Contract Map - Longshanks.pdf
PDF 5 MB Posted
- Attached to
- Longshanks IRSC Stewardship Federal contract opportunity
- Solicitation number
- 129JGP20R4007
About this file
This document includes a federal contract opportunity notice and related contract area map for a stewardship project on the Eldorado National Forest. The solicitation is for a stewardship contract to conduct post-fire restoration treatments across 3,746 acres impacted by the 2014 King Fire. The work includes six mandatory contract items such as cutting and machine piling of trees, grapple piling, and skidding and removal of 5,000 tons of biomass material. Three optional items are also included related to additional cutting and piling work. Objectives are to prepare sites for conifer reestablishment and reduce greenhouse gases through biomass removal. The response due date is 60 days from issuance, with a pre-bid meeting scheduled for April 28, 2020. Interested parties should monitor the Federal Business Opportunities website for amendments and direct technical questions to the listed contact.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix A - Longshanks.rev1.pdf | ||
| 129JGP20R4007 - Amendment 2.pdf | ||
| Site Visit Canceled 5.4.20.pdf | ||
| 129JGP20R4007 - Amendment 1.pdf | ||
| Experience Questionnaire.docx | DOCX document | |
| Standard TS Road Maintenance Specs July 2012.pdf | ||
| Fire Plan - Longshanks.pdf | ||
| 129JGP20R4007.pdf | ||
| Wage Determination 1977-0727.pdf | ||
| Appendix C - Longshanks Table.pdf | ||
| Appendix A - Longshanks.pdf | ||
| Appendix B - Longshanks.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
540 0
50 0
50 0 0
GE
OR
GE
TO
WN
RANGER
DISTRICT
AM
ER
IC
AN
RIVER
RANGER
DISTRICT
EL DORADO CO
PLACER
C O
PLACER CO
GEORGETOWN
RD
P L
A C
E R
C O
E L
D O
R A
D O
C O
GE
OR
GE
TO
WN
RD
PACIFIC
RD
PLACER
C O
PA
CI
FI
C
RD
EL DORADO
C O
EL
DO
RADO
C O
Tai ling s
Uncle Tom Cabin
Ramsey Crossing
McCulloh
Hales Crossing
Dawpit Spring RUBICON
RI
VE
R
Spring
Pilot
Creek
Desert Cold Spring
South
Cr eek
Lo n g
Jo hn
Cr eek
Bear Springs
Spring
Spring
Horse Spring
Spring
RUBICON
RIVER
South
Fork
Rubicon
River
McCulloh Spring
Stony Cr eek
Spring
Deer
Creek
Spring
Devil Peak
Little
Wallace
Cany on
S o u t h
Fo r k
SI
LV
ER
HILL
RID
GE
N E
V A
D A
P O
I N
T
R I
D G
E
Ro os t
Ca ny on
Big
Grizz ly
Ca ny on
Low er
Mead ow
Jerry Canyon L o n g
Ca n y o n
No rth
Wallace
Canyon
Little Crater
NEVADA
POINT
RID
GE
Wallace Canyon
N o r t h
F o r k
Sout h
Wa lla ce Ca ny on
N E V A D A P O I N T R I D G E
R A
L S
T O
N R
I D
G E
South
Wallace
Ca ny on
T1 4 N
R
E T1
4 N R
E
T14 N R13 E T13 N R13 E
T14 N R14 E T13 N R14 E
T12 N R13 E T13 N R13 E
T1 2 N
R
E T1
2 N R
E
T13 N R13 E T13 N R14 E
T12 N R14 E T13 N R14 E
29 28
6 5
30 29
13N42
N2
9P
14N16
N3
N2
2A B
17N02CC
14N22GB
14N25NB
14N08R
12N29C
14N08N
N2
5P A
14N08H
14N17BN
N0
8A
12N39
14N25L
N4
7C
14N22X
12N39B
14N08M
N2
5A
12N 47A
14N22F
13N33A
14N 21B
12N 39C
14N12A
14N11B
17N02CD
12N29J
13N42BW
12N47B
14N22E
13N65C
EL
D-6
17N02CB
12N98
14N08L
N2
5M
N2
5N A
13N71
N9
1A
14N25P
N1
1E
N2 9U
N1
6A
13N96
13N40A
14N20A
14N 10E
S
13N42D
14N22G
N1
2B
14N08D14 N0
8B 14N
22D
13N33
N3
12N46
14N08G
14N 17B
12N39
13N71
12N29Z
14N
N1
13N42E
13N76
14N10H
13N42F 13N
N4
NY
14N22H
13N 34A
12N39A
13N42C
13N42B
N3
9A
N1
7A
14N10C
N1
1C
12N47
14N22J
N1
13N68
14N19B
17N02C
13N34
13N 65B
14N08C
13N39B
14N08E
13N
14N10D
13N41
N2
2C
14N22A
13N67
13N74
12N39
13N73
13N10
14N17
14N08F
14N10E
14N22
13N39
14N
N2
014N19
14N12
14N
14N21
14N08
10 11
Item 3 - Pushing or Falling and Machine Piling Contract Area Map Section C.4, Appendix A Item 6 - Pushing or Falling and Machine Piling in 2020 Contract Area Map Section C.4, Appendix A, Restrictions Section F.4
Item 1 - Dead Tree Cutting and Machine Piling Contract Area Map Section C.4, Appendix A Item 2 - Grapple Piling, Contract Area Map Section C.4, Appendix A
Existing System Roads, Section H.7 and H.8, Road Maintenance Requirements Appendix C, Includes main acces roads below
Special Contract Restrictions, Section F.4, K-G.4.1#, Snag Retention H.12, No operations permitted Protected Streamcourse, Section H.9, 10' no cutting and equipment exclusion each side, (Ephemeral Stream)
Protected Streamcourse, Section H.19, 50' no cutting and equipment exclusion each side, (Intermittent Stream)
Controlled Area, No operations permitted within zones flagged in solid pink with purple and black stripe, Section H.12 Actual locations are not shown on this map. Contact District Office for map showing CA-1 areas.
