Construction Cost Breakdown Form.xls
XLS spreadsheet 57 KB Posted
- Attached to
- Exterior Lighting Upgrade - Fort Devens, MA Federal contract opportunity
- Solicitation number
- W15QKN-25-Q-A164
About this file
The Construction Cost Breakdown Form is an Excel spreadsheet template designed for contractors to detail project costs for the Exterior Lighting Upgrade project at Fort Devens, MA. The form provides a structured format for breaking down labor, equipment, and material costs, including columns for quantity, unit measure, manhours, crew skill sets, and total costs. It includes sections for general contractor overhead, profit, and bonding, with placeholders for calculating unit costs and total expenses across different project components.
The related federal contract opportunity (Solicitation Number W15QKN-25-Q-A164) is a 100% Service-Disabled Veteran-Owned Small Business set-aside for electrical construction services at Building 3413. The project involves demolishing and installing upgraded exterior lighting, with a firm-fixed-price contract and a 180-day performance period. Key dates include a mandatory site visit on June 3, 2025, and proposal submission deadline prior to that date. The contract is issued by the U.S. Army Contracting Command - New Jersey, with a NAICS code of 238210 and a size standard of $45 million. Contractors must submit a detailed technical capability statement, cost breakdown form, and meet specific requirements including SAM registration and insurance documentation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W15QKN25QA1640001 SF 30.pdf | ||
| B3413 Propose Exterior Lighting Plan.png | PNG image | |
| 25-Q-A164 - Exterior Lighting - Questions and Answers (1).docx | DOCX document | |
| Solicitation - W15QKN25QA164 (Released).pdf | ||
| 25-Q-A164 - DBA WD MA20250001 (d. 04.04.2025).pdf | ||
| B3413 Exterior Lighting Upgrades - PWS (d. 03.14.2025).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| ID | Sort | Type | Description (to include labor,equipment, material type and grade) | Quantity | Unit Measure | Labor in Manhours | Equipment | Material | Total Cost | ||||||||
| Crew (skill set) | Labor Hours | Total Hrs | City Cost Index | Unit Cost* | Total Labor Cost* | Unit Cost | Total Equipment Cost | City Cost Index | Unit Cost | Total Material Cost | |||||||
| Totals | |||||||||||||||||
| GENERAL CONTRACTOR | |||||||||||||||||
| OVERHEAD | $ - 0 | ||||||||||||||||
| $ - 0 | |||||||||||||||||
| PROFIT | $ - 0 | ||||||||||||||||
| $ - 0 | |||||||||||||||||
| BOND | $ - 0 | ||||||||||||||||
| GRAND TOTAL | $ - 0 | ||||||||||||||||
| Unit Cost* | Cost for one labor hour of the specified crew | ||||||||||||||||
| Total Labor Cost* | "=Unit Cost x Total Hours" |