bond(s) within THREE (3) business days. The Successful Bidder must provide certified copies of the recorded Performance and Payment

Bond(s) prior to the issuance of the Notice to Proceed. Failure to either return a signed Contract with COI to the County within TEN (10) calendar days after Notice of Award is sent or provide certified copies of the recorded Performance and Payment Bond(s) within THREE (3) business days after receipt of the executed contract will result in loss of surety.

☐ Please confirm

*Response required

5.3 START OF CONSTRUCTION AND CONTRACT COMPLETION TIME*

The Successful Bidder further agrees to begin work on the Project within Ten (10) calendar days after the date of issuance of the Notice to Proceed, to substantially complete the Project within One Hundred Sixty (160) calendar days of issuance of the date of the Notice to Proceed, and to finally complete the Project within

Thirty (30) calendar days from the date a punch list of remaining items is issued by the County. The Contractor shall comply with all specific completion dates and sequences indicated elsewhere in the Contract Documents.

☐ Please confirm

*Response required

5.4 SALES AND USE TAXES*

The Bidder agrees that any and all applicable federal, state and local sales and use taxes that are incurred by the Bidder are included in the stated bid price for the Project. The County is tax exempt from federal excise and state sales tax.

☐ Please confirm

*Response required

5.5 Acknowledgment of Bid Schedule*

By confirming, if awarded the contract, the Bidder agrees to accept as full payment for the work proposed under this Project, as specified in the Bidding Documents prepared by Walton County, and based upon their own estimate of the quantities and costs, including the cost of any necessary fee or permit provided as part of their bid.

☐ Please confirm

*Response required

5.6 BID FORM*

Please download the below documents, complete, and upload.

• BID_FORM_(14).docx

*Response required

5.7 Trench Safety Compliance*

Please download the below documents, complete, and upload.

• TRENCH_SAFETY_COMPLIANCE_(6...

*Response required

5.8 BID BOND*

Will you be utilizing Surety 2000 for submitting your Bid Bond?

