Combined Synopsis-N00244-25-Q-S106.pdf
PDF 229 KB Posted
- Attached to
- Laundry Services for PAX River Alert Facility Federal contract opportunity
- Solicitation number
- N00244-25-Q-S106
About this file
This is a Combined Synopsis/Solicitation for Laundry Services issued by the U.S. Navy, specifically for Fleet Reconnaissance Squadron 4 (VQ-4) Detachment at Patuxent River, Maryland. The solicitation (N00244-25-Q-S106) is for a firm-fixed-price purchase order to provide laundry services, with a base year from 29 September 2025 to 28 September 2026 and four optional one-year extensions through 28 September 2030. The contract requires the contractor to pick up, launder, press, and deliver approximately 19,200 pounds of laundry twice weekly, including items such as comforters, sheets, towels, and pillow cases, with a monthly estimated weight of 1,600 pounds.
The solicitation is a Full and Open Competition using a Lowest Price Technically Acceptable (LPTA) source selection process. Contractors must submit quotes by 11:00 AM PST on 2 September 2025, with an anticipated award date no later than 9 September 2025. The North American Industry Classification System (NAICS) code is 812320, with a size standard of $8.0 million. Contractors must demonstrate relevant laundry service experience and meet minimum requirements outlined in the Performance Work Statement, with delivery and pickup located within 5 miles of the base. The contract includes specific requirements for packaging, handling unserviceable items, and maintaining quality standards.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00244-25-Q-S106
COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL SERVICES
This is a combined synopsis/solicitation for commercial services prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) subpart 12.6: Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued.
This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-05 and Defense FAR Supplement (DFARS) Publication Notice 20250807. It is the responsibility of the contractor to be familiar with the applicable clauses and provisions included in both FAR and DFARS. The clauses may be accessed in full text at address: www.acquisition.gov.
This Request for Quote (RFQ) is Full and Open Competition, following the policies and procedures in FAR part 13: Simplified Acquisition Procedures. The North American Industry Classification System (NAICS) code for this solicitation and resultant purchase order is 812320, with a size standard of $8.0 million.
GENERAL INFORMATION
The closing response time and date for submission of quotes is 11:00 AM (PST) on 02 September 2025. Submission of Quotes: Contractors shall submit a quote to the Contract Specialist, Ms. Chelsey Hernandez-Guevara, via email ONLY at chelsey.l.hernandez-guevara.civ@us.navy.mil. Solicitation N00244-25-Q-S106 shall be written on the subject line.
There will be NO extensions granted. All responsible sources may submit a quotation which shall be considered by the agency.
Anticipated Award Date: No later than 9 September 2025
Point of Contact for this Solicitation is:
Name: Chelsey Hernandez-Guevara (Contract Specialist) Phone: 619-556-5342 Email: chelsey.l.hernandez-guevara.civ@us.navy.mil
Section B – Supplies or Services and prices/costs
REQUIRED SUPPLIES AND SERVICES
The resultant purchase order will use this Contract Line Item Number (CLIN) structure:
ITEM
NO
SERVICES QUANTITY UNIT UNIT
PRICE
AMOUNT
0001 LAUNDRY SERVICES
In accordance with the Performance Work Statement (PWS) in Section C.
19,200 Pound
0002 DELIVERY FEE
Pick up and delivery fee once a week in accordance with the Performance Work Statement (PWS) in Section C.
52 Each
Option Year 1
LAUNDRY SERVICES
In accordance with the Performance Work Statement (PWS) in Section C.
19,200 Pound
Option Year 1
DELIVERY FEE
Pick up and delivery fee once a week in accordance with the Performance Work Statement (PWS) in Section C.
52 Each
Option Year 2
LAUNDRY SERVICES
In accordance with the Performance Work Statement (PWS) in Section C.
19,200 Pound
Option Year 2
DELIVERY FEE
Pick up and delivery fee once a week in accordance with the Performance Work Statement (PWS) in Section C.
52 Each
Option Year 3
LAUNDRY SERVICES
In accordance with the Performance Work Statement (PWS) in Section C.
19,200 Pound
Option Year 3
DELIVERY FEE
Pick up and delivery fee once a week in accordance with the Performance Work Statement (PWS) in Section C.
52 Each
Option Year 4
LAUNDRY SERVICES
In accordance with the Performance Work Statement (PWS) in Section C.
