United States Department of the Interior
NATIONAL PARK SERVICE
Colorado National Monument
Scope of Work for 140P1221F0057
Project: Traffic Control (Flaggers)
Location: Colorado National Monument 1750 Rim Rock Drive, Fruita, CO 81521
This is a service contract for a not-to-exceed amount of $20,000
The Colorado National Monument is seeking interested parties to bid on providing intermittent traffic control personnel to assist with various roadway projects throughout the park.
Contract Period – June 1 through November 30, 2021.
Traffic control will be provided on an hourly basis not to exceed $20,000 during the contract period.
The nature of the traffic control will be intermittent to meet the needs of ongoing park wide projects.
Traffic control personnel may be needed for various time intervals during the contract period.
Traffic control personnel will not be scheduled for less than 8 hours in a day unless during periods of inclement weather in which personnel will be dismissed for the day at Colorado National Monument’s discretion.
The Colorado National Monument will provide 2 business days advance notification of traffic control personnel needs.
Traffic Control Company will provide the following:
· All personnel must be State of Colorado DOT flagger certified. Copies of certification must be provided in advance.
· All personnel must wear ANSI/ISEA approved personal protection equipment including the following: hard hat, safety vest, safety glasses, gloves.
· Radios for use during traffic control.
· Stop / Slow traffic control paddles meeting MUTCD standards.
· Transportation to and from the job site. Work will take place at various locations along Rim Rock Drive.
· Personnel must remain on site for the duration of the work day as directed by NPS staff.
· Confirm ability to consistently provide traffic control personnel with at least 2 business days notification.
Colorado National Monument will provide the following:
· All traffic control equipment (signs, cones, etc) meeting MUTCD standards to establish work zones.
· Set up of all traffic control equipment for the work zones.
· Traffic control personnel will be provided with two (2) 15 minute breaks and one (1) 30 minute lunch break.