https://government-project.s3.us-west-2.amazonaws.com/88564/132b3318-2d92-4ca8-82dc-b8dcc3728e2a_BID_FORM_%2814%29.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HSFM5VFP%2F20250701%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250701T111114Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjENr%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCICwCHHKWQr6%2BYlkq3OFx963rX5JSd5mhQDPF5hiEnqdeAiEA8UUo7pDlLWPrHjYUHxPF7SGH7%2FiA2HnI9OUgTw5EHl4qjAUI0v%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDODUp7m%2Fis14dkorcSrgBNzSHHVJz5WVgAwxmNxYJY%2Fej7kRND9I%2BnqNFFHorVZzIdADM%2BlsZHxLWtBLht4gaDk8vXJWwP3VBTDoqyf8D7rtWk%2BtNN%2BdI8zOJ6WNQoLYXvFyi5fYsbHlzDRyCcRkSFpzndqdyvU2xn67jgX9UVT2XupXf8dVKEzWp22Kj0nzttfMlCk21vRQH1ZcyqXX3QVFASDfzzTv6%2FaKxFoyJ3GrNxHh%2FwbN5wQbc5xm8nkXFZsryenRv0B8ykvPsf%2BQY5BBUdkMyHZm%2BLVfxtt1mJBzkp2Xnn8z5ImC4AfFcjxXkiT8O3XNSAN8K83cp45swWqLSWvwuZzVmb%2BbFEMfewfT1qGsIGcwuwpQZy9pzc7BTYmTsTm8xlTDWMwqWvEm9QS18FMxmH1HEWr9LfSsqpzjX%2BT4C7SseS%2B2P%2FRJoMJ087kuwLo7y5%2FkqcUY4tEkTgBBQyBbV6cdzgNAkjb9RHt6DVhBzPiU4O%2BI6KRaxAk4aNJS5Fn0KNBtbHv0W0hgw%2B3ENu2HESZQTf1lTrK6%2Fs5GLCM3zt7%2BuBJLWoOychooFCDEQG7T4hRbNN%2BjyORixz7C8k1ljFhtwq%2FnQ67HqQ7qbp%2FcEFnp7Md5%2FPm%2F0KnE3m0qnd2nqgB50hYU7pHPUcoAwE3WfMKyIwQCrfIWXmg5RT0YOSwHQILRJURJrxg3qDMoETBXSpOQ2nCkUXm0Zol1MC5pkkLhj5DQykzZNiYF%2FDFK%2FZ1GkS16uu7oQOykDujOorGMA%2BgQnDGKSiOX7FRoN92DKtHrjw4TfPl1FTDKgRoY1qFQ4Jsw0np7UnPtMKrQjsMGOpsBZ%2BVX1Ui1%2B2cYfVnC4ATZEgoftAjqsilGAwi4PXsIYKtVAVYv5pVyuIMOidVh1H%2BXl6YNLsB1qNxtflYJkVkSO%2FzIWbkrs%2FzRqFTFeJZHS%2BIFafw8PT9cGP6Us4AtWqtaAwLiioJZXAeEu3PJoAxu%2Fcxchb%2BdTcUYlTGmmPRnnQESg0Pa%2BDpG5nEclqR%2FctdPGNlW73fAj4cOkCQ%3D&X-Amz-Signature=28fc331017898b81aedc6ce9c1c60aae3d1e29ec0ee76584c2db435c53630041&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22BID_FORM_%2814%29.docx%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/88564/7b510b92-28f5-4224-804c-6e0a0fb1d185_TRENCH_SAFETY_COMPLIANCE_%286%29.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HSFM5VFP%2F20250701%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250701T111114Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjENr%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCICwCHHKWQr6%2BYlkq3OFx963rX5JSd5mhQDPF5hiEnqdeAiEA8UUo7pDlLWPrHjYUHxPF7SGH7%2FiA2HnI9OUgTw5EHl4qjAUI0v%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDODUp7m%2Fis14dkorcSrgBNzSHHVJz5WVgAwxmNxYJY%2Fej7kRND9I%2BnqNFFHorVZzIdADM%2BlsZHxLWtBLht4gaDk8vXJWwP3VBTDoqyf8D7rtWk%2BtNN%2BdI8zOJ6WNQoLYXvFyi5fYsbHlzDRyCcRkSFpzndqdyvU2xn67jgX9UVT2XupXf8dVKEzWp22Kj0nzttfMlCk21vRQH1ZcyqXX3QVFASDfzzTv6%2FaKxFoyJ3GrNxHh%2FwbN5wQbc5xm8nkXFZsryenRv0B8ykvPsf%2BQY5BBUdkMyHZm%2BLVfxtt1mJBzkp2Xnn8z5ImC4AfFcjxXkiT8O3XNSAN8K83cp45swWqLSWvwuZzVmb%2BbFEMfewfT1qGsIGcwuwpQZy9pzc7BTYmTsTm8xlTDWMwqWvEm9QS18FMxmH1HEWr9LfSsqpzjX%2BT4C7SseS%2B2P%2FRJoMJ087kuwLo7y5%2FkqcUY4tEkTgBBQyBbV6cdzgNAkjb9RHt6DVhBzPiU4O%2BI6KRaxAk4aNJS5Fn0KNBtbHv0W0hgw%2B3ENu2HESZQTf1lTrK6%2Fs5GLCM3zt7%2BuBJLWoOychooFCDEQG7T4hRbNN%2BjyORixz7C8k1ljFhtwq%2FnQ67HqQ7qbp%2FcEFnp7Md5%2FPm%2F0KnE3m0qnd2nqgB50hYU7pHPUcoAwE3WfMKyIwQCrfIWXmg5RT0YOSwHQILRJURJrxg3qDMoETBXSpOQ2nCkUXm0Zol1MC5pkkLhj5DQykzZNiYF%2FDFK%2FZ1GkS16uu7oQOykDujOorGMA%2BgQnDGKSiOX7FRoN92DKtHrjw4TfPl1FTDKgRoY1qFQ4Jsw0np7UnPtMKrQjsMGOpsBZ%2BVX1Ui1%2B2cYfVnC4ATZEgoftAjqsilGAwi4PXsIYKtVAVYv5pVyuIMOidVh1H%2BXl6YNLsB1qNxtflYJkVkSO%2FzIWbkrs%2FzRqFTFeJZHS%2BIFafw8PT9cGP6Us4AtWqtaAwLiioJZXAeEu3PJoAxu%2Fcxchb%2BdTcUYlTGmmPRnnQESg0Pa%2BDpG5nEclqR%2FctdPGNlW73fAj4cOkCQ%3D&X-Amz-Signature=08532c5b2ac5df9b3abd8cc3c33aeb4343397dd791dc00f5dafeadbb4bfac18e&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22TRENCH_SAFETY_COMPLIANCE_%286%29.docx%22&x-id=GetObject

☐ Yes

☐ No

*Response required

When equals "Yes"

8.1. Surety 2000 Electronic Bid Bond*

Please enter your Bid Bond information from Surety2000 below.

If you would like to use your preferred surety, please select "No" to the above question.

*Response required

When equals "No"

Bid Bond*

Please download the below documents, complete, and upload.

• 3.0_Walton_County_Florida_B...

*Response required

5.9 PREVIOUS EXPERIENCE AND CURRENT COMMITMENTS*

Please download the below documents, complete, and upload.

• PREVIOUS_EXPERIENCE_AND_CUR...

*Response required

5.10 SUBCONTRACTORS AND SUPPLIERS DECLARATION*

Please download the below documents, complete, and upload.

• SUBCONTRACTORS_AND_SUPPLIER...

*Response required

5.11 PUBLIC ENTITY CRIMES*

Please download the below documents, complete and have notarized.