19,200 Pound
Option Year 4
DELIVERY FEE
Pick up and delivery fee once a week in accordance with the Performance Work Statement (PWS) in Section C.
52 Each
TOTAL PRICE
Section C – Descriptions/specifications/Performance Work Statement
ALERT FACILITY LAUNDRY SERVICE
FAIRECONRON 4 DETACHMENT PATUXENT RIVER, MD
1.0 - BACKGROUND
VQ-4 Detachment was established at NAS Patuxent River as a permanent operational squadron.
It is part of the U.S.
Navy's TACAMO community, whose mission is to enable the President of the United States and the Secretary of Defense to directly communicate with U.S. submarines, bombers, and missile silos during a nuclear war
2.0 - PURPOSE
The contractor shall provide all labor, materials, tools impermeable bags, transportation and other incidentals necessary to launder, press, package, bundle, pick up and deliver Fleet Reconnaissance Squadron 4, Detachment Patuxent River, MD (VQ4 DET PAX) laundry items in accordance with Industry Standards and this Performance Work Statement (PWS).
3.0 - SCOPE
The scope of this contract is limited to the tasks outlined in Section 7.0.
4.0 - PERIOD OF PERFORMANCE
Base Year: 29 September 2025 to 28 September 2026
Option Year 1: 29 September 2026 to 28 September 2027
Option Year 2: 29 September 2027 to 28 September 2028
Option Year 3: 29 September 2028 to 28 September 2029
Option Year 4: 29 September 2029 to 28 September 2030
5.0 - PLACE OF PERFORMANCE
22296 Buck Road, Bldg. 2199
Patuxent River, MD 20670
6.0 – TECHNICAL POINT OF CONTACTS
All references and responsibilities to the Technical Point of Contact (TPOC) may be delegated to a designated Government authority, but only at the TPOC’s request.
NAME: SCW-1 N4 Supply
PHONE: TBD
EMAIL: TBD
VQ4 DET PAX Representative:
NAME: UT2 Deasy, Dylan
PHONE: TBD
EMAIL: TBD
7.0 – TASKS
7.1 PICK-UP AND DELIVERY
The Contractor shall pick up soiled laundry twice per week from the Place of Performance, and wash, dry, fold and deliver clean laundry to the same location twice weekly. Daily receipt shall be provided to the Contractor's representatives upon delivery with line item numbers, cost of each unit cleaned, and the extended price and total for Each ticket. A Government representative from VQ-4 DET PAX supply shall specify the times and places for pick-up and delivery. Pick-up and Delivery shall be twice per week, Wednesday pickup and Thursday drop off, UNLESS
STATED OTHERWISE IN SECTION 7.1.1.
7.1.1 SPECIAL REQUESTS
The contractor shall be flexible and have the ability to do same day pick-up and delivery, as well as the ability to do so on weekends and holidays. When sets are needed in a critical time, they must be delivered back within 3 hours.
7.1.2 LOCATION
We require a 5 mile proximity to base for critical requirements.
7.2 PICK-UP
Counting of articles shall be done by designated Government personnel prior to pick up. The Contractor shall verify the count at each pick-up day and sign the pick-up ticket provided by the VQ4 DET PAX Representative for the items being picked up. Such signature constitutes the agreement to the Government’s counts, unless specific exception is taken. A copy of the pick-up slip shall be retained by the VQ4 DET PAX Representative.
7.3 DELIVERY
The Contractor shall record number of pieces delivered on the delivery ticket and the VQ-4 DET PAX Representative shall verify this amount. Items not delivered on due date must be delivered the following business day, securely wrapped and labeled (Late Delivery). The contractor shall furnish the VQ4 DET PAX Representative the original and a copy of the delivery ticket. The contractor is responsible for the return of items picked up for servicing at the next regularly scheduled delivery.
7.4 PACKAGING OF LAUNDRY/DRY CLEANING ITEMS
Contractor shall ensure all linen quantities not packaged according to 7.7 and 7.12.1, shall state on the outside of the plastic the correct quantity enclosed in that particular bundle.
7.5 CORRECTION OF DELIVERY TICKET
The contractor shall notify the VQ-4 DET PAX Representative of all delivery ticket errors. The VQ4 DET PAX Representative may authorize the contractor to correct any errors on the delivery ticket such as but not limited to incorrect item description numbers, quantity errors, and line description errors. All corrections require the initials from both the VQ4 DET PAX Representative and the Contractor.
