Contract Map - Longshanks.pdf

PDF 5 MB Posted

Attached to
Longshanks IRSC Stewardship Federal contract opportunity
Solicitation number
129JGP20R4007
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

This document includes a federal contract opportunity notice and related contract area map for a stewardship project on the Eldorado National Forest. The solicitation is for a stewardship contract to conduct post-fire restoration treatments across 3,746 acres impacted by the 2014 King Fire. The work includes six mandatory contract items such as cutting and machine piling of trees, grapple piling, and skidding and removal of 5,000 tons of biomass material. Three optional items are also included related to additional cutting and piling work. Objectives are to prepare sites for conifer reestablishment and reduce greenhouse gases through biomass removal. The response due date is 60 days from issuance, with a pre-bid meeting scheduled for April 28, 2020. Interested parties should monitor the Federal Business Opportunities website for amendments and direct technical questions to the listed contact.

View the file

Other files for this federal contract opportunity

Other files attached to Longshanks IRSC Stewardship, newest first.
File Type Posted
Appendix A - Longshanks.rev1.pdf PDF
129JGP20R4007 - Amendment 2.pdf PDF
Site Visit Canceled 5.4.20.pdf PDF
129JGP20R4007 - Amendment 1.pdf PDF
Experience Questionnaire.docx DOCX document
Standard TS Road Maintenance Specs July 2012.pdf PDF
Fire Plan - Longshanks.pdf PDF
129JGP20R4007.pdf PDF
Wage Determination 1977-0727.pdf PDF
Appendix C - Longshanks Table.pdf PDF
Appendix A - Longshanks.pdf PDF
Appendix B - Longshanks.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

540 0

50 0

50 0 0

GE

OR

GE

TO

WN

RANGER

DISTRICT

AM

ER

IC

AN

RIVER

RANGER

DISTRICT

EL DORADO CO

PLACER

C O

PLACER CO

GEORGETOWN

RD

P L

A C

E R

C O

E L

D O

R A

D O

C O

GE

OR

GE

TO

WN

RD

PACIFIC

RD

PLACER

C O

PA

CI

FI

C

RD

EL DORADO

C O

EL

DO

RADO

C O

Tai ling s

Uncle Tom Cabin

Ramsey Crossing

McCulloh

Hales Crossing

Dawpit Spring RUBICON

RI

VE

R

Spring

Pilot

Creek

Desert Cold Spring

South

Cr eek

Lo n g

Jo hn

Cr eek

Bear Springs

Spring

Spring

Horse Spring

Spring

RUBICON

RIVER

South

Fork

Rubicon

River

McCulloh Spring

Stony Cr eek

Spring

Deer

Creek

Spring

Devil Peak

Little

Wallace

Cany on

S o u t h

Fo r k

SI

LV

ER

HILL

RID

GE

N E

V A

D A

P O

I N

T

R I

D G

E

Ro os t

Ca ny on

Big

Grizz ly

Ca ny on

Low er

Mead ow

Jerry Canyon L o n g

Ca n y o n

No rth

Wallace

Canyon

Little Crater

NEVADA

POINT

RID

GE

Wallace Canyon

N o r t h

F o r k

Sout h

Wa lla ce Ca ny on

N E V A D A P O I N T R I D G E

R A

L S

T O

N R

I D

G E

South

Wallace

Ca ny on

T1 4 N

R

E T1

4 N R

E

T14 N R13 E T13 N R13 E

T14 N R14 E T13 N R14 E

T12 N R13 E T13 N R13 E

T1 2 N

R

E T1

2 N R

E

T13 N R13 E T13 N R14 E

T12 N R14 E T13 N R14 E

29 28

6 5

30 29

13N42

N2

9P

14N16

N3

N2

2A B

17N02CC

14N22GB

14N25NB

14N08R

12N29C

14N08N

N2

5P A

14N08H

14N17BN

N0

8A

12N39

14N25L

N4

7C

14N22X

12N39B

14N08M

N2

5A

12N 47A

14N22F

13N33A

14N 21B

12N 39C

14N12A

14N11B

17N02CD

12N29J

13N42BW

12N47B

14N22E

13N65C

EL

D-6

17N02CB

12N98

14N08L

N2

5M

N2

5N A

13N71

N9

1A

14N25P

N1

1E

N2 9U

N1

6A

13N96

13N40A

14N20A

14N 10E

S

13N42D

14N22G

N1

2B

14N08D14 N0

8B 14N

22D

13N33

N3

12N46

14N08G

14N 17B

12N39

13N71

12N29Z

14N

N1

13N42E

13N76

14N10H

13N42F 13N

N4

NY

14N22H

13N 34A

12N39A

13N42C

13N42B

N3

9A

N1

7A

14N10C

N1

1C

12N47

14N22J

N1

13N68

14N19B

17N02C

13N34

13N 65B

14N08C

13N39B

14N08E

13N

14N10D

13N41

N2

2C

14N22A

13N67

13N74

12N39

13N73

13N10

14N17

14N08F

14N10E

14N22

13N39

14N

N2

014N19

14N12

14N

14N21

14N08

10 11

Item 3 - Pushing or Falling and Machine Piling Contract Area Map Section C.4, Appendix A Item 6 - Pushing or Falling and Machine Piling in 2020 Contract Area Map Section C.4, Appendix A, Restrictions Section F.4

