Please see Amendment 02

View the file

Other files for this federal contract opportunity

Other files attached to Concrete Repair Project, newest first.
File Type Posted
IMG_8267.JPG JPG image
Amendment_03.pdf PDF
ORIGIN~1.PDF PDF
IMG_8285.JPG JPG image
IMG_8266.JPG JPG image
IMG_8262.JPG JPG image
IMG_8256.JPG JPG image
IMG_8252.JPG JPG image
IMG_8247.JPG JPG image
IMG_8260.JPG JPG image
IMG_8244.JPG JPG image
IMG_8291.JPG JPG image
IMG_8301.JPG JPG image
IMG_8271.JPG JPG image
IMG_8297.JPG JPG image
IMG_8298.JPG JPG image
IMG_8284.JPG JPG image
IMG_8290.JPG JPG image
IMG_8303.JPG JPG image
IMG_8245.JPG JPG image
IMG_8296.JPG JPG image
IMG_8287.JPG JPG image
IMG_8249.JPG JPG image
IMG_8257.JPG JPG image
IMG_8255.JPG JPG image
IMG_8276.JPG JPG image
IMG_8309.JPG JPG image
IMG_8306.JPG JPG image
IMG_8302.JPG JPG image
IMG_8307.JPG JPG image
IMG_8253.JPG JPG image
IMG_8263.JPG JPG image
IMG_8273.JPG JPG image
IMG_8259.JPG JPG image
IMG_8300.JPG JPG image
IMG_8251.JPG JPG image
IMG_8305.JPG JPG image
IMG_8268.JPG JPG image
IMG_8258.JPG JPG image
IMG_8279.JPG JPG image
IMG_8288.JPG JPG image
IMG_8242.JPG JPG image
IMG_8272.JPG JPG image
IMG_8292.JPG JPG image
IMG_8267.JPG JPG image
IMG_8246.JPG JPG image
IMG_8294.JPG JPG image
IMG_8270.JPG JPG image
Amendment_01.pdf PDF
RFP_536_Concrete_Repairs_Project.pdf PDF
Show all 50

Concrete Repair Project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Contract ID Code Page of Pages

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)

02 September 4, 2018 EQ5P2SS1P-18-0085

6. ISSUED BY 7. ADMINISTERED BY (If other than Item 6)

General Services Administration AMD, Chicagoland Construction Contracting Team 230 S. Dearborn St., Suite 3600 Chicago, IL 60604

Same as Block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Country, State and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.

EQ5P2SS1P-18-0085

X 9B. DATED (SEE ITEM 11)

August 2, 2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM

14.

() A. THIS ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINSTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN

ITEM

14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return ____ copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Solicitation # EQ5P2SS1P-18-0085, Amendment 02 Concrete Repair and Waterproofing Project located at 536 S. Clark Street Chicago, IL 60605

Amendment 02 is issued to:

1) Extend the RFP closing date from September 7, 2018 to September 13, 2018.

2) Issue responses to submitted RFI’s

3) Issue the walkthrough sign in sheet

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE

SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous Edition unusable

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA FAR (48 CFR) 53.243

RFI’s 536 Concrete Repairs Project

Q1. Page 8 of 27 of RFP, Factor 2 states Offeror must submit a PPQ for each project in factor 1. Then it states that PPQs shall be submitted by the references directly to the government. Please confirm whether the Offeror or References are responsible for submitting the PPQs to government.

Answer: Offeror may submit with contact name, email address and direct phone number for the reference.

Q2. Can project experience of key subcontractors be used to fulfill Factor 1?

Answer: If and only if the key subcontractor will be used on this project.

Q3. General Note F throughout the Drawings state to “scrape all loose paint down to the substrate, prep, prime and paint all existing and new walls, columns and ceilings 100% in area of work, including chiller room and boiler room”. Will this work be considered in the Base Bid or a Bid Option? Please clarify and expand on the intent of this note.

Answer: All wall and ceiling surfaces (including columns) are to be prepped and painted as part of the base scope of work except where work is broken-out off the base scope into Options (from Addendum #1). Work noted as Option #6 and Option #7 would include the wall/ceiling prep and painting as part of those options and that scope would not be included in the base bid work.

Q4. Drawing A-101 Keyed Note A.08; near axis H – 16.9 to 17.7, note Bid Option # 7 is included. It is not clear if this note refers to Keyed Note A.08 or some other work. Please clarify.

