Counterfeit Prevention Plan.pdf

PDF 141 KB Posted

Attached to
Panel, Manual Trim Federal contract opportunity
Solicitation number
SPRHA4-25-R-0123
Issued by
Defense Logistics Agency Aviation

About this file

This is a Contract Data Requirements List (DD Form 1423-1) specifying the delivery requirements for a Counterfeit Prevention Plan (CPP) under contract FD2020-25-00123 for Panel, Manual Trim. The document requires the contractor to submit the CPP within 30 calendar days after contract award to the 416 SCMS/GUEAA office at Hill AFB, UT.

The CPP must follow Distribution Statement "D" restrictions for DoD and DoD contractors only, with export control warnings due to critical technology. The submission process requires a Letter of Transmittal and email delivery to richard.day.20@us.af.mil. If remediation is needed, the government will provide comments within 14 days, and the contractor must resubmit within 7 days of receiving comments. The document specifies no cost (NSP - Not Separately Priced) for this deliverable, with one draft and one final copy required.

View the file

Other files for this federal contract opportunity

Other files attached to Panel, Manual Trim, newest first.
File Type Posted
Packaging Statement of Work.pdf PDF
Engineering Data Requirements.pdf PDF
Engineering Data List.pdf PDF
Manufacturing Qualification Requirements.pdf PDF
SPRHA425R0123 CUI SSI.pdf PDF
Unmarked Eng Data.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

A MISC

Panel, Manual Trim FD2020-25-00123

A001 Counterfeit Prevention Plan CPP

DI-MISC-81832 CLIN for Data 416 SCMS/GUEAA

LT

A D

ONE/R

SEE BLK 16

SEE BLK 16

SEE BLK 16

416 SCMS/ 1 1

GUEAA

6070 Gum LN Bldg. 1213 Hill AFB, UT 84056-5826

SEE BLK 16

1 1 0

NOTE: Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4: Contractor Format Acceptable.

2. Blocks 7, 8, 14: The contractor shall submit a Letter of Transmittal and send the Contractors Counterfeit Protection Plan (CPP) via e-mail to:

richard.day.20@us.af.mil

3. Blocks 8, 10, 11, 12, 13: The contractor shall deliver the Counterfeit prevention Plan (CPP) NLT thirty (30) calendar days after contract award. If any remediation is required the Government comments will be provided to the contractor within fourteen (14) calendar days after receipt. If requested the contractor shall resubmit the CPP NLT seven (7) calendar days after receipt of Government comments.

4. Block 9: Distribution Statement, Export Control Warning shall be IAW DoD Instruction 5230.24

The following Distribution Statement shall be placed on the first sheet of each document and/or associated lists.

DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical technology). (Nov 24). Other requests for this document must be referred to 416 SCMS/GUEAB, Hill AFB, UT 84056-5826.

EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that determined to contain export-controlled technical data shall be marked with the following statement:

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

NSP

0.00

Nov 14 2024 Nov 14 2024

1 2

PINNEGAR.STEPH

ANIE.A.1102660737

Digitally signed by

PINNEGAR.STEPHANIE.A.1102660737

Date: 2024.11.14 13:08:09 -07'00'

DAY.RICHARD.AR

ON.1546810042

Digitally signed by

DAY.RICHARD.ARON.1546810042

Date: 2024.11.14 14:34:22 -07'00'

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

Page of Pages

A MISC

Panel, Manual Trim FD2020-25-00123

2 2

File details come from the government source that posted it. Updated .