Controlled Area, No operations permitted within zones flagged in pink and chartreuse flagging (CA-2) or zones flagged with orange "noxious weed" flagging (CA-3), Section H.12, Section H.17
Protection of Improvements, (Gate), Section C.4 Road and Water Supply Use, K-F.3.5#, Section F.4
Land Survey Monuments, Section H.11
Ground Based Skidding, Appendix B- G.4.2, K-G.4.2#, applicable to entire Contract Area Slash Requirements, K-G.7#, applicable to all landings
Other Ownership, Appendix A applicable to entire Contract Area Forest Wide Average of Forest Service Weather Stations, Appendix D
Protected Streamcourse, Section H.19, 100' no cutting and equipment exclusion each side, (Perennial Stream)
TRAC, SUSP,
SPACE
PAL
Protected Streamcourse, Section H.19, 25' no cutting and equipment exclusion each side, (Ephemeral Stream)
Protected Streamcourse, Section H19, 100' no cutting and equipment exclusion each side, (Intermittent Stream)
Longshanks CCI Grant Stewardship Contract
1/22/2020 T:\FS\NFS\Eldorado\Program\2400TimberMgmt\GIS\Georgetown\Longshanks\MXD\Longshanks_Contract_Map_NOARCH.mxd
0 2,000 4,0001,000 Feet
Main Access Roads
Optional Item 7 - Pushing or Falling and Machine Piling in 2020 Contract Area Map Section C.4, Appendix A, Restrictions Section F.4
Limited Operating Period, unless otherwise agreed work shall not begin until after June 1, 2020, Section F.4 or or
Georgetown Ranger District, Eldorado National Forest
Optional Item 8 - Placing coverings on machine piles and/or windrows Contract Area Map Section C.4, Appendix AProject Area
Units 16, 18, 19, 21, 26-28, 46, 50-53, 57, 58, 60, 62, 63, 65-67, 69 70 Section F.4, Section H.17
Equipment Cleaning
Deck and Machine Pile
Erosion prevention and control, Section F.4, Section H.18, Appendex B5 acres
Optional Item 9 - Grapple Piling Contract Area Map Section C.4, Appendix A
Acres 1 - Dead Tree Cutting and Machine Piling 461
1 16 2 6 3 17 4 7 5 6 6 10 7 22 8 4 9 25
10 4 11 7 12 5 13 9 15 97 16 18 17 17 18 24 19 11 20 73 21 11 22 24 23 7 24 4 25 19 26 18
2 - Grapple Piling 372 31 65 32 13 34 48 35 48 36 27 37 40 38 65 39 6 40 14 41 46
3 - Pushing or Falling and Machine Piling 1417 14 52 42 119 43 189 44 127 46 77 47 7 48 13 49 11 50 54 51 94 52 35 57 277 58 26 59 8 60 49 61 56 62 36 63 29 66 96 67 52 68 10
6 - Pushing or Falling and Machine Piling 149 71 40 72 28 73 18 74 13 75 41 76 9
Optional 7 - Pushing or Falling and Machine Piling 509 45 52 64 65 65 73 69 6 70 10 77 15 78 33 79 9 80 39 81 4 82 13 83 6 84 16 85 39 86 4 87 12 88 8 89 14 90 54 91 10 92 2 93 6 94 19
Optional 8 - placing coverings on piles 3327 Optional 9 - Grapple Piling 419
27 183 28 107 29 22 30 38 33 21 53 23 54 11 55 6 56 8
File details come from the government source that posted it. Updated .