Item 1 - Dead Tree Cutting and Machine Piling Contract Area Map Section C.4, Appendix A Item 2 - Grapple Piling, Contract Area Map Section C.4, Appendix A

Existing System Roads, Section H.7 and H.8, Road Maintenance Requirements Appendix C, Includes main acces roads below

Special Contract Restrictions, Section F.4, K-G.4.1#, Snag Retention H.12, No operations permitted Protected Streamcourse, Section H.9, 10' no cutting and equipment exclusion each side, (Ephemeral Stream)

Protected Streamcourse, Section H.19, 50' no cutting and equipment exclusion each side, (Intermittent Stream)

Controlled Area, No operations permitted within zones flagged in solid pink with purple and black stripe, Section H.12 Actual locations are not shown on this map. Contact District Office for map showing CA-1 areas.

Controlled Area, No operations permitted within zones flagged in pink and chartreuse flagging (CA-2) or zones flagged with orange "noxious weed" flagging (CA-3), Section H.12, Section H.17

Protection of Improvements, (Gate), Section C.4 Road and Water Supply Use, K-F.3.5#, Section F.4

Land Survey Monuments, Section H.11

Ground Based Skidding, Appendix B- G.4.2, K-G.4.2#, applicable to entire Contract Area Slash Requirements, K-G.7#, applicable to all landings

Other Ownership, Appendix A applicable to entire Contract Area Forest Wide Average of Forest Service Weather Stations, Appendix D

Protected Streamcourse, Section H.19, 100' no cutting and equipment exclusion each side, (Perennial Stream)

TRAC, SUSP,

SPACE

PAL

Protected Streamcourse, Section H.19, 25' no cutting and equipment exclusion each side, (Ephemeral Stream)

Protected Streamcourse, Section H19, 100' no cutting and equipment exclusion each side, (Intermittent Stream)

Longshanks CCI Grant Stewardship Contract

1/22/2020 T:\FS\NFS\Eldorado\Program\2400TimberMgmt\GIS\Georgetown\Longshanks\MXD\Longshanks_Contract_Map_NOARCH.mxd

0 2,000 4,0001,000 Feet

Main Access Roads

Optional Item 7 - Pushing or Falling and Machine Piling in 2020 Contract Area Map Section C.4, Appendix A, Restrictions Section F.4

Limited Operating Period, unless otherwise agreed work shall not begin until after June 1, 2020, Section F.4 or or

Georgetown Ranger District, Eldorado National Forest

Optional Item 8 - Placing coverings on machine piles and/or windrows Contract Area Map Section C.4, Appendix AProject Area

Units 16, 18, 19, 21, 26-28, 46, 50-53, 57, 58, 60, 62, 63, 65-67, 69 70 Section F.4, Section H.17

Equipment Cleaning

Deck and Machine Pile

Erosion prevention and control, Section F.4, Section H.18, Appendex B5 acres

Optional Item 9 - Grapple Piling Contract Area Map Section C.4, Appendix A

Acres 1 - Dead Tree Cutting and Machine Piling 461

1 16 2 6 3 17 4 7 5 6 6 10 7 22 8 4 9 25

10 4 11 7 12 5 13 9 15 97 16 18 17 17 18 24 19 11 20 73 21 11 22 24 23 7 24 4 25 19 26 18

2 - Grapple Piling 372 31 65 32 13 34 48 35 48 36 27 37 40 38 65 39 6 40 14 41 46

3 - Pushing or Falling and Machine Piling 1417 14 52 42 119 43 189 44 127 46 77 47 7 48 13 49 11 50 54 51 94 52 35 57 277 58 26 59 8 60 49 61 56 62 36 63 29 66 96 67 52 68 10

6 - Pushing or Falling and Machine Piling 149 71 40 72 28 73 18 74 13 75 41 76 9

Optional 7 - Pushing or Falling and Machine Piling 509 45 52 64 65 65 73 69 6 70 10 77 15 78 33 79 9 80 39 81 4 82 13 83 6 84 16 85 39 86 4 87 12 88 8 89 14 90 54 91 10 92 2 93 6 94 19

Optional 8 - placing coverings on piles 3327 Optional 9 - Grapple Piling 419

27 183 28 107 29 22 30 38 33 21 53 23 54 11 55 6 56 8

File details come from the government source that posted it. Updated .