7.6 MARKING OF SHEETS
The contractor shall ensure all bedding bundles be returned with like items wrapped together in sets of ten to ensure full accountability of linen that has been serviced.
7.7 POORLY WRAPPED BUNDLES
Any bundles found to be poorly wrapped, plastic not securely wrapped around bundles, or bundles broken open between delivery to linen exchange or delivery to point of base, shall be returned to the contractor to be re-wrapped, or re-cleaned if necessary, at no additional cost to the Government and shall be delivered on the next regular scheduled delivery.
7.8 THE GOVERNMENT BUNDLE COUNT
The Government shall count and wrap like items together for the contractor to ensure full accountability of linen to be serviced. Sheets and pillow cases shall be bundled in counts often
(10) when possible.
7.9 UNSERVICEABLE AND MISSING ARTICLES
The contractor shall ensure unserviceable articles and non-repairable articles shall be returned without any laundering or cleaning services performed on the article. These items are to be returned to the Government separate from serviceable items and identified as unserviceable. All stained linen shall also be marked stained and returned separate from clean items. Items damaged by the contractor and deemed not serviceable/not repairable, shall be ordered by the contractor within 2 business days and documentation of order must be provided to the VQ4 DET PAX Representative. Any articles missing from a scheduled delivery shall be delivered by the contractor on the next business day. The contractor shall provide a written or emailed explanation to the Contracting Officer (KO) and the VQ4 DET PAX Representative outlining circumstances concerning any missing articles, as well as corrective actions/measures taken to ensure a repeat incident shall not occur. Articles shall not be stock piled to be delivered at a later date.
7.10 SPECIAL LAUNDERING AND PACKAGING TASK
7.10.1 PACKAGING
Blankets and comforters shall be single wrapped and folded but not rolled. All wrapping shall be accomplished with plastic film unless specified elsewhere in the PWS.
7.10.2 LAUNDERING
The contractor shall ensure all items shall be laundered and dried in an appropriate controlled temperature to ensure minimum damage to the items.
7.10.3 MILDEW PREVENTION
All articles received at the Contractor’s plant in a moist or damp condition shall be immediately dried or promptly processed in order to prevent the development of mildew.
7.10.4 STAINS
The contractor shall accept segregated articles from Linen Exchange for stain wash. Stain wash shall be accomplished using special chemicals (rustication, special bleaching agents, etc.) and procedures to restore whiteness/color and to remove all rust and grease or oils from fabric. This may be performed to the extent of not more than 15% degradation of tensile strength per wash, to be tested and inspected by the VQ4 DET PAX Representative. Stain wash shall be returned in a segregated lot identified as "stained wash".
7.11 WORKMANSHIP AND SANITATION
Delivered finished articles shall conform to common commercial practices to include quality of cleanliness, finished and appearance.
7.12 PERFORMANCE EVALUATION MEETING
The contract manager may be required to meet with the VQ4 DET PAX Representative and the TPOC during the performance period of this contract. Meetings will be as often as necessary thereafter as determined by the TPOC. The minutes of all performance evaluation meetings may be prepared by the government and signed by the contract manager, TPOC, and VQ4 DET PAX Representative. Should the contractor non-concur with the minutes, the contractor shall so state any areas of non-concurrence in writing to the KO within 10 calendar days of receipt of the signed minutes. The minutes will be included in the contract file.
8.0 – CONSTRAINTS
8.1
In the case where the Contractor identifies extra work outside of the tasks listed in section 7.0, the TPOC shall be consulted first prior to commencement of work. Only the TPOC can approve of additional items to be installed, which shall require a formal contract modification prior to commencement of work.
8.2 STATE OR LOCAL DEPARTMENT OF HEALTH REGULATIONS
Compliance with any certifications of labeling requirements arising from state or local department of health regulations is the responsibility of the contractor.
8.3 ENVIRONMENTAL PROTECTION & SAFETY
The contractor shall be knowledgeable of and comply with all applicable federal, state, and local laws, regulations and requirements regarding environmental protection. In the event environmental laws or regulations change during the term of this contract, the contractor is required to comply as such laws come into effect.
8.4 FORMS AND PUBLICATIONS
The contractor shall obtain the forms and publications expressly required to perform the work in this contract via the VQ-4 DET PAX Representative upon written request (e-mail is acceptable).