Answer: This refers to the catch basin which is part of the work at the east wall. All of the work along this wall (as noted) is part of Option #7.

Q5. Section III.R Additional Terms and Conditions, 2 references Specification Section 01593, Security Regulations. The referenced section cannot be found in the solicitation package. Please provide.

Answer: This should refer to Section 01 35 53 - Security Procedures.

Q6. Section 012200, 1.7, 8 Item 8 references Detail A4 & B4/A500. Sheet drawing A500 does not include these details.

Provide.

Answer: This should be Detail 1 and 2 on A-500.

Q7. Reference Division 1, 015000, 2.2 Temporary Facilities. Will there be onsite space available for the specified field office requirements? If there is no onsite space will an offsite field office be required?

Answer: There will be limited space on the 2nd floor of the building for an office.

Q8. Section 013529, 1.5, B states that “The SSHO shall remain on-site while the Work is underway”. Will the SSHO be allowed to hold another onsite position or will the SSHO be a dedicated position?

Answer: SSHO may hold another position.

Q9. Section 013553, 1.2, B.1, What if any level of security clearance will be required of contractor’s personnel (Secret, TS, etc.)?

Answer: All will undergo a Tier 1 investigation.

Q10. Section 013553, 1.2, B.1, How much time will the government require for personnel vetting once the application has been submitted?

Answer: 4 weeks is a typical review time.

Q11. Will the pre-bid conference sign in sheet be available to offerors?

Answer: Yes.

Q12. 015000, 3.3, C, Project Signs. Will project signs be required for this project?

Answer: Yes.

Q13. Has all of the new proposed work shown on the construction documents been approved by the City of Chicago, so that the contractor can obtain the required construction permits?

Answer: The GC will need to get any required permits or submit to the Chicago Department of Underground Review.

Q14. II.D. Technical Proposal Factor 2: Experience on Similar Projects - For previous projects that have CPARS evaluations are questionnaires still required to be submitted?

Answer: Yes.

Q15. Confirm that GSA is to pay all cost related to ComEd coordination, engineering and onsite “Watch” personnel.

Answer: GSA will pay for ComEd contractors, engineering and onsite representatives.

Q16. Provide an email address for Maisha Earl so that we can obtain a quote for the work associated with Electrical Key Note E8 on sheet E-100. FYI…we have attempted numerous time to contact this person at the number (773-509-3524) provided in the bid drawings. Please advise…

Answer: GSA has no further contact information for this person.

Q17. Electrical Key Note E14 states that the EC is to provide an Exhaust/Ventilation system. This equipment would fall under HVAC contractors scope of work...wired by the electrical contractor.

Please provide amperage, voltage and number of poles(Wires) that we are to include in our base bid.

Answer: This is temporary ventilation and exhaust to control dust caused by demolition and construction activities. The GC will need to propose a system to accomplish this as part of their logistics and dust control plan, implement the system and remove it at the end of construction.

Q18. Clarification is needed for the video camera that is to be installed in the ComEd vault. i.e. Is this a stand alone system or is it to be connected to the building’s CCTV system? If it is to be connected to an existing system, please indicate head end location, dome or bullet type camera and location of camera. Will a monitor be required? Is this a temporary camera or is it to remain after the construction is completed?

Answer: This is a temporary, stand-alone system requested by ComEd, requirements of the system will have to be coordinated with ComEd.

Q19. Clarification is needed for the “Tunnel” lights that we are to install inside the ComEd vault. Please provide a detail for this apparatus.

Answer: These are temporary lights requested by ComEd to insure the ComEd vault is adequately lit during construction.

The GC will be required to propose a solution, install it and remove it at the end of the project.

Q20. We could not access the ComEd vault during the pre-bid meeting. Are pictures available of all areas in the vault that work is to occur?

Answer: Photos are available and attached.

Q21. Currently, the access to the ComEd vault is through a grate located in the dock area. Will confined space requirements apply?

Answer: If that grate is of the size that dictates confined space then those requirements will apply. All OSHA standards must be upheld.

Q22. Confirm that there is no electrical work related to the concrete repairs at exterior of building. Specifically electrical, communications, security conduits that may be underground and/or in concrete pour.

Answer: Electrical and low voltage work at the exterior of the building is not currently part of the project. If any existing electrical or low voltage systems are disturbed as a result of the Contractor’s work, they will be responsible for replacing that work.