Construction Cost Breakdown Form.xls

XLS spreadsheet 57 KB Posted

Attached to
Exterior Lighting Upgrade - Fort Devens, MA Federal contract opportunity
Solicitation number
W15QKN-25-Q-A164
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

The Construction Cost Breakdown Form is an Excel spreadsheet template designed for contractors to detail project costs for the Exterior Lighting Upgrade project at Fort Devens, MA. The form provides a structured format for breaking down labor, equipment, and material costs, including columns for quantity, unit measure, manhours, crew skill sets, and total costs. It includes sections for general contractor overhead, profit, and bonding, with placeholders for calculating unit costs and total expenses across different project components.

The related federal contract opportunity (Solicitation Number W15QKN-25-Q-A164) is a 100% Service-Disabled Veteran-Owned Small Business set-aside for electrical construction services at Building 3413. The project involves demolishing and installing upgraded exterior lighting, with a firm-fixed-price contract and a 180-day performance period. Key dates include a mandatory site visit on June 3, 2025, and proposal submission deadline prior to that date. The contract is issued by the U.S. Army Contracting Command - New Jersey, with a NAICS code of 238210 and a size standard of $45 million. Contractors must submit a detailed technical capability statement, cost breakdown form, and meet specific requirements including SAM registration and insurance documentation.

View the file

Other files for this federal contract opportunity

Other files attached to Exterior Lighting Upgrade - Fort Devens, MA, newest first.
File Type Posted
Solicitation Amendment W15QKN25QA1640001 SF 30.pdf PDF
B3413 Propose Exterior Lighting Plan.png PNG image
25-Q-A164 - Exterior Lighting - Questions and Answers (1).docx DOCX document
Solicitation - W15QKN25QA164 (Released).pdf PDF
25-Q-A164 - DBA WD MA20250001 (d. 04.04.2025).pdf PDF
B3413 Exterior Lighting Upgrades - PWS (d. 03.14.2025).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

IDSortTypeDescription (to include labor,equipment, material type and grade)QuantityUnit MeasureLabor in ManhoursEquipmentMaterialTotal Cost
Crew (skill set)Labor HoursTotal HrsCity Cost IndexUnit Cost*Total Labor Cost*Unit CostTotal Equipment CostCity Cost IndexUnit CostTotal Material Cost
Totals
GENERAL CONTRACTOR
OVERHEAD$ - 0
$ - 0
PROFIT$ - 0
$ - 0
BOND$ - 0
GRAND TOTAL$ - 0
Unit Cost*Cost for one labor hour of the specified crew
Total Labor Cost*"=Unit Cost x Total Hours"

File details come from the government source that posted it. Updated .