In the event that laws, regulations, Technical Orders, or publications change during the term of this contract, the contractor is required to comply as such changes come into effect.
8.5 ACCOUNTABILITY OF LAUNDRY AND WEIGHT
8.5.1
Government will consolidate solid linen in the contractor provide bins. The government will weigh the linen and record the weights on self-generated log. A count of activity specific items will be noted and brought to the attention of the contractor. Contractor will weigh linen once it arrives at cleaning facility and provide government with the weight. If there is a significant weight difference the laundry will be reweighed with both parties present.
8.5.2
The contractor will weigh linen prior to installation delivery and provide weight for individual and bundled items. The Government personnel will weigh upon receipt. The contractor will be notified immediately if weight differs significantly or if known items are missing. Note: Industry standards indicate that dirty linen weighs more than clean. A difference up to 8% between the two will be allowed.
8.6 MISSING AND/OR DAMAGED ITEMS
Any item identified as missing from a delivery, shall be reported no later than one (1) business day. The installation personnel will annotate on the delivery for item and count of the missing. If item is found, the article(s) shall be returned on the next delivery day. The contractor shall, annotate on delivery for the missing and have government representative to initial receipt of return. The contractor shall reimburse the Government the replacement cost of the items. The contractor is responsible for all items lost or damaged while in their possession.
8.7 CONTINUATION OF ESSENTIAL DOD CONTRACTOR SERVICES DURING CRISIS
This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DODI 3020.37, E2.l.l and E2.l.3.
9.0 – DEFINITIONS
9.1 STANDARD DEFINITIONS
- Defective Service. A unit of service which contains one or more defects or non-conformance with specified requirements.
- Quality Assurance. Those actions taken by the government to assure services meet the requirements of the PWS.
- VQ4 DET PAX Representative. A Government representative responsible for surveillance of contractor performance.
- Performance Plan (PP). An organized written document containing specific methods to per-form surveillance of the contractor.
9.2 TECHNICAL DEFINITIONS PECULIAR TO THIS PWS
- Unserviceable articles. Articles no longer useable or repairable for purpose intended.
- Repairable Items. Articles with minor rips, tears, open seams, holes, missing buttons and broken zippers. The CO may authorize repair beyond stated limitations.
- Laundering. The process by which soiled fabric items are cleaned and treated. The term includes cleaning by mechanical action or by hand in water solutions or detergents and other additives. For the purpose of this contract, the term includes repellent treatment, bleaching, bluing, chemical rinse (sour), starching, ironing and pressing operations as appropriate to the type of fabric and natural of soil.
- Clean. Finished articles that are dry and free of visible soil, wrinkles, lint, hair, debris, and objectionable odors. Spots and stains are removed when practical to do so without damaging the fabric.
- Dry Cleaning. Cleaning of articles by immersion in dry cleaning solvent with the use of mechanical action. Dry cleaning iay include pre-spotting and use of soaps and synthetic detergents as required in order to remove soil and stains. Drying is accomplished in a mechanical tumble dryer or in a drying cabinet with continuous flow of fresh air. - Minor Rips and Tears.
Normally less than 6 inches or when a repair does not alter serviceability or general appearance of the item.
10.0 – ITEMS AND MONTHLY ESTIMATES
ITEM(S)
- Comforters (1)
- Full flat sheets (2)
- Towels (2)
- Pillow Cases (2)
- Brown Dirty Linen Bag (1)
MONTHLY ESTIMATED WEIGHT: 1600 LBS
11.0 – INVOICING
The Contractor shall be responsible for submitting invoices and initiating receiving reports electronically to the GPC holder of this contract.
The Contractor shall submit invoices for payment and initiate receiving reports after each month of service. The Government shall process invoices for payment and associated receiving reports when in receipt.
12.0 – PRIVACY ACT STATEMENT
Pursuant to Title 5 United States Code 552a (I) (l), the contractor and all employees of the contractor working under this contract are required to comply with the requirements of 5 U.S.C.
552a (“The Privacy Act of 1974”).
