Amendment_03.pdf

PDF 97 KB Posted

Attached to
Concrete Repair Project Federal contract opportunity
Solicitation number
Not on record
Issued by
General Services Administration Public Buildings Service Region 5

About this file

See Amendment 03

View the file

Other files for this federal contract opportunity

Other files attached to Concrete Repair Project, newest first.
File Type Posted
IMG_8263.JPG JPG image
IMG_8273.JPG JPG image
IMG_8259.JPG JPG image
IMG_8300.JPG JPG image
IMG_8251.JPG JPG image
IMG_8305.JPG JPG image
IMG_8268.JPG JPG image
IMG_8258.JPG JPG image
IMG_8279.JPG JPG image
IMG_8288.JPG JPG image
IMG_8242.JPG JPG image
IMG_8272.JPG JPG image
IMG_8292.JPG JPG image
IMG_8267.JPG JPG image
IMG_8246.JPG JPG image
IMG_8294.JPG JPG image
IMG_8270.JPG JPG image
IMG_8281.JPG JPG image
IMG_8261.JPG JPG image
IMG_8277.JPG JPG image
IMG_8289.JPG JPG image
IMG_8299.JPG JPG image
IMG_8254.JPG JPG image
IMG_8308.JPG JPG image
IMG_8282.JPG JPG image
IMG_8295.JPG JPG image
IMG_8280.JPG JPG image
IMG_8275.JPG JPG image
IMG_8304.JPG JPG image
IMG_8264.JPG JPG image
IMG_8243.JPG JPG image
IMG_8286.JPG JPG image
Sign_In_Sheet_8-20-2018.pdf PDF
IMG_8278.JPG JPG image
IMG_8269.JPG JPG image
IMG_8250.JPG JPG image
IMG_8283.JPG JPG image
IMG_8248.JPG JPG image
IMG_8274.JPG JPG image
IMG_8265.JPG JPG image
IMG_8293.JPG JPG image
IMG_8285.JPG JPG image
IMG_8266.JPG JPG image
IMG_8262.JPG JPG image
IMG_8256.JPG JPG image
IMG_8252.JPG JPG image
IMG_8247.JPG JPG image
IMG_8260.JPG JPG image
IMG_8244.JPG JPG image
SF1442.pdf PDF
Show all 50

Concrete Repair Project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Contract ID Code Page of Pages

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)

03 September 7, 2018 EQ5P2SS1P-18-0085

6. ISSUED BY 7. ADMINISTERED BY (If other than Item 6)

General Services Administration AMD, Chicagoland Construction Contracting Team 230 S. Dearborn St., Suite 3600 Chicago, IL 60604

Same as Block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Country, State and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.

EQ5P2SS1P-18-0085

X 9B. DATED (SEE ITEM 11)

August 2, 2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM

14.

() A. THIS ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINSTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN

ITEM

14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return ____ copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Solicitation # EQ5P2SS1P-18-0085, Amendment 03 Concrete Repair and Waterproofing Project located at 536 S. Clark Street Chicago, IL 60605

Amendment 03 is issued to:

1) Change the RFP closing date time from September 13, 2018 at 4:00PM to September 13, 2018 at 10:00AM Central time. Emailed proposals are now acceptable instead of mailed/hand delivered hard copies.

2) Issue responses to submitted final RFI’s

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE

SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous Edition unusable

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA FAR (48 CFR) 53.243

RFI’s 536 Concrete Repairs Project

Q1. Details 1 & 2/S-002 – Notes refer to a schedule on S-100 for dimensional information. No such schedule appears on S-100. Is that information shown on A-100 & A-101 instead?

Answer: This schedule was removed from the sheet. The vertical dimension of repair is noted at each column on Sheet A-100 and A-101.

Q2. Sheets A-100 & A-101 – Provide plan dimensions of existing concrete column encasements.

Answer: There is a dimension at grid J14 which should be typical.

Q3. Provide dimensional information on wall and slab thicknesses for estimating quantities of full-depth/infill repairs.

Answer: See the original building drawings as part of the answer to this RFI - please note these are for reference only and not part of the construction documents.

Q4. for the formed concrete shown on sheets S-101 & S-200. tell me which “Option No.” they fall under

Answer: This concrete work shown on these sheets is base bid.

Q5. Please provide full specifications for the “Bread Box” that is to be replaced in the ComEd vault…see sheet E-102

Answer: This is essentially a mailbox where ComEd can keep records (watertight/dry). Comed requested this item and the current one is mounted on a column. There is no additional spec information available - see photo.

Q6. Please provide the full specifications for the “Plug Fuse Holder” to be replaced in the ComEd vault…see note #6 on sheet E-102

Answer: Provide a 2-circuit fuse holder: Bussmann by Eaton.