13.0 – IDENTIFICATION OF CONTRACTOR EMPLOYEES
In accordance with DFARS 211.106, there shall be a clear distinction between Government employees and service contractor employees. Service contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel. Contractor personnel will be required to obtain and wear badges or other visible identification for meetings with Government personnel to provide a clear distinction between service contractor employees and Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
14.0 – NON-PERSONAL SERVICES STATEMENT
Contractor employees performing services under this order will be controlled, directed, and supervised at all times by management personnel of the contractor. Contractor management will insure that employees properly comply with the performance work standards outlined in the SOW. Contractor employees will perform their duties independent of, and without the supervision of, any Government official or other Defense Contractor. The tasks, duties, and responsibilities set forth in the task order may not be interpreted or implemented in any inner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The Government will control access to the facility and will perform the inspection and acceptance of the completed work.
15.0 – CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED
FACILITIES, SENSITIVE INFORMATION, INFORMATION TECHNOLOGY (IT)
SYSTEMS OR PROTECTED HEALTH INFORMATION
Executive Order 13467, Reforming Processes Related to Suitability for Government Employee, Fitness for Contractor Employees and Eligibility for Access to Classified National Security Information, Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The 5 CFR 32 Part 157 in concert with DoD Manual 1000.13, Vol 1, implements the Federal Standards.
APPLICABILITY
This text applies to all DoD sponsored individuals who require CAC eligibility (or login and P/W if acceptable per contract) for: Physical access to DoD facilities or non-DoD facilities on behalf of DoD; Logical access to information systems (whether on site or remotely); or remote access to DoD networks that use only the CAC logon for user authentication, or access to sensitive and protected information. This applies to the Office of the Secretary of Defense, the Military Departments, the Office of the Chairman of the Joint Chiefs of Staff and the Joint Staff, the Combatant Copian’s, the Office of the Inspector General of the DoD, the Defense Agencies, the DoD Field Activities and all other organizational entities within the DoD (hereinafter referred to collectively as the "DoD Components").
Each contractor employee providing services at a Navy Coined under this contract is required to obtain a Department of Defense Common Access Card (DOD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.
ACCESS TO FEDERAL FACILITIES
Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DOD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Commands Security Manager upon arrival to the Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.
START-UP PERIOD
All contractor resource onboarding documents must be submitted via the prime contractor. The prime contractor shall take all necessary preparations to assume full responsibility for productive performance of the performance start date.
Definition of “productive”:
a. Visit Authorization Request (VAR)
b. Contractor Information Sheet (CIS)
c. Completed EQIP (Electronic Investigation)
d. All contractor resource(s) must have an active JPAS profile.
e. Common Access Card (CAC)
Note (1): Invoicing by the contractor will begin as of the commencement of the performance period of services and no reimbursement will be paid by the government for efforts expended during the start-up period.
Note (2): Foreign Nationals are not allowed access sot the functional/system side of Enterprise Resource Planning (ERP).
ACCESS TO DOD INFORMATION TECHNOLOGY (IT) SYSTEMS
In accordance with (IAW) Secretary of the Navy (SECNAV) M-5510.30, contractor employees who require access to Don or DOD networks are categorized as IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M5510.30, includes positions which require access to sensitive information. Sensitive information includes information protected under the Privacy Act, to include Protected Health Information (PHI). All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information System Security Manager (ISSM)/Information Assurance Manager (IAM).
Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) or T5 or T5R equivalent investigation , which is a higher level investigation than the National Agency Check with Law and Credit (NACLC)/T3/T3R described below. Due to the privileged system access, an investigation suitable for High Risk national security positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.
Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command CSM and ISSM/IAM upon arrival to the Navy coined and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) for is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor”.
The SAAR-N shall be forwarded to the Commands Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date iay result in delaying the individual’s start date.
When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Cyber Awareness training, and maintain a current requisite background investigation. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
INTERIM ACCESS
The Command Security Manager iay authorize issuance of a DoD CAC and interim access to a Don or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.
DENIAL OR TERMINATION OF ACCESS
The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, leaning information not authorized for public release.
CONTRACTOR’S SECURITY REPRESENTATIVE
The contractor shall designate an employee to serve as the Contractor’s Security Representative.
Within three work days after contract award, the contractor shall provide to the requiring activity’s Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security
Representative. The Contractor’s Security Representative shall be the primary point of contact on any security matter. The Contractor’s Security Representative shall not be replaced or removed without prior notice to the Contracting Officer and Command Security Manager.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL
PROCESS FOR CONTRACTORS ASSIGNED TO NATIONAL SECURITY POSITIONS OR
PERFORMING SENSITIVE DUTIES
Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Contractor employees under this contract are recognized as Noncritical Sensitive [ADP/IT-II] positions when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and Protected Health Information (PHI), provide support associated with fiduciary duties, or perform duties that have been identified as National Security Positions. At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC or T3 or T3R equivalent investigation to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The investigation consists of a standard NAC and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or IT-II position is required to complete:
- SF-86 Questionnaire for National Security Positions (or equivalent OPM investigative product)
- Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)
- Original Signed Release Statements
Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than 10 years) throughout the contract performance period. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the CSM upon arrival to the command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy Commands ISSM/IAM. Completion and approval of a System Authorization Access Request Navy (SAAR-N) for is required for all individuals accessing Navy Information Technology resources. The SAAR-N shall be forwarded to the Navy Commands Security Manager at least 30 days prior to the individual’s start date.
Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date.
The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Cyber Awareness training, and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the Command Security Manager. The Commands Security Manager will review the submitted documentation for completeness prior to submitting it to the Office of Personnel Management (OPM); Potential suitability or security issues identified iay render the contractor employee ineligible for the assignment. An unfavorable determination is final (subject to SF-86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract. The Command Security Manager will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DoD Central Adjudication Facility (CAF) for a determination.
If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a Visit Authorization Request (VAR) via the Joint Personnel Adjudication System (JPAS) or a hard copy VAR directly from the contractor’s Security
Representative. Although the contractor will take JPAS “Owning” role over the contractor employee, the Navy command will take JPAS "Servicing" role over the contractor employee during the hiring process and for the duration of assignment under that contract. The contractor shall include the IT Position Category per SECNAV M-5510.30 for each employee designated on a VAR. The VAR requires annual renewal for the duration of the employee’s performance under the contract.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL
PROCESS FOR CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE
DUTIES
Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc. ...) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:
- Must be either a US citizen or a US permanent resident with a minimum of 3 years of legal residency in the United
States (as required by The Deputy Secretary of Defense DTM 08-006 or its subsequent DoD instruction) and - Must have a favorably completed National Agency Check with Written Inquiries (NACI) or T1 investigation equivalent including a FBI fingerprint check prior to installation access.
To be considered for a favorable trustworthiness determination, the Contractor’s Security Representative must submit for all employees each of the following:
- SF-85 Questionnaire for Non-Sensitive Positions
- Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission) - Original Signed Release Statements
The contractor shall ensure each individual employee has a current favorably completed National Agency Check with Written Inquiries (NACI) or T1 equivalent investigation, or ensure successful FBI fingerprint results have been gained and investigation has been processed with
OPM
Failure to provide the required documentation at least 30 days prior to the individual’s start date is a result in delaying the individual’s start date.
* Consult with your CSM and ISSM/IAM for local policy when IT-III (non-sensitive) access is required for non-US citizens outside the United States.
243-9400(1-92) SUPTXT243-9400(1-92) AUTHORIZED CHANGES ONLY BY THE (Jan
2024) CONTRACTING OFFICER
AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
(a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract. (b) The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract. (c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. The address and telephone number of the Contracting Officer is:
NAME: Jose Juarez ADDRESS: 3985 Cummings Rd Bldg 116 3rd Floor San Diego, CA 92136
Section G – Contract Administration Data
ADMINISTRATIVE INFORMATION
GOVERNMENT POINT OF CONTACT (POC)
Chelsey Hernandez-Guevara Contract Specialist NAVSUP Fleet Logistics Center San Diego (FLCSD) 3985 Cummings Road, Bldg. 116, 3rd Floor San Diego, CA 92136-4200 E-mail: chelsey.l.hernandez-guevara.civ@us.navy.mil Phone: (619) 556-5342
REQUESTING ACTIVITY POC
TBD
CONTRACTOR POC
TBD
PAYMENT/INVOICING
Payment will be made via Government Purchase Card. Cardholder information is as follows:
Cardholder: TBD Phone: TBD E-Mail Address: TBD
After delivery completion, please provide the invoice and proof of delivery to the Cardholder listed above via email. The Cardholder will contact you with the appropriate purchase card information in order to process the transaction.
SALES TAX EXEMPTION: The Contractor is hereby advised that the United States Government and Agencies are exempt from State and Local Government Tax by virtue of Article 6 of the United States Constitution. No exemption certificate is required.
UNIT PRICES (OCT 2001)
Contractor unit prices, when incorporated into a Government contract, will be released under the Freedom of Information Act (FOIA) without further notice to the contractor submitter. If the Contractor takes issue with the release, it should submit its proposal data with the appropriate legends and explain in detail why such data cannot be released as a public record under the Freedom of Information Act.
SUPTXT 203.1106-1 (3-18) NAVY USE OF ABILITYONE SUPPORT CONTRACTOR -
RELEASE OF OFFEROR INFORMATION
NAVSUP Fleet Logistics Center San Diego (FLCSD) may utilize contractor support through the AbilityOne Program, as needed, to perform contract closeout functions for this acquisition.
Information, including business sensitive/confidential or proprietary data, that the offeror provides to the government or information already in the possession of the government may be viewed and utilized by the AbilityOne Program support contractor personnel during the course of its contract performance. The information that may be made available to the support contractor may include, for example, pricing and technical proposals, historical contract, pricing and performance information, Commercial Asset Visibility (CAV) reporting information and similar data/information.
By submission of a proposal in response to this solicitation, the offeror and its subcontractors consent to a release of their business sensitive/confidential or proprietary data to the government's AbilityOne Program support contractor personnel. AbilityOne will have a Non- Disclosure/Non-Use Agreement in place with the Government in order to comply with DFARS 252-227-7025. The offeror retains the right to engage AbilityOne in a non-disclosure agreement pursuant to DFARS 252.227-7025(b)(5)(iv).
REVIEW OF AGENCY PROTESTS
The contracting activity, Fleet Logistics Center San Diego (FLCSD) will process agency protests in accordance with the requirements set forth in FAR 33.103(d). Pursuant to FAR 33.103(d)(4), agency protests may be filed directly with the appropriate reviewing authority; or, a protester may appeal a decision rendered by a contracting officer to the reviewing authority.
The reviewing authority for FLCSD is the Director, Regional Contracts Department, Fleet Logistics Center San Diego at 3985 Cummings Road, Bldg. 116, San Diego, CA 92132-0060. Agency procurement protests should clearly identify the initial adjudicating official, i.e., the “contracting officer” or “reviewing official.”
Offerors should note this review of the Contracting Officer's decision will not extend GAO's timeliness requirements. Therefore, any subsequent protest to GAO must be filed within 10 days of knowledge of initial adverse agency action.
Section I – Contract Clauses
CONTRACT CLAUSES AND PROVISIONS
PROVISIONS INCORPORATED BY REFERENCE
52.204-7 System for Award Management NOV 2024
52.204-16 Commercial and Government Entity Code Reporting.
AUG 2020
52.204-20 Predecessor of Offeror
AUG 2020
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.204-26 Covered Telecommunications Equipment or Services- Representation
OCT 2020
52.212-1
Instructions to Offerors—Commercial Products and Commercial Services SEP 2023
252.203-7005 Representation Relating to Compensation of Former DoD Officials SEP 2022
252.204-7008 Compliance with Safeguarding Covered Defense Information Controls OCT 2016
252.204-7016 Covered Defense Telecommunications Equipment or Services—Representation
DEC 2019
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services— Representation
MAY 2021
252.204-7019 Notice of NISTSP 800-171 DoD Assessment Requirements
NOV 2023
252.204-7024 Notice on the Use of the Supplier Performance Risk System.
MAR 2023
252.225-7000
Buy American—Balance of Payments Program Certificate
FEB 2024
CLAUSES INCORPORATED BY REFERENCE
52.204-13 System for Award Management Maintenance OCT 2018
52.204-18 Commercial and Government Entity Code Maintenance. AUG 2020
52.212-3 Covered Telecommunications Equipment or Services- Representation
(DEVIATION 2025-O0003 AND 2025-O0004)
MAR 2025
52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services
52.217-5 Evaluation of Options JUL 1990 52.232-39 Unenforceability of Unauthorized Obligations
JUN 2013
252.203-7000 Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights
DEC 2022
252.204-7003 Control of Government Personnel Work Product APR 1992
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
(DEVIATION 2024-O0013 REVISION 1)
MAY 2024
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
252.204-7020 NIST SP 800-171DoD Assessment Requirements NOV 2023
252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.211-7003 Item Unique Identification and Valuation
252.225-7001 Buy American and Balance of Payments Program
FEB 2024
252.225-7002 Qualifying Country Sources as Subcontractors
MAR 2022
252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and
Receiving Reports
DEC 2018
252.232-7010 Levies on Contract Payments
DEC 2006
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel
JAN 2023
252.244-7000 Subcontracts for Commercial Products or Commercial Services
252.247-7023 Transportation of Supplies by Sea
OCT 2024
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Products and Commercial Services.
(DEVIATION 2025-O0003 and 2025-O0004) (Jan 2025) Deviation 2025-O0004 (Mar 2025)
Contract Terms and Conditions Required To Implement Statutes or Executive Orders- Commercial Products and Commercial Services (MAR 2025)(DEVIATION 2025-O0003 and 2025-O0004)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII,of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889 (a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.]
[ ] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C.
3509)).
[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
[ ] (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) (41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community-see FAR 3.900(a).
[X] (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
[ ] (6) [Reserved].
[ ] (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
[ ] (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
[X] (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).
[ ] (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders-Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) (Pub. L. 115-390, title II).
[ ] (11)
(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders-Prohibition. (Dec 2023) (Pub. L. 115-390, title II).
[ ] (ii) Alternate I (Dec 2023) of 52.204-30.
[X] (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025) (31 U.S.C.
6101 note).
[ ] (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
[ ] (14) [Reserved].
[ ] (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) (15 U.S.C.
657a).
[ ] (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
[ ] (17) [Reserved]
[X] (18)
(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
[ ] (ii) Alternate I (Mar 2020) of 52.219-6.
[ ] (19)
(i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
[ ] (ii) Alternate I (Mar 2020) of 52.219-7.
[ ] (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)(15 U.S.C. 637(d)(2) and (3)).
[ ] (21)
(i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) (15 U.S.C. 637(d)(4)).
[ ] (ii) Alternate I (Nov 2016) of 52.219-9.
[ ] (iii) Alternate II (Nov 2016) of 52.219-9.
[ ] (iv) Alternate III (Jun 2020) of 52.219-9.
[ ] (v) Alternate IV (Jan 2025) of 52.219-9.
[ ] (22)
(i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).
[ ] (ii) Alternate I (Mar 2020) of 52.219-13.
[ ] (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).
[ ] (24) 52.219-16, Liquidated Damages-Subcontracting Plan (Sep 2021) (15 U.S.C.
637(d)(4)(F)(i)).
[ ] (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran- Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024) (15 U.S.C. 657f).
[ ] (26)
(i) 52.219-28, Postaward Small Business Program Rerepresentation (Jan 2025) (15 U.S.C.
632(a)(2)).
[ ] (ii) Alternate I (Mar 2020) of 52.219-28.
[ ] (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).
[ ] (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).
[ ] (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) (15 U.S.C. 644(r)).
[ ] (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) (15 U.S.C. 637(a)(17)).
[X] (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
[ ] (32) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Jan 2025)(E.O.
13126).
[ ] (33) [Reserved]
[ ] (34) [Reserved]
[ ] (35)
(i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).
[ ] (ii) Alternate I (Jul 2014) of 52.222-35.
[X] (36)
(i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).
[ ] (ii) Alternate I (Jul 2014) of 52.222-36.
[ ] (37) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).
[ ] (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
[X] (39)
(i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O.
13627).
[ ] (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
[ ] (40) 52.222-54, Employment Eligibility Verification (Jan 2025) (Executive Order 12989).
(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
[ ] (41)
(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[ ] (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[ ] (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (May 2024) (42 U.S.C. 7671, et seq.).
[ ] (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (May 2024) (42 U.S.C. 7671, et seq.).
[ ] (44) 52.223-20, Aerosols (May 2024) (42 U.S.C. 7671, et seq.).
[ ] (45) 52.223-21, Foams (May 2024) (42 U.S.C. 7671, et seq.).
[ ] (46) 52.223-23, Sustainable Products and Services (MAR 2025) (DEVIATION 2025-O0004)) (7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).
[ ] (47)
(i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a).
[ ] (ii) Alternate I (Jan 2017) of 52.224-3.
[ ] (48)
(i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).
[ ] (ii) Alternate I (Oct 2022) of 52.225-1.
[ ] (49)
(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) (19 U.S.C.
3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .